CN106760523A - Wall split bolt method to set up on the outside of the underground structure that can be reused - Google Patents

Wall split bolt method to set up on the outside of the underground structure that can be reused Download PDF

Info

Publication number
CN106760523A
CN106760523A CN201611155425.5A CN201611155425A CN106760523A CN 106760523 A CN106760523 A CN 106760523A CN 201611155425 A CN201611155425 A CN 201611155425A CN 106760523 A CN106760523 A CN 106760523A
Authority
CN
China
Prior art keywords
reinforcing bar
continued access
sleeve
wall
split bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611155425.5A
Other languages
Chinese (zh)
Inventor
章虎
谭志斌
张保强
张涛
谷卫峰
曹天柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201611155425.5A priority Critical patent/CN106760523A/en
Publication of CN106760523A publication Critical patent/CN106760523A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention is specifically wall split bolt method to set up on the outside of a kind of underground structure that can be reused;Including setting the length to pull bar according to the thickness of outside wall, it is described to include connection reinforcing bar and two sections of continued access reinforcing bars to pull bar, at the two ends of connection reinforcing bar using mechanical mantle fiber, by two sections of continued access reinforcing bars using mechanical mantle fiber into full thread, sleeve is screwed into continued access reinforcing bar one end and incite somebody to action both firm weldings, the one end for connecting reinforcing bar is screwed into any one section of sleeve of continued access reinforcing bar, wall form is installed, connection reinforcing bar is passed through into template;The sleeve of the other end one section of continued access reinforcing bar of residue of the connection reinforcing bar is tightened;Concreting is carried out, form removable is carried out after concrete strength reaches requirement, reused by being backed out continued access reinforcing bar and sleeve using box spanner.The present invention uses above-mentioned construction procedure, and it can quickly remove the section components of Screw arbor with nut at both-ends after construction is finished, and so can further reduce construction cost and be easy to reuse again.

Description

Wall split bolt method to set up on the outside of the underground structure that can be reused
Technical field
The present invention relates to municipal works field, wall is to drawing spiral shell on the outside of specifically a kind of underground structure that can be reused Bolt method to set up.
Background technology
In wall formwork erection on the outside of underground structure, traditional approach is set up using the whole screw through walls with sealing piece And support shuttering.Termination screw thread part and sealing piece increased personnel's input and energy consumption, and be unfavorable for construction using welding Install;Time and effort consuming is cut after form removable to pull bar, and is not easy to anticorrosive construction at pull bar.
The content of the invention
It is an object of the present invention to provide a kind of simple structure and the underground structure external wall of recycling easy to use Body split bolt.
In order to achieve the above object, the present invention is realized in:
Wall split bolt method to set up on the outside of a kind of underground structure that can be reused, including
Step 1, according to the setting of the thickness of outside wall to the length of pull bar, it is described pull bar is included connection reinforcing bar 1 and two sections it is continuous Reinforcing bar 2 is connect, wherein, the connection length of reinforcing bar 1 should 6cm shorter than the thickness of outside wall;
Step 2, the mechanical mantle fiber of two ends use in connection reinforcing bar 1, the length of screw thread 12 is 3cm;
Step 3, by two sections of continued access reinforcing bars 2 using mechanical mantle fibers into full thread,
Step 4, the one end of continued access reinforcing bar 2 be screwed into sleeve 3 and will both firm weldings,
Step 5, by connect reinforcing bar 1 one end be screwed into any one section of sleeve of continued access reinforcing bar 23,
Step 6, wall form 4 is installed,
Step 7, will described in step 5 connect reinforcing bar 1 pass through template 4;The other end of the connection reinforcing bar 1 one section of continued access reinforcing bar of residue 2 sleeve 3 is tightened;Now, the bonding strength of whole split bolt is adjusted;
Step 8, using split bolt by template 4 fix check after carry out concreting,
Step 9, form removable is carried out after concrete strength reaches requirement,
Step 10, continued access reinforcing bar and sleeve are backed out using box spanner by reuse;
Wall after step 11, removal continued access reinforcing bar and sleeve is repaired floating using mortar.
The present invention uses above-mentioned construction procedure, and it can quickly move the section components of Screw arbor with nut at both-ends after construction is finished Remove, so can further reduce construction cost and be easy to reuse again.
Brief description of the drawings
Fig. 1 is this split bolt structural representation.
Fig. 2 is this split bolt use state schematic diagram.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, wall split bolt method to set up on the outside of a kind of underground structure that can be reused, including
Step 1, according to the setting of the thickness of outside wall to the length of pull bar, it is described pull bar is included connection reinforcing bar 1 and two sections it is continuous Reinforcing bar 2 is connect, wherein, the connection length of reinforcing bar 1 should 6cm shorter than the thickness of outside wall;
Step 2, the mechanical mantle fiber of two ends use in connection reinforcing bar 1, the length of screw thread 12 is 3cm;
Step 3, by two sections of continued access reinforcing bars 2 using mechanical mantle fibers into full thread,
Step 4, the one end of continued access reinforcing bar 2 be screwed into sleeve 3 and will both firm weldings,
Step 5, by connect reinforcing bar 1 one end be screwed into any one section of sleeve of continued access reinforcing bar 23,
Step 6, wall form 4 is installed,
Step 7, will described in step 5 connect reinforcing bar 1 pass through template 4;The other end of the connection reinforcing bar 1 one section of continued access reinforcing bar of residue 2 sleeve 3 is tightened;Now, the bonding strength of whole split bolt is adjusted;
Step 8, using split bolt by template 4 fix check after carry out concreting,
Step 9, form removable is carried out after concrete strength reaches requirement,
Step 10, continued access reinforcing bar and sleeve are backed out using box spanner by reuse;
Wall after step 11, removal continued access reinforcing bar and sleeve is repaired floating using mortar.
The present invention uses above-mentioned construction procedure, and it can quickly move the section components of Screw arbor with nut at both-ends after construction is finished Remove, so can further reduce construction cost and be easy to reuse again.

Claims (1)

1. wall split bolt method to set up on the outside of a kind of underground structure that can be reused, it is characterized in that:Including
Step 1, according to the setting of the thickness of outside wall to the length of pull bar, it is described to include connection reinforcing bar and two sections of continued accesses to pull bar Reinforcing bar, wherein, connection reinforcing bar length should 6cm shorter than the thickness of outside wall;
Step 2, the mechanical mantle fiber of two ends use in connection reinforcing bar, screw thread length is 3cm;
Step 3, by two sections of continued access reinforcing bars using mechanical mantle fibers into full thread,
Step 4, continued access reinforcing bar one end be screwed into sleeve and will both firm weldings,
Step 5, by connect reinforcing bar one end be screwed into any one section of sleeve of continued access reinforcing bar,
Step 6, wall form is installed,
Step 7, will described in step 5 connect reinforcing bar pass through template;The other end of the connection reinforcing bar one section of continued access reinforcing bar of residue Sleeve is tightened;Now, the bonding strength of whole split bolt is adjusted;
Step 8, using split bolt will template fix check after carry out concreting,
Step 9, form removable is carried out after concrete strength reaches requirement,
Step 10, continued access reinforcing bar and sleeve are backed out using box spanner by reuse;
Wall after step 11, removal continued access reinforcing bar and sleeve is repaired floating using mortar.
CN201611155425.5A 2016-12-14 2016-12-14 Wall split bolt method to set up on the outside of the underground structure that can be reused Pending CN106760523A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611155425.5A CN106760523A (en) 2016-12-14 2016-12-14 Wall split bolt method to set up on the outside of the underground structure that can be reused

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611155425.5A CN106760523A (en) 2016-12-14 2016-12-14 Wall split bolt method to set up on the outside of the underground structure that can be reused

Publications (1)

Publication Number Publication Date
CN106760523A true CN106760523A (en) 2017-05-31

Family

ID=58888225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611155425.5A Pending CN106760523A (en) 2016-12-14 2016-12-14 Wall split bolt method to set up on the outside of the underground structure that can be reused

Country Status (1)

Country Link
CN (1) CN106760523A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029813A (en) * 2019-05-16 2019-07-19 江西国金建设集团有限公司 A kind of deformation joint wall formwork construction method
CN113638598A (en) * 2021-09-14 2021-11-12 浙江大学 Anti-radiation concrete opposite-pulling bolt with reserved labyrinth-type holes and construction method
CN113882662A (en) * 2021-10-28 2022-01-04 中国建筑第八工程局有限公司 Template structure of high-altitude large-span boundary beam and construction method thereof
CN114232452A (en) * 2021-12-02 2022-03-25 中铁十一局集团有限公司 Construction method and device for quick pull rod of large-section tower column of cable-stayed bridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2843245A1 (en) * 1978-10-04 1980-04-10 Walter Hoff Universal formwork type screwed steel bar - has cylindrical base between helical elevations in cold rolled thread profiling
KR20020073615A (en) * 2001-03-15 2002-09-28 곽승수 Connecting salt attached washer for installing flash board
CN201297035Y (en) * 2009-03-09 2009-08-26 广东浩和建筑有限公司 Three-segments type water sealing split screw
CN101586394A (en) * 2008-05-27 2009-11-25 缪金云 Dual-conical (straight) sleeve threaded rod
CN205259605U (en) * 2015-12-22 2016-05-25 福建海源新材料科技有限公司 Novel stagnant water split bolt
CN105952155A (en) * 2016-07-07 2016-09-21 山东枣建建设集团有限公司 Combined detachable water-stop bolt and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2843245A1 (en) * 1978-10-04 1980-04-10 Walter Hoff Universal formwork type screwed steel bar - has cylindrical base between helical elevations in cold rolled thread profiling
KR20020073615A (en) * 2001-03-15 2002-09-28 곽승수 Connecting salt attached washer for installing flash board
CN101586394A (en) * 2008-05-27 2009-11-25 缪金云 Dual-conical (straight) sleeve threaded rod
CN201297035Y (en) * 2009-03-09 2009-08-26 广东浩和建筑有限公司 Three-segments type water sealing split screw
CN205259605U (en) * 2015-12-22 2016-05-25 福建海源新材料科技有限公司 Novel stagnant water split bolt
CN105952155A (en) * 2016-07-07 2016-09-21 山东枣建建设集团有限公司 Combined detachable water-stop bolt and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029813A (en) * 2019-05-16 2019-07-19 江西国金建设集团有限公司 A kind of deformation joint wall formwork construction method
CN113638598A (en) * 2021-09-14 2021-11-12 浙江大学 Anti-radiation concrete opposite-pulling bolt with reserved labyrinth-type holes and construction method
CN113882662A (en) * 2021-10-28 2022-01-04 中国建筑第八工程局有限公司 Template structure of high-altitude large-span boundary beam and construction method thereof
CN114232452A (en) * 2021-12-02 2022-03-25 中铁十一局集团有限公司 Construction method and device for quick pull rod of large-section tower column of cable-stayed bridge

Similar Documents

Publication Publication Date Title
CN106760523A (en) Wall split bolt method to set up on the outside of the underground structure that can be reused
CN103422674B (en) Prefabricated concrete structure Cast-in-Situ Segment concrete construction method
CN103206089A (en) Fabricated aluminum alloy formwork system construction method
CN105064684A (en) Construction structure using two sections of screw rods
CN207277847U (en) A kind of assembled overlapped shear wall fixing templates
CN102359273A (en) Method for reinforcing shear wall structure deformation joint template using fixing plate
CN103114722A (en) Three-sectional water stopping screw for basement exterior wall
CN103015735A (en) Construction method for planting wall lacing bars after pre-burying of sleeve assemblies
CN202767370U (en) Shear wall reinforcing steel bar locating frame clamp
CN204960321U (en) Use construction structures of two -period form screw rod
CN109958281A (en) Reinforcing device for building construction and application
CN213330018U (en) L type constructional column template reinforcing apparatus
CN108678368A (en) Small-sized beam body fixing templates and construction method
CN203795825U (en) Scaffold and wall connector and scaffold and wall connecting structure
CN106948599A (en) A kind of split bolt and its application method
CN205840298U (en) Scaffold exterior wall connector
CN203347233U (en) Tapered tie bolt for large steel formworks
CN202509764U (en) Template bracing structure for constructional column
CN205000643U (en) Wall stagnant water bolt is worn to waterproof concrete shear force wall
CN203499017U (en) Wall tie bar pre-embedded positioning device
CN203939240U (en) A kind of for post or the fixing single-ended mantle fiber split bolt of shear wall formwork
CN203113519U (en) Connection structure of structural outer wall and wall-attached rod of power plant cooling tower
CN114753630A (en) Cast-in-place side formwork reinforcing structure and method for top of prefabricated outer wall
CN208294088U (en) A kind of dismountable bracket
CN103089007A (en) Cast-in-place concrete floor punching pipe seal template device and using method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531