CN211008478U - Quick pile driver for building engineering - Google Patents

Quick pile driver for building engineering Download PDF

Info

Publication number
CN211008478U
CN211008478U CN201922176555.2U CN201922176555U CN211008478U CN 211008478 U CN211008478 U CN 211008478U CN 201922176555 U CN201922176555 U CN 201922176555U CN 211008478 U CN211008478 U CN 211008478U
Authority
CN
China
Prior art keywords
pile driver
lifting
plate
base
sliding blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922176555.2U
Other languages
Chinese (zh)
Inventor
梁智光
陶翠云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922176555.2U priority Critical patent/CN211008478U/en
Application granted granted Critical
Publication of CN211008478U publication Critical patent/CN211008478U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a building engineering technical field discloses a quick pile driver of building engineering. The device comprises a base, wherein the base is arranged on a moving mechanism, the moving mechanism comprises two parallel supporting plates, sliding blocks are oppositely arranged between the supporting plates, two guide posts are connected in parallel between the sliding blocks, a first rotating rod is arranged between the sliding blocks, and the first rotating rod is driven by a first motor fixed on the sliding blocks; the base is provided with a through hole for the corresponding guide post to pass through and a first threaded hole for the first rotating rod to thread through. Through the structure, the rapid pile driver for the construction engineering can move left and right in the range between the supporting plates, and the multi-pile-hole pile driving operation can be rapidly carried out.

Description

Quick pile driver for building engineering
Technical Field
The utility model relates to a building engineering technical field, specifically speaking relates to a quick pile driver of building engineering.
Background
In the construction process, the type and construction method of the pile are generally determined according to the soil layer condition, the surrounding environment condition, the upper load and the like, and the pile foundation is a deep foundation form generally adopted in the construction engineering.
The patent application for CN201820119785.8 discloses an efficient pile driver for building, the on-line screen storage device comprises a base, the bottom fixed mounting of base has the landing leg, the top fixed mounting of base has the support, the inboard fixed mounting of support has the guide rail, the inboard movable mounting of guide rail has the slider, two relative one side fixed mounting of slider have the connecting plate, the top fixed mounting of connecting plate has the motor, the output shaft department fixed mounting of motor has one end to run through and extend to the pivot of connecting plate below, the one end fixed mounting that motor output shaft was kept away from in the pivot has the bearing frame, the bottom fixed mounting of bearing frame has a screw thread column section of thick bamboo, the bottom fixed mounting of screw thread column section of thick bamboo has the copper sheathing, the top fixed mounting of connecting plate has the cushion, the top fixed. Although the device has high piling efficiency and is convenient for workers to construct and use, the device still has the defects that the pile driver is troublesome to move to an accurate piling point for piling, and the pile driver needs to be repeatedly moved when a plurality of pile holes are punched in a certain range, and the operation is complex.
SUMMERY OF THE UTILITY MODEL
Remove the pile driver that exists among the prior art and to carry out the pile to accurate pile driving point and pile comparatively troublesome and need the repeated pile driver that removes when beating a plurality of stake holes in certain within range, the defect of operation complicacy, the utility model provides a quick pile driver of building engineering. It can realize that the base removes in the within range between the backup pad, is convenient for carry out the function of many stake holes pile operation to the scope between the backup pad.
In order to solve the above technical problem, the present invention solves the above technical problems.
The quick pile driver for the construction engineering comprises a base, wherein the base is arranged on a moving mechanism, the moving mechanism comprises two parallel supporting plates, sliding blocks are oppositely arranged between the supporting plates, two guide posts are connected in parallel between the sliding blocks, a first rotating rod is arranged between the sliding blocks, and the first rotating rod is driven by a first motor fixed on the sliding blocks; the base is provided with a through hole for the corresponding guide post to pass through and a first threaded hole for the first rotating rod to thread through.
The utility model discloses an above-mentioned structure for first motor rotates and drives first rotation pole and rotates and drive the base and remove and then the base removes about between the backup pad along the guide post, realizes the change of base position between the backup pad, makes the quick pile driver of building engineering remove about can the within range between the backup pad, carries out many stake holes pile operation fast.
Preferably, the opposite side of backup pad just is located the lower tip and is equipped with the recess, and the recess just is located the upper end and is equipped with rotatable second dwang along the fore-and-aft direction, is equipped with the second screw hole that supplies to correspond second dwang screw thread and pass on the sliding block.
Through the utility model provides a structure for the second dwang rotates and can drive the sliding block along second dwang back-and-forth movement, makes the base can back-and-forth movement between the backup pad, realizes that the change of base position between the backup pad makes the quick pile driver of building engineering can be at the within range back-and-forth movement between the backup pad, carries out the operation of piling of many pile holes fast.
Preferably, lifting grooves are formed in the front side wall and the rear side wall of the groove and are positioned at the upper end part of the groove, connecting columns are fixed in the lifting grooves along the vertical direction, lifting blocks are arranged in the lifting grooves, mounting holes for the connecting columns to penetrate through are formed in the lifting blocks, second rotating rods are connected between the corresponding lifting blocks, and the second rotating rods are driven by a second motor fixed on the lifting blocks; the connecting column is sleeved with a buffer spring positioned below the lifting block.
The utility model discloses in, through buffer spring's setting for the quick pile driver of building engineering obtains the buffering at the vibration that the pile operation produced, makes the quick pile driver of building engineering obtain effectual protection.
Preferably, the bottom end of the supporting plate is provided with a fixing mechanism for fixing the supporting plate, the fixing mechanism comprises a fixing plate connected to the supporting plate, and the fixing plate is in threaded connection with a positioning pin inserted into the soil layer.
The utility model discloses in, insert through the locating pin and make the backup pad obtain further fixed in the soil layer, prevent that the removal of backup pad makes the stake hole beat askewly in the pile operation.
Preferably, the supporting plate is provided with a containing groove for containing the fixing mechanism, and the front side wall and the rear side wall of the containing groove, which are positioned at the bottom end part, are provided with limiting sliding grooves oppositely along the left and right direction; the fixed plate is movably arranged in the accommodating groove, and the side surface of the fixed plate is provided with a limiting column corresponding to the limiting sliding groove.
Through the utility model provides a structure for rotate the locating pin and make its rise and keep away from the soil layer, because spacing post is located spacing spout, make the fixed plate rotate round spacing post and promote the fixed plate and make spacing post move along spacing spout and accomodate the inslot along spacing spout and make fixed establishment accomodate the inslot in the preferred, thereby facilitate the use.
Preferably, a reinforcing plate is connected between the front side and the rear side of the supporting plate, and the stability of the supporting plate is preferably enhanced.
Drawings
Fig. 1 is a schematic view of a construction engineering quick pile driver in embodiment 1;
FIG. 2 is a schematic view of a moving mechanism in embodiment 1;
FIG. 3 is a schematic view of a support plate in embodiment 1;
FIG. 4 is a schematic view showing a coupling structure of a slide block and a lift block in embodiment 1;
fig. 5 is a schematic view of the fixing mechanism in embodiment 1.
The names of the parts indicated by the numerical references in the drawings are as follows: 100. a base; 110. a moving mechanism; 120. mounting a plate; 121. a column; 122. a hydraulic press; 130. a lifting plate; 141. a pile driving power motor; 142. rotating the piling bar; 210. a support plate; 211. a reinforcing plate; 220. a slider; 230. a fixing mechanism; 311. a groove; 312. a lifting groove; 313. a receiving groove; 314. a limiting chute; 320. a second rotating lever; 330. connecting columns; 331. a buffer spring; 340. a lifting block; 341. a second motor; 411. a second threaded hole; 412. a guide post; 420. a first rotating lever; 421. a first motor; 431. a through hole; 432. a first threaded hole; 441. mounting holes; 510. a fixing plate; 511. a limiting column; 521. and a positioning pin.
Detailed Description
For a further understanding of the present invention, reference will be made to the following detailed description taken in conjunction with the accompanying drawings and examples. It is to be understood that the examples are illustrative of the invention only and are not limiting.
Example 1
As shown in fig. 1-5, the embodiment provides a quick pile driver for construction engineering, which includes a base, the base is disposed on a moving mechanism 110, the moving mechanism 110 includes two parallel supporting plates 210, sliding blocks 220 are disposed between the supporting plates 210, two guiding posts 412 are connected between the sliding blocks 220 in parallel, a first rotating rod 420 is disposed between the sliding blocks 220, and the first rotating rod 420 is driven by a first motor 421 fixed on the sliding blocks 220; the base 100 is provided with a through hole 431 for the corresponding guide post 412 to pass through and a first screw hole 432 for the first rotation rod 420 to thread through.
In this embodiment, a mounting plate 120 is disposed above the base 100, the mounting plate 120 is connected to the base 100 through a column 121, a lifting plate 130 is disposed between the mounting plate 120 and the base 100, the columns 121 are disposed through the lifting plate 130, a hydraulic press 122 for driving the lifting plate 130 to lift is fixed above the mounting plate 120, a rotary piling rod 142 extending into the supporting plate 210 through the base 100 is disposed below the lifting plate 130, and a piling power motor 141 for driving the rotary piling rod 142 is disposed above the lifting plate 130; through the above structure, the hydraulic machine 122 drives the lifting plate 130 to descend, and simultaneously the piling power motor 141 drives the rotary piling rod 142 to rotate to carry out piling operation; through the arrangement of the moving mechanism 110, the moving mechanism 110 can drive the base 100 to move between the support plates 210, so that the device on the base plate can quickly carry out piling operation on the range between the support plates 210; wherein the sliding block 220, the guide posts 412 and the through holes 431 are arranged such that the base 100 can be installed between the support plates 210 and restricted such that the base 100 can move along the guide posts 412; through the arrangement of the first motor 421, the first rotating rod 420 and the first threaded hole 432, the first motor 421 rotates to drive the first rotating rod 420 to rotate to drive the base to move along the guide column 412, so that the base 100 moves left and right between the supporting plates 210, and the change of the position of the base 100 between the supporting plates 210 is realized; according to the technical scheme, the rapid pile driver for the construction engineering can move left and right in the range between the supporting plates 210, and the multi-pile-hole piling operation can be rapidly performed.
In this embodiment, the opposite side surfaces of the supporting plate 210 and the lower end portion are provided with a groove 311, the upper end portion inside the groove 311 and the front and rear direction are provided with a rotatable second rotating rod 320, and the sliding block 220 is provided with a second threaded hole 411 for the corresponding second rotating rod 320 to thread through.
Through the structure in this embodiment, because the guide post 412 is connected the sliding block 220 and is made the sliding block 220 receive the restriction, second dwang 320 threaded connection is in second screw hole 411 simultaneously for second dwang 320 rotates and can drive the sliding block 220 along the back-and-forth movement of second dwang 320, makes base 100 can back-and-forth movement between the backup pad 210, realizes that the change of base 100 position between the backup pad 210 makes the quick pile driver of building engineering can back-and-forth movement in the within range between the backup pad 210, carries out many pile holes pile driving operation fast.
In this embodiment, the front and rear side walls of the recess 311 and the upper end portion thereof are provided with a lifting groove 312, the lifting groove 312 is internally fixed with a connecting column 330 along the up-down direction, the lifting grooves 312 are internally provided with lifting blocks 340, the lifting blocks 340 are provided with mounting holes 441 for the connecting column 330 to pass through, the second rotating rods 320 are connected between the corresponding lifting blocks 340, and the second rotating rods 320 are driven by a second motor 341 fixed on the lifting blocks 340; the connecting post 330 is sleeved with a buffer spring 331 positioned below the lifting block 340.
Through the configuration in the present embodiment, the connection column 330 is disposed through the lifting block 340, so that the lifting block 340 can be installed in the lifting groove 312 and lifted along the connection column 330, wherein the buffer spring 331 is disposed so that the buffer spring 331 can buffer and damp the lifting block 340, so that the vibration generated by the construction engineering rapid pile driver during pile driving operation is buffered, and the construction engineering rapid pile driver is effectively protected.
In this embodiment, a fixing mechanism 230 for fixing the supporting plate 210 is disposed at the bottom end of the supporting plate 210, the fixing mechanism 230 includes a fixing plate 510 connected to the supporting plate 210, and a positioning pin 521 inserted into the soil layer is screwed onto the fixing plate 510.
Through the arrangement of the fixing plate 510 and the positioning pin 521 in the embodiment, the positioning pin 521 is inserted into the soil layer through the fixing plate 510 in a threaded manner, so that the support plate 210 can be further fixed, and the movement of the support plate 210 in the piling operation is prevented from skewing the pile hole.
In this embodiment, the supporting plate 210 is provided with a receiving groove 313 for receiving the fixing mechanism 230, and the front and rear side walls of the receiving groove 313 and the bottom end portion thereof are provided with a limiting sliding groove 314 along the left-right direction; the fixing plate 510 is movably disposed in the receiving groove 313, and a limiting post 511 is disposed on a side surface of the fixing plate 510 corresponding to the limiting sliding groove 314.
With the structure of the embodiment, the positioning pin 521 is rotated to lift away from the soil layer, and since the position-limiting column 511 is located in the position-limiting sliding slot 314, the fixing plate 510 rotates around the position-limiting column 511 and pushes the fixing plate 510 to make the position-limiting column 511 move along the position-limiting sliding slot 314 to move the inner side of the accommodating slot 313, so that the fixing mechanism 230 is preferably accommodated in the accommodating slot 313, thereby facilitating the use.
In this embodiment, a reinforcing plate 211 is connected between the front and rear sides of the supporting plate 210, so as to better enhance the stability of the supporting plate 210.
In a specific use of the rapid pile driver for construction engineering of the present embodiment, the support plate 210 is installed at a position where a pile hole is to be punched according to the position of the pile hole, the fixing plate 510 slides out of the receiving groove 313 and the positioning pin 521 is inserted into the soil layer to further fix the support plate 210, and then the first motor 421 and the second motor 341 are activated to allow the base 100 to move within the range between the support plates 210, so that the device on the base plate 100 can rapidly perform a pile driving operation.
In short, the above description is only a preferred embodiment of the present invention, and all the equivalent changes and modifications made in accordance with the claims of the present invention should be covered by the scope of the present invention.

Claims (6)

1. Quick pile driver of building engineering, including base (100), its characterized in that: the base (100) is arranged on a moving mechanism (110), the moving mechanism (110) comprises two parallel supporting plates (210), sliding blocks (220) are arranged between the supporting plates (210) relatively, two guide columns (412) are connected between the sliding blocks (220) in parallel, a first rotating rod (420) is arranged between the sliding blocks (220), and the first rotating rod (420) is driven by a first motor (421) fixed on the sliding blocks (220); the base (100) is provided with a through hole (431) for the corresponding guide column (412) to pass through and a first threaded hole (432) for the first rotating rod (420) to pass through.
2. Construction engineering fast pile driver according to claim 1, characterized in that: the opposite side of backup pad (210) just is located the lower tip and is equipped with recess (311), and recess (311) are interior and lie in the upper end and be equipped with rotatable second dwang (320) along the fore-and-aft direction, are equipped with on sliding block (220) to supply to correspond second dwang (320) second screw hole (411) that the screw thread passed.
3. Construction engineering fast pile driver according to claim 2, characterized in that: lifting grooves (312) are oppositely arranged on the front side wall and the rear side wall of the groove (311) and positioned at the upper end part, connecting columns (330) are fixed in the lifting grooves (312) along the vertical direction, lifting blocks (340) are arranged in the lifting grooves (312), mounting holes (441) for the connecting columns (330) to pass through are formed in the lifting blocks (340), the second rotating rods (320) are connected between the corresponding lifting blocks (340), and the second rotating rods (320) are driven by a second motor (341) fixed on the lifting blocks (340); the connecting column (330) is sleeved with a buffer spring (331) positioned below the lifting block (340).
4. Construction engineering fast pile driver according to claim 1, characterized in that: the bottom end of the supporting plate (210) is provided with a fixing mechanism (230) for fixing the supporting plate (210), the fixing mechanism (230) comprises a fixing plate (510) connected to the supporting plate (210), and a positioning pin (521) inserted into the soil layer is connected to the fixing plate (510) in a threaded mode.
5. Construction engineering fast pile driver according to claim 4, characterized in that: the supporting plate (210) is provided with a containing groove (313) for containing the fixing mechanism (230), and the front side wall and the rear side wall of the containing groove (313) and the bottom end part are oppositely provided with limit sliding grooves (314) along the left-right direction; the fixing plate (510) is movably arranged in the accommodating groove (313), and a limiting column (511) is arranged on the side surface of the fixing plate (510) corresponding to the limiting sliding groove (314).
6. Construction engineering fast pile driver according to claim 1, characterized in that: a reinforcing plate (211) is connected between the front side and the rear side of the supporting plate (210).
CN201922176555.2U 2019-12-07 2019-12-07 Quick pile driver for building engineering Expired - Fee Related CN211008478U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922176555.2U CN211008478U (en) 2019-12-07 2019-12-07 Quick pile driver for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922176555.2U CN211008478U (en) 2019-12-07 2019-12-07 Quick pile driver for building engineering

Publications (1)

Publication Number Publication Date
CN211008478U true CN211008478U (en) 2020-07-14

Family

ID=71482145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922176555.2U Expired - Fee Related CN211008478U (en) 2019-12-07 2019-12-07 Quick pile driver for building engineering

Country Status (1)

Country Link
CN (1) CN211008478U (en)

Similar Documents

Publication Publication Date Title
CN210289621U (en) Concrete core drilling machine
CN112554559A (en) Clamping device for splicing building templates
CN211008478U (en) Quick pile driver for building engineering
CN211873008U (en) Bottom displacement frame of cast-in-place pile machine
KR20130073532A (en) Worktable for hole processing of thrust pad
CN215104771U (en) A plant muscle perforating device for bridge construction
EP1754560A1 (en) Grooving apparatus for elevator hoist
CN209830317U (en) Automatic unloading formula boring machine
JP5886085B2 (en) Stage device and control method of stage device
JP3593090B2 (en) Splice plate drilling machine
CN219452003U (en) Multi-point tunneling type drilling mechanism
CN110697569A (en) Supporting leg column for crane operation
CN218563579U (en) Pile driving device for foundation construction
GB2097302A (en) Drilling rig
CN209834844U (en) Air transport vehicle structure
CN216866589U (en) Multi-azimuth moving mechanism for mast
CN218916870U (en) Rock sampling drilling machine
CN220185033U (en) Directional drilling equipment for municipal road construction
CN216034054U (en) Protection mechanism is used in pile driver transportation
CN221274971U (en) Hoisting structure for expressway construction
CN221742493U (en) Pile driver for constructional engineering
CN217298893U (en) Electronic piling and positioning device for building
CN215801608U (en) A pile device for river course renovation
CN220548412U (en) Fixed cutting device of laminate flooring
CN221345578U (en) Pile driving device for municipal construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200714

Termination date: 20201207

CF01 Termination of patent right due to non-payment of annual fee