CN209817441U - Aluminum alloy template pull rod fixing device - Google Patents
Aluminum alloy template pull rod fixing device Download PDFInfo
- Publication number
- CN209817441U CN209817441U CN201822276115.XU CN201822276115U CN209817441U CN 209817441 U CN209817441 U CN 209817441U CN 201822276115 U CN201822276115 U CN 201822276115U CN 209817441 U CN209817441 U CN 209817441U
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- pull rod
- construction
- flat iron
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides an aluminum alloy template pull rod fixing device, belonging to the technical field of construction engineering; the technical problems of high construction difficulty, high loss and high cost of the existing aluminum alloy template are solved; a pull rod fixing device for an aluminum alloy template comprises a flat iron, wherein the flat iron is in a flat long strip shape and is axially arranged, first connecting holes are formed in two ends of the flat iron, and the flat iron is used for connecting two opposite templates and is pre-embedded into concrete; one end of the L-shaped connecting piece is provided with a hook part, the other end of the L-shaped connecting piece is provided with a second connecting hole, the second connecting hole is fixedly connected with the first connecting hole through a bolt, and a fin is arranged on the outer side wall of the L-shaped connecting piece; this pull rod fixing device, its simple structure, maneuverability is strong, only loses this item of band iron after pouring the completion, has practiced thrift construction cost greatly, simultaneously, compares in traditional screw thread pull rod, and this device greatly reduced construction cycle, reduced the construction degree of difficulty simultaneously.
Description
Technical Field
The utility model belongs to the technical field of the building engineering construction, a aluminum alloy template pull rod fixing device is related to.
Background
With the development of aluminum alloy templates and the large application of the aluminum alloy templates in construction projects. The aluminum alloy template has the advantages of light weight, convenient disassembly and smooth and flat surface of the poured concrete. The aluminum alloy template is used, the disassembly is convenient, the transportation cost can be effectively reduced, and the construction period is saved. In the concrete formwork pouring construction. When concrete is poured into the formwork, the concrete is diffused outwards due to gravity, the formwork is easily pushed outwards, and meanwhile, when the concrete is condensed, a certain amount of expansion of the concrete can be generated, so that the formwork expansion phenomenon can be caused. When the concrete formwork is poured, a threaded pull rod device is mostly adopted for fixing the aluminum alloy formwork. The threaded connecting rod is convenient to connect and can tightly fix the aluminum alloy template.
But threaded connecting rods are costly. The connecting rod is required to traverse the whole aluminum alloy formwork pouring area. The amount of fixing screws used is large. After pouring is finished, the screw rod is greatly injected into concrete, and protruding parts at two ends of the screw rod need to be cut off. Two ends of the threaded connecting rod are fixed in a nut screwing mode. When concrete pouring construction is carried out, a large number of aluminum alloy templates are often needed to be used as supports, and threaded connecting rods are used for connection, so that the construction workload is greatly increased.
In view of the defects of the threaded connecting rod in the pouring construction of the aluminum alloy formwork, the threaded connecting rod comprises the following components: 1. when the aluminum alloy templates are spliced, a connection and fixation mode of the threaded pull rod is adopted, a large amount of labor is consumed, the construction operation difficulty is increased, and the engineering period is easily influenced; 2. the threaded pull rod is high in manufacturing cost, the threaded pull rod is disposable, and a large number of threaded pull rods are used to increase the construction cost. The search of relevant documents shows that at present there is no good solution to the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the above-mentioned problem that prior art exists, provide an aluminum alloy template pull rod fixing device that simple structure, the construction degree of difficulty are little, with low costs, the loss is little.
The purpose of the utility model can be realized by the following technical proposal: an aluminum alloy template pull rod fixing device comprises
The flat iron is in a flat long strip shape and is axially arranged, first connecting holes are formed in two ends of the flat iron, and the flat iron is used for connecting the two opposite templates and is pre-embedded into concrete;
and one end of the L-shaped connecting piece is provided with a hook part, the other end of the L-shaped connecting piece is provided with a second connecting hole, the second connecting hole is fixedly connected with the first connecting hole through a bolt, and the outer side wall of the L-shaped connecting piece is provided with fins.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. this pull rod fixing device, its simple structure, maneuverability is strong, only loses this item of band iron after pouring the completion, has practiced thrift construction cost greatly, simultaneously, compares in traditional screw thread pull rod, and this device greatly reduced construction cycle, reduced the construction degree of difficulty simultaneously.
2. The utility model discloses a through the combination of L type connecting piece and band iron, realized the construction of buildding of aluminum alloy template, whole construction method is simple, convenient, easy operation. Compared with the existing construction method, the construction method has the advantages of high construction efficiency and small potential safety hazard.
Drawings
Fig. 1 is a plan view of the flat iron of the present invention.
Fig. 2 is a plan view of the L-shaped connector of the present invention.
Fig. 3 is a cross-sectional view of the L-shaped connector of the present invention.
In the figure, 10, flat iron; 11. a first connection hole; 20. an L-shaped connector; 21. a hook portion; 22. a second connection hole; 23. and a fin.
Detailed Description
The following are specific embodiments of the present invention and the accompanying drawings are used to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
As shown in fig. 1-3, the utility model relates to an aluminum alloy formwork pull rod fixing device, which comprises a flat iron 10 and an L-shaped connecting piece 20.
The flat iron 10 is a flat long strip which is axially arranged, two ends of the flat iron 10 are provided with first connecting holes 11, the diameter of each first connecting hole 11 is 10mm, the flat iron 10 is used for connecting and fixing two opposite templates and is pre-embedded into concrete, the flat iron 10 is used for 1 time, after the pouring is finished, most of the flat iron 10 is poured in the wall body, the L-shaped connecting piece 20 can be recycled, the service life is long, the manufacturing process is simple, the price is low, one end of the L-shaped connecting piece 20 is provided with a hook part 21, the other end is provided with a second connecting hole 22, the second connecting hole 22 is fixedly connected with the first connecting hole 11 through a bolt, the outer side wall of the L-shaped connecting piece 20 is provided with a fin 23, the fins 23 are used for abutting against the lower portion of the template, so that the whole device can be stressed on average and can firmly lift the cross rod, the template building is simply and quickly completed, and meanwhile, the phenomenon of mold expansion in concrete pouring is effectively prevented.
The utility model discloses can adopt following step to be under construction:
s1: arranging an aluminum alloy template for pouring;
s2: the flat iron penetrates through the template, so that the first connecting holes at two ends of the flat iron are completely exposed out of the template;
s3: aligning a second connecting hole of the L-shaped connecting piece with a first connecting hole of the flat iron, and penetrating the two connecting holes by using bolts after the two connecting holes are aligned;
s4: other limiting devices are sequentially installed, and the limiting devices are installed in a horizontal line so as to be convenient for installing the cross rod;
s5: installing a horizontal cross rod at a concave position between the L-shaped connecting piece and the hook part, enabling the cross rod to be tightly attached to the L-shaped connecting piece and the aluminum alloy template, completing the installation work of the whole set of template, and pouring concrete;
s6: when the concrete is solidified to reach a certain strength, the cross bar is removed;
s7: taking down the fixing bolt and then taking down the L-shaped connecting piece;
s8: and after all the L-shaped connecting pieces are taken down, the aluminum alloy template is taken down, and the two end parts of the flat iron protruding from the concrete wall body are cut off to keep the wall surface smooth.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein may be made by those skilled in the art without departing from the spirit of the invention or exceeding the scope of the invention as defined in the accompanying claims.
Claims (1)
1. An aluminum alloy template pull rod fixing device is characterized by comprising
The flat iron is in a flat long strip shape and is axially arranged, first connecting holes are formed in two ends of the flat iron, and the flat iron is used for connecting the two opposite templates and is pre-embedded into concrete;
and one end of the L-shaped connecting piece is provided with a hook part, the other end of the L-shaped connecting piece is provided with a second connecting hole, the second connecting hole is fixedly connected with the first connecting hole through a bolt, and the outer side wall of the L-shaped connecting piece is provided with fins.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822276115.XU CN209817441U (en) | 2018-12-31 | 2018-12-31 | Aluminum alloy template pull rod fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822276115.XU CN209817441U (en) | 2018-12-31 | 2018-12-31 | Aluminum alloy template pull rod fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209817441U true CN209817441U (en) | 2019-12-20 |
Family
ID=68870523
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822276115.XU Active CN209817441U (en) | 2018-12-31 | 2018-12-31 | Aluminum alloy template pull rod fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209817441U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667424A (en) * | 2018-12-31 | 2019-04-23 | 宁波二十冶建设有限公司 | A kind of aluminum alloy mould plate draws lever fixing apparatus and construction method |
-
2018
- 2018-12-31 CN CN201822276115.XU patent/CN209817441U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667424A (en) * | 2018-12-31 | 2019-04-23 | 宁波二十冶建设有限公司 | A kind of aluminum alloy mould plate draws lever fixing apparatus and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103758291A (en) | Shearing reinforcing type semi-grouting sleeve | |
CN209817441U (en) | Aluminum alloy template pull rod fixing device | |
CN204715763U (en) | A kind of aluminum alloy mould plate diagonal brace supporting member pre-embedded bolt structure | |
CN108547383B (en) | Hoisting and inclined strut integrated embedded part and using method | |
CN220725750U (en) | Beam-column node template reinforcing device | |
CN203583859U (en) | Embedded bolt anchoring device for fixing cantilever I-shaped steel in building construction | |
CN203230178U (en) | Column formwork and column hoop | |
CN214942328U (en) | Reinforced energy-saving building concrete formwork device | |
CN203097290U (en) | Assembled type split bolt | |
CN205976532U (en) | Sleeve grout connection structure and wall body | |
CN205134546U (en) | But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization | |
CN202359816U (en) | Layering reinforcing and supporting device for on-situ concrete casting template | |
CN103590498A (en) | Thin-wall steel structure house corner connecting structure and connection method | |
CN210622270U (en) | Scaffold suitable for shear force wall | |
CN209585295U (en) | Tower crane attaches wall built-in fitting | |
CN208763436U (en) | A kind of PC component supporting apparatus | |
CN2711307Y (en) | Active wall-thorugh crew-bolt device | |
CN206971718U (en) | Novel road bridge anticollision wall form | |
KR20090091683A (en) | Fixing device for mold concrete column of construction | |
CN204940844U (en) | A kind of quick supporting mechanism based on standard combination template | |
CN219909315U (en) | Assembled concrete member node connecting device | |
CN215978480U (en) | Expanding hook bolt | |
CN216340983U (en) | Construction hangs template installation limiter | |
CN219753297U (en) | Supporting and reinforcing device for wall template | |
CN220245386U (en) | Detachable platform of tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |