Rigid beam balancing device and tube panel connecting structure Download PDFInfo
- Publication number
- CN210891608U CN210891608U CN201921562006.2U CN201921562006U CN210891608U CN 210891608 U CN210891608 U CN 210891608U CN 201921562006 U CN201921562006 U CN 201921562006U CN 210891608 U CN210891608 U CN 210891608U
- Authority
- CN
- China
- Prior art keywords
- balancing device
- tube panel
- rigid beam
- beam balancing
- hooks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a connection structure of a rigid beam balancing device and a tube panel, which comprises a tube panel and a rigid beam balancing device with flanges, wherein the tube panel comprises a plurality of tubes and a plurality of fins which are connected at intervals; the method is characterized in that: a plurality of groups of clamping hooks are fixedly connected on respective fins, each group of clamping hooks comprises two clamping hooks, the two clamping hooks are provided with two notches which are oppositely arranged, the flange of the rigid beam balancing device is arranged in the two notches of each group of clamping hooks, and the rigid beam balancing device and each group of clamping hooks are arranged in a clearance way; the utility model discloses not only be convenient for process, and can avoid taking place to interfere in the stiffening beam balancing unit installation, can accelerate the construction progress.
Description
Technical Field
The utility model relates to a stiffening beam balancing unit and tube panel connection structure.
Background
With the increase of energy demand, the development of various energy sources is accelerated in various places, and thermal power is restricted by environmental factors, but various technologies such as energy saving and emission reduction are realized and are continuously developed. As the boiler of the key equipment of thermal power, the top tube panel of the boiler is difficult to install the through rigid beam due to the small upper space, and the rigid beam balancing device with smaller installation height is adopted to improve the rigidity of the top tube panel; as shown in fig. 1 and 2, in the conventional stiffening beam balancing device, a plurality of lug plates 7 with notches are pre-embedded on a pipe 8 of a pipe panel in advance, and then flanges 11 of the stiffening beam balancing device 9 are placed in the notches of two lug plates 7 in the same group on site to be installed in a matching way; this structure welds on pipe 8 owing to otic placode 7, must prevent that pipe 8 from appearing welding hourglass, and not only the welding degree of difficulty is big, and the processing of being not convenient for can only be pre-buried in advance, nevertheless because various reasons such as error, frequently takes place to interfere at 9 in-process of on-the-spot installation rigid beam balancing unit, and the processing of being not convenient for again influences the construction progress.
Disclosure of Invention
The utility model aims at the above-mentioned not enough of prior art, provide a stiffening beam balancing unit and tube panel connection structure, it not only is convenient for process, and can avoid taking place to interfere in the stiffening beam balancing unit installation, can accelerate the construction progress.
In order to achieve the purpose, the rigid beam balancing device and tube panel connecting structure comprises a tube panel and a rigid beam balancing device with flanges, wherein the tube panel comprises a plurality of tubes and a plurality of fins which are connected at intervals; the method is characterized in that: a plurality of groups of clamping hooks are fixedly connected on respective fins, each group of clamping hooks comprises two clamping hooks, the two clamping hooks are provided with two notches which are oppositely arranged, the flange of the rigid beam balancing device is arranged in the two notches of each group of clamping hooks, and the rigid beam balancing device and each group of clamping hooks are arranged in a clearance way;
the clamping hooks are fixedly connected to the respective fins, so that the pipe does not need to be prevented from being welded, the welding difficulty is small, the processing is convenient, the rigid beam balancing device can be installed on site firstly, then the clamping hooks are welded, the interference in the process of installing the rigid beam balancing device can be avoided, and the construction progress can be accelerated;
as a further improvement of the present invention, the hooks are connected to the centers of the respective fins; the rigidity of the tube panel can be improved;
to sum up, the utility model discloses not only be convenient for process, and can avoid taking place to interfere in the stiffening beam balancing unit installation, can accelerate the construction progress.
Drawings
Fig. 1 is a front view of a prior art stiffening beam balance device coupled to a tube panel.
Fig. 2 is a left side view of fig. 1.
Fig. 3 is a front view of the embodiment of the present invention.
Fig. 4 is a left side view of fig. 3.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 3 to 4, the stiffening beam balance device and tube panel connecting structure of the embodiment includes a tube panel 1, a stiffening beam balance device 5 with a flange 4, the tube panel 1 includes a plurality of tubes 2 and a plurality of fins 3 connected by welding at intervals; a plurality of groups of hooks are fixedly connected to respective fins 3 in a welding manner, each group of hooks comprises two hooks 6, the two hooks 6 are provided with two notches which are oppositely arranged, the flange 4 of the rigid beam balancing device 5 is arranged in the two notches of each group of hooks 6, and the rigid beam balancing device 5 and each group of hooks are arranged in a clearance manner;
the clamping hooks 6 are fixedly connected to the respective fins 3, so that the pipe 2 does not need to be prevented from being welded, the welding difficulty is small, the processing is convenient, the rigid beam balancing device 5 can be installed on site firstly, the clamping hooks 6 are welded again, the interference in the process of installing the rigid beam balancing device 5 can be avoided, and the construction progress can be accelerated; the hooks 6 are connected to the centers of the respective fins 3, so that the rigidity of the tube panel 1 can be improved.
Claims (2)
1. A connection structure of a rigid beam balancing device and a tube panel comprises the tube panel and the rigid beam balancing device with a flange, wherein the tube panel comprises a plurality of tubes and a plurality of fins which are connected at intervals; the method is characterized in that: several groups of hooks are fixedly connected on the respective fins, each group of hooks comprises two hooks, the two hooks are provided with two notches which are oppositely arranged, the flange of the rigid beam balancing device is arranged in the two notches of each group of hooks, and the rigid beam balancing device and each group of hooks are arranged in a clearance way.
2. The stiffening beam balance and tube panel connection structure according to claim 1, wherein: the hooks are connected to the centers of the respective fins.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921562006.2U CN210891608U (en) | 2019-09-19 | 2019-09-19 | Rigid beam balancing device and tube panel connecting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921562006.2U CN210891608U (en) | 2019-09-19 | 2019-09-19 | Rigid beam balancing device and tube panel connecting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210891608U true CN210891608U (en) | 2020-06-30 |
Family
ID=71322078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921562006.2U Active CN210891608U (en) | 2019-09-19 | 2019-09-19 | Rigid beam balancing device and tube panel connecting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210891608U (en) |
-
2019
- 2019-09-19 CN CN201921562006.2U patent/CN210891608U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101872687B1 (en) | No-hole Corner bracket | |
CN210891608U (en) | Rigid beam balancing device and tube panel connecting structure | |
CN106378578A (en) | Spot welding clamp for pipe fitting | |
CN213178559U (en) | Van-type heat exchange station carriage body capable of being rapidly disassembled and assembled and van-type heat exchange station | |
CN214659029U (en) | Tower column maintenance device | |
CN211402412U (en) | Anemorumbometer support | |
CN203669977U (en) | Exhaust purifier connecting structure | |
CN110510504B (en) | Hoisting method of deck pipe system unit module | |
CN210528265U (en) | Simple hoisting device for steel box girder | |
CN209876213U (en) | Steel pipe butt joint auxiliary device | |
CN219818600U (en) | Welding fixture for side plate mounting frame | |
CN214331681U (en) | Large-diameter pipeline flange butt joint device | |
CN215883791U (en) | Steering column mounting structure | |
CN215967060U (en) | Seat assembly welding frock on folding arm series loop wheel machine | |
CN210919210U (en) | Exhaust elbow support structure of generator set | |
CN217760033U (en) | Novel angle bar square tube is consolidated to anti-bank of structure for building | |
CN211172065U (en) | Shared equipment foundation for multi-pipeline space | |
CN220505510U (en) | Fastener of screen frame fixed platform crossbeam | |
CN214245918U (en) | Integrated integrated pump set | |
CN219195880U (en) | A cut dirty grid for environmental protection engineering | |
CN220605808U (en) | Photovoltaic device for roof of box-type house and box-type house | |
CN218930129U (en) | New energy engineering vehicle battery module tray | |
CN210289290U (en) | Front and rear connecting support assembly welding device of circulating stereo garage | |
CN218205644U (en) | Scaffold bracket device for high-altitude installation of water-cooled wall of spiral section tube ring of boiler | |
CN215666461U (en) | Elevator guide rail bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |