CN210797642U - Assembled reinforced concrete inspection shaft of assembling fast - Google Patents

Assembled reinforced concrete inspection shaft of assembling fast Download PDF

Info

Publication number
CN210797642U
CN210797642U CN201921206923.7U CN201921206923U CN210797642U CN 210797642 U CN210797642 U CN 210797642U CN 201921206923 U CN201921206923 U CN 201921206923U CN 210797642 U CN210797642 U CN 210797642U
Authority
CN
China
Prior art keywords
well
piece
assembled
assembling
assemble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921206923.7U
Other languages
Chinese (zh)
Inventor
潘骁宇
杨泽良
严豪杰
杨仲元
丁万俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Institute of Communications
Original Assignee
Zhejiang Institute of Communications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Institute of Communications filed Critical Zhejiang Institute of Communications
Priority to CN201921206923.7U priority Critical patent/CN210797642U/en
Application granted granted Critical
Publication of CN210797642U publication Critical patent/CN210797642U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides an assembled reinforced concrete inspection shaft of assembling fast, the structure all adopts prefabricated component above its basic bed course, these prefabricated components constitute wholly from bottom to top, include well room bottom plate respectively, the room lateral wall of going into the well, go up the well room and assemble the piece, well room apron, the piece is assembled to the pit shaft, the piece is assembled to the walling crib and well head apron, wherein the piece is assembled to the pit shaft, go up the well room and assemble the piece, the walling crib is assembled the piece and all is adopted the annular that can artifical assemble fast and assemble the piece, the connection between the prefabricated component adopts flexible connection, through assembling the piece at the well room apron, the piece is assembled to the pit shaft, go up the top installation twice annular rubber seal strip of well room and walling crib assembly piece, it. The utility model discloses construction convenience has greatly alleviateed the hoisting engineering volume, and the installation is free nimble, and reduction of erection time when inspection shaft in use appears subsiding in a small amount, the accessible is changed the mode realization of walling crib prefabricated section and is restoreed fast.

Description

Assembled reinforced concrete inspection shaft of assembling fast
Technical Field
The utility model belongs to the technical field of city underground infrastructure's novel inspection shaft device technique and specifically relates to an assembled reinforced concrete inspection shaft of assembling fast is related to.
Background
Inspection wells are an essential underground infrastructure in municipal drainage. The inspection well in China at early stage mostly adopts a brick-built inspection well, plain concrete is plastered on the inner side and the outer side of the well wall, and the method has the defects of low strength, low durability, long construction period, poor seepage resistance, easiness in sedimentation and the like. With the advance of the rapid construction of the drainage pipeline assembly in China, the prefabricated reinforced concrete inspection well gradually enters the popularization and application stage.
The reinforced concrete inspection well has the advantages of high strength, good integrity, good seepage resistance and sedimentation resistance. The reinforced concrete inspection well adopted in China at the present stage comprises a cast-in-place reinforced concrete inspection well, a prefabricated reinforced concrete inspection well and a concrete module type inspection well. The cast-in-place inspection well has the risk of deep well operation, and the construction period is long, and the concrete maintenance degree of difficulty is big, and construction quality is difficult to control. The prefabricated assembly type inspection well is good in integrity and few in-site concrete operation, but the conventional assembly type inspection well is generally formed by assembling a bottom plate, an upper well chamber, a lower well chamber, a contraction opening, a shaft, a well cover and the like, except the well cover, the rest parts of the assembly type inspection well are installed by adopting mechanical hoisting, and certain difficulty is brought to later-stage maintenance. The modular inspection well adopts masonry construction, the process is convenient and flexible, the modular inspection well has the advantages of good pressure bearing, shearing resistance, low manufacturing cost and corrosion resistance of a concrete structure, but the modules need to be cut on site at the pipeline joint of a well chamber, and the overall masonry speed is reduced.
In recent years, with the rapid increase of traffic flow, the settlement phenomenon of the inspection well of the urban road is very common, so that the flatness of the road surface is reduced, and the driving comfort and the safety are influenced. Compared with the traditional brick inspection well, the reinforced concrete inspection well has great promotion in the aspect of settlement resistance, but along with the increase of the service life of the inspection well, the settlement and the subsequent maintenance problems are inevitable. At present, for the pavement damage caused by the settlement of the inspection well, a mode of adjusting a well ring is generally adopted, namely the well ring is firstly removed when the settlement occurs, fast hardening mortar and concrete are used for bedding and leveling, and then the well ring is installed again. The method needs concrete wet operation and maintenance, and brings certain influence on timely recovery of road traffic.
The publication number CN2546500Y is named as prefabricated concrete inspection well, the well chamber and the shaft are assembled by prefabricated reinforced concrete adjusting splicing blocks, the vertical direction between the adjusting splicing blocks is a tongue-and-groove joint, and the adjusting splicing blocks are sealed by polyurethane, rubber rings or cement mortar. Compared with a brick inspection well, the structure has the advantages of high construction speed, high quality and high compressive strength, is favorable for solving the problems of road well ring collapse and the like, and is produced industrially at present. However, each assembly block must be matched with hoisting equipment for construction, and the construction efficiency is influenced to a certain extent.
The publication number CN108331026A is named as a prefabricated reinforced concrete inspection well and a construction method thereof, and a well chamber and a shaft of the prefabricated reinforced concrete inspection well are connected by adopting prefabricated plate-shaped components through corner posts with grooves and tongues, so that rapid assembly can be realized. But each prefabricated plate block of the structure has a great self weight and is matched with hoisting equipment during assembly. In addition, after all prefabricated components of well room and pit shaft are assembled in place, still need make the structure become whole through tightening up the turn buckle, in case the inside disease that appears of structure, overhaul and change are more difficult.
Disclosure of Invention
In order to overcome present prefabricated assembled concrete inspection shaft exist assemble the piece from great, lift by crane the complicated defect of construction, the utility model provides a fast assembly type reinforced concrete inspection shaft that the dead weight is little, the equipment is convenient nimble, the construction is simple and convenient.
The utility model provides a technical scheme that its technical problem adopted is:
a fast-assembled reinforced concrete inspection well comprises a well chamber bottom plate, a lower well chamber, an upper well chamber, a shaft and a well ring which are arranged on a sand cushion foundation and are assembled from bottom to top, wherein a well chamber cover plate is arranged between the upper well chamber and the shaft, a well mouth cover plate is arranged above the well ring, the structure on the sand cushion foundation adopts prefabricated components, the well chamber bottom plate and the side wall of the lower well chamber are prefabricated at one time, the upper well chamber is assembled by a plurality of upper well chamber assembling blocks, the shaft is assembled by a plurality of shaft assembling blocks, the well ring is assembled by a plurality of well ring assembling blocks, the upper well chamber assembling blocks, the shaft assembling blocks and the well ring assembling blocks adopt more than two heights and can be combined at will among different heights, and simultaneously the well chamber assembling blocks, the shaft assembling blocks and the well ring assembling blocks adopt ring blocks which can be assembled manually and fast, adjacent annular assembling blocks are connected by adopting a tongue-and-groove.
Furthermore, the cross section of the annular assembling block is Z-shaped, two concave tongue-and-grooves are formed in the top of the cross section, and two convex tongue-and-grooves are formed in the bottom of the cross section.
And furthermore, ladder stand connecting pieces are arranged on the inner side walls of the shaft assembling blocks and the upper well chamber assembling blocks.
Furthermore, the height of the upper well chamber assembly block adopts three heights, namely 50mm, 80mm and 100 mm; the height of the shaft splicing block adopts three heights, namely 80mm, 100mm and 150 mm; the height of the well ring assembly block adopts three heights, namely 50mm, 60mm and 80 mm.
And furthermore, an annular rubber sealing strip is arranged at each concave rabbet at the top of the section of the annular assembling block.
Furthermore, the well chamber cover plate is a circular reinforced concrete prefabricated part with a hole, a first annular convex strip is arranged on the upper surface of the well chamber cover plate, a concave rabbet is arranged on the surface of the first annular convex strip, a concave rabbet is further arranged on the inner side of the first annular convex strip, and the two concave rabbets are assembled with two convex rabbets at the bottom of the adjacent shaft assembling block; the lower surface of the cover plate is also provided with a second annular convex strip, the surface of the second annular convex strip is a convex rabbet, the inner side of the second annular convex strip is also provided with a convex rabbet, and the two convex rabbets are assembled with two concave rabbets at the top part of the adjacent upper well chamber assembling block; an annular rubber sealing strip is arranged at each concave rabbet.
The beneficial effects of the utility model are that: the reinforced concrete inspection well has the advantages of reliable quality, good durability and settlement resistance. The application of the small-sized assembled precast block is convenient to construct, free and flexible to install and shortens the construction period; in addition, when the inspection well has a small amount of settlement in use, the quick repair can be realized by replacing the well ring assembly blocks.
Drawings
Fig. 1 is a top view of the present invention.
Fig. 2 is a cross-sectional view taken along line I-I of fig. 1.
FIG. 3 is a sectional view taken along line II-II of FIG. 1.
FIG. 4 is a plan view of a lost circulation module.
Fig. 5 is a cross-sectional view taken along line I-I of fig. 4.
FIG. 6 is a plan view of a wellbore construction block.
Fig. 7 is a cross-sectional view taken along line I-I of fig. 6.
FIG. 8 is a plan view of an upper well block.
Fig. 9 is a cross-sectional view taken along line I-I of fig. 8.
Fig. 10 is a plan view of a well cover plate.
Fig. 11 is a cross-sectional view taken along line I-I of fig. 10.
Fig. 12 is a sectional view II-II of fig. 10.
Fig. 13 is a schematic structural diagram of the node a in fig. 3.
In the figure: 1-shaft assembly blocks, 2-upper well assembly blocks, 3-walling assembly blocks, 4-well cover plates, 5-lower well chamber side walls, 6-well chamber bottom plates, 7-well cover plates, 8-ladder climbing iron pieces, 9-drainage pipelines, 10-sand cushion foundations, 11-rubber sealing strips, 12-concave tongue-and-groove and 13-convex tongue-and-groove.
Detailed Description
The present invention will be further described with reference to the accompanying drawings.
Referring to fig. 1-13, a fast-assembled assembly type reinforced concrete inspection well comprises a well chamber bottom plate 6, a lower well chamber, an upper well chamber, a shaft and a well ring which are arranged on a sand cushion foundation and are assembled from bottom to top, wherein a well chamber cover plate 4 is arranged between the upper well chamber and the shaft, a well opening cover plate 7 is arranged above the well ring, structures on the sand cushion foundation 10 are all prefabricated components, the prefabricated structures are connected by tongue-and-groove joints and sealed by an annular rubber sealing strip 11, and the assembly type reinforced concrete inspection well is circular in shape.
The shaft assembly block 1, the upper well chamber assembly block 2 and the well ring assembly block 3 are all annular assembly blocks which can be assembled manually and rapidly. The shaft assembling blocks 1, the upper well chamber assembling blocks 2 and the well ring assembling blocks 3 are in various heights, and can be combined at will among different heights, so that the assembling requirements of reinforced concrete inspection wells with different structures are met. The top of the assembling block is provided with two annular rubber sealing strips 11, so that the requirement of connection and sealing in the horizontal direction of the assembling block is met.
As shown in figure 1, reinforced concrete inspection shaft assemble block 2, well room apron 4, pit shaft assembly block 1, walling crib assembly block 3, well head cover plate 7 from bottom to top by well room bottom plate 6, lower well room lateral wall 5, go up the well room and assemble and form. The well chamber bottom plate 6 and the lower well chamber side wall 5 are heavy prefabricated components, need to be prefabricated in advance according to the design size of the inspection well and the size of a connecting pipeline, and are placed on the foundation mat 10 in a mechanical hoisting mode. The horizontal interface between the chamber floor 6 and the chamber sidewall 5 is sealed with a rubber seal. The part above the side wall 5 of the lower well chamber is of a manual assembly structure and adopts a light prefabricated component. The upper well chamber is formed by assembling upper well chamber assembling blocks 2, and the heights of the assembling blocks are 50mm, 80mm and 100 mm. The bottom of the well chamber cover plate 4 is connected with the upper well chamber assembling block 2, and the top of the well chamber cover plate is connected with the shaft assembling block 1. The shaft is formed by assembling shaft assembling blocks 1, and the heights of the assembling blocks are 80mm, 100mm and 150 mm. The walling crib is formed by assembling walling crib assembling blocks 3, and the heights of the assembling blocks are 50mm, 60mm and 80 mm.
Fig. 4, 6 and 8 are a walling crib assembly block 3, a shaft assembly block 1 and an upper well chamber assembly block 2 in sequence. The cross section of the assembly block is Z-shaped, the top of the cross section is provided with two concave tongues and grooves, and the bottom of the cross section is provided with two convex tongues and grooves, as shown in figure 13. A rubber sealing strip is arranged at each concave rabbet at the top of the splicing block, so that the sealing requirement of the splicing block is met. The assembly blocks are made of C25 concrete, ladder stand connecting pieces are arranged on the inner sides of the assembly blocks, and the assembly blocks can be connected with the ladder stand iron pieces 8 at proper positions according to height during installation.
As shown in fig. 11, the manhole cover plate is a perforated circular reinforced concrete prefabricated component, the upper surface of the manhole cover plate is provided with a first annular protruding strip, the surface of the first annular protruding strip is provided with a concave rabbet, the inner side of the first annular protruding strip is further provided with a concave rabbet, and the two concave rabbets are assembled with two convex rabbets at the bottom of the adjacent shaft assembling block; the lower surface of the cover plate is also provided with a second annular convex strip, the surface of the second annular convex strip is a convex rabbet, the inner side of the second annular convex strip is also provided with a convex rabbet, and the two convex rabbets are assembled with two concave rabbets at the top part of the adjacent upper well chamber assembling block; an annular rubber sealing strip is arranged at each concave rabbet.
The construction steps are as follows:
1. and excavating earthwork, leveling the field, and pouring the sand cushion foundation of the inspection well.
2. After the sand cushion foundation concrete reaches the design strength, a prefabricated reinforced concrete well chamber bottom plate and the side wall of the well chamber are hoisted in place in sequence by adopting hoisting equipment, and the well chamber bottom plate and the well chamber are sealed by adopting an annular rubber sealing strip. And a pipeline interface is arranged at the position of the reserved opening of the lower well chamber.
3. And (5) manually assembling the residual structure of the inspection well.
According to the sequence from bottom to top, the well chamber assembling blocks are installed, the size of each assembling block can be freely adjusted according to the height of the well chamber, and a well chamber cover plate is installed when the well chamber is installed at the designed height. And installing shaft assembling blocks on the well chamber cover plate, wherein the size of each assembling block is freely adjusted according to the height of the shaft, and installing the well ring assembling blocks when the shaft reaches the designed height. According to the design requirement, the ladder stand iron piece is connected with the ladder stand connecting piece on the assembling block. The assembly blocks are sealed by two annular rubber sealing strips.
4. And installing a wellhead cover plate.
The utility model discloses when the inspection shaft appears subsiding after using certain age, can realize quick replacement. The method comprises the following steps:
1. and (3) removing a well head cover plate of the inspection well, and removing loose materials in a certain range around the well head by adopting an electric pick, and reserving a working surface.
2. And removing the uppermost well ring assembly block, removing the annular rubber sealing strip of the lower well ring assembly block and cleaning the surface.
3. And according to the pre-measured subsidence value of the inspection well, the height of the well ring assembly block needing to be replaced is deduced, and the original assembly block is replaced by a new well ring assembly block.
4. Pouring the road surface around the inspection well, vibrating and maintaining, installing a well head cover plate after reaching the strength, and recovering the road traffic.
By adopting the reinforced concrete inspection well, the hoisting engineering amount can be greatly reduced in the construction stage, and the construction efficiency is improved; after the inspection well subsides, in the change work progress, it is little to have the excavation volume, and is little and construction advantage such as convenient to the road surface destruction.

Claims (6)

1. The utility model provides an assembled reinforced concrete inspection shaft of assembling fast, is including setting up well room bottom plate, lower well room, going up well room, pit shaft, walling crib on the sand cushion bed basis to splice from bottom to top and form, it is equipped with well room apron to go up between well room and the pit shaft, the top of walling crib is equipped with well head apron, its characterized in that: the structure on sand bed course basis all adopts prefabricated component, well room bottom plate and well room lateral wall down adopt disposable prefabrication, go up the well room and assemble the piece by a plurality of well rooms and assemble and form, the pit shaft is assembled the piece by a plurality of pit shafts and is assembled and form, the walling crib is assembled the piece by a plurality of walling cribs and is assembled and form, go up the well room and assemble piece, pit shaft and assemble the piece, the walling crib and assemble the piece and all adopt the height more than two kinds, but the combination wantonly between the different heights, the piece is assembled to well room, pit shaft, walling crib simultaneously and all adopt the annular that can artifical quick assemble to assemble the piece, adopts the tongue-and-groove to connect between the adjacent annular is assembled the piece.
2. The rapidly assembled reinforced concrete manhole as claimed in claim 1, wherein: the cross section of the annular assembling block is Z-shaped, two concave tongue-and-groove are arranged at the top of the cross section, and two convex tongue-and-groove are arranged at the bottom of the cross section.
3. A quick-assembling type reinforced concrete manhole as claimed in claim 1 or 2, wherein: the inner side walls of the shaft assembling blocks and the upper well chamber assembling blocks are provided with ladder stand connecting pieces.
4. A quick-assembling type reinforced concrete manhole as claimed in claim 1 or 2, wherein: the height of the upper well chamber assembly block adopts three heights, namely 50mm, 80mm and 100 mm; the height of the shaft splicing block adopts three heights, namely 80mm, 100mm and 150 mm; the height of the well ring assembly block adopts three heights, namely 50mm, 60mm and 80 mm.
5. The rapidly assembled reinforced concrete manhole as claimed in claim 2, wherein: and an annular rubber sealing strip is arranged at each concave rabbet at the top of the section of the annular assembling block.
6. The rapidly assembled reinforced concrete manhole as claimed in claim 2, wherein: the well chamber cover plate is a circular reinforced concrete prefabricated part with a hole, a first annular convex strip is arranged on the upper surface of the well chamber cover plate, a concave rabbet is arranged on the surface of the first annular convex strip, a concave rabbet is further arranged on the inner side of the first annular convex strip, and the two concave rabbets are assembled with two convex rabbets at the bottom of the adjacent shaft assembling block; the lower surface of the cover plate is also provided with a second annular convex strip, the surface of the second annular convex strip is a convex rabbet, the inner side of the second annular convex strip is also provided with a convex rabbet, and the two convex rabbets are assembled with two concave rabbets at the top part of the adjacent upper well chamber assembling block; an annular rubber sealing strip is arranged at each concave rabbet.
CN201921206923.7U 2019-07-30 2019-07-30 Assembled reinforced concrete inspection shaft of assembling fast Active CN210797642U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921206923.7U CN210797642U (en) 2019-07-30 2019-07-30 Assembled reinforced concrete inspection shaft of assembling fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921206923.7U CN210797642U (en) 2019-07-30 2019-07-30 Assembled reinforced concrete inspection shaft of assembling fast

Publications (1)

Publication Number Publication Date
CN210797642U true CN210797642U (en) 2020-06-19

Family

ID=71231315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921206923.7U Active CN210797642U (en) 2019-07-30 2019-07-30 Assembled reinforced concrete inspection shaft of assembling fast

Country Status (1)

Country Link
CN (1) CN210797642U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267892A (en) * 2020-08-28 2021-01-26 春涛国际建筑有限公司 Secondary pipe jacking construction operation method and system
CN115012447A (en) * 2022-07-20 2022-09-06 无锡市政设计研究院有限公司 Screw assembly type straight-through cable inspection well and construction method thereof
CN115045338A (en) * 2022-07-20 2022-09-13 无锡市政设计研究院有限公司 Prestressed reinforcement assembly type multi-loop straight-through cable inspection well and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267892A (en) * 2020-08-28 2021-01-26 春涛国际建筑有限公司 Secondary pipe jacking construction operation method and system
CN115012447A (en) * 2022-07-20 2022-09-06 无锡市政设计研究院有限公司 Screw assembly type straight-through cable inspection well and construction method thereof
CN115045338A (en) * 2022-07-20 2022-09-13 无锡市政设计研究院有限公司 Prestressed reinforcement assembly type multi-loop straight-through cable inspection well and construction method thereof

Similar Documents

Publication Publication Date Title
CN210797642U (en) Assembled reinforced concrete inspection shaft of assembling fast
CN107313517B (en) Connecting node for laminated wall and laminated floor slab in middle layer
CN108560684B (en) Heavy-load traffic road inspection well ring and construction method thereof
CN105951880A (en) Assembled underground structure of precast concrete planks and construction method thereof
CN105756070B (en) A kind of Fabricated Structure for Support of Excavation system based on prefabricated components
CN210887523U (en) Precast concrete assembled rainwater well
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
WO2018133746A1 (en) Underground building formed of piles and walls, and method for constructing same
CN112281888A (en) Excavation supporting method for foundation pit caisson
CN107288153B (en) Prefabricated gravity type barricade
CN104389360A (en) Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof
CN108396781B (en) Assembled shaft fore shaft circle beam member structure
CN206752632U (en) Plastic reinforcing steel composite construction municipal drainage inspection shaft
CN107023061B (en) Assembled plastic municipal drainage inspection well and construction method
CN112726784A (en) Fully-prefabricated PC sewer inspection well component assembly type structure and construction method
CN216920378U (en) Assembled underground well soil retaining device
CN220203894U (en) Steel corrugated pipe vertical shaft structure
CN217812124U (en) Assembled concrete elevator shaft with connecting platform
CN109137721A (en) A kind of prefabricated assembled suspension bridge bridge pier
CN204098068U (en) Prefabricated assembled concrete drainage inspection well
CN216839488U (en) Intelligent inverted hanging installation system
CN220080066U (en) Modularized concrete cofferdam
CN215715540U (en) Simple prefabricated inspection well
CN214997656U (en) Shield pipe gallery for constructing water collection pit by using steel pipe piece
CN216195393U (en) Precast concrete component for sealing construction of post-cast strip of top plate of underground chamber

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant