CN214659029U - Tower column maintenance device - Google Patents

Tower column maintenance device Download PDF

Info

Publication number
CN214659029U
CN214659029U CN202022839027.3U CN202022839027U CN214659029U CN 214659029 U CN214659029 U CN 214659029U CN 202022839027 U CN202022839027 U CN 202022839027U CN 214659029 U CN214659029 U CN 214659029U
Authority
CN
China
Prior art keywords
arc
steel pipe
tower column
plate
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022839027.3U
Other languages
Chinese (zh)
Inventor
陈才
夏大桥
赵海龙
张营营
余彬
王佳
宋爱光
张鹏
杨彪
王文智
王彦博
朱慢曼
付登科
赵宏蔚
陈博洋
蒲彦宇
彭康夫
余慈蕊
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Radio and Television (Beijing) Tashi Safety Technology Co.,Ltd.
Original Assignee
Zhongguangjian Beijing Tawei Safety Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongguangjian Beijing Tawei Safety Technology Co ltd filed Critical Zhongguangjian Beijing Tawei Safety Technology Co ltd
Priority to CN202022839027.3U priority Critical patent/CN214659029U/en
Application granted granted Critical
Publication of CN214659029U publication Critical patent/CN214659029U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model belongs to the technical field of the tower column maintenance, concretely relates to tower column maintenance device, include: the number of the steel pipe hoops is at least two, and each steel pipe hoop comprises an arc-shaped plate and connecting plates connected to two ends of the arc-shaped plate; the radius of the arc-shaped plates is the same as that of the tower column main body, the sum of central angles corresponding to at least two arc-shaped plates is less than 360 degrees, and the arc-shaped plates are suitable for annularly encircling the periphery of the tower column main body; the connecting pieces are the same as the steel pipe hoops in number and are suitable for connecting the connecting plates of two adjacent steel pipe hoops. And above-mentioned simple structure, the installation is simple and easy, occupation space is little, and the whole rigidity of structure is big, can form intact atress route, and then makes the main part of the tower resume original atress ability, and the safety redundancy is high.

Description

Tower column maintenance device
Technical Field
The utility model belongs to the technical field of the tower maintenance, concretely relates to tower maintenance device.
Background
The iron tower is used as a supporting structure and is widely applied to the fields of wind power, power transmission and the like, but potential safety hazards are easy to occur due to the simple structure and single stress of the tower column, and particularly, the overall safety of the iron tower is seriously influenced under the condition that the stress of a main body component of the tower body is insufficient or the fatigue effect of steel is continuously and prominently caused after the iron tower is used for a long time. In order to solve the problem, in the market industry at present, methods for reducing the load of the tower body and changing the stress system of the tower body are generally adopted. But reducing the load of the tower body can reduce the operating benefit of the iron tower and generate negative influence on the benefit of the iron tower; the mode of changing the stress system can increase the field requirement, and new potential safety hazards are easy to appear on the premise of simultaneously considering and meeting the original design, exploration and construction requirements. Therefore, the existing solution can only solve a part of problems, and the effect is not obvious.
China CN210013541U discloses a tower straightening device and a system thereof, which are also used for maintaining the structure of a tower main body, but the tower straightening device is of an upper and lower connection structure, and the connection position is easy to be misplaced, so that the stress capability is poor, the stress of the tower main body cannot be shared, and the function of the repaired tower main body cannot be ensured.
Therefore, to above not enough, the utility model discloses need provide a column maintenance device urgently to solve the reinforcement problem of current column main part component.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a tower column maintenance device to solve the reinforcement problem of current tower column main part component.
The utility model provides a tower maintenance device, include: the number of the steel pipe hoops is at least two, and each steel pipe hoop comprises an arc-shaped plate and connecting plates connected to two ends of the arc-shaped plate; the radius of the arc-shaped plates is the same as that of the tower column main body, the sum of central angles corresponding to at least two arc-shaped plates is less than 360 degrees, and the arc-shaped plates are suitable for annularly encircling the periphery of the tower column main body; the connecting pieces are the same as the steel pipe hoops in number and are suitable for connecting the connecting plates of two adjacent steel pipe hoops.
In the tower column maintenance device as described above, it is further preferable that the connecting plate is provided with a mounting hole; the connecting piece is a bolt fastener, and the bolt fastener is connected with the steel pipe hoop through the mounting hole.
Preferably, the steel pipe hoop further comprises a stiffening plate, and edges of the stiffening plate are connected with the connecting plate and the arc-shaped plate respectively.
In the tower column maintenance device, it is further preferable that the number of the stiffening plates is at least two, and the stiffening plates are respectively arranged at two ends of the steel pipe hoop; the stiffening plate is at least provided with a first edge and a second edge, the first edge is adjacent to the second edge, the first edge is connected with the arc-shaped plate, and the second edge is connected with the connecting plate.
In the tower column maintenance device described above, it is further preferable that the number of the stiffening plates is plural, the plural stiffening plates are respectively provided at both ends of the steel pipe hoop, and each of the connecting plates is connected to at least one of the stiffening plates.
In the tower column maintenance device according to the above, it is further preferable that the stiffening plate is in an arch shape, and three edges of the stiffening plate adjacent to each other in sequence are connected to the arc plate and the connecting plates at both ends thereof, respectively.
In the tower column maintenance device as described above, it is further preferable that the stiffening plate and the arc-shaped plate are perpendicular to each other, and the plane of the connecting plate is perpendicular to each other.
The tower column maintenance device is further preferably characterized in that the number of the steel pipe hoops is two, and the central angle of the arc-shaped plate in each steel pipe hoop is 160-170 degrees; the number of the steel pipe hoops is three, and the central angle of the arc-shaped plate in each steel pipe hoop is 100-110 degrees.
The tower column maintenance device further preferably further comprises at least two supporting pipe walls; the supporting pipe wall is of a strip structure with an arc-shaped end face, and the arc shape is the same as that of the arc-shaped plate; and two ends of each supporting pipe wall are respectively provided with one steel pipe hoop.
In the tower column maintenance device described above, it is further preferable that the support tube wall and the steel pipe hoop are integrally formed.
Compared with the prior art, the utility model has the following advantage:
the utility model discloses a tower maintenance device includes steel pipe staple bolt and connecting piece, wherein, the quantity of steel pipe staple bolt is two at least, and all include the arc and connect in the connecting plate at arc both ends, the radius of arc is the same with the radius of tower main part, and at least two the central angle sum that the arc corresponds is less than 360, be suitable for encircle in the periphery of tower main part, and can fix through the connecting piece. The steel pipe hoop with the structure is in an annular rigid structure and encircles the outer side of the tower column main body through the connecting pieces in an interconnected mode, specifically, the outer side of the part to be maintained of the tower column main body is protected in an encircling mode, the fitness of the steel pipe hoop with the original tower column main body is high, a complete stress path can be formed, and then the original stress capacity of the tower column main body is recovered, and the maintenance purpose is achieved. And the structure is simple, the installation is simple and easy, the occupied space is small, the integral rigidity of the structure is high, and the safety redundancy is high.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a sectional view of a tower column maintenance device in a use state of the utility model;
FIG. 2 is a schematic structural view of a steel pipe hoop;
fig. 3 is a schematic structural view of the steel pipe hoop and the supporting pipe wall in fig. 1.
Description of reference numerals:
the method comprises the following steps of 1-tower column main body, 2-steel pipe hoops, 3-arc-shaped plates, 4-connecting plates, 5-connecting pieces, 6-stiffening plates, 7-mounting holes and 8-supporting pipe walls.
Detailed Description
Example 1:
as shown in fig. 1, the present embodiment discloses a tower column maintenance device, including:
the number of the steel tube hoops 2 is at least two, and each steel tube hoop 2 comprises an arc-shaped plate 3 and connecting plates 4 connected to two ends of the arc-shaped plate 3; the radius of the arc-shaped plates 3 is the same as that of the tower column main body 1, and the sum of central angles corresponding to at least two arc-shaped plates 3 is less than 360 degrees and is suitable for annularly encircling the periphery of the tower column main body 1;
the number of the connecting pieces 5 is the same as that of the steel tube hoops 2, and the connecting pieces are suitable for connecting the connecting plates 4 of the two adjacent steel tube hoops 2.
In the structure, in order to realize the connection between two adjacent steel pipe hoops 2, the connecting plate 4 is provided with a mounting hole 7; the connecting piece 5 is a bolt fastener, and the bolt fastener is connected with the steel pipe hoop 2 through the mounting hole 7.
Further, in the above structure, in order to improve the deformation resistance of the arc-shaped plates 3 and the connecting plates 4, the steel pipe hoop 2 further includes stiffening plates 6, and edges of the stiffening plates 6 are respectively connected to the connecting plates 4 and the arc-shaped plates 3.
Specifically, the number of the stiffening plates 6 is at least two, and the stiffening plates are respectively arranged at two ends of the steel pipe hoop 2; the stiffening plate 6 is at least provided with a first edge and a second edge, the first edge is adjacent to the second edge, the first edge is connected with the arc-shaped plate 3, and the second edge is connected with the connecting plate 4. Furthermore, the number of the stiffening plates 6 is multiple, the stiffening plates 6 are respectively arranged at two ends of the steel pipe hoop 2, and each connecting plate 4 is at least connected with one stiffening plate 6.
Alternatively, as shown in fig. 2, the stiffening plate 6 is in an arch shape, and three edges of the stiffening plate 6 adjacent to each other in sequence are respectively connected to the arc-shaped plate 3 and the connecting plates 4 at two ends thereof.
The two structures of the stiffening plate 6 can improve the anti-deformation capacity of the arc-shaped plate 3 and the connecting plate 4, and the corresponding structures can be selected according to actual needs during actual use.
Further, in the above structure, in order to further strengthen the function of the stiffening plate 6 and improve the deformation resistance of the arc-shaped plate 3 and the connecting plate 4, the stiffening plate 6 is perpendicular to the arc-shaped surface of the arc-shaped plate 3 and the plane of the connecting plate 4.
Further, in the structure, the number of the steel tube hoops 2 is two, and the central angle of the arc-shaped plate 3 in each steel tube hoop 2 is 160-170 degrees; the number of the steel tube hoops 2 is three, and the central angle of the arc-shaped plate 3 in each steel tube hoop 2 is 100-110 degrees. The arrangement is suitable for enabling the at least two steel pipe hoops 2 to surround the tower column main body 1, a gap exists between the two steel pipe hoops, so that the connecting piece 5 is convenient to adjust and fixed on the structure of the tower column main body 1, and the connecting piece and the tower column main body 1 form a rigid structure. Simultaneously, other connection structure on the column main part 1 can also be dodged in the clearance, reduces the maintenance degree of difficulty.
Further, the structure also comprises at least two supporting pipe walls 8; the supporting pipe wall 8 is of a strip-shaped structure with an arc-shaped end face, and the arc-shaped shape is the same as that of the arc-shaped plate 3; two ends of each supporting pipe wall 8 are respectively provided with one steel pipe hoop 2, as shown in fig. 3. Preferably, the supporting pipe wall 8 and the steel pipe hoop 2 are of an integrally formed structure.
Furthermore, the dimensional specifications of the above structure can be adjusted to adapt to the corresponding installation of the tower column main body 1. Preferably, the structure is made of steel.
Further, this embodiment also provides a method for using the tower column maintenance device, including:
firstly, confirming the damage condition of the tower column main body 1, carrying out stress analysis on the tower column main body 1 based on the tower column maintenance device, further selecting a reasonable tower column maintenance device to confirm the dimension specification of each structure in the tower column maintenance device, and processing according to the dimension specification to obtain the steel pipe hoop 2 and the connecting piece 5 which are matched with the tower column main body 1.
Taking the steel pipe hoops 2 (or the supporting pipe walls 8 with the steel pipe hoops 2 at the two ends) to surround the periphery of the damaged part of the tower column main body 1, then taking the bolt fasteners to enable the bolts to penetrate through the mounting holes 7 of the two adjacent steel pipe hoops 2, and then fastening through nuts. And adjusting the connecting piece 5 to ensure that the steel pipe hoop 2, the connecting piece 5 and the tower column main body 1 form a rigid whole, so that the mechanical action of the original tower column structure is shared or replaced, and the stable support is realized.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (10)

1. A tower column maintenance device, comprising:
the number of the steel pipe hoops is at least two, and each steel pipe hoop comprises an arc-shaped plate and connecting plates connected to two ends of the arc-shaped plate; the radius of the arc-shaped plates is the same as that of the tower column main body, the sum of central angles corresponding to at least two arc-shaped plates is less than 360 degrees, and the arc-shaped plates are suitable for annularly encircling the periphery of the tower column main body;
the connecting pieces are the same as the steel pipe hoops in number and are suitable for connecting the connecting plates of two adjacent steel pipe hoops.
2. The tower column maintenance device according to claim 1, wherein the connection plate is provided with a mounting hole; the connecting piece is a bolt fastener, and the bolt fastener is connected with the steel pipe hoop through the mounting hole.
3. The tower column maintenance device of claim 2, wherein the steel pipe hoop further comprises a stiffening plate, and edges of the stiffening plate are connected with the connecting plate and the arc-shaped plate respectively.
4. The tower column maintenance device according to claim 3, wherein the number of the stiffening plates is at least two, and the stiffening plates are respectively arranged at two ends of the steel pipe hoop; the stiffening plate is at least provided with a first edge and a second edge, the first edge is adjacent to the second edge, the first edge is connected with the arc-shaped plate, and the second edge is connected with the connecting plate.
5. The tower column maintenance device according to claim 3, wherein the number of the stiffening plates is plural, the plural stiffening plates are respectively disposed at two ends of the steel pipe hoop, and each connecting plate is connected with at least one stiffening plate.
6. The tower column maintenance device according to claim 4, wherein the stiffening plate is in an arch shape, and three edges of the stiffening plate adjacent to each other in sequence are respectively connected with the arc-shaped plate and the connecting plates at two ends of the arc-shaped plate.
7. Tower column servicing device according to any one of claims 3-6, wherein the stiffening plate is perpendicular to the arc-shaped plate and the plane of the connection plate.
8. The tower column maintenance device according to claim 7, wherein the number of the steel pipe hoops is two, and the central angle of the arc-shaped plate in each steel pipe hoop is 160-170 degrees; the number of the steel pipe hoops is three, and the central angle of the arc-shaped plate in each steel pipe hoop is 100-110 degrees.
9. The tower column servicing device of claim 8, further comprising at least two support tube walls; the supporting pipe wall is of a strip structure with an arc-shaped end face, and the arc shape is the same as that of the arc-shaped plate; and two ends of each supporting pipe wall are respectively provided with one steel pipe hoop.
10. The tower column maintenance device of claim 9, wherein the support tube wall and the steel tube hoop are integrally formed.
CN202022839027.3U 2020-11-30 2020-11-30 Tower column maintenance device Active CN214659029U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022839027.3U CN214659029U (en) 2020-11-30 2020-11-30 Tower column maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022839027.3U CN214659029U (en) 2020-11-30 2020-11-30 Tower column maintenance device

Publications (1)

Publication Number Publication Date
CN214659029U true CN214659029U (en) 2021-11-09

Family

ID=78470259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022839027.3U Active CN214659029U (en) 2020-11-30 2020-11-30 Tower column maintenance device

Country Status (1)

Country Link
CN (1) CN214659029U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982314A (en) * 2021-12-10 2022-01-28 国网山东省电力公司临沂供电公司 Quick prosthetic devices of disconnected pole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982314A (en) * 2021-12-10 2022-01-28 国网山东省电力公司临沂供电公司 Quick prosthetic devices of disconnected pole

Similar Documents

Publication Publication Date Title
CN209855350U (en) Harmless reinforcing apparatus of angle steel
CN214659029U (en) Tower column maintenance device
CN202090661U (en) Alternating-current extra-high voltage one-tower double-circuit linear tower
CN113550616A (en) Reinforcing rod based on hoop connection and reinforcing method thereof
CN203361166U (en) Supporting beam for building foundation pit support
CN102881742A (en) Press fitting device for solar photovoltaic panel
CN210828556U (en) Reinforcing structure of angle steel component and truss iron tower
CN215862369U (en) Fuel cell engine mount suitable for multi-size installation
CN213681781U (en) Bridge pier stud outsourcing steel protects a section of thick bamboo and uses annular staple bolt
CN213015675U (en) Reverse balance flange and steel tower cylinder
CN214246717U (en) Tower column maintenance device and system
CN210855060U (en) Tower crane base easy to disassemble and assemble
CN202090655U (en) Inserting plate for joint connection of steel tube tower, steel tube tower and joint thereof
CN211369757U (en) Connection fitting and power transmission pole
CN221119322U (en) Old building wall body strutting arrangement
CN206220472U (en) A kind of bracing means for improving bracing members stability of strutting system
CN111841311A (en) Denitration reactor capable of reducing occupied space and installation method
CN215980299U (en) Connecting device for masts of double-material flange plate
CN213509857U (en) Superposition reinforced structure for power transmission tower
CN217841090U (en) Non-shear double-layer rigid flange joint
CN219553772U (en) Split type vibration bracket structure of battery package
CN214331681U (en) Large-diameter pipeline flange butt joint device
CN219365608U (en) Device for improving stability of angle steel tower
CN216922162U (en) Fixed tunnel bow member flange board processing positioner
CN216641618U (en) Human-shaped steel pipe tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Building 4, No. 5 Ping'an Road, Shilong Economic Development Zone, Mentougou District, Beijing, 102300, DY443

Patentee after: China Radio and Television (Beijing) Tashi Safety Technology Co.,Ltd.

Address before: Dy443, building 4, No. 5, Ping'an Road, Shilong Economic Development Zone, Mentougou District, Beijing 100045

Patentee before: ZHONGGUANGJIAN (BEIJING) TAWEI SAFETY TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address