CN210944766U - Installation and construction device of road cutting side ditch cover plate - Google Patents

Installation and construction device of road cutting side ditch cover plate Download PDF

Info

Publication number
CN210944766U
CN210944766U CN201921938929.3U CN201921938929U CN210944766U CN 210944766 U CN210944766 U CN 210944766U CN 201921938929 U CN201921938929 U CN 201921938929U CN 210944766 U CN210944766 U CN 210944766U
Authority
CN
China
Prior art keywords
cover plate
crane
support frame
lifting
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921938929.3U
Other languages
Chinese (zh)
Inventor
赵强
栾晓强
徐太昌
李亚平
陈霄
郭文静
张晓艳
黄帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201921938929.3U priority Critical patent/CN210944766U/en
Application granted granted Critical
Publication of CN210944766U publication Critical patent/CN210944766U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及建筑施工领域,特别涉及一种路堑边沟盖板安装施工装置。装置包括吊车和吊装组件,所述吊车包括行走装置,行走装置上分别安装有吊车骨架和吊车辅助架,所述吊车骨架包括第一支撑架和第二支撑架,第一支撑架上安装有扶手,第二支撑架上安装有吊钩,吊钩上悬挂吊装组件,所述吊装组件包括吊装绳,吊装绳两端分别活动连接吊具,吊具相对于吊装绳旋转,所述吊具包括吊环和固定在吊环上的倒T型件,倒T型件的竖向段固定连接吊环,倒T型件的横向段位于预留孔下方,用于兜托盖板。本实用新型通过两个吊具兜托盖板,吊运稳定,人工推动吊车将盖板移动到位进行安装,操作方便,人员投入少,降低人员劳动强度,提高施工效率,保证施工质量。

Figure 201921938929

The utility model relates to the field of building construction, in particular to a construction device for installing a road cutting side ditch cover plate. The device includes a crane and a hoisting assembly, the crane includes a walking device, a crane frame and a crane auxiliary frame are respectively installed on the walking device, the crane frame includes a first support frame and a second support frame, and the first support frame is installed with a handrail , a hook is installed on the second support frame, and a hoisting assembly is suspended on the hook, the hoisting assembly includes a hoisting rope, and the two ends of the hoisting rope are respectively connected with a sling, the sling rotates relative to the hoisting rope, and the sling includes a hoisting ring And the inverted T-shaped piece fixed on the lifting ring, the vertical section of the inverted T-shaped piece is fixedly connected to the lifting ring, and the lateral section of the inverted T-shaped piece is located below the reserved hole for pocketing the cover plate. The utility model uses two spreaders to support the cover plate, the lifting is stable, the crane is manually pushed to move the cover plate in place for installation, the operation is convenient, the personnel input is small, the labor intensity of personnel is reduced, the construction efficiency is improved, and the construction quality is guaranteed.

Figure 201921938929

Description

路堑边沟盖板安装施工装置Installation and construction device of road cutting side ditch cover plate

技术领域technical field

本实用新型涉及建筑施工领域,特别涉及一种路堑边沟盖板安装施工装置。The utility model relates to the field of building construction, in particular to a construction device for installing a road cutting side ditch cover plate.

背景技术Background technique

路堑边沟盖板均在项目部拌合站集中预制,经二次倒运,运输至施工现场安装,吊运过程中占用大量人员及机械,此外,倒运过程中存在预制盖板缺棱掉角情况发生,经研究决定,平整场地后将预制盖板使用塑料模具借助平板振动台现场预制,减少盖板倒运次数,由于施工现场空间有限,采用大型起重设备吊装盖板极为不便,因此,只能通过人工搬运方式将现场预制好的盖板搬运到路堑边沟槽口位置,再进行盖板的安装,采用这种方式,占用大量人员,增大人员的劳动强度,降低施工效率,并且安装精度不高,在使用撬棍调整安装位置时容易损坏盖板,施工质量不能保证。The cutting edge ditch cover plates are all prefabricated in the mixing station of the project department. After the second reverse transportation, they are transported to the construction site for installation. The lifting process takes up a lot of personnel and machinery. In addition, the prefabricated cover plates are missing edges and corners during the reverse transportation process. Occurred. After research, it was decided that after leveling the site, the prefabricated cover was prefabricated on-site with the help of a flat-plate vibrating table to reduce the number of reverse transportation of the cover. Due to the limited space at the construction site, it was extremely inconvenient to use large lifting equipment to hoist the cover. Therefore, only The prefabricated cover plate on site is transported to the groove edge position of the cutting edge by manual handling, and then the cover plate is installed. This method takes up a lot of personnel, increases the labor intensity of personnel, reduces the construction efficiency, and the installation accuracy If it is not high, it is easy to damage the cover plate when using the crowbar to adjust the installation position, and the construction quality cannot be guaranteed.

实用新型内容Utility model content

本实用新型的目的是为了解决通过人工搬运方式将施工现场预制好的盖板搬运到路堑边沟槽口位置再进行安装,劳动强度大,施工效率低,安装时盖板易损坏,施工质量不能保证的技术问题,提供一种路堑边沟盖板安装施工装置,能够保证施工质量,降低人员劳动强度,提高施工效率。The purpose of the utility model is to solve the problem of transporting the prefabricated cover plate on the construction site to the groove mouth position of the road cutting by manual handling, which is labor-intensive, low in construction efficiency, easy to damage during installation, and poor in construction quality. In order to solve the technical problem of guarantee, a construction device for installing a road cutting edge ditch cover plate is provided, which can ensure the construction quality, reduce the labor intensity of personnel, and improve the construction efficiency.

本实用新型为实现上述目的所采用的技术方案是:路堑边沟盖板安装施工装置,包括吊车和吊装组件,所述吊车包括行走装置,所述行走装置上分别安装有吊车骨架和吊车辅助架,所述吊车骨架包括第一支撑架和第二支撑架,所述第一支撑架和第二支撑架的一端分别固定在行走装置中轴的中点上,所述第一支撑架的另一端安装有扶手,所述第二支撑架的另一端安装有吊钩,所述吊钩上悬挂吊装组件,所述吊装组件包括吊装绳,所述吊装绳两端分别活动连接吊具,所述吊具相对于吊装绳旋转,所述吊具包括吊环和固定在吊环上的倒T型件,所述倒T型件的竖向段固定连接吊环,所述倒T型件的竖向段穿过盖板上的预留孔,所述倒T型件的横向段位于预留孔下方,用于兜托盖板。The technical scheme adopted by the present utility model to achieve the above purpose is: a construction device for installing a cutting edge ditch cover plate, including a crane and a hoisting assembly, the crane includes a traveling device, and a crane frame and a crane auxiliary frame are respectively installed on the traveling device. , the crane frame includes a first support frame and a second support frame, one end of the first support frame and the second support frame are respectively fixed on the midpoint of the central axis of the traveling device, and the other end of the first support frame A handrail is installed, a hook is installed on the other end of the second support frame, a hoisting assembly is suspended on the hook, and the hoisting assembly includes a hoisting rope, and the two ends of the hoisting rope are respectively connected with a sling, and the hoisting The hoisting tool rotates relative to the hoisting rope, the hoisting device includes a hoisting ring and an inverted T-shaped piece fixed on the hoisting ring, the vertical section of the inverted T-shaped piece is fixedly connected to the hoisting ring, and the vertical section of the inverted T-shaped piece passes through There is a reserved hole on the cover plate, and the transverse section of the inverted T-shaped piece is located below the reserved hole, which is used for pocketing the cover plate.

进一步地,所述第二支撑架上还安装有配重平台。Further, a counterweight platform is also installed on the second support frame.

进一步地,所述吊装绳上套设有防脱钩件,所述防脱钩件与吊钩相接触,用于防止吊装组件脱落。Further, the hoisting rope is sleeved with an anti-hook part, and the anti-hook part is in contact with the hook to prevent the hoisting assembly from falling off.

进一步地,所述吊环上设有连接孔,用于活动连接吊装绳。Further, the hoisting ring is provided with a connecting hole for movably connecting the hoisting rope.

进一步地,所述吊车辅助架包括立杆,所述立杆下端焊接在行走装置中轴的中点上,所述立杆两侧焊接有支撑架,所述两个支撑架与行走装置中轴形成三角形,所述立杆上还焊接有两个辅助支架,所述两个辅助支架的两端分别焊接在所述第一支撑架和第二支撑架上。Further, the crane auxiliary frame includes a vertical rod, the lower end of the vertical rod is welded on the midpoint of the central axis of the traveling device, the supporting frames are welded on both sides of the vertical rod, and the two supporting frames are connected to the central axis of the traveling device. A triangle is formed, two auxiliary brackets are welded on the vertical rod, and two ends of the two auxiliary brackets are respectively welded on the first support frame and the second support frame.

进一步地,所述行走装置为单轴滚轮。Further, the traveling device is a single-axis roller.

进一步地,所述吊车骨架采用空心钢管。Further, the crane frame adopts hollow steel pipe.

进一步地,所述吊钩采用精轧螺纹钢。Further, the hook is made of finish-rolled rebar.

进一步地,所述吊装绳采用钢丝绳。Further, the hoisting rope is a steel wire rope.

本实用新型通过吊具兜托盖板,采用两处吊点,使吊运更稳定,再通过吊车将盖板提起,推动吊车到路堑边沟槽口位置进行盖板安装,人员投入少,降低了人员的劳动强度,提高人员施工效率,吊车骨架的制作利用杠杆原理,大大节省人力,吊车骨架上安装有配重平台,可根据施工现场纵横坡及运距长短自行配重,安装效果好,盖板不易损坏,同时能够满足盖板安装缝隙规范要求,保证了施工质量,装置成本低,结构简单,操作灵活方便。The utility model supports the cover plate by a sling, adopts two lifting points to make the lifting more stable, and then lifts the cover plate by a crane, and pushes the crane to the position of the groove edge of the cutting edge for installation of the cover plate, which reduces the investment of personnel and reduces the cost of the cover plate. It reduces the labor intensity of personnel and improves the construction efficiency of personnel. The production of the crane frame uses the principle of leverage, which greatly saves manpower. The crane frame is equipped with a counterweight platform, which can be self-balancing according to the vertical and horizontal slopes of the construction site and the length of the transportation distance, and the installation effect is good. The cover plate is not easy to be damaged, and at the same time, it can meet the specification requirements for the installation gap of the cover plate, which ensures the construction quality, the installation cost is low, the structure is simple, and the operation is flexible and convenient.

附图说明Description of drawings

图1为本实用新型的结构主视图。FIG. 1 is a front view of the structure of the utility model.

图2为本实用新型的结构俯视图。FIG. 2 is a top view of the structure of the utility model.

图3为本实用新型的结构右视图。Fig. 3 is the right side view of the structure of the utility model.

图4为本实用新型的吊装组件结构主视图。FIG. 4 is a front view of the structure of the hoisting assembly of the present invention.

图中:1.吊具,2.辅助支架,3. 配重平台,4.行走装置,5.第一支撑架,6.第二支撑架,7.扶手,8.吊钩,9.防脱钩件,10.钢丝绳,11.立杆,12.支撑架。In the picture: 1. Spreader, 2. Auxiliary support, 3. Counterweight platform, 4. Walking device, 5. First support frame, 6. Second support frame, 7. Handrail, 8. Hook, 9. Anti-static Release hook, 10. Steel wire rope, 11. Pole, 12. Support frame.

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型进行详细说明,但本实用新型并不局限于具体实施例。The present utility model will be described in detail below with reference to the accompanying drawings and embodiments, but the present utility model is not limited to the specific embodiments.

如图1-3所示的路堑边沟盖板安装施工装置,包括吊车和吊装组件,吊车包括行走装置4,用于人工推动吊车,行走装置4上分别安装有吊车骨架和吊车辅助架,吊车骨架包括第一支撑架5和第二支撑架6,第一支撑架5和第二支撑架6的一端分别固定在行走装置4中轴的中点上,第一支撑架5的另一端安装有扶手7,第二支撑架6的另一端安装有吊钩8,吊钩8方向朝上,吊钩8上悬挂吊装组件,第二支撑架6上还安装有配重平台3,可根据施工现场纵横坡及运距长短自行配重,提高人员施工效率,吊车辅助架包括立杆11,立杆11下端焊接在行走装置4中轴的中点上,立杆11两侧焊接有支撑架12,两个支撑架12与行走装置4中轴形成三角形,可有效防止骨架变形,立杆11上部焊接有两个辅助支架2,两个辅助支架2的两端分别焊接在第一支撑架5和第二支撑架6上,吊装组件包括吊装绳,吊装绳两端分别活动连接吊具1,吊具1相对于吊装绳旋转,吊具1包括吊环和固定在吊环上的倒T型件,吊环上设有连接孔,用于活动连接吊装绳,倒T型件的竖向段固定连接吊环,倒T型件的竖向段穿过盖板上的预留孔,倒T型件的横向段位于预留孔下方,用于兜托盖板,吊装绳上套设有防脱钩件9,防脱钩件9与吊钩8相接触,用于防止吊装组件脱落。As shown in Figure 1-3, the installation and construction device for the cover plate of the cutting edge ditch includes a crane and hoisting components. The crane includes a traveling device 4, which is used to manually push the crane. The traveling device 4 is respectively installed with a crane frame and a crane auxiliary frame. The skeleton includes a first support frame 5 and a second support frame 6, one end of the first support frame 5 and the second support frame 6 are respectively fixed on the midpoint of the central axis of the traveling device 4, and the other end of the first support frame 5 is installed with a The handrail 7, the other end of the second support frame 6 is provided with a hook 8, the direction of the hook 8 is upward, the hanging assembly is suspended on the hook 8, and the counterweight platform 3 is also installed on the second support frame 6, which can be adjusted according to the construction site. The vertical and horizontal slopes and the length of the haul distance are self-weighted to improve the construction efficiency of the personnel. The auxiliary frame of the crane includes a vertical pole 11. The lower end of the vertical pole 11 is welded on the midpoint of the central axis of the traveling device 4, and the two sides of the vertical pole 11 are welded with support frames 12. The two support frames 12 and the central axis of the traveling device 4 form a triangle, which can effectively prevent the deformation of the skeleton. Two auxiliary supports 2 are welded on the upper part of the vertical rod 11, and the two ends of the two auxiliary supports 2 are respectively welded on the first support frame 5 and the second support frame. On the second support frame 6, the hoisting assembly includes a hoisting rope, and the two ends of the hoisting rope are respectively connected to the hoisting device 1. The hoisting device 1 rotates relative to the hoisting rope. The hoisting device 1 includes a hoisting ring and an inverted T-shaped piece fixed on the hoisting ring. There is a connecting hole for flexibly connecting the hoisting rope, the vertical section of the inverted T-shaped piece is fixed to connect the lifting ring, the vertical section of the inverted T-shaped piece passes through the reserved hole on the cover plate, and the horizontal section of the inverted T-shaped piece is located at The lower part of the reserved hole is used to hold the cover plate, and the hoisting rope is sleeved with an anti-releasing hook 9, which is in contact with the hook 8 to prevent the hoisting assembly from falling off.

优选地,上述行走装置4为单轴滚轮,可使用工地手推车轮子,滚轮外胎宽度为6.8cm,两轮胎间距为80cm。Preferably, the above-mentioned walking device 4 is a single-axle roller, which can be a wheelbarrow on a construction site. The width of the outer tire of the roller is 6.8 cm, and the distance between the two tires is 80 cm.

优选地,上述吊车骨架采用空心钢管。Preferably, the above crane frame adopts hollow steel pipe.

优选地,上述第一支撑架5的长度为4m。Preferably, the length of the first support frame 5 is 4m.

优选地,上述第二支撑架6的长度为2m。Preferably, the length of the above-mentioned second support frame 6 is 2m.

优选地,上述吊钩8采用精轧螺纹钢,可增加吊钩8与钢丝绳10的摩擦。Preferably, the above-mentioned hook 8 is made of fine-rolled threaded steel, which can increase the friction between the hook 8 and the wire rope 10 .

优选地,上述吊装绳采用钢丝绳10。Preferably, the above-mentioned hoisting rope adopts the steel wire rope 10 .

采用上述路堑边沟盖板安装施工装置,根据现场纵横坡,提前在配重平台3上自行配重,路堑边沟盖板存在三个20*3*13cm预留孔,根据盖板设计结构形式,使用圆钢制作吊具1,并在吊具1周围安装胶皮垫,注重成品保护,将吊具1穿过盖板预留孔中,旋转吊具1,使倒T型件的横向段兜托盖板,吊车头部设有吊钩8,将钢丝绳10悬挂在吊钩8上,人员操作吊车将盖板提起,再借助行走装置4推动吊车,行走装置4为单轴滚轮,可使用工地手推车轮子,综合考虑降低吊车自重及增加使用年限,滚轮外胎宽度为6.8cm,两轮胎间距为80cm,两名施工人员便可轻松将预制盖板准确放置到路堑边沟顶部槽口内,通过指挥人员调整盖板位置并辅助脱钩,保证左右两侧间距满足图纸及规范要求,继续循环盖板安装,直至路堑边沟盖板安装完成,后续使用干灰对缝隙进行填塞,安装后行车方向盖板无缝隙。The above-mentioned cutting edge ditch cover plate is used to install the construction device. According to the vertical and horizontal slope of the site, the counterweight is carried out on the counterweight platform 3 in advance. There are three 20*3*13cm reserved holes in the cutting edge ditch cover plate, and the structural form is designed according to the cover plate. , use round steel to make spreader 1, and install rubber pads around spreader 1, pay attention to the protection of finished products, pass spreader 1 through the reserved hole in the cover plate, rotate spreader 1, and make the horizontal section of the inverted T-shaped part pocket Hold the cover plate, the head of the crane is provided with a hook 8, and the wire rope 10 is suspended on the hook 8. The personnel operate the crane to lift the cover plate, and then push the crane with the help of the walking device 4. The walking device 4 is a single-axis roller, which can be used on the construction site. The wheel of the trolley is comprehensively considered to reduce the weight of the crane and increase the service life. The width of the wheel tire is 6.8cm, and the distance between the two tires is 80cm. Adjust the position of the cover plate and assist in decoupling to ensure that the distance between the left and right sides meets the requirements of the drawings and specifications. Continue to install the cover plate in a cycle until the installation of the cutting edge ditch cover plate is completed, and then use dry ash to fill the gap. After installation, the cover plate in the driving direction has no effect. gap.

吊车骨架材料为空心国标钢管,其制作利用杠杆原理,由两根空心管焊接进行对拉,大大节省人力,两侧分别有一根辅助钢管作为支撑,有效防止骨架变形,吊车骨架上安装有配重平台,可根据施工现场纵横坡及运距长短自行配重,提高人员施工效率,人员投入少,以往通过人工方式搬运盖板进行盖板安装,一天仅能安装200~250块,使用路堑边沟盖板安装施工装置,一天可安装350~400块预制盖板,极大提高施工效率,降低了人员的劳动强度,经现场检查,盖板安装拼缝宽度及盖板间距满足设计规范需求,保证了施工质量,装置成本低,结构简单,操作灵活方便。The frame material of the crane is hollow national standard steel pipe, which uses the principle of leverage. Two hollow tubes are welded and pulled in opposite directions, which greatly saves manpower. There is an auxiliary steel pipe on both sides as a support to effectively prevent the deformation of the frame. The crane frame is installed with a counterweight. The platform can be self-weighted according to the vertical and horizontal slopes of the construction site and the length of the transportation distance, which improves the construction efficiency of personnel and requires less personnel. In the past, the cover plate was manually transported for cover plate installation, and only 200 to 250 pieces could be installed a day. The cover plate installation and construction device can install 350 to 400 prefabricated cover plates a day, which greatly improves the construction efficiency and reduces the labor intensity of personnel. After on-site inspection, the width of the cover plate installation seam and the distance between the cover plates meet the requirements of the design specifications, ensuring that The construction quality is improved, the installation cost is low, the structure is simple, and the operation is flexible and convenient.

以上内容是结合优选技术方案对本实用新型所做的进一步详细说明,不能认定实用新型的具体实施仅限于这些说明。对本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型的构思的前提下,还可以做出简单的推演及替换,都应当视为本实用新型的保护范围。The above content is a further detailed description of the present invention in combination with the preferred technical solutions, and it cannot be considered that the specific implementation of the present invention is limited to these descriptions. For those of ordinary skill in the technical field of the present invention, simple deductions and replacements can be made without departing from the concept of the present invention, which should be regarded as the protection scope of the present invention.

Claims (9)

1. Cutting gutter apron installation construction equipment, its characterized in that: the lifting device comprises a crane and a lifting assembly, wherein the crane comprises a walking device (4), a crane framework and a crane auxiliary frame are respectively installed on the walking device (4), the crane framework comprises a first support frame (5) and a second support frame (6), one end of the first support frame (5) and one end of the second support frame (6) are respectively fixed on the middle point of the middle shaft of the walking device (4), a handrail (7) is installed at the other end of the first support frame (5), a lifting hook (8) is installed at the other end of the second support frame (6), the lifting assembly is suspended on the lifting hook (8), the lifting assembly comprises a lifting rope, two ends of the lifting rope are respectively and movably connected with a lifting appliance (1), the lifting appliance (1) rotates relative to the lifting rope, the lifting appliance (1) comprises a lifting ring and a reversed T-shaped piece fixed on the lifting ring, and the vertical section of the reversed T-shaped, the vertical section of the inverted T-shaped part penetrates through a preformed hole in the cover plate, and the transverse section of the inverted T-shaped part is located below the preformed hole and used for supporting the cover plate.
2. The cutting gutter cover plate installation and construction device of claim 1, wherein: and a counterweight platform (3) is also arranged on the second support frame (6).
3. The cutting gutter cover plate installation and construction device of claim 1, wherein: the anti-disengaging hook (9) is sleeved on the hoisting rope, and the anti-disengaging hook (9) is in contact with the lifting hook (8) and used for preventing the hoisting assembly from falling off.
4. The cutting gutter cover plate installation and construction device of claim 1, wherein: and the hanging ring is provided with a connecting hole for movably connecting a hoisting rope.
5. The cutting gutter cover plate installation and construction device of claim 1, wherein: the crane auxiliary frame comprises a vertical rod (11), the lower end of the vertical rod (11) is welded to the middle point of the middle shaft of the traveling device (4), support frames (12) are welded to two sides of the vertical rod (11), the two support frames (12) and the middle shaft of the traveling device (4) form a triangle, two auxiliary supports (2) are further welded to the vertical rod (11), and two ends of the two auxiliary supports (2) are respectively welded to the first support frame (5) and the second support frame (6).
6. The cutting trench cover plate installation and construction device according to any one of claims 1 to 5, characterized in that: the walking device (4) is a single-shaft roller.
7. The cutting trench cover plate installation and construction device according to any one of claims 1 to 5, characterized in that: the crane framework is made of hollow steel pipes.
8. The cutting trench cover plate installation and construction device according to any one of claims 1 to 5, characterized in that: and the lifting hook (8) is made of finish-rolled deformed steel.
9. The cutting trench cover plate installation and construction device according to any one of claims 1 to 5, characterized in that: the hoisting rope is a steel wire rope (10).
CN201921938929.3U 2019-11-12 2019-11-12 Installation and construction device of road cutting side ditch cover plate Expired - Fee Related CN210944766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921938929.3U CN210944766U (en) 2019-11-12 2019-11-12 Installation and construction device of road cutting side ditch cover plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921938929.3U CN210944766U (en) 2019-11-12 2019-11-12 Installation and construction device of road cutting side ditch cover plate

Publications (1)

Publication Number Publication Date
CN210944766U true CN210944766U (en) 2020-07-07

Family

ID=71376374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921938929.3U Expired - Fee Related CN210944766U (en) 2019-11-12 2019-11-12 Installation and construction device of road cutting side ditch cover plate

Country Status (1)

Country Link
CN (1) CN210944766U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112794254A (en) * 2020-12-23 2021-05-14 中国十九冶集团有限公司 Tool for mounting road side ditch cover plate
CN117686340A (en) * 2024-02-04 2024-03-12 菲普新材料科技(深圳)有限公司 Intensity detection system of ditch cover

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112794254A (en) * 2020-12-23 2021-05-14 中国十九冶集团有限公司 Tool for mounting road side ditch cover plate
CN117686340A (en) * 2024-02-04 2024-03-12 菲普新材料科技(深圳)有限公司 Intensity detection system of ditch cover
CN117686340B (en) * 2024-02-04 2024-04-16 菲普新材料科技(深圳)有限公司 Intensity detection system of ditch cover

Similar Documents

Publication Publication Date Title
CN211141352U (en) Combined track demolition device used in shield construction
CN204249072U (en) For stretch-draw and the baffle plate integrating device of precast beam stretch-draw
CN104032967B (en) Prefabricated assembled frame structure component construction method for hanging
CN204675673U (en) To construct between a kind of building block layer material vertical transferring apparatus
CN103274310B (en) Self-lifting type cableway transporting device
CN206172883U (en) Large pipe support promotes device of taking one's place
CN108455440A (en) Glass curtain wall large-size glass hoisting machine tool
CN203865931U (en) Hoisting combination tool of distribution transformer
CN201857761U (en) Hoisting and sliding device and hoisting and sliding equipment
CN203049587U (en) Multifunctional concrete storehouse surface placing boom
CN201762035U (en) A simple driving movable arm
CN106437047B (en) A kind of equipment transported for factory building roof plate with installing
CN210134344U (en) Trolley for mounting bridge center joint drain pipe
CN204897140U (en) Guide -car's wheel is changed and is used hoisting accessory
CN210049105U (en) Self-propelled bridge formwork operation trolley
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN209507399U (en) Be applied to prefab stable form hoist of sling cart
CN203581022U (en) GIS (geographic information system) equipment conveying device
CN207599140U (en) A kind of descending pipelines into ditch device
CN215666725U (en) A transportation hoisting device for downhole equipment
CN206158207U (en) Construction is with platform of unloading
CN205976394U (en) Convenient low layer construction scaffolding
CN204040442U (en) Integral lifting type elevator shaft operating platform
CN209618403U (en) A kind of handling device for slope
CN211169608U (en) Hanging basket prismatic sheet hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200707