CN210936422U - Waste treatment equipment that building site used - Google Patents

Waste treatment equipment that building site used Download PDF

Info

Publication number
CN210936422U
CN210936422U CN201921951489.5U CN201921951489U CN210936422U CN 210936422 U CN210936422 U CN 210936422U CN 201921951489 U CN201921951489 U CN 201921951489U CN 210936422 U CN210936422 U CN 210936422U
Authority
CN
China
Prior art keywords
waste material
installation shell
waste
power shaft
treatment structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921951489.5U
Other languages
Chinese (zh)
Inventor
唐进财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhongqiang Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921951489.5U priority Critical patent/CN210936422U/en
Application granted granted Critical
Publication of CN210936422U publication Critical patent/CN210936422U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Abstract

The utility model discloses a waste material treatment device for construction sites, wherein the whole waste material treatment structure is a cone structure, a first rib is spirally arranged on the outer side wall of the waste material treatment structure, the waste material treatment structure is installed in an installation shell in a horizontal mode, one end face with smaller bottom area of the waste material treatment structure is communicated with the external environment and is set as a discharge port, a power shaft is fixedly connected on one end face with larger bottom area of the waste material treatment structure, the middle section of the power shaft is connected with the power of a driving motor, and the other end of the power shaft is fixedly provided with a balancing weight; the peripheral installation shell part of waste material processing structure is provided with the second rib of spiral arrangement and second rib and first rib do not take place to interfere, and the top of installation shell is provided with the feed inlet and the feed inlet is linked together with the side of the great one end department of waste material processing structure basal area. The utility model discloses have to the crooked compression of waste material efficient, be convenient for to its beneficial effect that the building site used of collecting and outward transport.

Description

Waste treatment equipment that building site used
Technical Field
The utility model relates to a construction waste handles technical field, specific waste material treatment facility that building site used that says so.
Background
A great deal of construction waste is often produced in the construction process of a building, most of the construction waste is waste reinforcing steel bars, steel plate materials and waste concrete materials, the waste reinforcing steel bars and steel plate materials have recycling value, but the construction waste is used as the waste of a construction site, the structural form of the construction waste is irregular, and the construction waste is compacted in the collection process.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned weak point that exists among the prior art, the utility model aims at providing a to the crooked compression of waste material efficient, be convenient for to its collection and the waste material treatment facility for building site of outward transport.
The utility model discloses a realize that the technical scheme that above-mentioned purpose adopted is: the waste treatment equipment for the construction site comprises an installation shell and a treatment mechanism, wherein the treatment mechanism is installed inside the installation shell and comprises a waste treatment structure, a driving motor, a power shaft and a balancing weight, the waste treatment structure is integrally of a cone structure, first ribs are spirally arranged on the outer side wall of the waste treatment structure, the waste treatment structure is installed in the installation shell in a horizontal mode, one end face of the waste treatment structure with the smaller bottom area is communicated with the external environment and is set as a discharge port, the power shaft is fixedly connected to one end face of the waste treatment structure with the larger bottom area, the middle section of the power shaft is in power connection with the driving motor, and the balancing weight is fixedly installed at the other end of the power shaft; the peripheral installation shell part department of waste material processing structure is provided with the second rib of spiral arrangement just second rib and first rib do not take place to interfere, the top of installation shell is provided with the feed inlet just the feed inlet with the side of the great one end department of waste material processing structure basal area is linked together.
Further, the installation shell includes waste material processing part and equipment fixing part, the waste material processing structure sets up in the waste material processing part, driving motor, power shaft, balancing weight set up in the equipment fixing part, driving motor adopts the horizontal mounting means fixed mounting just in the installation shell fixed mounting has a running gear in driving motor's the axis of rotation, the middle section department fixed mounting of power shaft has drive gear, drive gear and running gear meshing are connected.
Furthermore, a circular partition plate is fixedly connected to the end face of the end with the larger bottom area of the waste treatment structure, the edge of the circular partition plate is in contact with the installation shell and keeps rotating relatively, and the installation shell is divided into a waste treatment part and an equipment installation part by the circular partition plate.
Furthermore, more than two sets of mounting bearings which are oppositely arranged are arranged in the equipment mounting part, and the power shaft is clamped in the mounting bearings in a relative rotating mode.
Furthermore, the bottom of the mounting shell is provided with a foundation fixing seat.
The utility model has the advantages that: because the construction waste is the incomplete section of reinforcing bar, steel sheet for the majority, has feed inlet input waste material processing portion with this part construction waste, drives the waste material processing structure rotation at driving machine work, because take place relative rotation between first rib and the second rib, carries out crooked extrusion to construction waste to compress into the steel ring of closely arranging with irregular reinforcing bar waste, realize the crooked compression of waste material efficient, be convenient for to its beneficial effect of collecting and outward transport.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure: the device comprises an installation shell 1, a waste treatment structure 2, a driving motor 3, a power shaft 4, a balancing weight 5, a first rib 6, a discharge port 7, a second rib 8, a feed port 9, a waste treatment part 10, an equipment installation part 11, a rotating gear 12, a transmission gear 13, a circular partition plate 14 and an installation bearing 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, a waste treatment device for a construction site comprises an installation shell 1 and a treatment mechanism, wherein the treatment mechanism is installed inside the installation shell 1 and comprises a waste treatment structure 2, a driving motor 3, a power shaft 4 and a balancing weight 5, the waste treatment structure 2 is integrally in a cone structure, a first rib 6 is spirally arranged on the outer side wall of the waste treatment structure 2, the waste treatment structure 2 is installed in the installation shell 1 in a horizontal mode, the end face of one end with a smaller bottom area of the waste treatment structure 2 is communicated with the external environment and is set as a discharge hole 7, the end face of one end with a larger bottom area of the waste treatment structure 2 is fixedly connected with the power shaft 4, the middle section of the power shaft 4 is in power connection with the driving motor 3, and the balancing weight 5 is fixedly installed at the other end of the power; the part of the installation shell 1 at the periphery of the waste treatment structure 2 is provided with second ribs 8 which are spirally arranged, the second ribs 8 do not interfere with the first ribs 6, the top of the installation shell 1 is provided with a feed inlet 9, and the feed inlet 9 is communicated with the side surface at the end with larger bottom area of the waste treatment structure 2.
In the utility model, the installation shell 1 comprises a waste treatment part 10 and an equipment installation part 11, a waste treatment structure 2 is arranged in the waste treatment part 10, the driving motor 3, the power shaft 4 and the balancing weight 5 are arranged in the equipment installation part 11, the driving motor 3 is fixedly installed in the installation shell 1 in a horizontal installation mode, a rotating gear 12 is fixedly installed on a rotating shaft of the driving motor 3, a transmission gear 13 is fixedly installed at the middle section of the power shaft 4, the transmission gear 13 is meshed with the rotating gear 12 to ensure that the driving motor 3 stably transmits the power generated by the work to the power shaft 4, and the power shaft 4 drives the waste treatment structure 2 to stably rotate, so that the construction waste is stably treated;
a circular partition plate 14 is fixedly connected to the end face of one end with a larger bottom area of the waste treatment structure 2, the edge of the circular partition plate 14 is in contact with the installation shell 1 and keeps relative rotation, the installation shell 1 is divided into a waste treatment part 10 and an equipment installation part 11 by the circular partition plate 14, and the waste materials are prevented from entering the equipment installation part 11 to damage equipment in the waste treatment process;
more than two sets of mounting bearings 15 which are oppositely arranged are arranged in the equipment mounting part 11, and the power shaft 4 is clamped in the mounting bearings 15 in a relative rotation mode, so that the stable rotation of the power shaft 4 is further ensured;
the lower margin fixing base is installed to installation shell 1 bottom, guarantees the stability of this application in the course of the work.
The utility model discloses a theory of operation is: because the construction waste is the incomplete section of reinforcing bar, steel sheet for the majority, with this part construction waste have feed inlet 9 input waste disposal part 10, drive waste disposal structure 2 rotation at driving machine work, because take place relative rotation between first rib 6 and the second rib 8, carry out crooked extrusion to construction waste to compress into the steel ring of closely arranging with irregular reinforcing bar waste, be convenient for to its collection and outward transport.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. A waste treatment apparatus for a construction site, characterized in that: comprises an installation shell (1) and a processing mechanism, wherein the processing mechanism is arranged in the installation shell (1), the treatment mechanism comprises a waste treatment structure (2), a driving motor (3), a power shaft (4) and a balancing weight (5), the whole waste material treatment structure (2) is in a cone structure, the outer side wall of the waste material treatment structure (2) is spirally provided with first ribs (6), the waste treatment structure (2) is horizontally arranged in the installation shell (1), one end face with smaller bottom area of the waste treatment structure (2) is communicated with the external environment and is provided with a discharge hole (7), the end face of one end with larger bottom area of the waste material treatment structure (2) is fixedly connected with the power shaft (4), the middle section of the power shaft (4) is in power connection with the driving motor (3), the other end of the power shaft (4) is fixedly provided with the balancing weight (5); the waste material treatment structure is characterized in that a second rib (8) which is arranged in a spiral mode is arranged at the part of an installation shell (1) on the periphery of the waste material treatment structure (2), the second rib (8) is not interfered with a first rib (6), a feeding hole (9) is formed in the top of the installation shell (1), and the feeding hole (9) is communicated with the side face of the end, with the large bottom area, of the waste material treatment structure (2).
2. The waste treatment apparatus for construction sites of claim 1 wherein: installation shell (1) includes waste material processing part (10) and equipment fixing part (11), waste material processing structure (2) sets up in waste material processing part (10), driving motor (3), power shaft (4), balancing weight (5) set up in equipment fixing part (11), driving motor (3) adopt the mounting means fixed mounting of recumbent in installation shell (1) just fixed mounting has rotating gear (12) in the axis of rotation of driving motor (3), the middle part department fixed mounting of power shaft (4) has drive gear (13), drive gear (13) are connected with rotating gear (12) meshing.
3. A waste treatment plant for construction sites, according to claim 2, characterized in that: the waste material processing structure is characterized in that a circular partition plate (14) is fixedly connected to the end face of the end with the larger bottom area of the waste material processing structure (2), the edge of the circular partition plate (14) is in contact with the installation shell (1) and keeps rotating relatively, and the installation shell (1) is divided into a waste material processing part (10) and an equipment installation part (11) by the circular partition plate (14).
4. A waste treatment plant for construction sites according to claim 3, characterized in that: more than two sets of mounting bearings (15) which are oppositely arranged are arranged in the equipment mounting part (11), and the power shaft (4) is clamped in the mounting bearings (15) in a relative rotating mode.
5. The waste treatment apparatus for construction sites of claim 1 wherein: the bottom of the mounting shell (1) is provided with a foundation fixing seat.
CN201921951489.5U 2019-11-13 2019-11-13 Waste treatment equipment that building site used Expired - Fee Related CN210936422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921951489.5U CN210936422U (en) 2019-11-13 2019-11-13 Waste treatment equipment that building site used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921951489.5U CN210936422U (en) 2019-11-13 2019-11-13 Waste treatment equipment that building site used

Publications (1)

Publication Number Publication Date
CN210936422U true CN210936422U (en) 2020-07-07

Family

ID=71391765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921951489.5U Expired - Fee Related CN210936422U (en) 2019-11-13 2019-11-13 Waste treatment equipment that building site used

Country Status (1)

Country Link
CN (1) CN210936422U (en)

Similar Documents

Publication Publication Date Title
CN211842413U (en) Novel waste treatment equipment for wood working
CN210151808U (en) River course device of decontaminating
CN110961207A (en) Breaker that building solid waste recycled
CN205965978U (en) High -efficient type electrode anode material circulation breaker
CN112387378A (en) Garbage crushing device for environment-friendly recycling bin
CN206304851U (en) A kind of building material crushes feeding device
CN108262141A (en) A kind of building waste fast-crushing device
CN112808400A (en) Kitchen garbage processing apparatus convenient to use
CN210936422U (en) Waste treatment equipment that building site used
CN111359744A (en) Construction waste treatment device
CN214636772U (en) Waste treatment device that building site used
CN207102722U (en) A kind of multi-stage crushing device of building waste
CN112387357B (en) Antiwind anti-sticking dies double-cutter head garbage disposer
CN205413180U (en) SCR denitration catalyst cutting reducing mechanism
CN215353865U (en) Novel construction waste retrieves for construction device
CN107715975A (en) One kind building culled wood reducing mechanism
CN214491079U (en) High-efficient blending device of raw materials for gangue baked brick production
CN214833365U (en) Municipal works slot rubbish cleaning device
CN213914003U (en) Crushing and screening device convenient to move
CN214600493U (en) Sorting device for recycling treatment of construction waste
CN212237461U (en) Garbage disposal equipment for construction to dust is handled
CN211838140U (en) Based on processing apparatus for building engineering
CN213000287U (en) Building reducing mechanism
CN215197204U (en) Solid waste treatment device
CN212918945U (en) Steel section collector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210611

Address after: 242000 No.14, building D, Zhenxing East Street, Wuxing Township, Xuanzhou District, Xuancheng City, Anhui Province

Patentee after: Anhui Zhongqiang Construction Engineering Co.,Ltd.

Address before: No. 1, shanzhutang, Henggang village committee, Lishao Town, Luoding City, Yunfu City, Guangdong Province, 527239

Patentee before: Tang Jincai

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200707

Termination date: 20211113

CF01 Termination of patent right due to non-payment of annual fee