CN211111858U - Furnace top cooling and spraying device - Google Patents

Furnace top cooling and spraying device Download PDF

Info

Publication number
CN211111858U
CN211111858U CN201921510910.9U CN201921510910U CN211111858U CN 211111858 U CN211111858 U CN 211111858U CN 201921510910 U CN201921510910 U CN 201921510910U CN 211111858 U CN211111858 U CN 211111858U
Authority
CN
China
Prior art keywords
high pressure
pressure water
spraying
factory building
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921510910.9U
Other languages
Chinese (zh)
Inventor
浦心扣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Qixin Metallurgical Equipment Manufacturing Co ltd
Original Assignee
Jiangsu Qixin Metallurgical Equipment Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Qixin Metallurgical Equipment Manufacturing Co ltd filed Critical Jiangsu Qixin Metallurgical Equipment Manufacturing Co ltd
Priority to CN201921510910.9U priority Critical patent/CN211111858U/en
Application granted granted Critical
Publication of CN211111858U publication Critical patent/CN211111858U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Nozzles (AREA)

Abstract

The utility model discloses a furnace roof cooling atomizer, including setting up mounting bracket (1) at top in the factory building, setting up cistern (2) and high pressure water pump (3) outside the factory building, cistern (2) in-connection is equipped with high pressure water piping (4), high pressure water piping (4) pass through mount (5) with the factory building and are connected, the connection is equipped with feed water valve (6) on high pressure water piping (4), the end of intaking of high pressure water piping (4) is equipped with filter (7), the other end of high pressure water piping (4) extends to the dispersion of factory building top and is a plurality of spraying delivery pipe (8), spraying delivery pipe (8) below is connected and is equipped with a plurality of atomizer (9), each the end of intaking of spraying delivery pipe (8) all is connected and is equipped with water intaking valve (10). Compared with the prior art, the utility model the advantage lies in: simple structure, and can quickly and effectively reduce the temperature of the furnace top.

Description

Furnace top cooling and spraying device
Technical Field
The utility model relates to a heat sink technical field specifically indicates a furnace roof cooling atomizer.
Background
The coke oven is a furnace generally built by refractory bricks and refractory blocks, which is used for carbonizing coal to produce coke, the top of the coke oven has a high-temperature and high-dust environment, a top worker does not have a cooling device in the environment, the environment temperature is too high, people are easy to have heatstroke and fall, and particularly, when a coal car rapidly travels, people are easy to have casualty accidents once the people are fuzzy in consciousness, so that the top of the coke oven needs to take cooling measures to ensure the personal safety of the workers, water is generally sprayed to the top of the coke oven to cool, but because the water quality cannot be ensured, a nozzle for spraying water is easy to block, the nozzle needs to be frequently replaced to ensure the development of normal cooling work, and a large amount of maintenance cost is generated.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome the above technical problem, and provide a furnace top cooling atomizer which has simple structure, convenient maintenance and can quickly and effectively reduce the temperature of the furnace top.
In order to solve the technical problem, the utility model provides a technical scheme does: the utility model provides a furnace roof cooling atomizer, includes the mounting bracket that sets up top in the factory building, sets up cistern and high pressure water pump outside the factory building, the connection is equipped with high pressure water piping in the cistern, high pressure water pump and high pressure water piping connection, high pressure water piping passes through the mount with the factory building and is connected, high pressure water piping is last to be connected and is equipped with the feed valve, high pressure water piping's the end of intaking is equipped with the filter, high pressure water piping's the other end extends to the dispersion of factory building top and is a plurality of spraying delivery pipes, the spraying delivery pipe is installed in the mounting bracket below, the connection of spraying delivery pipe below is equipped with a plurality of atomizer, each the water intaking.
After the structure more than adopting, the utility model has the advantages of it is following: the utility model discloses simple structure, low in cost can be quick effectual reduces furnace roof temperature, high pressure water pipeline's the end of intaking is equipped with the filter, and the setting of filter can block impurity entering high pressure water pipeline in the cistern, blocks atomizer, adopts behind the atomizer, and moisture floats in the air earlier, can not form the infiltration and destroy the furnace roof structure, can also adsorb the dust in the air to ambient temperature is taken away to the form of vapor, makes the moisture evaporation, realizes effectively cooling, guarantees that the operational environment of furnace roof operating area meets the requirements, and is simple and practical, and it is convenient to maintain.
As the improvement, one side of cistern is equipped with the spillway hole, and whether the setting of spillway hole can monitor the cistern normal water and reach the retaining limit, can avoid the cistern normal water volume to add too much and cause the wasting of resources.
As an improvement, the water supply valve is an electric switch valve, the water inlet valve is an electric regulating valve, the electric switch valve can control water in the water storage tank to be output to the high-pressure water pipeline, the water in the spraying water supply pipe is ensured to be sufficient, and the electric regulating valve can regulate the speed of water flow in the spraying water supply pipe so as to regulate the size of sprayed water.
As the improvement, the spraying delivery pipe is welded on the mounting frame, the spraying delivery pipe and the mounting frame are integrally in a groined structure, the welding form is firmer, the spraying delivery pipe and the mounting frame are integrally in the groined structure, so that the mounting frame is uniformly stressed, the structure is more stable, and meanwhile, the spraying cooling can be carried out on any position of the furnace top.
As an improvement, the spray water supply pipe and the atomizing spray head are both made of high-temperature-resistant steel plates, and high-temperature-resistant materials are adopted to adapt to the high temperature of the furnace top, so that the service life of the cooling and spraying device is prolonged.
As an improvement, the atomizing nozzle can adjust the water outlet form and size, the water outlet quantity of the atomizing nozzle can be adjusted according to the actual temperature of the furnace top, the atomizing cooling efficiency is improved, and the resource waste is avoided.
Drawings
Fig. 1 is a schematic structural view of the furnace top cooling and spraying device of the present invention.
Fig. 2 is an external structure schematic diagram of the furnace top cooling and spraying device of the utility model.
Fig. 3 is a schematic structural view of a spray water supply pipe of the furnace top cooling and spraying device of the utility model.
As shown in the figure: 1. the device comprises a mounting frame, 2, a reservoir, 2.1, an overflow hole, 3, a high-pressure water pump, 4, a high-pressure water pipeline, 5, a mounting frame, 6, a water supply valve, 7, a filter, 8, a spray water supply pipe, 9, an atomizing nozzle, 10 and a water inlet valve.
Detailed Description
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "inner", "outer", "center", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a specific orientation configuration and operation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be further noted that, unless otherwise explicitly stated or limited, the terms "provided", "mounted", "connected", and the like are to be understood in a broad sense, and for example, they may be fixedly connected, detachably connected, or integrally connected, mechanically connected, electrically connected, directly connected, indirectly connected through an intermediate medium, or connected to the inside of two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The present invention will be described in further detail with reference to the accompanying drawings.
Combine attached 1-3, a furnace roof cooling atomizer, including set up in the factory building in the mounting bracket 1 of top, set up cistern 2 and high pressure water pump 3 outside the factory building, 2 in-connection in the cistern are equipped with high pressure water pipe 4, high pressure water pump 3 is connected with high pressure water pipe 4, high pressure water pipe 4 passes through mount 5 with the factory building and is connected, high pressure water pipe 4 is gone up to connect and is equipped with feed water valve 6, high pressure water pipe 4's the end of intaking is equipped with filter 7, high pressure water pipe 4's the other end extends to the dispersion of factory building top and is a plurality of spraying delivery pipe 8, spraying delivery pipe 8 is installed in mounting bracket 1 below, the connection of spraying delivery pipe 8 below is equipped with a plurality of atomizer 9, each the water intaking end of spraying delivery pipe 8 all.
One side of cistern 2 is equipped with spillway hole 2.1, feed valve 6 is the electric switch valve, water intaking valve 10 is electrical control valve, 8 welding of spraying delivery pipe are on mounting bracket 1, 8 and the whole groined type structure that becomes of mounting bracket 1 of spraying delivery pipe, 8 and 9 all adopt high temperature resistant steel sheet to make of spraying delivery pipe and atomizer, atomizer 9 can adjust out water form and size.
The utility model discloses when concrete implementation, pour into the cooling water into cistern 2, stop to annotate water into cistern 2 when spillway hole 2.1 has rivers to go out, open high pressure water pump 3 and feed water valve 6, the water under high pressure flows into high pressure water pipe 4 after filter 7 filters impurity, adjust water intaking valve 10 and make the water under high pressure get into each spraying delivery pipe 8, the water under high pressure is through 9 atomizing backs, evenly spray in furnace roof operation area, vapor evaporation can make and reduce the furnace roof temperature, guarantee that the operational environment in furnace roof operation area meets the requirements, and is simple and practical, and the maintenance is convenient.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (6)

1. The utility model provides a furnace roof cooling atomizer, includes mounting bracket (1) that sets up top in the factory building, sets up cistern (2) and high pressure water pump (3) outside the factory building, its characterized in that: cistern (2) in-connection is equipped with high pressure water piping (4), high pressure water pump (3) are connected with high pressure water piping (4), high pressure water piping (4) pass through mount (5) with the factory building and are connected, high pressure water piping (4) are gone up to connect and are equipped with feed valve (6), the end of intaking of high pressure water piping (4) is equipped with filter (7), the other end of high pressure water piping (4) extends to the dispersion of factory building top and is a plurality of spraying delivery pipe (8), install in mounting bracket (1) below spraying delivery pipe (8), spraying delivery pipe (8) below is connected and is equipped with a plurality of atomizer (9), each the end of intaking of spraying delivery pipe (8) all connects and is equipped with water intaking valve (10).
2. The furnace roof cooling spray device of claim 1, wherein: and one side of the water storage tank (2) is provided with an overflow hole (2.1).
3. The furnace roof cooling spray device of claim 1, wherein: the water supply valve (6) is an electric switch valve, and the water inlet valve (10) is an electric regulating valve.
4. The furnace roof cooling spray device of claim 1, wherein: the spraying water supply pipe (8) is welded on the mounting frame (1), and the spraying water supply pipe (8) and the mounting frame (1) are integrally of a groined structure.
5. The furnace roof cooling spray device of claim 1, wherein: the spray water supply pipe (8) and the atomizing nozzle (9) are both made of high-temperature-resistant steel plates.
6. The furnace roof cooling spray device of claim 1, wherein: the atomizing nozzle (9) can adjust the shape and size of the discharged water.
CN201921510910.9U 2019-09-11 2019-09-11 Furnace top cooling and spraying device Expired - Fee Related CN211111858U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921510910.9U CN211111858U (en) 2019-09-11 2019-09-11 Furnace top cooling and spraying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921510910.9U CN211111858U (en) 2019-09-11 2019-09-11 Furnace top cooling and spraying device

Publications (1)

Publication Number Publication Date
CN211111858U true CN211111858U (en) 2020-07-28

Family

ID=71722984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921510910.9U Expired - Fee Related CN211111858U (en) 2019-09-11 2019-09-11 Furnace top cooling and spraying device

Country Status (1)

Country Link
CN (1) CN211111858U (en)

Similar Documents

Publication Publication Date Title
CN107321968B (en) A kind of mobile casting dust removal device of foundry industry
CN211111858U (en) Furnace top cooling and spraying device
CN210544041U (en) Spraying presses down dirt system
CN212158912U (en) Boiler furnace pressure measuring device
CN203297065U (en) Waste heat recycling system of air compressor
CN210473927U (en) Slag discharging structure of fluidized bed reactor
CN209165536U (en) A kind of ground heating system based on air source heat pump
CN109974486A (en) A kind of cooling equipment of board-like granular material
CN215086072U (en) Novel SNCR flue gas denitration device
CN114292673A (en) Blast furnace gas wet pervaporation dechlorination method and dechlorination device
CN209263691U (en) A kind of combustion furnace graphite low-temperature flue gas waste heat recyclable device
CN110864321A (en) Spray quench tower
CN220454296U (en) Water spraying device of grate cooler
CN201906919U (en) Water-cooled spot welder with self-circulation water tank
CN212082002U (en) Aluminum melting furnace with low energy consumption
CN216149315U (en) Spraying device for excavator or breaking hammer and excavator or breaking hammer
CN206235186U (en) A kind of fluid bed
CN208949332U (en) A kind of metallurgy high-temperature furnace body
CN217055344U (en) Engine exhaust cooling device and engineering machinery
CN211424449U (en) Spray quench tower
CN214023467U (en) Energy-concerving and environment-protective type is ladle structure for lithium cell
CN218167332U (en) Dust removal device for refractory material crusher
CN219580161U (en) Energy-saving vulcanizing tower for steel mill
CN213866352U (en) Billet heating furnace
CN214987605U (en) Coated oil heating oil storage tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728