upper frame
platform
pulley
heavy hammer
mine rescue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921551865.1U
Other languages
Chinese (zh)
Inventor
校丁亮
李林林
辛涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN HEAVY EQUIPMENT CHENGHE COAL MINE MACHINERYCO Ltd
Original Assignee
XI'AN HEAVY EQUIPMENT CHENGHE COAL MINE MACHINERYCO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI'AN HEAVY EQUIPMENT CHENGHE COAL MINE MACHINERYCO Ltd filed Critical XI'AN HEAVY EQUIPMENT CHENGHE COAL MINE MACHINERYCO Ltd
Priority to CN201921551865.1U priority Critical patent/CN210992775U/en
Application granted granted Critical
Publication of CN210992775U publication Critical patent/CN210992775U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a body-building force detector for mine rescue teams, which comprises a main body support and an action mechanism, wherein the main body support comprises an upper frame, a support leg I, a platform, a pulley placing frame, a slide rail vertically and fixedly arranged between the bottom of the upper frame and the top of the platform, and a support leg II arranged at the bottom of the platform and corresponding to the slide rail, the upper frame is of a box-type structure with an opening at the lower part, and the platform is a quadrilateral flat plate; the actuating mechanism comprises a heavy hammer, a cushion pad arranged between the heavy hammer and the platform, a tension rope for drawing the heavy hammer and a pulley block arranged on a pulley yoke, wherein the tension rope comprises a drawing end and a free end, two holes are formed in the upper portion of the upper frame and the position corresponding to the position of the heavy hammer, the pulley yoke is composed of two pentagonal steel plates, and the pulley block is fixedly arranged in the middle of the steel plates. The utility model is suitable for an outdoor abominable training environment, the symmetry sets up two sets of actuating mechanism simultaneously, satisfies mine rescue team high strength, high frequency training, satisfies the requirement that two people used simultaneously.

Description

Mine rescue team is with body-building power detection ware
Technical Field
The utility model belongs to the technical field of the body-building apparatus, concretely relates to mine rescue team examines strength ware with body-building.
Background
In the mine rescue team daily training process, body-building apparatus will satisfy outdoor adverse circumstances, high strength, high frequency and many people simultaneous training, but domestic body-building apparatus is mainly civilian, many uses in indoor body-building, and body-building apparatus only can supply alone to use once, the use figure of apparatus has been increased, because the restriction of mine rescue team's the adverse circumstances of work, the apparatus can not set up too much again, produce the contradiction between training requirement and environmental constraint, can't satisfy outdoor high strength training of mine rescue team and match, consequently need one kind can satisfy the training match requirement and can adapt to adverse circumstances's body-building apparatus urgently.
Disclosure of Invention
The utility model provides a mine rescue team uses body-building power examine ware can realize that two people use simultaneously, satisfies mine rescue team high strength, high frequency training.
The technical scheme of the utility model is that: a body-building force detector for mine rescue teams comprises a main body support and an action mechanism, wherein the main body support comprises an upper frame, supporting legs I arranged at the bottoms of four corners of the upper frame, a platform fixed on the supporting legs I in parallel with the upper frame, a pulley frame arranged in the middle of the upper part of the upper frame, sliding rails vertically and fixedly arranged between the bottom of the upper frame and the top of the platform, and supporting legs II arranged at the bottom of the platform and corresponding to the sliding rails, wherein the upper frame is of a box-type structure with an opening at the lower part, and the platform is a quadrilateral flat plate; the actuating mechanism comprises a heavy hammer, a buffer pad arranged between the heavy hammer and the platform, a tension rope for drawing the heavy hammer, and a pulley block arranged on a pulley yoke, wherein the heavy hammer is arranged on a slide rail, the buffer pad is fixed on the upper part of the platform, the tension rope comprises a traction end and a free end, two holes are formed in the upper part of the upper frame and the corresponding position of the heavy hammer, the traction end of the tension rope bypasses the pulley block to pass through the holes to be fixedly connected with the heavy hammer, the free end of the tension rope is drawn to draw the heavy hammer to move up and down along the slide rail, the pulley yoke is composed of two pentagonal steel plates, and the pulley block is fixedly arranged in the.
The scheme is further that the slide rail comprises two equal angle steels which are parallel to each other, the equal angle steels are composed of two strip steel materials which are perpendicular to each other, the joints of the equal angle steels are arranged oppositely, two sliding grooves are formed in the positions, corresponding to the slide rail, of the heavy hammer, and the equal angle steels are arranged in the sliding grooves, so that the heavy hammer moves up and down along the slide rail.
According to the scheme, the sliding rail is composed of two vertical rods which are parallel to each other, sliding grooves are formed in opposite positions of the vertical rods and extend to the axial direction of the whole vertical rod, sliding blocks are arranged at positions, corresponding to the sliding grooves, of the heavy hammer, the sliding blocks move in the sliding grooves, and the heavy hammer can move up and down in the sliding rail.
The scheme is further, the number of the slide rails is two, the slide rails are symmetrically arranged at the bottom of the upper frame, and two persons can train and compete at the same time.
The scheme is further that the number of the pulley blocks is two, and the pulley blocks are symmetrically arranged on the pulley frame.
In a further scheme, the pulley block at least comprises two pulleys, and the traction end of the tension rope sequentially rounds the pulleys to traction the heavy hammer.
The scheme is further that the free end of the pull rope is provided with a pull ring, and the pull ring is arranged through a rope inserting method, so that the pull rope is more stable and firm.
In the scheme, a buffer pad is also arranged in the upper frame to buffer the impact force of the heavy punch on the upper frame.
The scheme is further that the buffer pad is made of rubber or polyurethane materials, and the purposes of buffering and noise reduction are achieved.
In a further scheme, the tensile rope is a nylon rope.
The utility model has the advantages that: the utility model is used for body-building of mine rescue team and match utilize mining steel preparation main part mechanism, and not only fine play supports the effect of actuating mechanism, and is durable, can also be applicable to outdoor abominable training environment, utilizes weight-pulley direction principle, and the symmetry sets up two sets of actuating mechanisms simultaneously, satisfies mine rescue team high strength, high frequency training, the requirement that two people used simultaneously.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
wherein: 1. landing leg I, 2, platform, 3, landing leg II, 4, blotter, 5, weight, 6, slide rail, 7, put on the shelf, 8, pulley yoke, 9, pulley, 10, tensile rope.
Detailed Description
The present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which a person skilled in the art can, without any creative effort, fully implement the present invention.
The utility model discloses a concrete implementation mode is: as shown in fig. 1 and 2, the device comprises a main body support and an actuating mechanism, wherein the main body support comprises an upper frame 7, supporting legs I1 arranged at the bottoms of four corners of the upper frame 7, a platform 2 fixed on the supporting legs I1 in parallel with the upper frame 7, a pulley frame 8 arranged in the middle of the upper part of the upper frame 7, sliding rails 6 vertically and fixedly arranged between the bottom of the upper frame 7 and the upper part of the platform 2, and supporting legs II 3 arranged at the bottom of the platform 2 and corresponding to the sliding rails 6, wherein the upper frame 7 is of a box-type structure with an opening at the lower part, and the platform 2 is a quadrilateral; the actuating mechanism comprises a heavy hammer 5, a buffer pad 4 arranged between the heavy hammer 5 and the platform 2, a tension rope 10 for drawing the heavy hammer 5, and a pulley block arranged on a pulley frame 8, wherein the heavy hammer 5 is arranged on a slide rail 6, the buffer pad 4 is fixed at the bottom of the heavy hammer 5 to play a buffering role and prevent impact force from damaging the platform 2, the tension rope 10 comprises a drawing end and a free end, two holes are formed in the corresponding positions of the upper part of the upper frame 7 and the position of the heavy hammer 5, the drawing end of the tension rope 10 bypasses the pulley block to penetrate through the holes to be fixedly connected with the heavy hammer 5, the free end of the tension rope 10 is drawn to draw the heavy hammer 5 to move up and down along the slide rail 6, the support leg II 3 prevents the platform 2 from deforming under the action of gravity of the heavy hammer 5, the pulley frame 8 is composed of two pentagonal.
Preferably, the slide rail 6 is composed of two parallel equal angle steels, the equal angle steels are composed of two long steel bars which are perpendicular to each other, the connection positions are arranged oppositely, two sliding grooves are arranged at the corresponding positions of the heavy hammer 5 and the slide rail 6, and the equal angle steels are arranged in the sliding grooves, so that the heavy hammer 5 moves up and down along the slide rail 6.
Preferably, the slide rail 6 is composed of two vertical rods parallel to each other, the opposite positions of the vertical rods are provided with sliding grooves, the sliding grooves extend to the axial direction of the whole vertical rod, the positions of the heavy hammer 5 corresponding to the sliding grooves are provided with sliding blocks, the sliding blocks move in the sliding grooves, and the heavy hammer 5 moves up and down in the slide rail 6.
Preferably, the number of the slide rails 6 is two, and the slide rails are symmetrically arranged at the bottom of the upper frame 7, so that two persons can train and compete at the same time.
Preferably, the number of the pulley blocks is two, and the pulley blocks are symmetrically arranged on the pulley frame 8.
Preferably, the pulley block at least comprises two pulleys 9, and the traction end of the tension rope 10 sequentially passes around the pulleys 9 to draw the heavy hammer 5.
Preferably, the free end of the tensile cord 10 is provided with a pull ring.
Preferably, the pull ring is arranged through a rope inserting method, so that the pull ring is more stable and firm.
Preferably, a buffer pad 4 is also arranged inside the upper frame 7 to buffer the impact force of the weight 5 on the upper frame 7.
Preferably, the buffer pad 4 is made of rubber or polyurethane material, so as to achieve the purposes of buffering and reducing noise.
Preferably, the tensile cord 10 is a nylon cord.
The utility model has the advantages that the whole frame, namely the upper frame, the supporting leg I, the supporting leg II and the platform are made of mining steel, is suitable for outdoor severe training environment, is firm and durable, meets the requirements of high strength and high frequency training of mine rescue teams, utilizes the weight-pulley guiding principle, simultaneously and symmetrically sets two groups of action mechanisms, can meet the conditions of two-person simultaneous training or competition, sets a buffer cushion to achieve the purposes of buffering and noise reduction, sets the weight when the platform is not used, sets the supporting leg II to reduce the influence of gravity on the platform, the tension rope is made of nylon ropes, the joint part is connected into a pull ring by a rope inserting method, is firm and reliable, the pulley is low-carbon steel, is provided with a built-in bearing to reduce friction, after the weight is lifted by the tension rope through the pulley during use, falls down by the action of gravity, and performs vertical reciprocating motion to achieve the, the mechanism with two groups of actions manufactured symmetrically can realize the simultaneous training of two persons.
While the preferred embodiments of the present invention have been described, it is to be understood that the invention is not limited to the precise embodiments described, and that equipment and structures not described in detail are understood to be practiced as commonly known in the art; any simple modification, equivalent change and modification made to the above embodiments according to the technical spirit of the present invention will still fall within the protection scope of the technical solution of the present invention by those skilled in the art without departing from the technical solution of the present invention.

Claims (10)

1. A body-building force detector for mine rescue teams is characterized by comprising a main body support and an action mechanism, wherein the main body support comprises an upper frame, supporting legs I, a platform, a pulley frame, a sliding rail and supporting legs II, the supporting legs I are arranged at the bottoms of four corners of the upper frame, the platform is fixed on the supporting legs I in parallel with the upper frame, the pulley frame is arranged in the middle of the upper portion of the upper frame, the sliding rail is vertically and fixedly arranged between the bottom of the upper frame and the top of the platform, the supporting legs II are arranged at the bottom of the platform and correspond to the sliding rail in position, the upper; the actuating mechanism comprises a heavy hammer, a buffer pad arranged between the heavy hammer and the platform, a tension rope for drawing the heavy hammer, and a pulley block arranged on a pulley yoke, wherein the heavy hammer is arranged on a slide rail, the buffer pad is fixed on the upper part of the platform, the tension rope comprises a traction end and a free end, two holes are formed in the upper part of the upper frame and the corresponding position of the heavy hammer, the traction end of the tension rope bypasses the pulley block to pass through the holes to be fixedly connected with the heavy hammer, the free end of the tension rope is drawn to draw the heavy hammer to move up and down along the slide rail, the pulley yoke is composed of two pentagonal steel plates, and the pulley block is fixedly arranged in the.
2. A mine rescue team body-building force detector as claimed in claim 1, wherein the slide rail is composed of two parallel equal angle steel, the equal angle steel is composed of two long steel bars perpendicular to each other, the connection point is opposite, two sliding grooves are provided at the position of the weight corresponding to the slide rail, the equal angle steel is placed in the sliding grooves, so that the weight can move up and down along the slide rail.
3. A mine rescue team body-building force detector as claimed in claim 1, wherein the slide rail is composed of two vertical rods parallel to each other, the vertical rods are provided with sliding grooves at opposite positions, the sliding grooves extend to the axial direction of the whole vertical rod, the weight is provided with sliding blocks at positions corresponding to the sliding grooves, the sliding blocks move in the sliding grooves, and the weight can move up and down in the slide rail.
4. A mine rescue team body-building force detector as claimed in claim 2 or 3, wherein the number of the slide rails is two, and the slide rails are symmetrically arranged at the bottom of the upper frame, so that two persons can train and compete at the same time.
5. The mine rescue team body-building force detector as claimed in claim 4, wherein the number of the pulley blocks is two, and the pulley blocks are symmetrically arranged on the pulley yoke.
6. The mine rescue team body-building force detector as claimed in claim 5, wherein the pulley block comprises at least two pulleys, and the traction end of the tension rope passes through the pulleys in sequence to draw the weight.
7. The mine rescue team body-building force detector as claimed in claim 1, wherein the free end of the tension rope is provided with a pull ring, and the pull ring is arranged through a rope inserting method, so that the mine rescue team body-building force detector is more stable and firm.
8. The mine rescue team body-building force detector as claimed in claim 1, wherein a cushion pad is also arranged inside the upper frame to buffer the impact force of the weight on the upper frame.
9. The mine rescue team body-building force detector as claimed in claim 8, wherein the cushion pad is made of rubber or polyurethane material to achieve the purposes of buffering and noise reduction.
10. The mine rescue team fitness force detector as claimed in claim 1, wherein the tension rope is a nylon rope.
CN201921551865.1U 2019-09-18 2019-09-18 Mine rescue team is with body-building power detection ware Active CN210992775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921551865.1U CN210992775U (en) 2019-09-18 2019-09-18 Mine rescue team is with body-building power detection ware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921551865.1U CN210992775U (en) 2019-09-18 2019-09-18 Mine rescue team is with body-building power detection ware

Publications (1)

Publication Number Publication Date
CN210992775U true CN210992775U (en) 2020-07-14

Family

ID=71466169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921551865.1U Active CN210992775U (en) 2019-09-18 2019-09-18 Mine rescue team is with body-building power detection ware

Country Status (1)

Country Link
CN (1) CN210992775U (en)

Similar Documents

Publication Publication Date Title
CN209809406U (en) A four limbs strength training chair for gymnasium
CN206138649U (en) Integrated device is tempered to sports person's arm thigh
CN210396204U (en) Horizontal safety protection net of overhanging outer frame for engineering site
CN208145354U (en) A kind of highly-safe workout trainer of arm strength
CN213100643U (en) Pulling force dorsal muscle training ware for sports training
CN108643539A (en) A kind of safety protection device for building construction
CN206631067U (en) One kind behaviour's force exerciser
CN210992775U (en) Mine rescue team is with body-building power detection ware
CN212522851U (en) A be convenient for adjust counter weight structure for fitness equipment
CN210457310U (en) High-efficient safe building material hoisting device
CN107694070A (en) A kind of free combat sandbag
CN207101780U (en) A kind of Multifunctional sports device
CN205460875U (en) Magnetic control coaster protection device for gymnastic training
CN212998291U (en) Basketball is thrown and is trained with arm strength trainer
CN209714176U (en) A kind of telecontrol equipment taken exercise for strength
CN206809618U (en) A kind of strength tempers special sports apparatus
CN203315676U (en) Upward expandor
CN208160891U (en) A kind of supine posture body building training device
CN206427955U (en) A kind of ground pile type double cable shift mechanism
CN205699268U (en) A kind of spiking training volleyball net frame
CN203315640U (en) Anti-resistance walking machine
CN206642326U (en) A kind of volleyball training blocker
CN208274889U (en) It is a kind of to promote the double of fitness and use fitness equipment
CN220928804U (en) Safety net for working aloft
CN215309953U (en) Multifunctional body-building double-bar rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant