CN202012078U - Bearing support for anchor bar with expanding ends - Google Patents

Bearing support for anchor bar with expanding ends Download PDF

Info

Publication number
CN202012078U
CN202012078U CN201020604032XU CN201020604032U CN202012078U CN 202012078 U CN202012078 U CN 202012078U CN 201020604032X U CN201020604032X U CN 201020604032XU CN 201020604032 U CN201020604032 U CN 201020604032U CN 202012078 U CN202012078 U CN 202012078U
Authority
CN
China
Prior art keywords
bearing support
hole
utility
model
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020604032XU
Other languages
Chinese (zh)
Inventor
孟岍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Zhonghai Electric Power Engineering Co., Ltd.
Original Assignee
HAINAN ZHONGHAI ELECTRIC POWER ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAINAN ZHONGHAI ELECTRIC POWER ENGINEERING CO LTD filed Critical HAINAN ZHONGHAI ELECTRIC POWER ENGINEERING CO LTD
Priority to CN201020604032XU priority Critical patent/CN202012078U/en
Application granted granted Critical
Publication of CN202012078U publication Critical patent/CN202012078U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technology field of anchoring of a power supply circuit in strong weathered rock formations, medium weathered rock formations, and micro weathered rock formations, and particularly relates to a bearing support for an anchor bar with expanding ends. the bearing support is characterized in that, supporting plates are connected with the bottom of a through steel bar disposed in the anchor bar; one end of the support plate is provided with a through hole, a steel wire stay wire is connected on the through hole. The bearing support in the utility model is advantageous in that, since the two supporting plates are disposed, the two supporting plates can smoothly pass through at a straight hole section, and naturally expands at the expanding section, and anchor bar bearing capacity is greatly improved. The bearing support in the utility model is suitable for strong weathered soil and a rock formation with a higher crushing degree, and end expanding effect can be greatly improved. The bearing support in the utility model is also suitable for various foundation piles for iron tower foundation bearing force with more than 500 KV of power transmission lines, building engineering, bridge engineering, etc., and is particularly suitable for use in various weathered soil layers and rock formations.

Description

Expand end anchor pole bogey
Technical field
The utility model relates to power transmission sequence, and the technical field of the anchoring of severely-weathered rock stratum, medium weathering, gentle breeze rock stratum relates in particular to anchor pole bogey at the bottom of a kind of expansion.
Background technology
Along with the high speed development of China's electric utility, overhead line structures pull out on the basis, press down with horizontal thrust and strengthen, and obviously increase the load of column foot plinth.The iron tower foundation of a lot of aerial power transmission lines will shovel out the construction base surface, excavates the square foundation ditch, in the hole reinforcing bar is set, and placing of concrete is resisted and pulled out load and horizontal loading on the powerful iron tower.In the last few years the scientific research personnel by to power line tower basic stress characteristics discover that same basis is born simultaneously and pressed down load and horizontal loading under certain condition, and pull out load and horizontal loading bearing simultaneously under another condition.By to the researching and analysing of various forms of Rock Bolt Foundation destructive process stressing conditions, pulling out load in the discovery is the major control condition of base fixed, is exactly the destructive process of single anchor pole in fact.Therefore, the scientific research personnel of this area all lithosphere on the research and utilization mountain improve single anchor pole on pull out load, and facts have proved by construction and not only to have overcome the shortcoming that traditional column foot embodiment exists, pulling out load on the single anchor pole of while also is improved to some extent, be mainly used in power transmission sequence and expand end anchor pole, severely-weathered rock stratum, medium weathering, the anchoring of gentle breeze rock stratum, anchor pole foundation bolt bottom just is provided with an anchor slab less than the straight hole diameter at the bottom of the expansion in the past, when bearing capacity is big, the bearing capacity of bottom anchor slab in concrete is restricted, thereby bearing capacity is lower.
Summary of the invention
The utility model is the technical problem that exists at prior art, provides a kind of and can obviously improve anchor pole bogey at the bottom of a kind of expansion of expanding end anchor pole bearing capacity.
In order to solve the problems of the technologies described above, the utility model is achieved in that
Expand end anchor pole bogey, it comprises anchor pole, is connected with fagging in the reinforcing bar bottom of the built-in perforation of anchor pole; One end of fagging is provided with through hole, is connected with the steel wire backguy on the through hole.
Described fagging live axle is connected the homonymy of reinforcing bar.
Described fagging live axle respectively is connected the both sides of reinforcing bar.
The bottom of described reinforcing bar is provided with through hole, also is provided with central through hole on the fagging, two faggings is connected to the both sides of reinforcing bar by pin.
Described two faggings are connected the homonymy of reinforcing bar.
One end of described fagging is longer than the other end.
Described fagging is provided with more than one at least.
Because the utility model has added two faggings in the reinforcing bar bottom of the built-in perforation of anchor pole, can pass through smoothly in the straight hole section, trails naturally in the reaming section, therefore can obviously improve the anchor pole bearing capacity.The utility model is applicable to severely-weathered soil property and the higher lithosphere of degree of crushing, and expanding end effect can be significantly improved.The utility model is applicable to transmission line of electricity various basic pile foundations such as the use of iron tower foundation bearing capacity, construction work bridge engineering more than 500 kilovolts, is particularly useful for using in the soil layer, lithosphere of various weathering.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is that the A-A of Fig. 1 is to sectional view.
Fig. 3 is the fagging structural representation.
Among the figure: reinforcing bar 1, nut 2, steel wire backguy 3, fagging 4, pin 5, straight hole 6, central through hole 7, through hole 8, reaming 9.
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
The specific embodiment
Embodiment 1:
As shown in Figure 1 and Figure 2, Fig. 1 is a structural representation of the present utility model; Fig. 2 is that the A-A of Fig. 1 is to sectional view.
Anchor pole bogey at the bottom of the expansion of the present invention, it is that reinforcing bar 1 two bottom sides in the built-in perforation of anchor pole is connected with two faggings 4 relatively by live axle; One end of fagging 4 is longer than the other end, and an end of two faggings 4 is respectively equipped with on 8, two through holes 8 of through hole and connects two steel wire backguys 3 respectively.
During concrete enforcement, as shown in Figure 1, the anchor pole bogey is elder generation's drilling bore hole on various rocks at the bottom of the expansion of the present invention, and the top in hole is straight hole 6, and the bottom in hole is that the bottom of straight hole 6 is provided with the reaming 9 greater than the diameter of straight hole 6.During enforcement, manually pull steel wire backguy 3 respectively by ground artificial, making two faggings 4 is that long end makes progress all the time in straight hole 6, is in vertical state, and promptly fagging 4 is in closure state all the time.In the time of in reinforcing bar 1 is in reaming 9 downwards, because the space increases, ground artificial manually cuts off steel wire backguy 3 respectively, or ground is drawn back in steel wire backguy 3 all can.At this moment, the long end above two faggings 4 is auto-reverse, stretches to both sides and opens, and forms cross shaped head, and this moment, fluid concrete in the hole got final product, and concrete standard is C30.The top rebars 1 of anchor pole is fixed on the basic plane by nut 2 and gets final product.
Embodiment 2:
With two faggings 4 respectively live axle be connected the homonymy of reinforcing bar 1, pass two through holes 8 on the fagging 4 by same steel wire backguy 3 during enforcement, cross other with example 1.
Embodiment 3:
As shown in Figure 3, Fig. 3 is the fagging structural representation.
The utility model is to be provided with through hole in reinforcing bar 1 bottom of the built-in perforation of anchor pole, also be provided with central through hole 7 on the fagging 4, when two faggings 4 being connected to the both sides of reinforcing bar 1 by cottor pin pin 5, make the long end of fagging 4 be in position upwards, the long end of two faggings 4 is equipped with on 8, two through holes 8 of through hole and connects two steel wire backguys 3 respectively.
During concrete enforcement, pass two through holes 8 on the fagging 4 respectively with two steel wire backguys 3, manually pull two steel wire backguys 3 by ground artificial, make it be in closure state, in the time of in reinforcing bar 1 is in reaming 9 downwards, by extracting steel wire backguy 3 manually out, then two faggings 4 are opened naturally to both sides and are stretched, form cross shaped head, this moment, fluid concrete in the hole got final product.
Embodiment 4:
During enforcement, with steel wire backguy of 8 usefulness of the through hole on two faggings 43 connect pull also can, other is with embodiment 3.
Embodiment 5:
During concrete enforcement, described fagging 4 can also be established one, three, four ... polylith all can.

Claims (2)

1. expand end anchor pole bogey, it comprises anchor pole; It is characterized in that: reinforcing bar (1) bottom in the built-in perforation of anchor pole is connected with fagging (4); One end of fagging (4) is provided with through hole (8), is connected with steel wire backguy (3) on the through hole (8).
2. according to anchor pole bogey at the bottom of the described expansion of claim 1, it is characterized in that: described fagging (4) live axle is connected the homonymy of reinforcing bar (1).
3. according to anchor pole bogey at the bottom of the described expansion of claim 1, it is characterized in that: described fagging (4) live axle respectively is connected the both sides of reinforcing bar (1).
4. anchor pole bogey at the bottom of the expansion according to claim 1, it is characterized in that: the bottom of described reinforcing bar (1) is provided with through hole, also be provided with central through hole (7) on the fagging (4), two faggings (4) be connected to the both sides of reinforcing bar (1) by pin (5).
5. anchor pole bogey at the bottom of the expansion according to claim 4 is characterized in that: described two faggings (4) are connected the homonymy of reinforcing bar (1).
6. according to anchor pole bogey at the bottom of claim 1 or 2 or the 3 or 4 described expansions, it is characterized in that: an end of described fagging (4) is longer than the other end.
7. according to anchor pole bogey at the bottom of claim 1 or the 4 described expansions, it is characterized in that: described fagging (4) is provided with more than one at least.
CN201020604032XU 2010-11-12 2010-11-12 Bearing support for anchor bar with expanding ends Expired - Fee Related CN202012078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020604032XU CN202012078U (en) 2010-11-12 2010-11-12 Bearing support for anchor bar with expanding ends

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020604032XU CN202012078U (en) 2010-11-12 2010-11-12 Bearing support for anchor bar with expanding ends

Publications (1)

Publication Number Publication Date
CN202012078U true CN202012078U (en) 2011-10-19

Family

ID=44782691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020604032XU Expired - Fee Related CN202012078U (en) 2010-11-12 2010-11-12 Bearing support for anchor bar with expanding ends

Country Status (1)

Country Link
CN (1) CN202012078U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088276A (en) * 2014-07-10 2014-10-08 国家电网公司 Supporting device for power transmission line under-reamed anchor rod
CN105133608A (en) * 2015-09-07 2015-12-09 国网山东省电力公司济南供电公司 Anchor rod used for power construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088276A (en) * 2014-07-10 2014-10-08 国家电网公司 Supporting device for power transmission line under-reamed anchor rod
CN104088276B (en) * 2014-07-10 2015-11-18 国家电网公司 A kind of power transmission sequence expands the bracing or strutting arrangement of end anchor pole
CN105133608A (en) * 2015-09-07 2015-12-09 国网山东省电力公司济南供电公司 Anchor rod used for power construction

Similar Documents

Publication Publication Date Title
CN103806462B (en) Power transmission circuit soil layer steel strand prestress expands anchor pole basis, the end
CN101487355B (en) Telegraph pole and its mounting and fixing method
CN104179178A (en) Flexible umbrella supporting anchor bolt and method for supporting soil slope thereby
CN105155548B (en) A kind of drag-line double-row pile (wall) supporting construction
CN201031390Y (en) Tools type enlarged footing plucking resistance pile
CN201411691Y (en) Anchor rod supporting device
CN101691760B (en) Composite foundation combining anchor rods with excavation and construction method thereof
CN204212162U (en) A kind of side slope grouting reinforcement structure
CN202227368U (en) Underground groove structured anti-floating structure
CN202012078U (en) Bearing support for anchor bar with expanding ends
CN201272968Y (en) Combined anchorage system
CN201502065U (en) Anchor rod joint excavation compound basis
CN204676581U (en) A kind of rock foundation overhead power transmission line line pole tower and bracing wire novel foundation
CN208328968U (en) A kind of upper stake suitable for large-scale cyclic load is casted anchor novel foundation
CN201121310Y (en) Bottom expanding bearing equipment of weathered rock formation anchor bar
CN203361182U (en) Unequal-length bottom-expanded rock anchor pile of power transmission pole tower
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN104594375B (en) A kind of rock foundation overhead power transmission line line pole tower and guyed foundation and construction technology
CN101349063B (en) Iron tower foundation of overhead power transmission line severely-weathered rock formation winding anchor rod
CN105040693A (en) End expanding type anti-floating anchor rod
CN110792095B (en) Multi-pile bearing platform-spiral anchor composite foundation
CN204898666U (en) Forced back slip casting cavity reaming stock
CN201443071U (en) Galvanized anchor rod
CN201495554U (en) Anchor bolt combination excavating compound base
CN113818474A (en) Assembly type bearing platform anchor cable foundation of power transmission tower and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHENYANG SINO POWER

Free format text: FORMER OWNER: HAINAN ZHONGHAI ELECTRIC POWER ENGINEERING CORPORATION

Effective date: 20130121

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 570105 HAIKOU, HAINAN PROVINCE TO: 110013 SHENYANG, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130121

Address after: 110013, No. 10, Hui Gong street, Shenhe District, Liaoning, Shenyang (room 1804)

Patentee after: Shenyang Zhonghai Electric Power Engineering Co., Ltd.

Address before: 8, Overseas Building, 36 Kun Kun North Road, 570105, Hainan, Haikou Province, B4

Patentee before: Hainan Zhonghai Electric Power Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111019

Termination date: 20141112

EXPY Termination of patent right or utility model