CN210975463U - Auxiliary supporting structure for urban construction - Google Patents

Auxiliary supporting structure for urban construction Download PDF

Info

Publication number
CN210975463U
CN210975463U CN201921596406.5U CN201921596406U CN210975463U CN 210975463 U CN210975463 U CN 210975463U CN 201921596406 U CN201921596406 U CN 201921596406U CN 210975463 U CN210975463 U CN 210975463U
Authority
CN
China
Prior art keywords
inserted bar
template
establishing
pipe
urban construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921596406.5U
Other languages
Chinese (zh)
Inventor
李造林
吕锋伟
朱己戊
徐向羽
杨可龙
姚鹏飞
李冬
祝晓辉
席明星
常帅
李奇
候红京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Degang Construction Engineering Co ltd
Original Assignee
Luoyang Degang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Degang Construction Engineering Co ltd filed Critical Luoyang Degang Construction Engineering Co ltd
Priority to CN201921596406.5U priority Critical patent/CN210975463U/en
Application granted granted Critical
Publication of CN210975463U publication Critical patent/CN210975463U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a city is auxiliary stay structure for construction, including establishing template and inserted bar, establish one side of template and be provided with the inserted bar, the surface at inserted bar top is provided with connecting thread, and the inserted bar has the screwed pipe through connecting thread threaded connection, and the middle part fixedly connected with of screwed pipe surface compresses tightly the dish, compresses tightly the dish and is located the top of establishing the template, and the outer fixed surface of inserted bar lower part is connected with the pipe box. This auxiliary stay structure is used in urban construction, through the setting of inserted bar top connecting thread and screwed pipe, can highly adjust compressing tightly the dish to guarantee that the flexibility of vertical height is fixed, the simple and crude technical problem of structure of having overcome traditional technology, can compress tightly fixedly to the formwork of establishing of co-altitude not, the flexibility is high, therefore, the clothes hanger is strong in practicability, in addition, through the setting of backup pad and support down tube, good supporting role has been played the inserted bar and the formwork of establishing, the appearance of the race mould condition has greatly been reduced.

Description

Auxiliary supporting structure for urban construction
Technical Field
The utility model relates to a strutting arrangement technical field specifically is an auxiliary stay structure is used in urban construction.
Background
The urban construction is an important component of urban management, the urban construction is based on planning, the urban living environment is transformed through construction engineering, each material facility in the urban system is constructed, the urban construction content comprises the physical form of each material facility in the urban system, the urban construction is basic and staged work which creates good conditions for managing cities, the urban construction is special economic work which is obvious in process and periodicity, the cities are planned and built and put into operation and play functions, the service is provided, the good living environment is really created for the citizens, the normal life of the citizens is guaranteed, the urban economic social development is served, and therefore the urban construction is finally served for urban operation based on the urban planning.
In urban construction, there are a large amount of roads and the foundation bed course that face greatly and need the pouring concrete, traditional operation adopts the flitch usually, the wooden wedge, nail and bar formwork field assembly, select 3 ~ 4 points to adopt the mode that the sledge hammered into ground, knock into the flitch extension through spikes and lath and lean on at the wooden wedge edge, and knock into the flitch again and fix the flitch position on ground, this work progress needs a large amount of nails to go to fix a position the flitch position, construction process is simple and crude, construction speed is slow, easy the running die among the concrete pouring process, consequently, provide an auxiliary stay structure for the urban construction now.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a city is supplementary bearing structure for construction has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a city is construction and is used supplementary bearing structure, is including erecting template and inserted bar, one side of erecting the template is provided with the inserted bar, the surface at inserted bar top is provided with connecting thread, the inserted bar has the screwed pipe through connecting thread threaded connection, the middle part fixedly connected with of screwed pipe surface compresses tightly the dish, it is located the top of erecting the template to compress tightly the dish, the outer fixed surface of inserted bar lower part is connected with the pipe box.
Optionally, the outer surface of the inserted bar is connected with a nut in a threaded manner, and the nut is located above the threaded pipe.
Optionally, the outer diameter of the pipe sleeve is the same size as the outer diameter of the threaded pipe.
Optionally, a supporting plate is fixedly connected to one side of the pipe sleeve, and the lower surface of the supporting plate and the lower surface of the pipe sleeve are located on the same horizontal line.
Optionally, one side of the inserted link is fixedly connected with a supporting diagonal rod, and the supporting diagonal rod is fixedly connected with the supporting plate.
(III) advantageous effects
The utility model provides an auxiliary stay structure is used in urban construction possesses following beneficial effect:
1. this auxiliary stay structure is used in urban construction, through the setting of inserted bar top connecting thread and screwed pipe, can highly adjust compressing tightly the dish to guarantee that the flexibility of vertical height is fixed, the simple and crude technical problem of structure of having overcome traditional technology, can compress tightly fixedly to the formwork of establishing of co-altitude not, the flexibility is high, therefore, the clothes hanger is strong in practicability, in addition, through the setting of backup pad and support down tube, good supporting role has been played the inserted bar and the formwork of establishing, the appearance of the race mould condition has greatly been reduced.
2. This auxiliary stay structure is used in city construction has improved the atress ability of erecting the template for the construction speed of erecting the template, and the component can reuse, simple to operate, and circulated use is in other projects, has solved the technical problem that traditional technology scene equipment precision is low, overall stability is poor.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic view of the structure of the present invention.
In the figure: 1. erecting a template; 2. inserting a rod; 3. connecting threads; 4. a threaded pipe; 5. a compression disc; 6. pipe sleeve; 7. a nut; 8. a support plate; 9. and supporting the diagonal rods.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: the utility model provides a city is construction and is used supplementary bearing structure, including establishing template 1 and inserted bar 2, establish one side of template 1 and be provided with inserted bar 2, the surface at 2 tops of inserted bar is provided with connecting thread 3, inserted bar 2 has screwed pipe 4 through connecting thread 3 threaded connection, the surface threaded connection of inserted bar 2 has nut 7, nut 7 is located the top of screwed pipe 4, the middle part fixedly connected with pressure disk 5 of screwed pipe 4 surface, pressure disk 5 is located establishes the top of template 1, the fixed surface of 2 lower parts of inserted bar is connected with pipe box 6, the external diameter of pipe box 6 is the same with the external diameter size of screwed pipe 4, one side fixedly connected with backup pad 8 of pipe box 6, and the lower surface of backup pad 8 and the lower surface of pipe box 6 are located same horizontal line, one side fixedly connected with of inserted bar 2 supports down tube 9, support down tube 9 and backup pad 8 fixed connection.
The utility model discloses when using, according to propping up the concrete height of establishing template 1, rotate and compress tightly dish 5 and make it move on the vertical direction, adjust to suitable position after, install nut 7 in the top of 2 screwed pipes of inserted bar 4, at this moment, be fixed in one side of establishing template 1 with inserted bar 2 for lie in compress tightly one side of 4 screwed pipes and pipe box 6 of dish 5 below and prop up establish template 1 and hug closely can.
To sum up, this auxiliary stay structure is used in urban construction, through the setting of 2 top connecting thread 3 of inserted bar and screwed pipe 4, can adjust the height that compresses tightly dish 5, thereby guarantee the nimble fixed of vertical height, the simple and crude technical problem of structure of traditional technology has been overcome, can compress tightly fixedly to the formwork 1 of establishing of co-altitude not, the flexibility is high, therefore, the clothes hanger is strong in practicability, in addition, through backup pad 8 and the setting of supporting down tube 9, good supporting role has been played to inserted bar 2 and the formwork 1 of establishing, greatly reduced the appearance of the race mould condition, the atress ability of establishing formwork 1 has been improved, the construction speed of establishing formwork 1 has been accelerated, the component can reuse, easy to assemble, circulated use in other engineering, the technical problem of traditional technology on-the-site equipment precision low, the overall stability is poor is solved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a city construction is with supplementary bearing structure, includes to prop up and establishes template (1) and inserted bar (2), its characterized in that: prop up one side of establishing template (1) and be provided with inserted bar (2), the surface at inserted bar (2) top is provided with connecting thread (3), inserted bar (2) have screwed pipe (4) through connecting thread (3) threaded connection, the middle part fixedly connected with of screwed pipe (4) surface compresses tightly dish (5), it is located the top of establishing template (1) to compress tightly dish (5), the outer fixedly connected with pipe box (6) of inserted bar (2) lower part.
2. The auxiliary support structure for urban construction according to claim 1, wherein: the outer surface of the inserted bar (2) is in threaded connection with a nut (7), and the nut (7) is located above the threaded pipe (4).
3. The auxiliary support structure for urban construction according to claim 1, wherein: the outer diameter of the pipe sleeve (6) is the same as the outer diameter of the threaded pipe (4).
4. The auxiliary support structure for urban construction according to claim 1, wherein: one side of the pipe sleeve (6) is fixedly connected with a supporting plate (8), and the lower surface of the supporting plate (8) and the lower surface of the pipe sleeve (6) are located on the same horizontal line.
5. The auxiliary support structure for urban construction according to claim 1, wherein: one side fixedly connected with of inserted bar (2) supports down tube (9), support down tube (9) and backup pad (8) fixed connection.
CN201921596406.5U 2019-09-24 2019-09-24 Auxiliary supporting structure for urban construction Expired - Fee Related CN210975463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921596406.5U CN210975463U (en) 2019-09-24 2019-09-24 Auxiliary supporting structure for urban construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921596406.5U CN210975463U (en) 2019-09-24 2019-09-24 Auxiliary supporting structure for urban construction

Publications (1)

Publication Number Publication Date
CN210975463U true CN210975463U (en) 2020-07-10

Family

ID=71447277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921596406.5U Expired - Fee Related CN210975463U (en) 2019-09-24 2019-09-24 Auxiliary supporting structure for urban construction

Country Status (1)

Country Link
CN (1) CN210975463U (en)

Similar Documents

Publication Publication Date Title
CN203960895U (en) Anchor slab bolt assembly and tower foundation assembly
CN203021923U (en) Big cantilever bent cap steel truss construction platform
CN206360402U (en) Basement roof ruggedized construction
CN210975463U (en) Auxiliary supporting structure for urban construction
CN212270985U (en) Underground continuous wall foundation structure for soft soil foundation
CN210684727U (en) Construction safety supporting construction
CN201809971U (en) Floor formwork erecting system with large plate-span precast beam
CN207660094U (en) A kind of Quick assembling structure of house foundation
CN206267169U (en) A kind of split blade type prestressing force anchor slab
CN213296881U (en) Steel structure upright post for assembly type building
CN206368489U (en) A kind of firm levelling device of container movable plank house
CN206015685U (en) A kind of Collapsible Loess District deep basal pit diaphram wall inner support system
CN219653724U (en) Spliced foundation protection structure
CN204626419U (en) Large width foundation pit supporting construction
CN213867901U (en) Conveniently-installed underground pile for public facilities
CN214885436U (en) Building design builds template
CN216339656U (en) Prefabricated assembled retaining wall that can afforest
CN217949406U (en) External type shock insulation system of rubber resets
CN215483639U (en) Steel construction anti-wind device
CN214940256U (en) Connection structure between company mountain building and basement rock stratum
CN213233522U (en) Column base connecting device of steel column applied to underground mechanical garage
CN214740194U (en) Steel structure supporting beam for building
CN219653730U (en) Foundation pit retaining structure of building construction
CN216130132U (en) Inclined strut underground structure is thrown in soft soil foundation double-deck
CN221168130U (en) Steel construction building connecting foot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200710

Termination date: 20210924