CN210857253U - Foundation fixing node of permanent box type house - Google Patents
Foundation fixing node of permanent box type house Download PDFInfo
- Publication number
- CN210857253U CN210857253U CN201921542550.0U CN201921542550U CN210857253U CN 210857253 U CN210857253 U CN 210857253U CN 201921542550 U CN201921542550 U CN 201921542550U CN 210857253 U CN210857253 U CN 210857253U
- Authority
- CN
- China
- Prior art keywords
- foundation
- plate
- steel plate
- ring beam
- foundation ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型涉及模块化建筑技术领域,公开了一种永久性箱式房屋的基础固定节点。本实用新型包括基础圈梁和位于基础圈梁上的顺次拼接的模块房屋,模块房屋包括钢结构骨架和围设在钢结构骨架表面的面板,钢结构骨架为为由立柱和横梁围合而成的长方体框架;长方体框架的底部四周端角处通过第一连接件与基础圈梁上的预埋件连接固定,第一连接件包括水平钢板,垂直于水平钢板板面设置的定位销和连接螺栓;水平钢板下表面与预埋钢板的上表面焊接固定,定位销插设在立柱内,连接螺栓的头部与水平钢板的上表面焊接固定,杆部端头竖直向上穿过横梁的下翼缘板后通过螺母锁紧固定。本实用新型连接牢固性好,稳定性强,施工便捷高效,定位准确性好。
This utility model relates to the field of modular building technology and discloses a foundation fixing node for a permanent box-type house. The utility model includes a foundation ring beam and sequentially assembled modular houses located on the foundation ring beam. The modular houses include a steel structural frame and panels surrounding the surface of the steel structural frame. The steel structural frame is a cuboid frame formed by columns and beams. The bottom four corners of the cuboid frame are connected and fixed to embedded parts on the foundation ring beam via first connectors. The first connector includes a horizontal steel plate, a positioning pin perpendicular to the surface of the horizontal steel plate, and connecting bolts. The lower surface of the horizontal steel plate is welded and fixed to the upper surface of the embedded steel plate. The positioning pin is inserted into the column, and the head of the connecting bolt is welded and fixed to the upper surface of the horizontal steel plate. The end of the bolt passes vertically upward through the lower flange plate of the beam and is locked and fixed by a nut. This utility model has good connection firmness, strong stability, convenient and efficient construction, and good positioning accuracy.
Description
技术领域technical field
本实用新型涉及模块化建筑技术领域,特别是涉及一种永久性箱式房屋的基础固定节点。The utility model relates to the technical field of modular construction, in particular to a foundation fixing node of a permanent box-type house.
背景技术Background technique
装配式建筑的应用越来越广泛,其中,箱式建筑以其建造质量高、施工速度快、绿色环保等优点逐渐应用于永久性多层甚至高层建筑中。The application of prefabricated buildings is becoming more and more extensive. Among them, box-type buildings are gradually used in permanent multi-storey and even high-rise buildings due to their advantages of high construction quality, fast construction speed, and environmental protection.
目前的箱式房屋,各模块间之间多通过标准配套的角件进行连接,而模块房屋的底部,通常在四周端角处设置钢制支腿,与圈梁连接固定,其连接的牢固性直接影响着上层建筑的稳定性。但是支腿支座的受力面积小,存在连接牢固性差,稳定性差的问题,用于临时性的箱式房屋尚可满足使用要求,但是作为永久性建筑使用,承受较大压力的支腿,随着使用年限的延长,损坏的几率越来越大,存在一定的安全隐患,也在一定程度上限制了建筑的使用寿命。In the current box-type houses, the modules are mostly connected by standard matching corner pieces, and the bottom of the module house is usually set with steel legs at the four corners, which are connected and fixed with the ring beam, and the firmness of the connection is guaranteed. It directly affects the stability of the superstructure. However, the force area of the outrigger support is small, and there are problems of poor connection firmness and poor stability. The temporary box house can still meet the requirements of use, but as a permanent building, the outrigger that bears greater pressure, With the extension of the service life, the probability of damage is increasing, and there are certain safety hazards, which also limit the service life of the building to a certain extent.
实用新型内容Utility model content
本实用新型提供一种连接牢固性好,稳定性强,施工便捷高效,定位准确性好的永久性箱式房屋的基础固定节点。The utility model provides a foundation fixing node of a permanent box-type house with good connection firmness, strong stability, convenient and efficient construction, and good positioning accuracy.
解决的技术问题是:现有的箱式房屋与基础的连接多适用于临时性建筑,连接牢固性差,稳定性差,使用寿命短。The technical problem to be solved is: the connection between the existing box-type house and the foundation is mostly suitable for temporary buildings, and the connection firmness is poor, the stability is poor, and the service life is short.
为解决上述技术问题,本实用新型采用如下技术方案:In order to solve the above-mentioned technical problems, the utility model adopts the following technical solutions:
本实用新型永久性箱式房屋的基础固定节点,包括基础圈梁和位于基础圈梁上的顺次拼接的模块房屋,模块房屋包括钢结构骨架和围设在钢结构骨架表面的面板,钢结构骨架为为由立柱和横梁围合而成的长方体框架,立柱为方钢管,横梁为工字钢或H型钢,横梁端面与立柱侧壁焊接固定;The foundation fixing node of the permanent box-type house of the utility model comprises a foundation ring beam and a sequentially spliced modular house located on the foundation ring beam. The skeleton is a cuboid frame enclosed by columns and beams, the columns are square steel pipes, the beams are I-beam or H-beam, and the end faces of the beams are welded and fixed to the side walls of the columns;
基础圈梁内设置有预埋件,预埋件包括位于基础圈梁顶面上的预埋钢板,设置在基础圈梁内的抗剪键和锚固筋;Embedded parts are arranged in the foundation ring beam, and the embedded parts include a pre-embedded steel plate located on the top surface of the foundation ring beam, and shear keys and anchor bars arranged in the foundation ring beam;
长方体框架的底部四周端角处通过第一连接件与基础圈梁上的预埋件连接固定,第一连接件包括水平钢板,垂直于水平钢板板面设置的定位销和连接螺栓;水平钢板下表面与预埋钢板的上表面焊接固定,定位销与立柱同轴设置,插设在立柱内,连接螺栓的头部与水平钢板的上表面焊接固定,杆部端头竖直向上穿过横梁的下翼缘板后通过螺母锁紧固定;The end corners around the bottom of the cuboid frame are connected and fixed with the embedded parts on the foundation ring beam through first connectors, the first connectors include horizontal steel plates, locating pins and connecting bolts arranged perpendicular to the surface of the horizontal steel plates; The surface is welded and fixed with the upper surface of the embedded steel plate, the locating pin is coaxially arranged with the column, inserted in the column, the head of the connecting bolt is welded and fixed with the upper surface of the horizontal steel plate, and the end of the rod part passes through the beam vertically upward. After the lower flange plate is locked and fixed by nuts;
长方体框架的横梁通过第二连接件与基础圈梁连接固定,第二连接件沿横梁长度方向间隔设置,第二连接件包括L形角码,L形角码的竖向肢板与横梁焊接固定,水平肢板通过膨胀螺栓与基础圈梁连接固定。The beam of the cuboid frame is connected and fixed with the basic ring beam through a second connecting piece, the second connecting piece is arranged at intervals along the length direction of the beam, and the second connecting piece includes an L-shaped corner code, and the vertical limb plate of the L-shaped corner code is welded and fixed with the beam , the horizontal limb plate is connected and fixed with the foundation ring beam through expansion bolts.
本实用新型永久性箱式房屋的基础固定节点,进一步的,所述预埋钢板为矩形钢板,预埋钢板边沿与相邻基础圈梁的边沿之间的最小距离不小于200mm,预埋钢板长度方向的水平中轴线与基础圈梁的轴线位于同一竖直面内。The foundation fixing node of the permanent box house of the utility model, further, the embedded steel plate is a rectangular steel plate, the minimum distance between the edge of the embedded steel plate and the edge of the adjacent foundation ring beam is not less than 200mm, and the length of the embedded steel plate is not less than 200mm. The horizontal central axis of the direction is in the same vertical plane as the axis of the foundation ring beam.
本实用新型永久性箱式房屋的基础固定节点,进一步的,所述抗剪键为十字形抗剪键,由相互垂直的两块矩形钢板组成,一端与预埋钢板下表面焊接固定,另一端竖直向下伸至基础圈梁内,抗剪键的竖向中轴线与预埋钢板的几何中心重叠设置。The foundation fixing node of the permanent box-type house of the utility model, further, the shear key is a cross-shaped shear key, which is composed of two rectangular steel plates that are perpendicular to each other, one end is welded and fixed with the lower surface of the embedded steel plate, and the other end is welded and fixed. It extends vertically downward into the foundation ring beam, and the vertical central axis of the shear key overlaps with the geometric center of the embedded steel plate.
本实用新型永久性箱式房屋的基础固定节点,进一步的,所述锚固筋垂直于预埋钢板的板面设置,并在预埋钢板的板面内均匀排布,顶端向上伸入预埋钢板内并焊接固定,底端向下伸入基础圈梁内,锚固筋的底端垂直弯折并水平延伸形成锚固钩。The foundation fixing node of the permanent box house of the utility model, further, the anchoring bars are arranged perpendicular to the board surface of the pre-embedded steel plate, and are evenly arranged in the board surface of the pre-embedded steel plate, and the top extends upward into the pre-embedded steel plate. The bottom end of the anchoring bar is bent vertically and extended horizontally to form an anchoring hook.
本实用新型永久性箱式房屋的基础固定节点,进一步的,所述锚固筋伸入基础圈梁内的长度不小于锚固筋公称直径的30倍,锚固钩的长度不小于120mm,相邻锚固筋之间的距离不大于300mm。The foundation fixing node of the permanent box-type house of the present utility model, further, the length of the anchoring bar extending into the foundation ring beam is not less than 30 times the nominal diameter of the anchoring bar, the length of the anchoring hook is not less than 120mm, and the adjacent anchoring bar is not less than 120mm. The distance between them is not more than 300mm.
本实用新型永久性箱式房屋的基础固定节点,进一步的,相邻两个所述立柱之间设置有对拉螺栓,对拉螺栓水平穿过相邻立柱和内部的定位销后通过螺母锁紧固定。For the foundation fixing node of the permanent box-type house of the present invention, further, a pair of pull bolts are arranged between two adjacent vertical columns, and the pair of pull bolts horizontally pass through the adjacent columns and the internal positioning pins and then are locked by nuts. fixed.
本实用新型永久性箱式房屋的基础固定节点,进一步的,所述L形角码的竖向肢板顶部和底部分别与横梁的上翼缘板和下翼缘板端面焊接固定,竖向肢板与横梁腹板之间还设置有一对相互平行的连接板,连接板板面垂直于竖向肢板的板面设置,四周边沿分别与横梁的上翼缘板下表面、腹板侧面、上翼缘板上表面和竖向肢板板面焊接固定。The foundation fixing node of the permanent box house of the present utility model, further, the top and bottom of the vertical limb plate of the L-shaped corner yard are respectively welded and fixed with the end faces of the upper flange plate and the lower flange plate of the beam, and the vertical limbs are welded and fixed respectively. A pair of parallel connection plates are also arranged between the plate and the web of the beam. The plate surface of the connection plate is perpendicular to the plate surface of the vertical limb plate. The upper surface of the flange plate and the vertical limb plate are welded and fixed.
本实用新型永久性箱式房屋的基础固定节点,进一步的,两个所述连接板之间设置有定位筒,定位筒为方钢管,中轴线垂直于竖向肢板的板面设置,并与竖向肢板的几何中心重叠设置,定位筒一端与竖向肢板的板面焊接固定,另一端水平伸至两个连接板之间。The foundation fixing node of the permanent box-type house of the utility model, further, a positioning cylinder is arranged between the two connecting plates, the positioning cylinder is a square steel pipe, and the central axis is perpendicular to the plate surface of the vertical limb plate, and is arranged with the vertical limb plate. The geometric centers of the vertical limb plates are overlapped and arranged, one end of the positioning cylinder is welded and fixed with the plate surface of the vertical limb plates, and the other end extends horizontally between the two connecting plates.
本实用新型永久性箱式房屋的基础固定节点,进一步的,所述L形角码的水平肢板与基础圈梁之间设置有垫板,垫板为矩形钢板,两侧边沿与基础圈梁的两侧边沿对齐设置,厚度与横梁和基础圈梁之间的缝隙高度相配合。The foundation fixing node of the permanent box house of the utility model, further, a backing plate is arranged between the horizontal limb plate of the L-shaped corner code and the foundation ring beam, and the backing plate is a rectangular steel plate, and the edges on both sides are connected to the foundation ring beam. The edges of the two sides are aligned, and the thickness matches the height of the gap between the beam and the foundation ring beam.
本实用新型永久性箱式房屋的基础固定节点,进一步的,所述第二连接件还包括对称设置在L形角码两侧的加劲板。The foundation fixing node of the permanent box-type house of the utility model, further, the second connecting piece further comprises stiffening plates symmetrically arranged on both sides of the L-shaped corner yard.
本实用新型永久性箱式房屋的基础固定节点与现有技术相比,具有如下有益效果:Compared with the prior art, the foundation fixing node of the permanent box-type house of the utility model has the following beneficial effects:
本实用新型将模块房屋的钢结构骨架直接坐落在基础圈梁上,并不设置有一定高度的支脚,通过第一连接件将端角处的立柱与横梁与基础圈梁连接,通过第二连接件将横梁中段间隔性的与基础圈梁连接,实现了钢结构骨架与圈梁基础的直接连接,结构更加稳定,连接刚性更强,大大提高了模块房屋的使用寿命。In the utility model, the steel structure skeleton of the modular house is directly seated on the foundation ring beam without a certain height of support feet. The middle part of the beam is connected to the foundation ring beam at intervals, realizing the direct connection between the steel structure skeleton and the ring beam foundation, the structure is more stable, the connection rigidity is stronger, and the service life of the modular house is greatly improved.
本实用新型第一连接件与预埋件连接,通过第一连接件上的定位销和连接螺栓对底层模块房屋进行精确定位,吊装时将立柱和横梁端部的开孔分别对准定位销和连接螺栓,下放并通过螺母锁紧,即可同步完成定位和连接,大大降低了安装过程中的定位难度,提高了定位的精准度,避免因为一个点出现偏差,而造成整个箱体偏离基础圈梁设置。The first connecting piece of the utility model is connected with the pre-embedded piece, and the ground-floor modular house is precisely positioned through the positioning pins and connecting bolts on the first connecting piece. The connecting bolts are lowered and locked by nuts to complete the positioning and connection synchronously, which greatly reduces the difficulty of positioning during the installation process, improves the positioning accuracy, and avoids the deviation of the entire box from the base ring due to deviation of one point. Beam settings.
下面结合附图对本实用新型的永久性箱式房屋的基础固定节点作进一步说明。The foundation fixing nodes of the permanent box-type house of the present invention will be further described below with reference to the accompanying drawings.
附图说明Description of drawings
图1为本实用新型永久性箱式房屋的结构示意图;Fig. 1 is the structural representation of the permanent box-type house of the present utility model;
图2为圈梁的结构示意图;Fig. 2 is the structural representation of ring beam;
图3为预埋件与第一连接件连接节点处的剖面示意图;3 is a schematic cross-sectional view of the connection node between the embedded part and the first connector;
图4为预埋件的结构示意图;Fig. 4 is the structural schematic diagram of the embedded part;
图5为第一连接件的结构示意图;5 is a schematic structural diagram of a first connector;
图6为预埋件与第一连接件连接节点处安装结构示意图;6 is a schematic diagram of the installation structure at the connection node between the embedded part and the first connector;
图7为第二连接件的结构示意图;7 is a schematic structural diagram of a second connector;
图8为第二连接件的连接节点处的侧视图。FIG. 8 is a side view at the connection node of the second connector.
附图标记:Reference number:
1-基础圈梁;2-预埋件;21-预埋钢板;22-抗剪键;23-锚固筋;24-锚固钩;3-第一连接件;31-水平钢板;32-定位销;33-连接螺栓;4-对拉螺栓;5-第二连接件;51-L形角码;52-加劲板;53-定位筒;54-膨胀螺栓;6-连接板;7-垫板;8-立柱;9-横梁。1- Foundation ring beam; 2- Embedded parts; 21- Embedded steel plates; 22- Shear keys; 23- Anchor bars; 24- Anchor hooks; 3- The first connecting piece; 31- Horizontal steel plates; ;33-connecting bolts;4-tension bolts;5-second connecting piece;51-L-shaped angle code;52-stiffening plate;53-positioning cylinder;54-expansion bolts;6-connecting plate;7-backing plate ; 8-column; 9-beam.
具体实施方式Detailed ways
如图1和图2所示,本实用新型永久性箱式房屋的基础固定节点,包括基础圈梁1,位于基础圈梁1上的顺次拼接的模块房屋,模块房屋通过连接件与基础圈梁1连接固定。As shown in Fig. 1 and Fig. 2, the foundation fixing node of the permanent box-type house of the present utility model includes a foundation ring beam 1, a modular house which is located on the foundation ring beam 1 and spliced in sequence, and the module house is connected to the foundation ring through a connector Beam 1 is connected and fixed.
如图3所示,基础圈梁1为现场浇筑或工厂预制均可,基础圈梁1内设置有预埋件2,如图4所示,预埋件2包括位于基础圈梁1顶面上的预埋钢板21,设置在基础圈梁1内的抗剪键22和锚固筋23;预埋钢板21为厚度不小于25mm的矩形钢板,预埋钢板21边沿与相邻基础圈梁1的边沿之间的最小距离不小于200mm,预埋钢板21长度方向的水平中轴线与基础圈梁1的轴线位于同一竖直面内;抗剪键22为十字形抗剪键,由相互垂直的两块厚度不小于16mm的矩形钢板组成,一端与预埋钢板21下表面焊接固定,另一端竖直向下伸至基础圈梁1内,抗剪键22的竖向中轴线与预埋钢板21的几何中心重叠设置,抗剪键22的高度不小于200mm;锚固筋23垂直于预埋钢板21的板面设置,并在预埋钢板21的板面内均匀排布,顶端向上伸入预埋钢板21内并焊接固定,底端向下伸入基础圈梁1内,伸入基础圈梁1内的长度不小于锚固筋23公称直径的30倍,锚固筋23的底端垂直弯折并水平延伸形成锚固钩24,锚固钩24的长度不小于120mm,相邻锚固筋23之间的距离不大于300mm。As shown in FIG. 3 , the foundation ring beam 1 can be cast-in-place or factory prefabricated. The foundation ring beam 1 is provided with an embedded
模块房屋包括钢结构骨架和围设在钢结构骨架表面的面板,钢结构骨架为为由立柱8和横梁9围合而成的长方体框架,立柱8为方钢管,横梁9为工字钢或H型钢,横梁9端面与立柱8侧壁焊接固定。The modular house includes a steel structure skeleton and panels arranged around the surface of the steel structure skeleton. The steel structure skeleton is a cuboid frame enclosed by a column 8 and a
长方体框架的底部四周端角处通过第一连接件3与基础圈梁1上的预埋件2连接固定,如图5和图6所示,第一连接件3包括水平钢板31,垂直于水平钢板31板面设置的定位销32和连接螺栓33;水平钢板31为厚度不小于6mm的矩形钢板,下表面与预埋钢板21的上表面焊接固定,定位销32底端与水平钢板31上表面焊接固定,顶端向上伸入立柱8内,定位销32与立柱8同轴设置,便于模块房屋的吊装定位,大大减少了施工难度,提高了定位精准度;定位销32的高度不小于50mm,相邻两个立柱8之间设置有对拉螺栓4,对拉螺栓4水平穿过相邻立柱8和内部的定位销32后通过螺母锁紧固定,实现相邻模块房屋之间的连接,可有效增强模块房屋之间的整体性,承担连接节点处部分的弯矩,而且对拉螺栓4同时穿过立柱8与内部的定位销32,大大提高了连接刚性;连接螺栓33的头部与水平钢板31的上表面焊接固定,杆部端头竖直向上穿过横梁9的下翼缘板后通过螺母锁紧固定,不仅实现横梁9与基础圈梁1的固定连接,承担连接节点处的部分剪力作用,而且起到定位的作用,便于吊装定位,简化了放线和校准的工序,降低了施工难度,提高了施工效率。The corners around the bottom of the cuboid frame are connected and fixed with the embedded
长方体框架的横梁9通过第二连接件5与基础圈梁1连接固定,如图7所示,第二连接件5沿横梁9长度方向间隔设置,相邻第二连接件5之间的距离不大于2m,第二连接件5包括L形角码51和对称设置在L形角码51两侧的加劲板52,L形角码51的竖向肢板顶部和底部分别与横梁9的上翼缘板和下翼缘板端面焊接固定,如图8所示,竖向肢板与横梁9腹板之间还设置有一对相互平行的连接板6,连接板6板面垂直于竖向肢板的板面设置,四周边沿分别与横梁9的上翼缘板下表面、腹板侧面、上翼缘板上表面和竖向肢板板面焊接固定,两个连接板6之间设置有定位筒53,定位筒53为方钢管,中轴线垂直于竖向肢板的板面设置,并与竖向肢板的几何中心重叠设置,定位筒53一端与竖向肢板的板面焊接固定,另一端水平伸至两个连接板6之间。L形角码51的水平肢板与基础圈梁1之间设置有垫板7,垫板7为矩形钢板,两侧边沿与基础圈梁1的两侧边沿对齐设置,厚度与横梁9和基础圈梁1之间的缝隙高度相配合;水平肢板通过膨胀螺栓54与基础圈梁1连接固定,水平肢板的外侧面不超过基础圈梁1的侧立面设置。The
由于连接板6在模块房屋工厂预制时已经设置在横梁9上,现场安装固定时,只需将第二连接件5上的定位筒53插入两连接板6之间,再进行焊接即可完成第二连接件5的设置,省去了测量和定位的工序,大大减少了现场工作量,提高了施工效率。Since the connecting plate 6 has already been set on the
而基础圈梁1宽于横梁9的宽度设置,外侧留有第二连接件5的安装宽度,不仅便于第二连接件5的设置,提高模块房屋与基础圈梁1的连接刚性,而且可减小模块房屋对基础圈梁1边沿的压力,避免使用年限过长后,容易出现的基础圈梁1损毁的情况,可有效提高模块房屋设置的稳定性和使用寿命。The basic ring beam 1 is set wider than the width of the
以上所述的实施例仅仅是对本实用新型的优选实施方式进行描述,并非对本实用新型的范围进行限定,在不脱离本实用新型设计精神的前提下,本领域普通技术人员对本实用新型的技术方案作出的各种变形和改进,均应落入本实用新型权利要求书确定的保护范围内。The above-mentioned embodiments are only to describe the preferred embodiments of the present invention, and do not limit the scope of the present invention. On the premise of not departing from the design spirit of the present invention, those of ordinary skill in the art can understand the technical solutions of the present invention. Various modifications and improvements made shall fall within the protection scope determined by the claims of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921542550.0U CN210857253U (en) | 2019-09-17 | 2019-09-17 | Foundation fixing node of permanent box type house |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921542550.0U CN210857253U (en) | 2019-09-17 | 2019-09-17 | Foundation fixing node of permanent box type house |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210857253U true CN210857253U (en) | 2020-06-26 |
Family
ID=71308407
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921542550.0U Active CN210857253U (en) | 2019-09-17 | 2019-09-17 | Foundation fixing node of permanent box type house |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210857253U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111910960A (en) * | 2020-07-16 | 2020-11-10 | 中铁武汉勘察设计研究院有限公司 | A prefabricated structure and system for a mobile transfer island |
| CN112502285A (en) * | 2020-08-31 | 2021-03-16 | 天津泰明加德低碳住宅科技发展有限公司 | DNA module fast-assembling room |
| CN113463767A (en) * | 2021-07-24 | 2021-10-01 | 湖南建工集团有限公司 | Steel structure unit room stacking structure system |
| CN115045398A (en) * | 2022-06-17 | 2022-09-13 | 南京工业大学 | A stable free combination box house |
-
2019
- 2019-09-17 CN CN201921542550.0U patent/CN210857253U/en active Active
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111910960A (en) * | 2020-07-16 | 2020-11-10 | 中铁武汉勘察设计研究院有限公司 | A prefabricated structure and system for a mobile transfer island |
| CN112502285A (en) * | 2020-08-31 | 2021-03-16 | 天津泰明加德低碳住宅科技发展有限公司 | DNA module fast-assembling room |
| CN113463767A (en) * | 2021-07-24 | 2021-10-01 | 湖南建工集团有限公司 | Steel structure unit room stacking structure system |
| CN115045398A (en) * | 2022-06-17 | 2022-09-13 | 南京工业大学 | A stable free combination box house |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11332929B2 (en) | Large-angle sloping roof steel structure and construction method thereof | |
| CN210857253U (en) | Foundation fixing node of permanent box type house | |
| CN105649325B (en) | The adjustable tripod support system of assembly concrete shear wall structure and method | |
| CN103452311B (en) | A kind of erection method of shaped steel suspended structural support frame | |
| CN110284732B (en) | Modularized container building connection node | |
| CN207553289U (en) | A kind of assembled steel and concrete frame space modular structure and system | |
| CN111206680B (en) | Combined floor system frame structure building system | |
| CN107605038A (en) | A kind of assembled steel and concrete frame space modular structure and system and construction method | |
| CN110725525A (en) | A kind of supporting device of prefabricated cantilever scaffold and its construction method | |
| CN217323144U (en) | A tower crane attached to a wall pier | |
| CN216587872U (en) | Supporting device | |
| CN110424538A (en) | An Inner Beam-Column Joint | |
| CN219931554U (en) | A cantilevered steel structure construction platform with formwork system | |
| CN112049415A (en) | Construction method of cornice formwork | |
| CN215858982U (en) | Follow-on corner support of encorbelmenting | |
| CN108678424A (en) | A kind of the steel latticework support device and method for supporting of super-heavy component | |
| CN217353856U (en) | A prefabricated concrete enclosure | |
| CN212404844U (en) | Bracket system for cast-in-situ flange plate of I-shaped steel-concrete composite beam | |
| CN215368613U (en) | Shaped steel hangs outrigger external corner construction structures | |
| CN116657875A (en) | Cantilever steel structure construction platform with formwork system and construction method | |
| CN214033785U (en) | A one-sided formwork support system | |
| CN214614236U (en) | Vertical anti-pulling static load test counterforce device of concrete filling pile | |
| CN115929010A (en) | Construction method for pre-mounting overhanging I-shaped steel beam of building external scaffold | |
| CN115749258A (en) | High-altitude overhanging roof formwork supporting system | |
| CN212428071U (en) | Steel platform formwork of high-altitude large-span concrete structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 406-6, floor 4, building 6, No. 38, Yongda Road, Daxing biomedical industry base, Zhongguancun Science and Technology Park, Daxing District, Beijing Patentee after: CSCEC Integrated Construction Co.,Ltd. Address before: 100195 83 Changqing Garden Road, Haidian District, Beijing Patentee before: CHINA CONSTRUCTION MODULAR HOUSING Co.,Ltd. |
