CN210947277U - Light steel keel partition wall free of auxiliary keel - Google Patents
Light steel keel partition wall free of auxiliary keel Download PDFInfo
- Publication number
- CN210947277U CN210947277U CN201921405120.4U CN201921405120U CN210947277U CN 210947277 U CN210947277 U CN 210947277U CN 201921405120 U CN201921405120 U CN 201921405120U CN 210947277 U CN210947277 U CN 210947277U
- Authority
- CN
- China
- Prior art keywords
- keel
- opening
- vertical
- reinforcement
- partition wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型提供了一种免副龙骨的轻钢龙骨隔墙,其包括龙骨基架,龙骨基架多个平行的竖龙骨,竖龙骨的一侧设置有第一开口,多个竖龙骨的顶部连接有横向的C形顶部龙骨,多个竖龙骨的底部连接有横向的C形底部龙骨,竖龙骨的内腔分为上安装腔和下安装腔,上安装腔内安装有上补强件,下安装腔内安装有下补强件,上补强件的横断面呈等腰梯形,下补强件的横断面呈矩形,竖龙骨的表面固定连接有墙板卡接件,每相邻的两墙板卡接件之间卡接有墙板。本实用新型相较于现有技术在保证隔墙强度的前提下可以取消副龙骨,因此可以有效地降低施工成本且提高施工效率。
The utility model provides a light steel keel partition wall without auxiliary keels, which comprises a keel base frame, a plurality of parallel vertical keels, one side of the vertical keel is provided with a first opening, and the tops of the plurality of vertical keels are provided with a first opening. A horizontal C-shaped top keel is connected, and the bottoms of a plurality of vertical keels are connected with a horizontal C-shaped bottom keel. The inner cavity of the vertical keel is divided into an upper installation cavity and a lower installation cavity, and an upper reinforcement is installed in the upper installation cavity. A lower reinforcement is installed in the lower installation cavity, the cross section of the upper reinforcement is an isosceles trapezoid, and the cross section of the lower reinforcement is rectangular. A wall plate is clamped between the two wall plate clamping parts. Compared with the prior art, the utility model can eliminate the auxiliary keel on the premise of ensuring the strength of the partition wall, so the construction cost can be effectively reduced and the construction efficiency can be improved.
Description
技术领域technical field
本实用新型涉及一种轻钢龙骨隔墙,具体而言,涉及一种免副龙骨的轻钢龙骨隔墙。The utility model relates to a light steel keel partition wall, in particular to a light steel keel partition wall without auxiliary keels.
背景技术Background technique
装配式装饰是近年新兴的一种装饰施工形式。装配式装饰顾名思义,即是将装饰所需要使用的各个部品部件在工厂内实现生产完成,然后运输到装饰现场进行组合安装,免去了传统的装饰现场对各部品部件的测量、切割等作业,施工更为简单方便,可以极大地提高装饰现场的施工效率,并且施工现场更为整洁和美观,不会产生过多的装饰材料垃圾,是一种更为绿色环保的装饰施工形式。Prefabricated decoration is an emerging form of decoration construction in recent years. As the name implies, prefabricated decoration is to complete the production of various parts and components required for decoration in the factory, and then transport them to the decoration site for combined installation, eliminating the need for the traditional decoration site to measure and cut each part. The construction is simpler and more convenient, which can greatly improve the construction efficiency of the decoration site, and the construction site is more tidy and beautiful, and will not generate too much decoration material waste, which is a more green and environmentally friendly decoration construction form.
现在的轻钢龙骨在作为隔墙的基层时,通常需要安装有多个竖向的主龙骨和多个横向的副龙骨进行横竖交叉后形成整个基层结构,由于需要使用多个副龙骨进行强度补强,否则会出现墙面的自持强度不高、时间长了易变性的问题,因而造成了目前整个隔墙成本无法进一步降低,且安装比较复杂,影响现场的施工效率。When the current light steel keel is used as the base of the partition wall, it is usually necessary to install multiple vertical main keels and multiple horizontal auxiliary keels to form the entire base structure after horizontal and vertical cross. Otherwise, there will be problems of low self-sustaining strength of the wall and long-term variability, thus causing the current cost of the entire partition wall to be unable to be further reduced, and the installation is more complicated, which affects the construction efficiency of the site.
实用新型内容Utility model content
鉴于此,本实用新型提供了一种免副龙骨的轻钢龙骨隔墙,其在竖龙骨中加入了上补强件、中间补强件和下补强件,以此替代了传统的副龙骨的补强作用,从而在保证隔墙强度的前提下可以取消副龙骨,因此可以有效地降低施工成本且提高施工效率。In view of this, the utility model provides a light steel keel partition wall without auxiliary keel, which adds upper reinforcement, middle reinforcement and lower reinforcement to the vertical keel, thereby replacing the traditional auxiliary keel Therefore, the auxiliary keel can be eliminated under the premise of ensuring the strength of the partition wall, so the construction cost can be effectively reduced and the construction efficiency can be improved.
为此,本实用新型提供了一种免副龙骨的轻钢龙骨隔墙,其包括龙骨基架,龙骨基架多个平行的竖龙骨,竖龙骨的横断面呈矩形,且竖龙骨的一侧设置有沿着竖龙骨的长度方向延伸的第一开口,竖龙骨的相对两侧面的端部形成在第一开口的弧形折弯端,多个竖龙骨的顶部连接有横向的C形顶部龙骨,多个竖龙骨的底部连接有横向的C形底部龙骨,多个竖龙骨的中部穿设有中间补强件,其将竖龙骨的内腔分为上安装腔和下安装腔,上安装腔内安装有上补强件,下安装腔内安装有下补强件,上补强件的横断面呈等腰梯形,上补强件的第一侧面形成第一闭口面,上补强件上对应第一侧面的第二侧面形成沿着上补强件的长度方向延伸的第二开口,上补强件从第一开口卡入上安装腔内,第一闭口面朝内,第二开口朝外,下补强件的横断面呈矩形,下补强件的第三侧面形成沿着下补强件的长度方向延伸的第三开口,下补强件上对应第三侧面的第四侧面形成第二闭口面,下补强件从第一开口卡入下安装腔内,第三开口朝内,第二闭口面朝外,竖龙骨的表面固定连接有墙板卡接件,其沿着竖龙骨的长度方向延伸,每相邻的两墙板卡接件之间卡接有墙板。Therefore, the utility model provides a light steel keel partition wall without auxiliary keels, which comprises a keel base frame, a plurality of parallel vertical keels on the keel base frame, the cross section of the vertical keel is rectangular, and one side of the vertical keel is rectangular. A first opening extending along the length direction of the vertical keel is provided, the ends of the opposite sides of the vertical keel are formed at the arc-shaped bent ends of the first opening, and the tops of the plurality of vertical keels are connected with a horizontal C-shaped top keel , the bottom of the plurality of vertical keels is connected with a horizontal C-shaped bottom keel, and the middle of the plurality of vertical keels is provided with an intermediate reinforcing piece, which divides the inner cavity of the vertical keel into an upper installation cavity and a lower installation cavity, and the upper installation cavity An upper reinforcement is installed inside, a lower reinforcement is installed in the lower installation cavity, the cross section of the upper reinforcement is an isosceles trapezoid, the first side of the upper reinforcement forms a first closed surface, and the upper reinforcement The second side surface corresponding to the first side surface forms a second opening extending along the length direction of the upper reinforcing piece, the upper reinforcing piece is clipped into the upper installation cavity from the first opening, the first closed opening faces inward, and the second opening faces In addition, the cross section of the lower reinforcement is rectangular, the third side of the lower reinforcement is formed with a third opening extending along the length direction of the lower reinforcement, and the fourth side corresponding to the third side is formed on the lower reinforcement. On the second closing surface, the lower reinforcing piece is clamped into the lower installation cavity from the first opening, the third opening faces inward, and the second closing face faces outward, and the surface of the vertical keel is fixedly connected with a wallboard clip, which is along the vertical direction. The length direction of the keel extends, and a wall plate is clamped between each adjacent two wall plate clamping parts.
进一步地,上述竖龙骨上除开第一开口的其他三侧面上分别设置有三第一折弯弧面,第一折弯弧面沿着竖龙骨的长度方向延伸,第一折弯弧面的弧弯向竖龙骨的内部,且第一折弯弧面位于竖龙骨的侧面的中间位置上。Further, the other three sides of the above-mentioned vertical keel except the first opening are respectively provided with three first bending arc surfaces, the first bending arc surfaces extend along the length direction of the vertical keel, and the arc of the first bending arc surface is To the inside of the vertical keel, and the first bending arc surface is located at the middle position of the side surface of the vertical keel.
进一步地,上述墙板卡接件包括顶部的卡接部和底部的连接部,卡接部和连接部之间固定连接,墙板的侧沿卡于卡接部内,连接部卡于第一折弯弧面的弧形槽内。Further, the above-mentioned wallboard clip includes a top clipping part and a bottom connecting part, the clipping part and the connecting part are fixedly connected, the side edge of the wallboard is clipped in the clipping part, and the connecting part is clipped in the first folding part. Inside the arc groove of the curved surface.
进一步地,上述卡接部的横断面呈工字形,连接部的横断面呈等腰三角形,连接部内为空心结构,连接部的尖角部朝向第一折弯弧面的弧形槽内。Further, the cross-section of the clipping portion is I-shaped, the cross-section of the connecting portion is an isosceles triangle, the inside of the connecting portion is a hollow structure, and the sharp corner portion of the connecting portion faces into the arc groove of the first bending arc surface.
进一步地,上述卡接部的顶板的宽度为卡接部的底板的宽度的一半,且卡接部的底板固定连接于连接部,墙板的侧沿卡入卡接部的顶板和卡接部的底板之间的空间内。Further, the width of the top plate of the above-mentioned clamping part is half the width of the bottom plate of the clamping part, and the bottom plate of the clamping part is fixedly connected to the connecting part, and the side edge of the wall plate is clamped into the top plate and the clamping part of the clamping part. the space between the bottom plates.
进一步地,上述中间补强件的横断面呈矩形,中间补强件的顶面形成沿着中间补强件的长度方向延伸的第四开口,中间补强件的底面形成第三闭口面,第四开口朝向上安装腔,第三闭口面朝向下安装腔。Further, the cross section of the above-mentioned intermediate reinforcement is rectangular, the top surface of the intermediate reinforcement forms a fourth opening extending along the length direction of the intermediate reinforcement, the bottom surface of the intermediate reinforcement forms a third closed surface, and the third opening is formed on the bottom surface of the intermediate reinforcement. The four openings face the upper installation cavity, and the third closed face faces the lower installation cavity.
进一步地,上述上补强件的相对两斜面之间形成29-31°的夹角。Further, an included angle of 29-31° is formed between the two opposite inclined surfaces of the upper reinforcing member.
进一步地,上述第一闭口面上设置有沿着上补强件的长度方向延伸的第二折弯弧面,第二折弯弧面的弧弯朝向第二开口。Further, the first closing surface is provided with a second bending arc surface extending along the length direction of the upper reinforcing member, and the arc of the second bending arc surface faces the second opening.
进一步地,上述第二闭口面上设置有沿着下补强件的长度方向延伸的第三折弯弧面,第三折弯弧面的弧弯朝向第三开口。Further, the second closing surface is provided with a third bending arc surface extending along the length direction of the lower reinforcing member, and the arc of the third bending arc surface faces the third opening.
本实用新型所提供的一种免副龙骨的轻钢龙骨隔墙中,其在竖龙骨中加入了上补强件、中间补强件和下补强件,以此替代了传统的副龙骨的补强作用,从而在保证隔墙强度的前提下可以取消副龙骨,因此本实用新型相较于现有技术具有以下优点:In the light steel keel partition wall without auxiliary keel provided by the utility model, an upper reinforcement piece, a middle reinforcement piece and a lower reinforcement piece are added to the vertical keel, so as to replace the traditional auxiliary keel. Reinforcing effect, so that the auxiliary keel can be cancelled under the premise of ensuring the strength of the partition wall, so the utility model has the following advantages compared with the prior art:
1)解决了隔墙自持强度不高,以及封板后表面不平整的问题;1) Solve the problem of low self-sustaining strength of partition wall and uneven surface after sealing;
2)强化了轻钢龙骨基材,抗压强度大,同时减少了墙面厚度,整体构造易拼装,易拆卸,减少了墙板的找平工序;2) The light steel keel base material is strengthened, the compressive strength is high, and the wall thickness is reduced, the overall structure is easy to assemble and disassemble, and the leveling process of the wall panel is reduced;
3)实现了节约资源,减少了建筑承重,减少装修成本,及绿色环保的装修理念;3) Realize the concept of saving resources, reducing the load-bearing of the building, reducing the cost of decoration, and the decoration concept of green environmental protection;
4)墙面板不需要胶水、钉子等进行固定,由固定件的方式插入墙板卡接件中,免除了甲醛的释放及对型材本身的破坏,隔音、防潮、保暖效果更好;4) The wall panel does not need glue, nails, etc. to be fixed, and is inserted into the wall panel clip by the way of fixing parts, which avoids the release of formaldehyde and the damage to the profile itself, and the effect of sound insulation, moisture resistance and warmth is better;
5)实现了工厂预制,现场直接进行拼装的干作业施工方法,整个施工过程简单,绿色环保,解决了材料浪费、工艺繁琐,施工废料多的问题。5) The dry work construction method of factory prefabrication and direct assembly on site is realized. The entire construction process is simple, green and environmentally friendly, and solves the problems of material waste, cumbersome craftsmanship and a lot of construction waste.
附图说明Description of drawings
通过阅读下文优选实施方式的详细描述,各种其他的优点和益处对于本领域普通技术人员将变得清楚明了。附图仅用于示出优选实施方式的目的,而并不认为是对本实用新型的限制。而且在整个附图中,用相同的参考符号表示相同的部件。在附图中:Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The accompanying drawings are only for the purpose of illustrating the preferred embodiments, and are not considered to be a limitation of the present invention. Also, the same components are denoted by the same reference numerals throughout the drawings. In the attached image:
图1为本实用新型实施例提供的一种免副龙骨的轻钢龙骨隔墙的结构拆分图;Fig. 1 is the structural disassembly diagram of a kind of auxiliary keel-free light steel keel partition wall provided by the embodiment of the present utility model;
图2为本实用新型实施例提供的一种免副龙骨的轻钢龙骨隔墙的总装图;Fig. 2 is the general assembly drawing of a kind of light steel keel partition wall without auxiliary keel provided by the embodiment of the present utility model;
图3为本实用新型实施例提供的一种免副龙骨的轻钢龙骨隔墙中上补强件的安装示意图;3 is a schematic diagram of the installation of the upper reinforcing member in a light steel keel partition wall free of auxiliary keels provided by an embodiment of the present utility model;
图4为本实用新型实施例提供的一种免副龙骨的轻钢龙骨隔墙中下补强件的安装示意图;4 is a schematic diagram of the installation of the middle and lower reinforcing members of a light steel keel partition wall without auxiliary keels provided by an embodiment of the present utility model;
图5为本实用新型实施例提供的一种免副龙骨的轻钢龙骨隔墙中墙板卡接件的安装示意图。FIG. 5 is a schematic diagram of the installation of a middle wall panel clip of a light steel keel partition wall free of auxiliary keels according to an embodiment of the present invention.
具体实施方式Detailed ways
下面将参照附图更详细地描述本公开的示例性实施例。虽然附图中显示了本公开的示例性实施例,然而应当理解,可以以各种形式实现本公开而不应被这里阐述的实施例所限制。相反,提供这些实施例是为了能够更透彻地理解本公开,并且能够将本公开的范围完整的传达给本领域的技术人员。Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided so that the present disclosure will be more thoroughly understood, and will fully convey the scope of the present disclosure to those skilled in the art.
实施例一:Example 1:
参见图1至图5,图中示出了本实用新型实施例一提供的一种免副龙骨的轻钢龙骨隔墙,主要包括龙骨基架,龙骨基架多个平行的竖龙骨1,竖龙骨1的横断面呈矩形,且竖龙骨1的一侧设置有沿着竖龙骨1的长度方向延伸的第一开口11,竖龙骨1的相对两侧面的端部形成在第一开口11的弧形折弯端111,多个竖龙骨1的顶部连接有横向的C形顶部龙骨2,多个竖龙骨1的底部连接有横向的C形底部龙骨3,多个竖龙骨1的中部穿设有中间补强件16,其将竖龙骨1的内腔分为上安装腔12和下安装腔13,上安装腔12内安装有上补强件14,下安装腔13内安装有下补强件15,上补强件14的横断面呈等腰梯形,上补强件14的第一侧面形成第一闭口面141,上补强件14上对应第一侧面的第二侧面形成沿着上补强件14的长度方向延伸的第二开口142,上补强件14从第一开口11卡入上安装腔12内,第一闭口面141朝内,第二开口142朝外,下补强件15的横断面呈矩形,下补强件15的第三侧面形成沿着下补强件15的长度方向延伸的第三开口151,下补强件15上对应第三侧面的第四侧面形成第二闭口面152,下补强件15从第一开口11卡入下安装腔13内,第三开口151朝内,第二闭口面152朝外,竖龙骨1的表面固定连接有墙板卡接件4,其沿着竖龙骨1的长度方向延伸,每相邻的两墙板卡接件4之间卡接有墙板5。Referring to FIGS. 1 to 5 , a light steel keel partition wall without auxiliary keels provided in the first embodiment of the present utility model is shown, which mainly includes a keel base frame, a plurality of parallel vertical keels 1 on the keel base frame, and a vertical The cross section of the keel 1 is rectangular, and one side of the vertical keel 1 is provided with a first opening 11 extending along the length direction of the vertical keel 1, and the ends of the opposite sides of the vertical keel 1 are formed in the arc of the first opening 11. The top of the plurality of vertical keels 1 is connected with a horizontal C-shaped top keel 2, the bottom of the plurality of vertical keels 1 is connected with a horizontal C-shaped bottom keel 3, and the middle of the plurality of vertical keels 1 is provided with The
本实施例所提供的一种免副龙骨的轻钢龙骨组件中,其在竖龙骨中加入了上补强件、中间补强件和下补强件,以此替代了传统的副龙骨的补强作用,具体来说,上补强件的等腰梯形结构保证上部的竖龙骨受到收缩的力,而下补强件的矩形结构保证下部的竖龙骨受到张开的力,上部的收缩配合下部的张开作用使得墙板的作用力向竖龙骨的底部方向施加,保证上部受力小、下部受力大,而底部结构较顶部结构更为稳固,而中间部分由中间补强件进行补强作用,从而保证了在隔墙具有安装强度的前提下可以取消副龙骨的使用,因此本实用新型相较于现有技术具有以下优点:In the light steel keel assembly without auxiliary keel provided in this embodiment, an upper reinforcement piece, a middle reinforcement piece and a lower reinforcement piece are added to the vertical keel, so as to replace the reinforcement of the traditional auxiliary keel. Strong action, specifically, the isosceles trapezoid structure of the upper reinforcement ensures that the upper vertical keel is subjected to the force of contraction, while the rectangular structure of the lower reinforcement ensures that the lower vertical keel is subjected to the opening force, and the upper contraction cooperates with the lower The opening effect of the wall panel causes the force of the wall panel to be applied to the bottom of the vertical keel, ensuring that the upper force is small and the lower force is large, and the bottom structure is more stable than the top structure, and the middle part is reinforced by the middle reinforcement. Therefore, compared with the prior art, the utility model has the following advantages:
1)解决了隔墙自持强度不高,以及封板后表面不平整的问题;1) Solve the problem of low self-sustaining strength of partition wall and uneven surface after sealing;
2)强化了轻钢龙骨基材,抗压强度大,同时减少了墙面厚度,整体构造易拼装,易拆卸,减少了墙板的找平工序;2) The light steel keel base material is strengthened, the compressive strength is high, and the wall thickness is reduced, the overall structure is easy to assemble and disassemble, and the leveling process of the wall panel is reduced;
3)实现了节约资源,减少了建筑承重,减少装修成本,及绿色环保的装修理念;3) Realize the concept of saving resources, reducing the load-bearing of the building, reducing the cost of decoration, and the decoration concept of green environmental protection;
4)墙面板不需要胶水、钉子等进行固定,由固定件的方式插入墙板卡接件中,免除了甲醛的释放及对型材本身的破坏,隔音、防潮、保暖效果更好;4) The wall panel does not need glue, nails, etc. to be fixed, and is inserted into the wall panel clip by the way of fixing parts, which avoids the release of formaldehyde and the damage to the profile itself, and the effect of sound insulation, moisture resistance and warmth is better;
5)实现了工厂预制,现场直接进行拼装的干作业施工方法,整个施工过程简单,绿色环保,解决了材料浪费、工艺繁琐,施工废料多的问题。5) The dry work construction method of factory prefabrication and direct assembly on site is realized. The entire construction process is simple, green and environmentally friendly, and solves the problems of material waste, cumbersome craftsmanship and a lot of construction waste.
实施例二:Embodiment 2:
参见图1至图5,图中示出了本实用新型实施例二提供的一种免副龙骨的轻钢龙骨隔墙,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:竖龙骨1上除开第一开口11的其他三侧面上分别设置有三第一折弯弧面17,第一折弯弧面17沿着竖龙骨1的长度方向延伸,第一折弯弧面17的弧弯向竖龙骨1的内部,且第一折弯弧面17位于竖龙骨1的侧面的中间位置上,该墙板卡接件4具体包括顶部的卡接部41和底部的连接部42,卡接部41和连接部42之间固定连接,卡接部41的横断面具体呈工字形,连接部42的横断面呈等腰三角形,连接部42内为空心结构,连接部42的尖角部朝向第一折弯弧面17的弧形槽内,卡接部41的顶板441的宽度为卡接部41的底板442的宽度的一半,且卡接部41的底板442固定连接于连接部42,墙板5的侧沿卡入卡接部41的顶板441和卡接部41的底板442之间的空间内。通过上述结构的设置,三角形的连接部保证了整个卡接件底部的稳固性,并且三角形的连接部卡在弧形槽内会保持平衡,因而可以形成对墙板安装的调平作用,保证墙板安装的水平度。Referring to FIGS. 1 to 5 , a light steel keel partition wall without auxiliary keels provided in the second embodiment of the present utility model is shown in the drawings. On the basis of the above-mentioned embodiments, this embodiment further makes the following As an improved technical solution: the other three sides of the vertical keel 1 except the first opening 11 are respectively provided with three first bending arc surfaces 17, and the first bending arc surfaces 17 extend along the length direction of the vertical keel 1, and the first bending arc surfaces 17 The arc of the bending
实施例三:Embodiment three:
参见图1至图2,图中示出了本实用新型实施例二提供的一种免副龙骨的轻钢龙骨隔墙,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:中间补强件16的横断面呈矩形,中间补强件16的顶面形成沿着中间补强件16的长度方向延伸的第四开口161,中间补强件16的底面形成第三闭口面162,第四开口161朝向上安装腔12,第三闭口面162朝向下安装腔13。通过上述结构的设置,可以保证中间补强件的强度。Referring to FIGS. 1 to 2 , a light steel keel partition wall without auxiliary keels provided in the second embodiment of the present invention is shown in the drawings. On the basis of the above-mentioned embodiments, this embodiment further makes the following As an improved technical solution: the cross section of the
实施例四:Embodiment 4:
参见图3,图中示出了本实用新型实施例四提供的一种免副龙骨的轻钢龙骨隔墙,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:上补强件14的相对两斜面143之间形成29-31°的夹角,优选为30°,可以保证上补强件的卡接强度。Referring to FIG. 3, the figure shows a light steel keel partition wall without auxiliary keels provided by the fourth embodiment of the present utility model. On the basis of the above-mentioned embodiments, the present embodiment further makes the following improvements. Technical solution: An included angle of 29-31° is formed between the opposite two
实施例五:Embodiment 5:
参见图3,图中示出了本实用新型实施例五提供的一种免副龙骨的轻钢龙骨隔墙,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:第一闭口面141上设置有沿着上补强件14的长度方向延伸的第二折弯弧面144,第二折弯弧面144的弧弯朝向第二开口142。通过上述结构的设置,第二折弯弧面可以形成与第一折弯弧面之间的卡接作用。Referring to FIG. 3, the figure shows a light steel keel partition wall without auxiliary keels provided by the fifth embodiment of the present utility model. On the basis of the above-mentioned embodiments, the present embodiment further makes the following improvements. Technical solution: the
实施例六:Embodiment 6:
参见图4,图中示出了本实用新型实施例六提供的一种免副龙骨的轻钢龙骨隔墙,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:第二闭口面152上设置有沿着下补强件15的长度方向延伸的第三折弯弧面153,第三折弯弧面153的弧弯朝向第三开口151。通过上述结构的设置,第三折弯弧面可以形成与第一折弯弧面之间的卡接作用。Referring to FIG. 4, the figure shows a light steel keel partition wall without auxiliary keels provided by the sixth embodiment of the present utility model. On the basis of the above-mentioned embodiments, this embodiment further makes the following improvements as Technical solution: the
上述实施例所述的一种免副龙骨的轻钢龙骨隔墙通过以下安装方法进行安装,该方法具体包括以下安装步骤:The light steel keel partition wall without auxiliary keel described in the above embodiment is installed by the following installation method, and the method specifically includes the following installation steps:
S1:准备多个竖龙骨1,其之间平行布置,将一中间补强件16穿过多个竖龙骨1,中间补强件16在竖龙骨1中分出上安装腔12和下安装腔13,安装时使中间补强件16的第四开口161朝向上安装腔12,使中间补强件16的第三闭口面162朝向下安装腔13;S1: Prepare a plurality of vertical keels 1, arrange them in parallel, and pass an intermediate reinforcing
S2:在多个竖龙骨1的顶部卡入横向的C形顶部龙骨2,将多个竖龙骨1的底部卡入横向的C形底部龙骨3中;S2: the tops of the plurality of vertical keels 1 are clipped into the horizontal C-shaped top keels 2, and the bottoms of the plurality of vertical keels 1 are clipped into the horizontal C-shaped bottom keels 3;
S3:将一横断面呈梯形的上补强件14从竖龙骨1的第一开口11卡入上安装腔12中,上补强件14的第一闭口面141朝内并抵住中间补强件16的内壁,上补强件14的相对两斜面143斜向抵住中间补强件16的内壁,上补强件14的第二开口142朝向第一开口11;S3: Insert an upper reinforcing piece 14 with a trapezoidal cross section into the
S4:将一横断面呈矩形的下补强件15从竖龙骨1的第一开口11卡入下安装腔13中,下补强件15的第三开口151朝竖龙骨1的内部,下补强件15的相对两侧面抵住中间补强件16的内壁,下补强件15的第二闭口面152朝向第一开口11并封住第一开口11位于下安装腔13的部分;S4: Insert a lower reinforcing
S5:在竖龙骨1表面的第一折弯弧面17的弧形槽内卡入墙板卡接件4,墙板卡接件4底部的连接部42卡入第一折弯弧面17的弧形槽内,利用卡接部41和墙板卡接件4顶部的卡接部41之间的柔性连接板,使得卡接部在弧形槽内变形后卡住弧形槽,墙板5的侧沿卡入卡接部41的顶板441和卡接部41的底板442之间的空间内。S5: The
其中,新型强化的竖龙骨有50×50mm、75mm×75mm、100mm×100mm多种型号,应对不同的拼装问题;每种型号均呈C字型,且三面留有圆形凹槽加强筋,用以增强竖龙自持强度,并预留龙骨纯平连接件的安装位置;凹槽系半径为8mm的半圆形;龙骨纯平连接件(墙板卡接件)为三角形+工字型构造,两侧有卡槽与墙板进行固定,内部中空;底座三角形与强化竖龙凹槽沉合,可用螺母螺栓、沉头螺钉等与强化竖龙进行连接;上补强件和下补强件在需要的位置(如门窗洞、线盒等)进行补强,只需要对准在强化竖龙的开口处拍入即可卡住。Among them, the new reinforced vertical keel has a variety of models of 50 × 50mm, 75mm × 75mm, 100mm × 100mm, to deal with different assembly problems; each model is C-shaped, and there are circular groove reinforcement ribs on three sides. In order to enhance the self-sustaining strength of the vertical dragon, and reserve the installation position of the keel flat connector; the groove is a semicircle with a radius of 8mm; the keel flat connector (wall panel clip) is a triangle + I-shaped structure, There are card slots on both sides for fixing with the wall panels, and the interior is hollow; the triangle of the base fits into the groove of the reinforced vertical dragon, and nuts, bolts, countersunk head screws, etc. can be used to connect with the reinforced vertical dragon; the upper and lower reinforcing parts are The required positions (such as door and window holes, wire boxes, etc.) are reinforced, and they only need to be slammed into the opening of the reinforced vertical dragon to be stuck.
显然,本领域的技术人员可以对本实用新型进行各种改动和变型而不脱离本实用新型的精神和范围。这样,倘若本实用新型的这些修改和变型属于本实用新型权利要求及其等同技术的范围之内,则本实用新型也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present utility model fall within the scope of the claims of the present utility model and their equivalents, the present utility model is also intended to include these modifications and variations.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921405120.4U CN210947277U (en) | 2019-08-27 | 2019-08-27 | Light steel keel partition wall free of auxiliary keel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921405120.4U CN210947277U (en) | 2019-08-27 | 2019-08-27 | Light steel keel partition wall free of auxiliary keel |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210947277U true CN210947277U (en) | 2020-07-07 |
Family
ID=71387352
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921405120.4U Expired - Fee Related CN210947277U (en) | 2019-08-27 | 2019-08-27 | Light steel keel partition wall free of auxiliary keel |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210947277U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110453823A (en) * | 2019-08-27 | 2019-11-15 | 金螳螂精装科技(苏州)有限公司 | A kind of light steel keel partition wall without auxiliary keel and its installation method |
| CN111827530A (en) * | 2020-07-09 | 2020-10-27 | 商丘工学院 | A kind of super high-rise building reverse hanging partition wall and construction method thereof |
| CN112982743A (en) * | 2021-02-23 | 2021-06-18 | 浙江省建筑科学设计研究院有限公司 | Gypsum wallboard, assembly type gypsum internal partition wall and mounting method of assembly type gypsum internal partition wall |
| CN115075402A (en) * | 2022-07-21 | 2022-09-20 | 浙江亚厦装饰股份有限公司 | High-sound-insulation assembled framework partition wall module connecting structure and mounting method thereof |
-
2019
- 2019-08-27 CN CN201921405120.4U patent/CN210947277U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110453823A (en) * | 2019-08-27 | 2019-11-15 | 金螳螂精装科技(苏州)有限公司 | A kind of light steel keel partition wall without auxiliary keel and its installation method |
| CN110453823B (en) * | 2019-08-27 | 2024-08-16 | 金螳螂精装科技(苏州)有限公司 | Light steel keel partition wall free of auxiliary keel and mounting method thereof |
| CN111827530A (en) * | 2020-07-09 | 2020-10-27 | 商丘工学院 | A kind of super high-rise building reverse hanging partition wall and construction method thereof |
| CN112982743A (en) * | 2021-02-23 | 2021-06-18 | 浙江省建筑科学设计研究院有限公司 | Gypsum wallboard, assembly type gypsum internal partition wall and mounting method of assembly type gypsum internal partition wall |
| CN115075402A (en) * | 2022-07-21 | 2022-09-20 | 浙江亚厦装饰股份有限公司 | High-sound-insulation assembled framework partition wall module connecting structure and mounting method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211572122U (en) | A kind of partition wall door and window opening keel reinforcement structure | |
| CN205314257U (en) | M section bar and adopt building piece connection structure of this section bar | |
| CN217537416U (en) | A kind of prefabricated building wall broken bridge keel structure | |
| CN112127523A (en) | Assembled decorates integration partition wall nonstandard device | |
| CN205713101U (en) | Buckling piece and cast-in-situ template assembly | |
| CN110453823B (en) | Light steel keel partition wall free of auxiliary keel and mounting method thereof | |
| CN210288789U (en) | A quick-assembled prefabricated partition wall installation structure | |
| CN216740226U (en) | Assembled overlap tenon keel and finished slat partition wall | |
| CN101831972A (en) | Expanding keel frame component | |
| CN205276639U (en) | Pin -connected panel roof module and assemble roof | |
| CN210947278U (en) | A light steel keel assembly without auxiliary keel | |
| CN103452209B (en) | Double-layer composite slat cast-in-situ internal partition wall structure | |
| CN209339372U (en) | A kind of multi-layer walls system | |
| CN110453871A (en) | An assembled wall panel installation structure with stable support | |
| CN108661212B (en) | Partition plate installation connecting piece | |
| CN217399991U (en) | External hanging connection structure of composite wall board | |
| CN211421466U (en) | Prefabricated environmental protection wall body | |
| CN113250396B (en) | Quick-mounting rock plate structure | |
| CN213418330U (en) | Fixing part for back groove | |
| CN211775008U (en) | Ground keel frame structure | |
| CN211172852U (en) | Stable supporting assembly type wallboard mounting structure | |
| CN206971482U (en) | A kind of top connection card of assembled wall | |
| CN105113629A (en) | Low-rise concrete special-shaped column prefabricated type structure | |
| CN211572116U (en) | A kind of arch hole keel reinforcement structure | |
| CN223189962U (en) | Magnetic resonance compatible wall decoration assembly |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200707 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |