CN211006220U - Town road brick that permeates water - Google Patents
Town road brick that permeates water Download PDFInfo
- Publication number
- CN211006220U CN211006220U CN201921572255.XU CN201921572255U CN211006220U CN 211006220 U CN211006220 U CN 211006220U CN 201921572255 U CN201921572255 U CN 201921572255U CN 211006220 U CN211006220 U CN 211006220U
- Authority
- CN
- China
- Prior art keywords
- water
- brick
- grooves
- water permeable
- brick bodies
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a municipal road water permeable brick, which belongs to the technical field of floor tiles and comprises brick bodies, grooves, connecting blocks, water permeable holes and communicating grooves, the utility model can smoothly drain rainwater downwards in a slope manner when raining, and leads the rainwater downwards to the ground through the water guide grooves to avoid water accumulation on the road surface, after a single brick body is blocked, the water permeable holes can be communicated with the water guide grooves to drain the water accumulation of the adjacent brick bodies, meanwhile, the brick bodies on the whole road form an area net to be connected into a whole body to carry out water drainage work together, the side surfaces of the brick bodies are butted through the connecting blocks, so that the brick bodies are connected into a whole body, the connecting gaps between the brick bodies can be effectively eliminated, the rainwater is prevented from accumulating in the gaps between the brick bodies, the rainwater is led downwards to the ground through the water accumulating grooves, the water accumulation in the gaps between the brick bodies is avoided, and the pedestrians are prevented from stepping on the tilted brick bodies, the clothes are wetted by the water splashed in the gaps, so that the clothes are more humanized.
Description
Technical Field
The utility model relates to a ceramic tile technical field specifically is a road ceramic tile.
Background
The floor tile is a ground decoration material, also called floor tile, a large number of floor tiles are laid on the existing municipal road sidewalk, but the existing floor tile can not dredge rainwater under the rainwater, and the rainwater is easy to accumulate on holes or surfaces, so that the water drainage work is easy to stop when the floor tile is blocked;
rainwater is easily accumulated in gaps among the brick bodies of the floor tiles, and when pedestrians step on the loosened and raised brick bodies, clothes are easily wetted by water splashed in the gaps;
because the road floor tiles are inconvenient to use due to the problems, further research needs to be carried out on the existing road floor tiles to provide a new municipal road water permeable tile.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects existing in the prior art, and provides a municipal road water permeable brick which can obliquely and smoothly dredge rainwater downwards when raining, lead rainwater downwards into the ground through a water chute to avoid surface water accumulation, can be communicated with the water chute through a water permeable hole after a single brick body is blocked, dredge the water accumulation of adjacent brick bodies, form an area net by the brick bodies on the whole road, connect the brick bodies into a whole body, carry out drainage work together, butt joint the side surfaces of the brick bodies through a connecting block to enable the brick bodies to be connected into a whole body, effectively eliminate connecting gaps between the brick bodies, avoid rainwater accumulation in the gaps between the brick bodies, lead rainwater downwards into the ground through a water accumulating groove, avoid water accumulation in the gaps between the brick bodies, avoid pedestrians stepping on the tilted brick bodies, and wet clothes by water splashed in the gaps, so that the system is more humanized.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a town road brick that permeates water, includes the brick body, recess, connecting block, the hole and the intercommunication groove of permeating water, the integration of the surface of the brick body is provided with the recess, the bottom integration of recess is provided with the guiding gutter, both ends integration is provided with the connecting block about the brick body, the integration of the surface of connecting block is provided with the side body recess, the bottom integration of side body recess is provided with the ponding groove, the side integration of the brick body is provided with the hole of permeating water, the side integration that the brick body lies in the hole of permeating water is provided with the intercommunication groove.
Preferably, the surface integration of the brick body is provided with three sets of recesses, and the recess is trapezoidal form.
Preferably, the surfaces of the front end and the back end of the brick body are provided with three groups of grooves, and the water guide grooves penetrate through the grooves at the front end and the back end and are communicated with the grooves at the front end and the back end.
Preferably, the connecting blocks are arranged in a long strip shape, and the two groups of connecting blocks are matched with each other.
Preferably, the side body grooves are trapezoidal, and the water collecting grooves penetrate through the side body grooves at the front end and the back end and are communicated with the side body grooves at the front end and the back end.
Preferably, the holes of permeating water are provided with six groups, and are respectively positioned at two ends of the side surface of the brick body.
Preferably, the six groups of water permeable holes are respectively arranged on the side surface of the water guide groove, and the water permeable holes are communicated with the water guide groove.
Preferably, the communicating groove is rectangular, and the communicating groove penetrates through the side wall of the water permeable hole and is communicated with the water permeable hole. Compared with the prior art, the beneficial effects of the utility model are as follows:
(1) the municipal road water permeable brick can be installed by paving brick bodies on the front side and the back side, the side surfaces of the brick bodies are butted through the connecting blocks, so that the brick bodies are connected into a whole, three groups of grooves are arranged on the surfaces of the front end and the back end of the brick bodies, the water guide grooves penetrate through the grooves of the front end and the back end and are communicated with the grooves of the front end and the back end, the brick bodies can be combined in the front side and the back side, the same effect is achieved after the brick bodies are combined integrally, the three groups of grooves are integrally arranged on the surfaces of the brick bodies, the grooves are trapezoidal, the trapezoidal grooves can smoothly guide rainwater downwards in an inclined mode when raining, the rainwater is guided downwards through the water guide grooves to the ground, the surface water accumulation is avoided, when the water guide grooves of a single brick body are blocked, the water guide holes can be communicated with the water guide grooves through the water permeable holes, the water guide, connect to become whole, carry out hydrophobic work jointly, the intercommunication groove is the rectangle setting, and the intercommunication groove runs through the lateral wall in the hole of permeating water and is linked together with the hole of permeating water for the water of dredging from the hole of permeating water can dredge through the intercommunication groove is whole, avoids single hole of permeating water to block up, causes hydrophobic work stagnation.
(2) Secondly, through setting up the positive and negative brick body of laying, dock the side of the brick body through the connecting block, make to connect between the brick body and form wholly, can effectively eliminate the joint gap between the brick body, store up the rainwater in avoiding the gap between the brick body, be trapezoidal form through setting up the side recess, and the ponding groove runs through the side recess at positive and negative both ends, be linked together with the side recess at positive and negative both ends, the side recess that is trapezoidal form can be when raining, the slope dredges the rainwater downwards smoothly, through ponding groove leading-in ground downwards, avoid ponding in the gap between the brick body, avoid the pedestrian to step on the brick body of perk, the clothes are wetted by the water that splashes in the gap, make more humanized.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic front structural view of the present invention.
Fig. 3 is a schematic view of the assembly structure of the present invention.
In the figure: 1-brick body; 2-a groove; 3, connecting blocks; 4-water permeable holes; 5-a communicating groove; 201-a water chute; 301-side body groove; 302-water collecting tank.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention.
Example (b):
as shown in figures 1-3;
the embodiment provides a town road brick that permeates water, including the brick body 1, recess 2, connecting block 3, permeate water hole 4 and intercommunication groove 5, the integration of the surface of the brick body 1 is provided with recess 2, the bottom integration of recess 2 is provided with guiding gutter 201, both ends integration is provided with connecting block 3 about the brick body 1, the integration of the surface of connecting block 3 is provided with side body recess 301, the bottom integration of side body recess 301 is provided with ponding groove 302, the side integration of the brick body 1 is provided with the hole 4 of permeating water, the side integration that the brick body 1 is located the hole 4 of permeating water is provided with intercommunication groove 5.
Further, the integration of the surface of the brick body 1 is provided with three groups of grooves 2, and the groove 2 is trapezoidal, and the groove 2 that is trapezoidal can dredge the rainwater downwards smoothly when raining, and the surface ponding is avoided to leading-in ground downwards through guiding gutter 201.
Further, the positive and negative both ends surface of the brick body 1 all is provided with three group's recesses 2, and the guiding gutter 201 runs through the recess 2 at positive and negative both ends, is linked together with the recess 2 at positive and negative both ends, can carry out positive and negative combination at the brick body 1, has the same effect after whole combination.
Further, connecting block 3 is rectangular form setting, and agrees with between two sets of connecting blocks 3 mutually, through positive and negative brick body 1, docks through connecting block 3 for it is whole to connect the formation between the brick body 1.
Further, side body recess 301 is trapezoidal form, and ponding groove 302 runs through the side body recess 301 at positive and negative both ends, is linked together with the side body recess 301 at positive and negative both ends, and the side body recess 301 that is trapezoidal form can be when raining, and the slope is dredged the rainwater downwards smoothly, through ponding groove 302 leading-in ground downwards, avoids ponding in the gap between the brick body 1, avoids the pedestrian to step on the brick body 1 of perk, is drenched the clothes by the water of splashing in the gap.
Furthermore, the holes 4 of permeating water are provided with six groups, and are respectively positioned at two ends of the side surface of the brick body 1.
Further, six groups of holes 4 of permeating water set up respectively in the side of guiding gutter 201, and the hole 4 of permeating water is linked together with guiding gutter 201, and guiding gutter 201 when single brick 1 is blockked up, when leading to the drainage unblocked, can communicate with guiding gutter 201 through hole 4 of permeating water, dredge 1 ponding of adjacent brick, and brick 1 on the whole road forms the area net simultaneously, connects into whole, carries out hydrophobic work jointly.
Further, intercommunication groove 5 is the rectangle setting, and intercommunication groove 5 runs through the lateral wall in hole 4 of permeating water and is linked together with hole 4 of permeating water for can dredge through intercommunication groove 5 is whole from the water that 4 of permeating water dredged, avoids single hole 4 of permeating water to block up, causes hydrophobic work stagnation.
The working principle is as follows:
when the municipal road water permeable brick provided by the utility model is used, the brick body 1 is paved positively and negatively, the side surfaces of the brick body 1 are butted through the connecting block 3, so that the brick body 1 is connected into a whole, three groups of grooves 2 are arranged on the surfaces of the positive and negative ends of the brick body 1, the water guide grooves 201 penetrate through the grooves 2 of the positive and negative ends and are communicated with the grooves 2 of the positive and negative ends, the positive and negative combination can be carried out on the brick body 1, the same effect can be achieved after the whole combination, the three groups of grooves 2 are integrally arranged on the surface of the brick body 1, the grooves 2 are in a ladder shape, the ladder-shaped grooves 2 can smoothly drain rainwater downwards in an inclined mode when raining, the rainwater is guided downwards through the water guide grooves 201 to the ground, the road surface is prevented from being accumulated, when the water guide grooves 201 of a single brick body 1 are blocked, and the drainage is not smooth, the water guide can be communicated with the water guide grooves 201, meanwhile, the brick bodies 1 on the whole road form an area network which is connected into a whole to carry out drainage work together, the communicating groove 5 is arranged in a rectangular shape, and the communicating groove 5 penetrates through the side wall of the water permeable hole 4 and is communicated with the water permeable hole 4, so that water drained from the water permeable hole 4 can be drained integrally through the communicating groove 5, and the blockage of the single water permeable hole 4 is avoided, and the drainage work is stopped;
through setting up positive and negative brick body 1 of laying, dock the side of the brick body 1 through connecting block 3, make to connect between the brick body 1 and form wholly, can effectively eliminate the connecting gap between the brick body 1, store up the rainwater in avoiding the gap between the brick body 1, be trapezoidal form through setting up side body recess 301, and ponding groove 302 runs through the side body recess 301 at positive and negative both ends, be linked together with the side body recess 301 at positive and negative both ends, the side body recess 301 that is trapezoidal form can be when raining, the slope dredges the rainwater downwards smoothly, through ponding groove 302 leading-in ground downwards, avoid ponding in the gap between the brick body 1, avoid the pedestrian to step on the brick body 1 of perk, the clothes are drenched by the water that splashes in the gap, make more humanized.
The above is only the preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, without departing from the concept of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent.
Claims (8)
1. The utility model provides a town road brick that permeates water, includes the brick body (1), recess (2), connecting block (3), permeates water hole (4) and intercommunication groove (5), its characterized in that, the surface integration of the brick body (1) is provided with recess (2), the bottom integration of recess (2) is provided with guiding gutter (201), both ends integration is provided with connecting block (3) about the brick body (1), the surface integration of connecting block (3) is provided with side body recess (301), the bottom integration of side body recess (301) is provided with ponding groove (302), the side integration of the brick body (1) is provided with hole (4) of permeating water, the side integration that the brick body (1) is located hole (4) of permeating water is provided with intercommunication groove (5).
2. The municipal road water permeable brick according to claim 1, wherein three sets of grooves (2) are integrally formed on the surface of the brick body (1), and the grooves (2) are trapezoidal.
3. The municipal road water permeable brick according to claim 1, wherein the brick body (1) is provided with three sets of grooves (2) on the front and back surfaces, and the water guide grooves (201) penetrate through the grooves (2) on the front and back surfaces and are communicated with the grooves (2) on the front and back surfaces.
4. The municipal road water permeable brick according to claim 1, wherein the connecting blocks (3) are arranged in an elongated shape, and two groups of connecting blocks (3) are engaged with each other.
5. The municipal road water permeable brick according to claim 1, wherein the side body grooves (301) are trapezoidal, and the water collecting grooves (302) penetrate through the side body grooves (301) at the front and back ends and are communicated with the side body grooves (301) at the front and back ends.
6. The municipal road water permeable brick according to claim 1, wherein the water permeable holes (4) are arranged in six groups and located at two ends of the side surface of the brick body (1).
7. The municipal road water permeable brick according to claim 1 or 6, wherein the six groups of water permeable holes (4) are respectively arranged on the side surface of the water chute (201), and the water permeable holes (4) are communicated with the water chute (201).
8. The municipal road water permeable brick according to claim 1, wherein the communication groove (5) is rectangular and the communication groove (5) communicates with the water permeable holes (4) through the side walls of the water permeable holes (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921572255.XU CN211006220U (en) | 2019-09-20 | 2019-09-20 | Town road brick that permeates water |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921572255.XU CN211006220U (en) | 2019-09-20 | 2019-09-20 | Town road brick that permeates water |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211006220U true CN211006220U (en) | 2020-07-14 |
Family
ID=71497339
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921572255.XU Expired - Fee Related CN211006220U (en) | 2019-09-20 | 2019-09-20 | Town road brick that permeates water |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211006220U (en) |
-
2019
- 2019-09-20 CN CN201921572255.XU patent/CN211006220U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211006220U (en) | Town road brick that permeates water | |
CN205223783U (en) | But hole regenerative permeable ground surface structure | |
CN210151514U (en) | Drainage floor tile | |
CN213476519U (en) | Sidewalk rainwater drainage system | |
CN211689725U (en) | Landscape drainage road surface | |
CN211621048U (en) | Floor tile | |
CN211571261U (en) | Garden road structure | |
CN210737276U (en) | Antiskid type brick that permeates water convenient to firm installation | |
CN208136655U (en) | A kind of environmental protection brick applied to road surfacing | |
CN217922888U (en) | Concrete block made of recycled building wastes | |
CN219972837U (en) | Permeable pavement brick | |
CN210507010U (en) | Ponding-preventing structural brick of landscape corridor | |
CN214328351U (en) | Regenerated hybrid fiber concrete floor tile | |
CN211621047U (en) | Drainage paving brick | |
CN211734907U (en) | Gardens drainage pavior brick | |
CN213596730U (en) | Light energy-saving square hollow brick | |
CN213625053U (en) | Drainage structure for roadbed and pavement | |
CN214882707U (en) | Floor tile easy to drain water | |
CN210797159U (en) | Water permeable brick | |
CN210316237U (en) | Flat tile convenient for draining accumulated water | |
CN216809428U (en) | Small-range accumulated water treatment structure for concrete pavement | |
CN220685670U (en) | Terrace structure permeates water | |
CN211848715U (en) | Vertical curb | |
CN214497775U (en) | Novel oval groove drainage canal | |
CN213896596U (en) | Structural water permeable brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200714 Termination date: 20210920 |
|
CF01 | Termination of patent right due to non-payment of annual fee |