CN210855107U - Building material conveying device - Google Patents
Building material conveying device Download PDFInfo
- Publication number
- CN210855107U CN210855107U CN201822128450.5U CN201822128450U CN210855107U CN 210855107 U CN210855107 U CN 210855107U CN 201822128450 U CN201822128450 U CN 201822128450U CN 210855107 U CN210855107 U CN 210855107U
- Authority
- CN
- China
- Prior art keywords
- pulley
- wire rope
- hoist engine
- assembly
- hoist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004566 building material Substances 0.000 title claims abstract description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 4
- 239000004035 construction material Substances 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract 1
- 239000000463 material Substances 0.000 description 7
- 238000000034 method Methods 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses mainly be applied to the building technology field, in particular to building material conveyor, including the hoist engine, the hoist engine passes through wire rope and connects the hoist basket, wire rope passes first assembly pulley from hoist engine department in proper order, second assembly pulley and third assembly pulley, first assembly pulley includes first pulley block, install first fixed pulley on the first pulley block, first pulley block and hoist engine are all installed on the base, the second assembly pulley includes the second pulley block that two levels were arranged, install the second fixed pulley on the second pulley block respectively, hoist basket top sets up the third pulley block, install the movable pulley on the third pulley block, second pulley block and wire rope end are all installed on the top mounting panel. The utility model discloses compact structure is reasonable, can rational utilization building space, and easy to assemble and use, occupation space is little, and good operation can improve the efficiency of construction, reduces construction cost.
Description
Technical Field
The utility model relates to a building material conveyor mainly is applied to building technical field.
Background
In the process of building facilities, a large amount of manpower and consumed time are consumed for transporting indoor basic materials, a tower crane or other lifting devices are used in the traditional method, the mechanical structure is complex, the operation is inconvenient, the existing building machinery material lifter generally adopts a cross-bracing type hydraulic lifting platform, the hydraulic lifting platform occupies a shallow foundation pit, and is a driving form which is preferably selected by a small-medium lifting platform.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is: the building material conveying device is compact in structure, small in occupied space, convenient to operate and convenient to lift.
Building material conveyor, including the hoist engine, the hoist engine passes through wire rope and connects the hoist basket, wire rope passes first assembly pulley, second assembly pulley and third assembly pulley from the hoist engine in proper order, first assembly pulley includes first pulley block, install first fixed pulley on the first pulley block, first pulley block and hoist engine are all installed on the base, the second assembly pulley includes the second pulley block that two levels were arranged, install the second fixed pulley on the second pulley block respectively, hoist basket top sets up the third pulley block, install the movable pulley on the third pulley block, second pulley block and wire rope end are all installed on the top mounting panel.
The winch plays a driving role, the winch pulls the steel wire rope to stretch, the steel wire rope can pull the hoisting basket to move up and down, the first pulley block, the second pulley block and the third pulley block are arranged so that the pulling force direction of the steel wire rope is convenient, materials are convenient to lift, and the stress structure is optimized.
And the steel wire rope penetrates out of the winch and sequentially bypasses the first fixed pulley, the two second fixed pulleys and the movable pulley to be installed on the top installation plate. The first fixed pulley, the two second fixed pulleys and the movable pulley are arranged, so that the steel wire rope is conveniently tensioned, the stress of the steel wire rope is conveniently optimized, and the material is conveniently lifted.
The hoisting basket is of a closed structure, and the side wall of the hoisting basket is provided with a switch door.
The utility model has the advantages that:
the structure is compact and reasonable, the building space can be reasonably utilized, the installation and the use are convenient, the occupied space is small, the operation is good, the construction efficiency can be improved, and the construction cost is reduced.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure: 1. a winch; 2. a first fixed pulley; 3. a wire rope; 4. a second fixed pulley; 5. a second pulley seat; 6. a top mounting plate; 7. a movable pulley; 8. a third pulley seat; 9. hoisting a basket; 10. a first pulley seat.
Detailed Description
The invention will be further described with reference to the accompanying drawings:
as shown in fig. 1, building material conveyor, including hoist engine 1, hoist engine 1 connects hoist basket 9 through wire rope 3, wire rope 3 passes first assembly pulley, second assembly pulley and third assembly pulley from hoist engine 1 in proper order, first assembly pulley includes first pulley seat 10, install first fixed pulley 2 on the first pulley seat 10, first pulley seat 10 and hoist engine 1 are all installed on the base, the second assembly pulley includes the second pulley seat 5 that two levels were arranged, install second fixed pulley 4 on the second pulley seat 5 respectively, hoist basket 9 top sets up third pulley seat 8, install movable pulley 7 on the third pulley seat 8, second pulley seat 5 and wire rope 3 end are all installed on top mounting panel 6. The steel wire rope 3 penetrates out of the winch 1 and sequentially winds around the first fixed pulley 2, the two second fixed pulleys 4 and the movable pulley 7 to be installed on the top installation plate 6. The hoisting basket 9 is set to be a closed structure, and the side wall of the hoisting basket 9 is provided with a switch door.
During the use, put into hoist basket 9 with the material or the container that holds the material, start hoist engine 1, hoist engine 1 pulls wire rope 3, and the ascending or the decline of hoist basket 9 can be accomplished in wire rope 3 atress, realizes the lift transportation of material.
Claims (3)
1. The utility model provides a building material conveyor which characterized in that: including hoist engine (1), hoist engine (1) is through wire rope (3) connection hoist basket (9), wire rope (3) are from hoist engine (1) to pass first assembly pulley in proper order, second assembly pulley and third assembly pulley, first assembly pulley includes first pulley seat (10), install first fixed pulley (2) on first pulley seat (10), first pulley seat (10) and hoist engine (1) are all installed on the base, the second assembly pulley includes second pulley seat (5) that two levels were arranged, install second fixed pulley (4) on second pulley seat (5) respectively, hoist basket (9) top sets up third pulley seat (8), install movable pulley (7) on third pulley seat (8), second pulley seat (5) and wire rope (3) end are all installed on top mounting panel (6).
2. The construction material conveying device according to claim 1, wherein: the steel wire rope (3) penetrates out of the winch (1) and sequentially bypasses the first fixed pulley (2), the two second fixed pulleys (4) and the movable pulley (7) to be installed on the top installation plate (6).
3. The construction material conveying device according to claim 1, wherein: the hoisting basket (9) is of a closed structure, and the side wall of the hoisting basket (9) is provided with a switch door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822128450.5U CN210855107U (en) | 2018-12-18 | 2018-12-18 | Building material conveying device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822128450.5U CN210855107U (en) | 2018-12-18 | 2018-12-18 | Building material conveying device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210855107U true CN210855107U (en) | 2020-06-26 |
Family
ID=71295681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822128450.5U Expired - Fee Related CN210855107U (en) | 2018-12-18 | 2018-12-18 | Building material conveying device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210855107U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779234A (en) * | 2019-01-25 | 2019-05-21 | 天长市华利机械实业有限公司 | A kind of scaffold big door frame and its production method |
CN115783811A (en) * | 2022-12-19 | 2023-03-14 | 中煤科工智能储装技术有限公司 | Coal flattening compaction device |
-
2018
- 2018-12-18 CN CN201822128450.5U patent/CN210855107U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779234A (en) * | 2019-01-25 | 2019-05-21 | 天长市华利机械实业有限公司 | A kind of scaffold big door frame and its production method |
CN109779234B (en) * | 2019-01-25 | 2020-11-06 | 天长市华利机械实业有限公司 | Large gate frame for scaffold and production method thereof |
CN115783811A (en) * | 2022-12-19 | 2023-03-14 | 中煤科工智能储装技术有限公司 | Coal flattening compaction device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210855107U (en) | Building material conveying device | |
CN206985563U (en) | A kind of manhole cover hoisting device | |
CN110670879A (en) | High-rise hoisting method for large equipment | |
CN203636994U (en) | Energy-saving type lifting system based on concrete mixing | |
CN201512331U (en) | Large-tonnage permanent-magnet synchronous freight elevator | |
CN203255902U (en) | Multi-pulley-block four-winch linkage derrick lifting platform | |
CN202429934U (en) | Lifting device for parts in hub of wind generating set, and wind generating set | |
CN216038307U (en) | Wind-powered electricity generation blade girder hoisting accessory | |
CN2247206Y (en) | Hydraulic lifting device for storeyed stereo garage | |
CN201165442Y (en) | Towing construction lifter | |
CN201520004U (en) | Automatic plate feeding machine of building block bricks | |
CN219507476U (en) | Mobilizable assembled wallboard hoist device | |
CN203739261U (en) | Lifting movable garbage compressor for garbage transfer station | |
CN112694023A (en) | Safe and efficient lifting device for building construction | |
CN206645695U (en) | More component special hangers | |
CN201694777U (en) | Self hoisting device of hydraulic turbine volute | |
CN201534738U (en) | Energy-saving construction elevator with rack and pinion | |
CN2256418Y (en) | Creeping formwork lifting frame for lift shaft | |
CN203922508U (en) | A kind of Portable crane device | |
CN216190327U (en) | Novel hoist is used in precast beam hoist and mount | |
CN201040693Y (en) | Domestic weight hoister | |
CN204702438U (en) | A kind of micro lifter lifting mechanism | |
CN220283359U (en) | Industrial factory building vertical hoisting device | |
CN215854693U (en) | Platform rail mounted hoist device | |
CN209778139U (en) | lifting mechanism capable of reducing energy consumption |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220317 Address after: 255000 room 1207, 12 / F, building B, Yunlong international, 28a3 Huaguang Road, Zhangdian District, Zibo City, Shandong Province Patentee after: Shandong Yingxian Information Technology Co.,Ltd. Address before: 255314 Unicom Road, Zibo New District, Shandong, Zibo Patentee before: ZIBO VOCATIONAL INSTITUTE |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200626 |