CN210939781U - Turn round king's block precast concrete pouring platform dolly - Google Patents

Turn round king's block precast concrete pouring platform dolly Download PDF

Info

Publication number
CN210939781U
CN210939781U CN201921406206.9U CN201921406206U CN210939781U CN 210939781 U CN210939781 U CN 210939781U CN 201921406206 U CN201921406206 U CN 201921406206U CN 210939781 U CN210939781 U CN 210939781U
Authority
CN
China
Prior art keywords
supporting member
cross beam
platform
welded
pedal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921406206.9U
Other languages
Chinese (zh)
Inventor
殷立中
邹杨
张宇
王瑞新
刘�文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
Original Assignee
CCCC Tianjin Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Harbour Engineering Co Ltd filed Critical CCCC Tianjin Harbour Engineering Co Ltd
Priority to CN201921406206.9U priority Critical patent/CN210939781U/en
Application granted granted Critical
Publication of CN210939781U publication Critical patent/CN210939781U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a prefabricated concrete pouring platform trolley for twisted Chinese character 'wang', which comprises a left support component, a right support component and an upper support platform component; the left supporting component comprises two left upright columns and a left inclined supporting component, and traveling wheels are mounted at the lower ends of the left upright columns; the right supporting member comprises two right upright columns and a right inclined supporting member, and traveling wheels are mounted at the lower ends of the right upright columns; four pedal mounting area pedal panels of the upper support platform member; a pedal support beam is welded in the pedal mounting area on the lower surface of the pedal panel; and a triangular front inclined supporting member and a triangular rear inclined supporting member are welded between the front side surface and the rear side surface of the left upright and the right upright and the front cross beam and the rear cross beam of the upper supporting platform member respectively. The utility model discloses the cost is lower, and the technology is simple and convenient, and the construction is swift, and maneuverability is strong, has effectively solved the prefabrication and has turned round the difficult problem that king's word concrete tank car transportation and pouring cost are high, the concrete slump is big.

Description

Turn round king's block precast concrete pouring platform dolly
Technical Field
The utility model belongs to the technical field of turn round king's block prefabrication, especially, relate to an use turns round king's block precast concrete platform dolly below 5 t.
Background
In the traditional prefabrication construction of the twisted king blocks, concrete is mostly poured by a concrete tank truck or manually fed and poured. The concrete is transported and poured by the concrete tank truck by adopting the known technology and the traditional construction process, the concrete slump is larger, the construction cost is higher, and the common quality problems of the concrete are more.
Therefore, the trolley for the precast concrete pouring platform of the twisted king blocks is designed, the cost can be reduced, the construction efficiency can be improved, and the operability is high.
SUMMERY OF THE UTILITY MODEL
The problem that exists to prior art, the utility model provides a cost is lower, and the technology is simple and convenient, and the construction is swift, and maneuverability is strong, has effectively solved the prefabrication and has turned round the difficult problem of king's word concrete tank car transportation and casting cost height, concrete slump are big and turn round king's word precast concrete pouring platform dolly.
The utility model is realized in such a way, the precast concrete pouring platform trolley for the twisted king-shaped blocks is characterized by comprising a left supporting member, a right supporting member and an upper supporting platform member; the left supporting member and the right supporting member are in the same structure, the left supporting member and the right supporting member are respectively and vertically welded at the left end and the right end of the upper supporting member platform, and the left supporting member and the right supporting member are flush with the outer side edge of the supporting member platform;
the left supporting component comprises two left upright columns and a left inclined supporting component, the left inclined supporting component is positioned on the inner side surfaces of the two left upright columns, one end of the left inclined supporting component is welded on the left upright column, and the other end of the left inclined supporting component is welded on the upper supporting platform component; the lower ends of the left upright posts are provided with walking wheels;
the right inclined supporting member comprises two right upright columns and a right inclined supporting member, the right inclined supporting member is positioned on the inner side surfaces of the two right upright columns, one end of the right inclined supporting member is welded on the right upright column, and the other end of the right inclined supporting member is welded on the upper supporting platform member; the lower ends of the right upright posts are provided with walking wheels;
the upper supporting platform component comprises a frame, the frame is formed by sequentially welding a left cross beam, a right cross beam, a front cross beam and a rear cross beam, two middle longitudinal beams are symmetrically welded between the front cross beam and the rear cross beam, two middle cross beams are welded between the two longitudinal beams, and the two middle cross beams and the two longitudinal beams surround the middle position of the frame to form a feed opening; the middle longitudinal beam, the middle cross beam, the left cross beam, the right cross beam, the front cross beam and the rear cross beam of the frame are enclosed to form four pedal mounting areas; a pedal panel is welded in each pedal mounting area; a pedal support beam is welded in the pedal mounting area on the lower surface of the pedal panel; and a triangular front inclined supporting member and a triangular rear inclined supporting member are welded between the front side surface and the rear side surface of the left upright and the right upright and the front cross beam and the rear cross beam of the upper supporting platform member respectively.
The utility model discloses can also adopt following technical scheme:
go up the welding on the frame of supporting platform component and have the striker plate, the outflow of concrete when concrete placement has effectively been solved in the design of striker plate, has reduced the waste of concrete on the one hand, and on the other hand has improved the operational environment, reduces outflow cement adhesion and twists reverse the wang word and prefabricate the mould.
The footboard supporting beam all is provided with several in every footboard installing zone, and several footboard supporting beams form a plurality of triangle-shaped bearing structure in the footboard installing zone, improve the intensity that bears, and the stability that adopts triangle-shaped bearing structure in addition is high.
The left stand column of the left supporting member, the right stand column of the right supporting member and the frame of the upper supporting platform member are all made of channel steel, so that the processing and the welding are easy, and the materials are easy to draw simultaneously.
The left inclined supporting member, the right inclined supporting member, the front inclined supporting member, the rear inclined supporting member and the pedal supporting beam are all angle steels. Easy processing and welding, and easy material selection.
The utility model has the advantages and technological effect: the utility model discloses simple structure, convenient to use has effectively solved concrete tank car transportation, the big, lower grey quantity control difficulty of the slump of cast concrete, construction cost scheduling problem, greatly reduced construction cost, reduced the concrete common fault, improved construction quality for advantages such as construction progress. Because the utility model discloses an auxiliary stay all adopts the triangle-shaped structure, has improved the stability and the bearing strength of dolly greatly, in addition, this utility model has fully proved enforceability and economical through engineering embodiment experiment.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a rear view of FIG. 1;
FIG. 3 is a left side view of FIG. 1;
FIG. 4 is a right side view of FIG. 1;
fig. 5 is a top view of fig. 1 with the striker plate removed.
Middle, 10, left support member; 11. a left upright post; 12. a left diagonal support member; 13. a traveling wheel; 20. a right support member; 21. a right upright post; 22. a right diagonal support member; 23. a traveling wheel; 30. an upper support platform member; 31. a left cross beam; 32. a right cross member; 33. a front cross member; 34. a rear cross member; 35. a middle longitudinal beam; 36. a middle cross beam; 37. a feeding port; 38. a pedal panel; 38-1, pedal support beam; 39. a front diagonal support member; 40. a rear diagonal support member; 50. a striker plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The trolley for the precast concrete pouring platform for the twisted king-shaped blocks has the advantages of low cost, simple and convenient process, quick construction and strong operability, and effectively solves the problems of high transportation and pouring cost and large concrete slump of a precast twisted king-shaped concrete tank truck. Please refer to fig. 1 to 5 for the detailed structure;
a trolley for a precast concrete pouring platform of a twisted king block comprises a left supporting member 10, a right supporting member 20 and an upper supporting platform member 30; the left supporting member and the right supporting member are in the same structure, the left supporting member and the right supporting member are respectively and vertically welded at the left end and the right end of the upper supporting member platform, and the left supporting member and the right supporting member are flush with the outer side edge of the supporting member platform;
the left supporting member 10 comprises two left upright posts 11 and a left inclined supporting member 12, the left inclined supporting member is positioned on the inner side surfaces of the two left upright posts, one end of the left inclined supporting member is welded on the left upright post, and the other end of the left inclined supporting member is welded on the upper supporting platform member; the lower ends of the left upright posts are provided with walking wheels 13;
the right supporting member 20 comprises two right upright posts 21 and a right inclined supporting member 22, the right inclined supporting member is positioned on the inner side surfaces of the two right upright posts, one end of the right inclined supporting member is welded on the right upright post, and the other end of the right inclined supporting member is welded on the upper supporting platform member; the lower ends of the right upright posts are provided with walking wheels 23;
the upper supporting platform component 30 comprises a frame, the frame is formed by sequentially welding a left cross beam 31, a right cross beam 32, a front cross beam 33 and a rear cross beam 34, two middle longitudinal beams 35 are symmetrically welded between the front cross beam and the rear cross beam, two middle cross beams 36 are welded between the two longitudinal beams, and a feed opening 37 is formed by enclosing the two middle cross beams and the two longitudinal beams at the middle position of the frame; the middle longitudinal beam, the middle cross beam, the left cross beam, the right cross beam, the front cross beam and the rear cross beam of the frame are enclosed to form four pedal mounting areas; a pedal panel 38 is welded in each pedal mounting area; a pedal support beam 38-1 is welded in the pedal mounting area on the lower surface of the pedal panel; triangular front inclined supporting members 39 and triangular rear inclined supporting members 40 are welded between the front side surface and the rear side surface of the left upright post and the rear side surface of the right upright post and the front cross beam and the rear cross beam of the upper supporting platform member respectively.
The utility model discloses can also adopt following technical scheme:
go up the welding on the frame of supporting platform component and have striker plate 50, the outflow of concrete when concrete placement has effectively been solved in the design of striker plate, has reduced the waste of concrete on the one hand, and on the other hand has improved the operational environment, reduces outflow cement adhesion on turning round king's word prefabrication mould.
The footboard supporting beam all is provided with several in every footboard installing zone, and several footboard supporting beams form a plurality of triangle-shaped bearing structure in the footboard installing zone, improve the intensity that bears, and the stability that adopts triangle-shaped bearing structure in addition is high.
The left stand column of the left supporting member, the right stand column of the right supporting member and the frame of the upper supporting platform member are all made of channel steel, so that the processing and the welding are easy, and the materials are easy to draw simultaneously.
The left inclined supporting member, the right inclined supporting member, the front inclined supporting member, the rear inclined supporting member and the pedal supporting beam are all angle steels. Easy processing and welding, and easy material selection.
In addition, the plane size of the upper supporting platform component of the utility model is larger than the maximum size of the twisted Chinese character 'wang', and the lower ash hole of the platform is slightly smaller than the top opening of the template, so as to prevent the concrete from falling outside the template;
the utility model is slightly higher than the template of the twisted king character block;
the utility model discloses the application method, at first, artifical support the template, the template is on a straight line as far as possible; after the template is erected, manually pushing the trolley to the position of the template, and aligning the ash outlet of the platform with the position of the top opening of the template; pouring concrete on a trolley platform by a loader, and manually discharging ash; and manually vibrating the concrete, and manually pushing the trolley to the position of the next template after the concrete is poured.
The utility model discloses make full use of the flexibility of small-size device, be applicable to the construction of little slump concrete, adopt the dump truck transportation, the loader directly falls the concrete on the platform dolly, and artifical cooperation divides the ash, reduces workman intensity of labour, has both satisfied the needs of construction, has improved the construction progress, improves construction quality, can reduce the concrete slump when the configuration concrete, reduces concrete water cement ratio, has practiced thrift engineering cost greatly.
The above description is only exemplary of the present invention and should not be taken as limiting, and any modifications, equivalents, improvements, etc., which are made within the spirit and principles of the present invention, such as square steel, should be considered within the scope of the present invention.

Claims (5)

1. A prefabricated concrete pouring platform trolley for a twisted king-shaped block is characterized by comprising a left supporting member, a right supporting member and an upper supporting platform member; the left supporting member and the right supporting member are in the same structure, the left supporting member and the right supporting member are respectively and vertically welded at the left end and the right end of the upper supporting member platform, and the left supporting member and the right supporting member are flush with the outer side edge of the supporting member platform;
the left supporting component comprises two left upright columns and a left inclined supporting component, the left inclined supporting component is positioned on the inner side surfaces of the two left upright columns, one end of the left inclined supporting component is welded on the left upright column, and the other end of the left inclined supporting component is welded on the upper supporting platform component; the lower ends of the left upright posts are provided with walking wheels;
the right inclined supporting member comprises two right upright columns and a right inclined supporting member, the right inclined supporting member is positioned on the inner side surfaces of the two right upright columns, one end of the right inclined supporting member is welded on the right upright column, and the other end of the right inclined supporting member is welded on the upper supporting platform member; the lower ends of the right upright posts are provided with walking wheels;
the upper supporting platform component comprises a frame, the frame is formed by sequentially welding a left cross beam, a right cross beam, a front cross beam and a rear cross beam, two middle longitudinal beams are symmetrically welded between the front cross beam and the rear cross beam, two middle cross beams are welded between the two longitudinal beams, and the two middle cross beams and the two longitudinal beams surround the middle position of the frame to form a feed opening; the middle longitudinal beam, the middle cross beam, the left cross beam, the right cross beam, the front cross beam and the rear cross beam of the frame are enclosed to form four pedal mounting areas; a pedal panel is welded in each pedal mounting area; a pedal support beam is welded in the pedal mounting area on the lower surface of the pedal panel; and a triangular front inclined supporting member and a triangular rear inclined supporting member are welded between the front side surface and the rear side surface of the left upright and the right upright and the front cross beam and the rear cross beam of the upper supporting platform member respectively.
2. The precast concrete platform trolley for twisted king blocks according to claim 1, wherein: and a striker plate is welded on the frame of the upper supporting platform component.
3. The precast concrete platform trolley for twisted king blocks according to claim 1, wherein: the pedal supporting beams are arranged in each pedal mounting area and form a plurality of triangular supporting structures in the pedal mounting areas.
4. The precast concrete platform trolley for twisted king blocks according to claim 1, wherein: the left upright post of the left supporting member, the right upright post of the right supporting member and the frame of the upper supporting platform member are all made of channel steel.
5. The wrest queen block precast concrete pouring platform trolley according to claim 4, characterized in that: the left inclined supporting member, the right inclined supporting member, the front inclined supporting member, the rear inclined supporting member and the pedal supporting beam are all angle steels.
CN201921406206.9U 2019-08-27 2019-08-27 Turn round king's block precast concrete pouring platform dolly Active CN210939781U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921406206.9U CN210939781U (en) 2019-08-27 2019-08-27 Turn round king's block precast concrete pouring platform dolly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921406206.9U CN210939781U (en) 2019-08-27 2019-08-27 Turn round king's block precast concrete pouring platform dolly

Publications (1)

Publication Number Publication Date
CN210939781U true CN210939781U (en) 2020-07-07

Family

ID=71373657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921406206.9U Active CN210939781U (en) 2019-08-27 2019-08-27 Turn round king's block precast concrete pouring platform dolly

Country Status (1)

Country Link
CN (1) CN210939781U (en)

Similar Documents

Publication Publication Date Title
CN104863375B (en) Multifunctional circulation transport cart
CN201666157U (en) Inverted arch integral type moving die carrier
CN201738250U (en) Arch culvert and arch ring steel die trolley
CN100547174C (en) The prefab form and the construction technology thereof of concrete flow passage gradual change fillet segment top board construction
CN210622302U (en) Pouring template for building construction
CN210939781U (en) Turn round king's block precast concrete pouring platform dolly
CN102206934B (en) Method for block-by-block casting of concrete continuous beam bridge by using military truss shift mould
CN207482772U (en) A kind of applied to precasting yard concrete transportation and the operation for moving beam vehicle
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN201495664U (en) Novel hollow floor slab with precast prestress
CN106013014B (en) A kind of jacked piles with small section side wall lining formwork erection constructing device
CN205712565U (en) A kind of prefabricated two-sided wall
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN209277899U (en) A kind of tunnel lining trolley that lining cutting surface quality is good
CN210530314U (en) Formwork frame is pour to steel concrete combination shear wall T type node
CN211250709U (en) Concrete prefabricated part web stirrup positioning device
CN211081900U (en) Tunnel reinforcing structure
CN208280134U (en) A kind of pile foundation construction operation platform device
CN210460691U (en) City gate-type tunnel lining quick detach template system
CN212828427U (en) Reinforcing steel bar framework transport tool
CN101914990B (en) Beam-type transition layer cast-in-situ crossbeam construction formwork supporting system
CN217537791U (en) Pin-connected panel walking operation platform truck
CN218862104U (en) Column formwork reinforced structure
CN214994613U (en) Double-concrete-beam and concrete frame column connecting structure for building design
CN209011560U (en) Metro Station Structure frame column punching block ruggedized construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210421

Address after: 300461 No. 41, Taierzhuang Road, Tianjin, Hexi District

Patentee after: CCCC TIANJIN DREDGING Co.,Ltd.

Patentee after: CCCC TIANJIN DREDGING HARBOUR CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 300480 No. 8 Dongheng Street, Hangu, Binhai New Area, Tianjin

Patentee before: CCCC TIANJIN DREDGING HARBOUR CONSTRUCTION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right