CN211004412U - Stacker is with dismouting sky rail guide pulley frock - Google Patents
Stacker is with dismouting sky rail guide pulley frock Download PDFInfo
- Publication number
- CN211004412U CN211004412U CN201922067265.4U CN201922067265U CN211004412U CN 211004412 U CN211004412 U CN 211004412U CN 201922067265 U CN201922067265 U CN 201922067265U CN 211004412 U CN211004412 U CN 211004412U
- Authority
- CN
- China
- Prior art keywords
- full
- stacker
- tooth bolt
- tooling
- rail guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forklifts And Lifting Vehicles (AREA)
Abstract
The utility model relates to the technical field of stacker auxiliary equipment, in particular to a detachable top rail guide wheel tool for a stacker, which comprises a tool support plate used as a support and a full-tooth bolt used for fixing; the two tool supporting plates are arranged in a bilateral symmetry mode, and the two full-tooth bolts are arranged in a bilateral symmetry mode; the full-tooth bolt is installed on the tool supporting plate. The utility model discloses install the frock backup pad on the entablature, it is fixed to utilize the bolt to screw up after aligning first through-hole and second through-hole respectively, pass the screw hole with full tooth bolt and install in the frock backup pad, and adjust the position of full tooth bolt, make full tooth bolt can withstand the both sides of sky rail, screw up the nut again and install the both sides in the screw hole and fix full tooth bolt, can prevent that the staff from taking place the accident and toppling over at the entablature of changing sky rail guide pulley in-process stacker, improve maintenance security simultaneously, promote work efficiency and reduce cost.
Description
Technical Field
The utility model relates to a stacker auxiliary assembly technical field specifically is a dismouting sky rail guide pulley frock for stacker.
Background
The stacker is a special device which adopts a fork or a string rod as a fetching device and grabs, carries and stacks goods in warehouses, workshops and the like or picks and places unit goods from a high-rise goods shelf, and is very important hoisting and transporting equipment.
However, in the process of replacing the head rail guide wheel of the existing stacker, the upper cross beam may be accidentally toppled, goods on a goods shelf are damaged, workers are injured, and the workers fall off, so that safety accidents, personnel injuries and economic losses are caused.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a dismouting sky rail guide pulley frock for stacker installs this frock on the crossbeam of stacker, and the staff of being convenient for can safe convenient change sky rail guide pulley, prevents unexpected the emergence, improves work efficiency, reduce cost to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a tooling for disassembling and assembling a top rail guide wheel for a stacking machine comprises a tooling support plate used as a support and a full-tooth bolt used for fixing;
the two tool supporting plates are arranged in a bilateral symmetry mode, and the two full-tooth bolts are arranged in a bilateral symmetry mode;
the full-tooth bolt is installed on the tool supporting plate.
As a further aspect of the present invention: two first through holes are formed in the tool supporting plate, and the aperture of each first through hole is not smaller than that of the corresponding second through hole formed in the upper cross beam.
As a further aspect of the present invention: the hole center distance between the first through holes is the same as the hole center distance between the second through holes.
As a further aspect of the present invention: the top end of the tool supporting plate is provided with a screw hole, and the full-tooth bolt penetrates through the screw hole to be installed and fixed.
As a further aspect of the present invention: two nuts are installed on the full-tooth bolt in a threaded connection mode, and the two nuts are installed on the left side and the right side of the threaded hole respectively.
As a further aspect of the present invention: the top end of the full-tooth bolt is propped against the head rail of the upper cross beam, and the full-tooth bolt is positioned above the head rail guide wheel.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the tooling for detaching the top rail guide wheel for the stacker can prevent an upper cross beam of the stacker from accidentally toppling over when workers replace the top rail guide wheel, and meanwhile, the maintenance safety is improved, the working efficiency is improved, and the cost is reduced;
2. during installation, a tool supporting plate is installed on the upper cross beam, the first through hole and the second through hole are respectively aligned and then are screwed and fixed by using bolts, the full-tooth bolt penetrates through the screw hole and is installed on the tool supporting plate, the position of the full-tooth bolt is adjusted, the full-tooth bolt can prop against two sides of the top rail, and nuts are screwed and installed on two sides of the screw hole to fix the full-tooth bolt;
3. when the movable roof rail guide wheel is dismounted, the upper beam is pushed to the top side by adjusting the length of the full-tooth bolt, so that the movable roof rail cannot block the movable roof rail guide wheel on the other side, and the movable roof rail guide wheel is convenient to dismount.
Drawings
In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the drawings that are needed in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention.
Fig. 1 is a schematic structural diagram of a tooling for disassembling and assembling a head rail guide wheel for a stacker.
Fig. 2 is a schematic structural view of a head sheave guide rail.
Fig. 3 is a schematic structural diagram of the stacker after the tooling for disassembling and assembling the head sheave guide wheel and the head sheave guide rail are installed.
Fig. 4 is a schematic structural view of the upper cross beam after being inclined.
Fig. 5 is a schematic structural diagram of what is in the tooling for disassembling and assembling the head guide wheel for the stacker.
Fig. 6 is a structural schematic diagram of the disassembled head sheave guide rails on two sides.
In the figure: 1-a tool support plate, 2-a first through hole, 3-a screw hole, 4-a full-tooth bolt, 5-a nut, 6-an upper cross beam, 7-a second through hole, 8-a head rail and 9-a head rail guide wheel.
Detailed Description
In order to make the technical problem, technical solution and advantageous effects to be solved by the present invention more clearly understood, the following description is given in conjunction with the accompanying drawings and embodiments to illustrate the present invention in further detail. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
In the description of the present invention, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1
Referring to fig. 1 to 3, in an embodiment of the present invention, a tooling for assembling and disassembling a head rail guide wheel for a stacker includes a tooling support plate 1 for supporting and a full-tooth bolt 4 for fixing; the two tooling support plates 1 are arranged in a bilateral symmetry mode, and the two full-tooth bolts 4 are arranged in a bilateral symmetry mode; the full-tooth bolt 4 is installed on the tool supporting plate 1.
Furthermore, two first through holes 2 are formed in the tool supporting plate 1, and the aperture of each first through hole 2 is not smaller than that of a second through hole 7 formed in the upper cross beam 6.
Specifically, the hole center distance between the first through holes 2 is the same as the hole center distance between the second through holes 7.
The tool supporting plate 1 is installed on the upper cross beam 6, and the first through hole 2 and the second through hole 7 are aligned and then are screwed by bolts.
Further, a threaded hole 3 is formed in the top end of the tool supporting plate 1, and the full-tooth bolt 4 penetrates through the threaded hole 3 to be installed and fixed.
Specifically, two nuts 5 are installed on the full-tooth bolt 4 in a threaded connection mode, and the two nuts 5 are installed on the left side and the right side of the threaded hole 3 respectively.
Specifically, the top end of the all-tooth bolt 4 is abutted against a head rail 8 of the upper cross beam 6, and the all-tooth bolt 4 is positioned above a head rail guide wheel 9.
The full-tooth bolt 4 penetrates through the threaded hole 3 to be installed on the tool supporting plate 1, the position of the full-tooth bolt 4 is adjusted, the full-tooth bolt 4 can be abutted against the two sides of the overhead rail 8, and the nut 5 is screwed up and installed on the two sides of the threaded hole 3 to fix the full-tooth bolt 4.
As shown in fig. 4 to 6, during dismantling, after the head rail guide wheel 9 on one side is dismantled, the upper cross beam 6 is pushed to the top side by adjusting the length of the full-tooth bolt 4, so that the head rail 8 cannot block the head rail guide wheel 9 on the other side, and the head rail guide wheel 9 is convenient to dismantle; the operation can be reversed when installing a new sky-rail guide wheel 9, the sky-rail guide wheel 9 on one side is installed firstly, the sky-rail guide wheel 9 on the other side is installed after the upper cross beam 6 is straightened, and finally the tool is disassembled.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.
Claims (6)
1. A tooling for disassembling and assembling a top track guide wheel for a stacker is characterized by comprising a tooling support plate (1) used as a support and a full-tooth bolt (4) used for fixing;
the two tooling support plates (1) are arranged in a bilateral symmetry mode, and the two full-tooth bolts (4) are arranged in a bilateral symmetry mode;
the full-tooth bolt (4) is installed on the tool supporting plate (1).
2. The tooling for assembling and disassembling the head rail guide wheel for the stacker according to claim 1, wherein the tooling support plate (1) is provided with two first through holes (2), and the aperture of the first through hole (2) is not smaller than that of the second through hole (7) provided on the upper beam (6).
3. The tooling for disassembling and assembling the head sheave of claim 2, wherein the center distance between the first through holes (2) is the same as the center distance between the second through holes (7).
4. The tooling for assembling and disassembling the top guide wheel for the stacker according to claim 1, wherein a threaded hole (3) is formed in the top end of the tooling support plate (1), and the full-tooth bolt (4) passes through the threaded hole (3) to be installed and fixed.
5. The tooling for assembling and disassembling the head rail guide wheel for the stacker according to claim 4, wherein two nuts (5) are installed on the full-thread bolt (4) in a threaded manner, and the two nuts (5) are respectively installed on the left side and the right side of the threaded hole (3).
6. The tooling for assembling and disassembling the head rail guide wheel for the stacker crane according to claim 2, wherein the top end of the all-tooth bolt (4) is abutted against the head rail (8) of the upper cross beam (6), and the all-tooth bolt (4) is positioned above the head rail guide wheel (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922067265.4U CN211004412U (en) | 2019-11-26 | 2019-11-26 | Stacker is with dismouting sky rail guide pulley frock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922067265.4U CN211004412U (en) | 2019-11-26 | 2019-11-26 | Stacker is with dismouting sky rail guide pulley frock |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211004412U true CN211004412U (en) | 2020-07-14 |
Family
ID=71498435
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922067265.4U Expired - Fee Related CN211004412U (en) | 2019-11-26 | 2019-11-26 | Stacker is with dismouting sky rail guide pulley frock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211004412U (en) |
-
2019
- 2019-11-26 CN CN201922067265.4U patent/CN211004412U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110759232A (en) | Hoisting tool and hoisting method for lower support roller stepped plate of four-roller type rolling mill | |
CN211004412U (en) | Stacker is with dismouting sky rail guide pulley frock | |
CN2818654Y (en) | Self-walking straight-arm overhead operating platform | |
CN204848138U (en) | Stacker close -coupled plays to rise leading wheel | |
CN216972992U (en) | Railway line component replacement guiding and positioning device | |
CN202214139U (en) | Unhooking prevention device | |
CN201215028Y (en) | Special hanger for hoisting upper casing of turbine set | |
CN210239674U (en) | Dismantled and assembled excavation rack | |
CN113336136A (en) | Dismounting and carrying device for lifting hook protector of hydropower station bridge crane and operation method of dismounting and carrying device | |
CN209974210U (en) | Chain guide rail type hydraulic lifting platform | |
CN202671575U (en) | Converter lifting in-place protection pad device | |
CN215048012U (en) | Detachable movable clamp for large I-shaped structural part | |
CN214870052U (en) | Clamping tool for machining end beam of crane | |
CN109704187B (en) | Detachable and adjustable lifting device for steel rib column | |
CN221093368U (en) | Device for hoisting cross beam of rolling mill | |
CN218325793U (en) | Guide rail anti-overturning structure | |
CN219132159U (en) | SBB series normally closed safety brake cylinder dismounting and separating device | |
CN215854673U (en) | Lifting machine for disassembling scraped car | |
CN221093646U (en) | Extensible lifting platform | |
CN215516428U (en) | Lifting device for quick-wear part of impact crusher | |
CN218507362U (en) | Lightweight general energy storage box hoisting tool | |
CN214213591U (en) | Lead screw flange separator | |
LU503569B1 (en) | Working platform and operation method thereof | |
CN220814845U (en) | Elevator well lifting platform | |
CN220334599U (en) | Assembly base of light lorry-mounted crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200714 Termination date: 20201126 |