CN206368489U - A kind of firm levelling device of container movable plank house - Google Patents

A kind of firm levelling device of container movable plank house Download PDF

Info

Publication number
CN206368489U
CN206368489U CN201621392808.XU CN201621392808U CN206368489U CN 206368489 U CN206368489 U CN 206368489U CN 201621392808 U CN201621392808 U CN 201621392808U CN 206368489 U CN206368489 U CN 206368489U
Authority
CN
China
Prior art keywords
bolt
movable plank
plank house
levelling device
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621392808.XU
Other languages
Chinese (zh)
Inventor
苏卫东
杨继美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Double Fame Technology Development Co Ltd
Original Assignee
Beijing Double Fame Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Double Fame Technology Development Co Ltd filed Critical Beijing Double Fame Technology Development Co Ltd
Priority to CN201621392808.XU priority Critical patent/CN206368489U/en
Application granted granted Critical
Publication of CN206368489U publication Critical patent/CN206368489U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model is related to a kind of firm levelling device of container movable plank house, the connector being connected including levelling device and with the column pin of movable plank house, the levelling device includes the first bolt, first bolt includes being arranged with the leveling nut coordinated with the fixing bolt screw thread on the pre-embedded bolt being fixedly installed in concrete layer and the fixing bolt being arranged at outside concrete layer, the fixing bolt;Connector includes fixed plate and is vertically connected at the connecting pole in the dead plate upper end face, and fixed plate, which is provided with, can run through the through hole of the fixing bolt, and the column pin of connecting pole and movable plank house is connected;Fixing nut is arranged with above fixing bolt up-regulation flush nut, fixing bolt is through the through hole in the fixed plate so that fixed plate is fixedly connected on the leveling nut and fixing nut.The firm levelling device causes movable plank house more firm, and can adjust movable plank house and be horizontal, and adjusts very simple.

Description

A kind of firm levelling device of container movable plank house
Technical field
The utility model is related to simple building building field, more specifically to a kind of the steady of container movable plank house Gu levelling device.
Background technology
Container movable plank house, is also container house, refers mainly to the material based on container slightly engineered and turn into The fenestrate house for having a door.Such container house is common in construction site and used as the dormitory of workman, and someone also regards rental housing Room is used, and also peasant household or farmer builds in the fields;Certainly it is using this is not limited only to, and the use of movable plank house is increasingly wide It is general.Its is sturdy and durable, builds conveniently, therefore, container house is also referred to as people's container.
However, there is more deficiency in current movable plank house, such as:Movable plank house most at present is without firm dress accordingly Put, be only located in ground, simple vertical columns pin is carried out with soil etc. and just may be used.It is well known that movable plank house is typically placed in Field or the less place of the signs of human habitation, its natural conditions are also corresponding more severe, especially northern, and the days such as strong wind often occur Gas, hence in so that the phenomenons such as rock, topple over, blow down occurs in movable plank house, sometimes staff needs temporarily to exist in strong wind Add on movable plank house and lean on timber etc. to blow down.In addition, in the industrial production, it is impossible to accomplish that the height of each column pin is homogeneous Cause, therefore often occur rugged situation, and generally adjusted in the prior art using column sole pad some wood chips etc. Section height, and because movable plank house most at present does not have special securing device, simply put on the ground, therefore, use one section The situation of the sinking of ground beside column pin occurs after time, therefore, it is desirable to multiple related users or staff Some angle for making a concerted effort to lift movable plank house is padded to its relatively low column pin progress.
Utility model content
In view of this, the purpose of this utility model there is provided a kind of firm levelling device of container movable plank house, Solve the deficiency mentioned in the prior art.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of firm levelling device of container movable plank house, including levelling device and be connected with the column pin of movable plank house Connector;
The levelling device includes the first bolt, and first bolt includes the pre-buried spiral shell being fixedly installed in concrete layer The tune coordinated with the fixing bolt screw thread is arranged with bolt and the fixing bolt being arranged at outside concrete layer, the fixing bolt Flush nut;
The connector includes fixed plate and is vertically connected in the connecting pole in the dead plate upper end face, the fixed plate to set There is the through hole that can run through the fixing bolt, the connecting pole is connected with the column pin of the movable plank house;
Fixing nut is arranged with above leveling nut on the fixing bolt, the fixing bolt passes through the fixation Through hole on plate is so that fixed plate is fixedly connected between the leveling nut and fixing nut.
Further, the pre-embedded bolt is made up of the first bolt portion and the second bolt portion, the first bolt portion and It is in 0~180 degree between two bolt portions.
Further, it is in 90~140 degree between the first bolt portion and the second bolt portion.
Further, the connecting pole is fixedly connected with the column pin of movable plank house by multiple second bolts.
Further, the column pin of the connecting pole and movable plank house is formed in one or welded.
Further, the fixed plate is fixedly connected with the connecting pole by the 3rd bolt.
Further, the fixed plate is formed in one or welded with the connecting pole.
Further, swash plate is fixed provided with right angle between the fixed plate and the connecting pole.
Further, the concrete layer is arranged in the pit on ground.
The utility model has the advantages that:
1. the firm levelling device of the container movable plank house in the utility model firmly can fix movable plank house, Blow, earthquake etc. can be fixed on the ground firmly, be greatly reduced its possibility rocked, and be not in tilt Or the phenomenon such as blow down.
2. the firm levelling device in the utility model is capable of the height of convenient adjusting post pin, i.e., can adjust activity Board house is horizontal, and adjusts very simple.
3. the levelling device and connector in the utility model are simple in construction, and cost is low, easy to implement, and connector Add and cause when withdrawing movable plank house, can only give up connector and without damaging the movable plank house bodies such as column pin;This reality There is extremely important application value with new its.
Brief description of the drawings
The utility model is described in further detail below according to accompanying drawing.
Fig. 1 is the structural representation of the movable plank house described in the utility model embodiment;
Fig. 2 is the structural representation of the firm levelling device described in the utility model embodiment;
Fig. 3 is the structural representation of the firm levelling device described in the utility model another embodiment;
Fig. 4 is the connector described in the utility model embodiment and the structural representation of column pin junction;
Fig. 5 is A-A sectional views in Fig. 4;
Fig. 6 is another structural representation of connector.
In figure, 2, leveling nut, 3, concrete layer, 4, ground, 5, connection steel disc, 6, fixing nut, 7, fixed plate, 8, even Connect post, 9, column pin, 10, right angle fix swash plate, 11, pre-embedded bolt, 12, fixing bolt, the 51, second bolt, 71, through hole, 100th, movable plank house, the 111, first bolt portion, the 112, second bolt portion.
Embodiment
The technical scheme in the utility model embodiment is clearly and completely described below, it is clear that described reality It is a part of embodiment of the utility model to apply example, rather than whole embodiments.Embodiment of the present utility model presented below Detailed description be not intended to limit claimed scope of the present utility model, but be merely representative of of the present utility model selected Embodiment.Based on the embodiment in the utility model, this area commonsense method personnel are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Embodiment 1
As shown in Fig. 1~2, a kind of firm levelling device of container movable plank house, including levelling device and and portable plate The connector that the column pin 9 in room 100 is connected;Column pin 9 is the lowest end for all columns for supporting each movable plank house 100 Point, i.e., for the part for being positioned over ground 4, each column pin 9 of movable plank house 100 is connected with connector.
Levelling device includes the first bolt, and first bolt includes the fixed pre-embedded bolt being embedded in concrete layer 3 11 and the fixing bolt 12 that is arranged at outside concrete layer 3, that is, it is embedded in the part bolt referred to as pre-embedded bolt in concrete layer 3 11, it is exposed to the outside of concrete layer 3 or part bolt above is referred to as fixing bolt 12;Be arranged with the fixing bolt 12 with The leveling nut 2 that the screw thread of fixing bolt 12 is connected;The concrete layer 3 is generally positioned in the pit on ground 4, non- It is often solid, firm.
Connector includes fixed plate 7 and is vertically connected in the connecting pole 8 of the upper surface of fixed plate 7, the fixed plate 7 to set Have a through hole 71 that can run through the fixing bolt 12, one end of the connecting pole 8 be fixedly connected in fixed plate 7 other end with The column pin 9 of the movable plank house 100 is fixedly connected;
The fixing bolt 12 is provided with the fixing nut that the fixed plate 7 can be fixed on the leveling nut 2 6.In use, the fixed plate 7 passes through the fixing bolt 12 so that the fixed plate 7 is positioned over institute by through hole 71 thereon State on leveling nut 2, the fixing nut 6 coordinated with the screw thread of fixing bolt 12 is also arranged with the fixing bolt 12, will Fixing nut 6, which is linked in, to be extended on the fixing bolt 12 of the upper surface above section of fixed plate 7, then tightens fixing nut 6, So that the fixed plate 7 is fixedly connected between leveling nut 2 and fixing nut 6.Energy is moved up or moves down by leveling nut 2 The height of enough adjustment fixing plates 7, so as to adjust the height of each column pin 9 so that movable plank house 100 is in fully horizontal shape State.
As further preferred embodiment, as shown in figure 3, pre-embedded bolt 11 is by the first bolt portion 111 and the second spiral shell Spigot 112 is constituted, and the angle [alpha] between bolt portion 112 of the first bolt portion 111 and second is in 0~180 degree, i.e., by pre-buried spiral shell The angle [alpha] that bolt 11 is bent between two parts, two parts is 0~180 degree, and preferably α is 90~140 degree, and such as preferred α is 130 degree. So that the combination of pre-embedded bolt 11 and concrete layer 3 is more firm.
As further preferred embodiment, as shown in Figures 4 and 5, the column pin 9 of connecting pole 8 and movable plank house passes through Multiple second bolts 51 are fixedly connected, specifically, can by the lower surface of the upper surface of connecting pole 8 and column pin 9 to its, Ji Jiangli Suspension column 9 is placed on the top of connecting pole 8, and by setting connection steel disc 5 in the both sides of connecting pole 8 and the interface of column pin 9, so Connection steel disc 5 is fixed on connecting pole 8 and column pin 9 with multiple second bolts 51 afterwards, so that by connecting pole 8 and column pin 9 It is fixedly connected on together, the connection ensure that intensity and conveniently dismount connecting pole 8 at any time;Certainly, other connection sides Formula can also, this is not limited only in actual applications.
As further preferred embodiment, as shown in fig. 6, fixed plate 7 is solid by the 3rd bolt with the connecting pole 8 Fixed connection.Also right angle can be set to fix swash plate 10 between the fixed plate 7 and the connecting pole 8 simultaneously, for further reinforcing Fixed plate 7 and connecting pole 8, i.e., a right-angle side for right angle being fixed into swash plate 10 are fixedly connected with fixed plate 7, another right-angle side It is fixedly connected with connecting pole 8, being fixedly connected herein can be bolt connection, weld or be integrally formed.
Fixed plate 7 in the present embodiment can be formed in one or weld with the connecting pole 8, the connecting pole 8 and activity The column pin 9 of board house is alternatively and is integrally formed or welds, pillar species that specifically can be according to column with connecting pole 8 or practical operation Comfort level etc. is determined;Fixed plate, connecting pole 8 etc. can be metallic plate, such as steel plate or iron plate.
Depending on the number of the first bolt, the second bolt 51, the 3rd bolt in the present embodiment etc. is according to actual conditions, as long as It disclosure satisfy that intensity just may be used.
Column, column pin 9, connecting pole 8 in the present embodiment etc. can be shaped steel, angle steel, channel-section steel, I-steel, hollow Steel etc., it is of course also possible to be other;It can specifically be decided according to the actual requirements.
When it is implemented, operating in practice very simple, a pit is dug on ground 4, concrete is then poured into a mould, and the It is unusually strong, firm after drying in the lower end insertion concrete layer 3 of one bolt, then cover one on each first bolt Individual leveling nut 2, in use, will cause to fix in the through hole 71 in the partial insertion fixed plate of fixing bolt 12 in the first bolt Plate is placed on leveling nut 2, is then twisted or the lower stubborn height for adjusting movable plank house by the upper of leveling nut 2, is treated that height is adjusted After the completion of section, fixing nut 6 is added on fixing bolt, fixing nut is tightened fixed plate is just fixed on the He of leveling nut 2 Between fixing nut.
In actual applications, in order to more firmly, can also after fixed plate is fixed, pour into a mould again concrete make it is solid Partly it is each attached to below fixed board in concrete, it is unusually strong.After being finished, fixing nut is taken apart, by fixed plate and fixation Bolt is separated, then levelling device is given up, and connector can be continuing with;Certainly, also connector also can be given up according to actual needs Abandon.It should also be noted that, in building field, its intensity of multiple tracks bolt connection is very big, it is fully able to reach use intensity.
It is described above, only the utility model preferably embodiment, but protection domain of the present utility model is not This is confined to, any those skilled in the art can readily occur in the technical scope that the utility model is disclosed Change or replacement, should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should It is defined by the protection domain of claims.

Claims (9)

1. a kind of firm levelling device of container movable plank house, including levelling device and it is connected with the column pin of movable plank house Connector, it is characterised in that:
The levelling device includes the first bolt, first bolt include being fixedly installed on pre-embedded bolt in concrete layer and It is arranged at the leveling spiral shell for being arranged with and coordinating with the fixing bolt screw thread on the fixing bolt outside concrete layer, the fixing bolt It is female;
The connector includes fixed plate and is vertically connected at the connecting pole in the dead plate upper end face, and the fixed plate is provided with energy Enough run through the through hole of the fixing bolt, the connecting pole is connected with the column pin of the movable plank house;
Fixing nut is arranged with above leveling nut on the fixing bolt, the fixing bolt is passed through in the fixed plate Through hole so that fixed plate is fixedly connected between the leveling nut and fixing nut.
2. the firm levelling device of container movable plank house according to claim 1, it is characterised in that:The pre-embedded bolt It is made up of the first bolt portion and the second bolt portion, is in 0~180 degree between the first bolt portion and the second bolt portion.
3. the firm levelling device of container movable plank house according to claim 2, it is characterised in that:First bolt It is in 90~140 degree between portion and the second bolt portion.
4. the firm levelling device of container movable plank house according to claim 1, it is characterised in that:The connecting pole with The column pin of movable plank house is fixedly connected by multiple second bolts.
5. the firm levelling device of container movable plank house according to claim 1, it is characterised in that:The connecting pole with The column pin of movable plank house is formed in one or welded.
6. the firm levelling device of container movable plank house according to claim 1, it is characterised in that:The fixed plate with The connecting pole is fixedly connected by the 3rd bolt.
7. the firm levelling device of container movable plank house according to claim 1, it is characterised in that:The fixed plate with The connecting pole is formed in one or welded.
8. the firm levelling device of container movable plank house according to claim 6, it is characterised in that:The fixed plate with Between the connecting pole swash plate is fixed provided with right angle.
9. according to the firm levelling device of container movable plank house according to any one of claims 1 to 8, it is characterised in that: The concrete layer is arranged in the pit on ground.
CN201621392808.XU 2016-12-16 2016-12-16 A kind of firm levelling device of container movable plank house Expired - Fee Related CN206368489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621392808.XU CN206368489U (en) 2016-12-16 2016-12-16 A kind of firm levelling device of container movable plank house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621392808.XU CN206368489U (en) 2016-12-16 2016-12-16 A kind of firm levelling device of container movable plank house

Publications (1)

Publication Number Publication Date
CN206368489U true CN206368489U (en) 2017-08-01

Family

ID=59392363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621392808.XU Expired - Fee Related CN206368489U (en) 2016-12-16 2016-12-16 A kind of firm levelling device of container movable plank house

Country Status (1)

Country Link
CN (1) CN206368489U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115977252A (en) * 2022-08-18 2023-04-18 广州建筑产业开发有限公司 Leveling device for modular house foundation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115977252A (en) * 2022-08-18 2023-04-18 广州建筑产业开发有限公司 Leveling device for modular house foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN211714015U (en) House building structure built in underground space
CN106638969A (en) Container portable house
CN206368489U (en) A kind of firm levelling device of container movable plank house
CN108412087A (en) Improve the prefabricated reinforcement structure and loam wall of loam wall globality
CN206635779U (en) Soil nailed wall retaining structure
CN211898493U (en) Pile and pile foundation platform connecting device for building
CN207228774U (en) A kind of high municipal administration guardrail of protective
CN210684727U (en) Construction safety supporting construction
CN209040280U (en) A kind of assembled connecting node of double brackets
CN205025029U (en) Clear water precast concrete exterior wall cladding connected node structure
CN208219921U (en) Improve the prefabricated reinforcement connection structure and loam wall of loam wall globality
CN204624885U (en) A kind of standard knot support chassis of elevator
CN207660094U (en) A kind of Quick assembling structure of house foundation
CN206635780U (en) A kind of soil nailed wall retaining structure
CN207048356U (en) Building foundation pit construction safety barrier
CN213115585U (en) Stable form bearing structure that building engineering used
CN203603527U (en) Adjustable sliding block oblique beam steel frame canopy guard structure for brickwork house
CN210459920U (en) Construction frame
CN208183812U (en) A kind of column footing seismic reinforcing structure
CN112302038A (en) Collapsible loess slope protective structure
CN218091902U (en) Support connection structure for civil engineering
CN105525556A (en) Connecting piece for splicing wooden box units to form light wood structural platform and splicing method
CN206887978U (en) A kind of thermal insulation environment protection architecture foundation structure
CN206646830U (en) Large span can turnover type concrete pump pipe type steel support system
CN206220116U (en) Factory building upright post basic

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170801

Termination date: 20171216

CF01 Termination of patent right due to non-payment of annual fee