CN210918249U - Template split bolt sleeve - Google Patents

Template split bolt sleeve Download PDF

Info

Publication number
CN210918249U
CN210918249U CN201921629716.2U CN201921629716U CN210918249U CN 210918249 U CN210918249 U CN 210918249U CN 201921629716 U CN201921629716 U CN 201921629716U CN 210918249 U CN210918249 U CN 210918249U
Authority
CN
China
Prior art keywords
sleeve
movable
plate
fixed
water stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921629716.2U
Other languages
Chinese (zh)
Inventor
胡忠刚
吕春侠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puyang Hengrui Building Material Technology Co ltd
Original Assignee
Puyang Hengrui Building Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Puyang Hengrui Building Material Technology Co ltd filed Critical Puyang Hengrui Building Material Technology Co ltd
Priority to CN201921629716.2U priority Critical patent/CN210918249U/en
Application granted granted Critical
Publication of CN210918249U publication Critical patent/CN210918249U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a template split bolt sleeve, which comprises a sleeve, a fixed clamp plate, a movable clamp plate, a fixed water stop plate and a movable water stop plate, wherein the sleeve is of a hollow structure, the fixed water stop plate is fixedly arranged at one end of the sleeve, a fastening thread is arranged at the other end of the sleeve, and the movable water stop plate is arranged on the fastening thread; the middle part of the sleeve is provided with an external thread, one end of the external thread is provided with a fixed clamp plate, the fixed clamp plate is provided with a ribbed plate, a movable clamp plate is arranged on the external thread, one side of the movable clamp plate is provided with a sleeve, a ribbed plate is arranged between the sleeve and the movable clamp plate, and a heat-insulating plate is arranged between the fixed clamp plate and the movable clamp plate; generally, the utility model is convenient for installing and taking out the split bolt, and can ensure the recycling of the split bolt; the heat insulation board can be fixed, the use of a part of locators is saved, and the construction efficiency is improved.

Description

Template split bolt sleeve
Technical Field
The utility model belongs to the technical field of the construction apparatus, especially, relate to a template split bolt sleeve pipe.
Background
With the continuous improvement of the building energy-saving requirement and the building fire-proof standard requirement, the external thermal insulation of the building external wall can not completely meet the industry requirement. At present, the heat preservation and structure integration in the technology of the built-in heat preservation cast-in-place concrete composite shear wall is more and more popularized, a net rack plate consisting of a heat preservation plate and a steel wire mesh is arranged in the middle of a wall body, and concrete is simultaneously poured on two sides of the wall body during construction to form a composite heat preservation structure system. When thermal insulation wall constructs, generally need be fixed in the steel reinforcement cage with the heated board with the locator, prevent that the heated board from taking place the condition of skew. Meanwhile, in the construction process of the heat insulation wall body, a split bolt is needed and used for the tie between the inner formwork and the outer formwork of the wall body to bear the lateral pressure and other loads of concrete, so that the space between the inner formwork and the outer formwork can meet the design requirement, and the split bolt is also the fulcrum of the formwork and the supporting structure thereof; in order to facilitate recycling of the split bolts, split bolt sleeves need to be arranged in advance during construction.
At present, the installation difficulty of the positioner is high, the workload of workers is high, and the construction progress is influenced. If can set up some fixing device to the stay bolt sleeve pipe, play certain fixed action to the heated board, play the function the same with the locator, replace the use of some locators, reduce the installation quantity of locator, improve the efficiency of construction.
Disclosure of Invention
An object of the utility model is to provide a template is to stay bolt sleeve pipe, this sleeve pipe simple structure, it is simple and convenient to make the installation, can guarantee the cyclic recycle of stay bolt on the one hand, and on the other hand can play the fixed action to the heated board, has high use value.
The purpose of the utility model is realized like this: a template split bolt sleeve comprises a sleeve, a fixed clamp plate, a movable clamp plate, a fixed water stop plate and a movable water stop plate, wherein the sleeve is of a hollow structure, the fixed water stop plate is fixedly arranged at one end of the sleeve, a fastening thread is arranged at the other end of the sleeve, and the movable water stop plate is arranged on the fastening thread; the sleeve pipe middle part set up the external screw thread, the one end department of external screw thread set up solid fixed splint, solid fixed splint department set up the floor, the external screw thread on install movable splint, one side of movable splint set up the sleeve, sleeve and movable splint between set up the floor, solid fixed splint, movable splint between set up the heated board.
Further, the diameter of the movable clamping plate is 2-3 times of the outer diameter of the sleeve.
Further, the diameter of the movable water stop plate is 2-3 times of the outer diameter of the sleeve, and the diameter of the fixed clamping plate is the same as that of the movable water stop plate.
Furthermore, the fixed splint and the fixed water stop plate are arranged on the same side.
Furthermore, the movable clamping plate and the movable water stop plate are arranged on the same side.
The utility model discloses the beneficial effect who produces is: firstly, the utility model discloses set up the external screw thread in the sleeve pipe outside, the movable clamp plate's of being convenient for installation with take off, and can move through twisting to solid fixed splint to press from both sides tight heated board. Secondly, the utility model discloses the solid fixed splint and the activity splint that set up on the sleeve pipe play the fixed action to the heated board, have played the function the same with the locator, can reduce the installation volume of locator, save material and manual work have improved the efficiency of construction. Thirdly, the utility model discloses the fixed stagnant water board and the activity stagnant water board that set up play certain stagnant water effect, prevent to corrode the reinforcing bar in the sleeve pipe from the water that concrete and casing mouth portion oozed.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is the utility model discloses the structural schematic diagram when installing on the heated board.
Fig. 3 is a schematic perspective view of the movable splint.
In the figure: 1. the heat-insulation board comprises a sleeve 2, a fixed clamping plate 3, a movable clamping plate 4, a fixed water stop plate 5, a movable water stop plate 6, a fastening thread 7, an external thread 8, a rib plate 9, a sleeve 10 and a heat-insulation board.
Detailed Description
The embodiments of the present invention will be further described with reference to the accompanying drawings.
Example 1
As shown in the attached drawings 1-3, the template split bolt sleeve comprises a sleeve 1, a fixed clamp plate 2, a movable clamp plate 3, a fixed water stop plate 4 and a movable water stop plate 5, wherein the sleeve 1 is of a hollow structure, the fixed water stop plate 4 is fixedly arranged at one end of the sleeve 1, a fastening thread 6 is arranged at the other end of the sleeve 1, and the movable water stop plate 5 is arranged on the fastening thread 6; sleeve pipe 1 middle part set up external screw thread 7, the one end department of external screw thread 7 set up solid fixed splint 2, solid fixed splint 2 department set up floor 8, external screw thread 7 on install movable splint 3, one side of movable splint 3 set up sleeve 9, sleeve 9 and movable splint 2 between set up floor 8, solid fixed splint 2, movable splint 3 between set up heated board 10.
Further, the diameter of the movable clamping plate 3 is 2-3 times of the outer diameter of the sleeve 1.
Furthermore, the diameter of the movable water stop plate 5 is twice of the outer diameter of the sleeve 1, and the diameter of the fixed clamping plate 2 is the same as that of the movable water stop plate 5.
Furthermore, the fixed splint 2 and the fixed water stop plate 4 are arranged on the same side.
Furthermore, the movable clamping plate 3 and the movable water stop plate 5 are arranged on the same side.
The utility model discloses when using: after the heat insulation plate is installed on the steel reinforcement cage, drilling a sleeve on the heat insulation plate to penetrate through a required hole, penetrating the end part of the external thread of the sleeve through the heat insulation plate, and enabling the fixing clamp plate to be tightly attached to the side face of the heat insulation plate; then, the movable clamping plate penetrates through the fastening threaded end of the sleeve and is installed on the external thread, and the movable clamping plate is rotated to enable the movable clamping plate to be tightly attached to the other side face of the heat insulation plate. Then, the movable water stop plate is screwed on the fastening screw threads, then the template is supported, and finally the split bolt is installed in the sleeve.
Generally, the utility model is convenient for installing and taking out the split bolt, and can ensure the recycling of the split bolt; the heat insulation board can be fixed, the use of a part of locators is saved, and the construction efficiency is improved.

Claims (5)

1. The utility model provides a template split bolt sleeve pipe, includes sleeve pipe, solid fixed splint, activity splint, fixed stagnant water board, activity stagnant water board, the sleeve pipe be hollow structure, its characterized in that: one end of the sleeve is fixedly provided with a fixed water stop plate, the other end of the sleeve is provided with a fastening thread, and a movable water stop plate is arranged on the fastening thread; the sleeve pipe middle part set up the external screw thread, the one end department of external screw thread set up solid fixed splint, solid fixed splint department set up the floor, the external screw thread on install movable splint, one side of movable splint set up the sleeve, sleeve and movable splint between set up the floor, solid fixed splint, movable splint between set up the heated board.
2. The formwork split bolt bushing of claim 1, wherein: the diameter of the movable clamping plate is 2-3 times of the outer diameter of the sleeve.
3. The formwork split bolt bushing of claim 1, wherein: the diameter of the movable water stop plate is 2-3 times of the outer diameter of the sleeve, and the diameter of the fixed clamping plate is the same as that of the movable water stop plate.
4. The formwork split bolt bushing of claim 1, wherein: the fixed clamping plate and the fixed water stop plate are arranged on the same side.
5. The formwork split bolt bushing of claim 1, wherein: the movable clamping plate and the movable water stop plate are arranged on the same side.
CN201921629716.2U 2019-09-27 2019-09-27 Template split bolt sleeve Expired - Fee Related CN210918249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921629716.2U CN210918249U (en) 2019-09-27 2019-09-27 Template split bolt sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921629716.2U CN210918249U (en) 2019-09-27 2019-09-27 Template split bolt sleeve

Publications (1)

Publication Number Publication Date
CN210918249U true CN210918249U (en) 2020-07-03

Family

ID=71366152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921629716.2U Expired - Fee Related CN210918249U (en) 2019-09-27 2019-09-27 Template split bolt sleeve

Country Status (1)

Country Link
CN (1) CN210918249U (en)

Similar Documents

Publication Publication Date Title
CN110761456A (en) Cast-in-place meshed composite heat-insulation wall system with water stop bolts and implementation process
CN208534048U (en) Thermometric Screw arbor with nut at both-ends for priming system and high radiation worker-house large volume concrete structural
CN103114722A (en) Three-sectional water stopping screw for basement exterior wall
CN206289945U (en) A kind of assembled Portable safety crosshead
CN210918249U (en) Template split bolt sleeve
CN106760523A (en) Wall split bolt method to set up on the outside of the underground structure that can be reused
CN211279058U (en) Prefabricated assembled concrete structure fast-assembling sleeve built-in fitting
CN203347233U (en) Tapered tie bolt for large steel formworks
CN207332318U (en) A kind of Prefabricated outer wall load bearing wall assembly type is to idler arm
CN216041972U (en) Installation assembly in steel wire mesh combined heat-insulation plate cast-in-place concrete wall
CN110185261A (en) A kind of shear wall formwork inner supporting structure
CN206591839U (en) A kind of reinforcing bar posting having enough to meet the need
CN112609963B (en) Installation anchoring device of composite heat-insulation template and use method thereof
CN215443119U (en) ALC wallboard entrance to a cave pouring structure
CN212248808U (en) Connecting device for cast-in-place concrete structure building outer wall heat preservation system
CN210976195U (en) Cast-in-place has net compound incubation wall system with stagnant water bolt
CN211949042U (en) Cast-in-place and prefabricated heat preservation integration system of building outer wall
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN203097291U (en) Reinforcing and counter-pulling device of building construction formwork
CN210622270U (en) Scaffold suitable for shear force wall
CN209817441U (en) Aluminum alloy template pull rod fixing device
CN203213319U (en) Water stopping steel plate fixing device in building construction
CN212613373U (en) Assembled truss and wall form system of no perforation heat preservation
CN205777445U (en) A kind of external scaffolding assembled drawknot dot structure
CN212948418U (en) Wall connecting piece for connecting inner and outer disassembly-free templates and steel reinforcement cage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200703

Termination date: 20210927

CF01 Termination of patent right due to non-payment of annual fee