CN210797278U CN201921054349.8U CN201921054349U CN210797278U CN 210797278 U CN210797278 U CN 210797278U CN 201921054349 U CN201921054349 U CN 201921054349U CN 210797278 U CN210797278 U CN 210797278U
Authority
CN
China
Prior art keywords
steel bar
hanging basket
hanging
bridge construction
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921054349.8U
Other languages
Chinese (zh)
Inventor
田成瑞
段清伟
赵娟娟
郑凤丝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921054349.8U priority Critical patent/CN210797278U/en
Application granted granted Critical
Publication of CN210797278U publication Critical patent/CN210797278U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge construction is with hanging basket, including hanging the basket main part, hang the top of basket main part and install the triangle-shaped framework, smooth roof beam is installed to the below of the inside of triangle-shaped framework, the body frame is installed to the intermediate position of smooth roof beam top, the bracing piece is installed to both sides on the body frame, the reinforcement crossbeam is installed to the inboard of body frame, the one end of the inside of smooth roof beam is installed and is stored up solid device. The utility model discloses a middle part of hanging basket main part is provided with seven steel bar connection suspender, and the first half of steel bar connection suspender passes through screw rod threaded connection with the triangle-shaped framework, can make die block support frame and triangle-shaped framework be connected more firmly through seven steel bar connection suspender, make the cement of the pouring of the inside of cast-in-place notes section more firm, improved the stability can of hanging the basket, can prevent through last screw rod that unfavorable phenomena such as slippage appear in long-term use at the position that steel bar connection suspender and triangle-shaped framework are connected.

Description

Hanging basket for bridge construction
Technical Field
The utility model relates to a bridge construction technical field specifically is a bridge construction is with hanging basket.
Background
The hanging basket is the main equipment in cantilever construction, and can be divided into 4 types of truss type, inclined pull type, section steel type and mixed type according to the structural form. Comprehensively comparing the characteristics and the weight of the hanging baskets in various forms, the types of steel adopted, the construction process and the like according to the construction process requirements of the concrete cantilever and the requirements of design drawings on the hanging baskets; the hanging basket has the design principle of light dead weight, simple structure, firmness and stability, convenient forward movement and assembly and disassembly, stronger reusability, small deformation after stress and the like, and the lower space of the hanging basket is sufficient, thereby providing a larger construction operation surface and being beneficial to the construction operation of the steel bar formwork.
The appearance of the hanging basket for bridge construction greatly facilitates the construction operation of a bridge, but the hanging basket for bridge construction at the current stage has a plurality of defects, for example, the hanging basket is poor in stability and inconvenient to move in the bridge construction process.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bridge construction is with hanging basket to solve among the prior art at the in-process of bridge construction, hang basket poor stability, the not convenient for problem of removal.
In order to achieve the above object, the utility model provides a following technical scheme: a hanging basket for bridge construction comprises a hanging basket main body, a triangular framework is installed above the hanging basket main body, a sliding beam is installed below the inside of the triangular framework, a main frame is installed at the middle position above the sliding beam, supporting rods are installed on two sides of the main frame, a reinforcing cross beam is installed on the inner side of the main frame, a solid storage device is installed at one end of the inside of the sliding beam, a track is installed below the solid storage device, a cast-in-place section is installed at the middle position of the hanging basket main body, a sealing baffle is installed at the other end of the inside of the cast-in-place section, a side mold support is installed on the outer side of the cast-in-place section, a bottom mold support frame is installed at the bottom of the cast-in-place section, steel bar connecting hanging belts are installed on two sides of the connecting position of the bottom mold support frame and the triangular framework, upper screw rods are installed on the steel bar connecting hanging, the top of going up the screw rod is installed the stopper, the connection net rack board is installed to the top of the inside of die block support frame, the curb plate is connected to the V type is installed to the both sides of the inside of die block support frame.
Preferably, the cast-in-place section is connected with the side die support in a sliding and embedding manner, and the side die support is connected with the bottom die support frame in a welding manner.
Preferably, a pulley is arranged at the middle position inside the solid storage device, and the solid storage device is connected with the rail in a sliding mode through the pulley.
Preferably, the steel bar connecting slings are provided with seven steel bar connecting slings, the two steel bar connecting slings are arranged at two ends of one side of the joint of the triangular framework and the bottom die supporting frame, and the other five steel bar connecting slings are arranged at two ends and the middle position of the other side of the joint of the triangular framework and the bottom die supporting frame.
Preferably, the connecting net rack plate is connected with the bottom die support frame through welding, the plane above the connecting net rack plate and the top die support frame is arranged on the same horizontal plane, and the connecting net rack plate is arranged in a cross structure.
Preferably, the limiting block is connected with the upper screw rod in a welding mode, and the outer side of the limiting block is of a hexagonal structure.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a middle part of hanging basket main part is provided with seven steel bar connection suspender, and the first half of steel bar connection suspender passes through screw rod threaded connection with the triangle-shaped framework, can make die block support frame and triangle-shaped framework be connected more firmly through seven steel bar connection suspender, make the cement of the pouring of the inside of cast-in-place notes section more firm, improved the stability can of hanging the basket, can prevent through last screw rod that unfavorable phenomena such as slippage appear in long-term use at the position that steel bar connection suspender and triangle-shaped framework are connected.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a top view of the triangular frame of the present invention.
Fig. 3 is a top view of the bottom die supporting frame of the present invention.
In the figure: 1. reinforcing the cross beam; 2. a main frame; 3. a support bar; 4. a limiting block; 5. a jack; 6. a triangular framework; 7. a sliding beam; 8. an upper screw rod; 9. a casting section is carried out; 10. the steel bar is connected with the hanging strip; 11. a side form support; 12. a bottom die support frame; 13. a V-shaped connecting side plate; 14. a track; 15. a storage and fixation device; 16. connecting the net rack plate; 17. sealing the baffle; 18. a hanging basket main body.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, in an embodiment of the present invention, a hanging basket for bridge construction includes a hanging basket main body 18, a triangular frame 6 is installed above the hanging basket main body 18, the triangular frame 6 mainly supports the hanging basket main body 18, a sliding beam 7 is installed below the inside of the triangular frame 6, the sliding beam 7 is convenient for the triangular frame 6 to extend forward, a main frame 2 is installed at a middle position above the sliding beam 7, the main frame 2 triangularly supports and fixes the triangular frame 6, support rods 3 are installed at two sides of the main frame 2, the support rods 3 strengthen and fix the main frame 2, a reinforcing cross beam 1 is installed at the inner side of the main frame 2, the reinforcing cross beam 1 transversely stabilizes the main frame 2, a storage and fixation device 15 is installed at one end of the inside of the sliding beam 7, the storage and fixation device 15 fixes the triangular frame 6, a pulley is installed at a middle position inside the storage and fixation device 15, the storage and fixing device 15 is connected with the rail 14 in a sliding mode through pulleys, the rail 14 is installed below the storage and fixing device 15, the rail 14 facilitates moving of the sliding beam 7, the cast-in-place section 9 is installed in the middle of the hanging basket body 18, the cast-in-place section 9 is used for pouring cement, the cast-in-place section 9 is connected with the side mold support 11 in a sliding and embedding mode, the side mold support 11 is connected with the bottom mold support 12 in a welding mode, a sealing baffle 17 is installed at the other end of the inner portion of the cast-in-place section 9, the sealing baffle 17 prevents poured cement from overflowing, the side mold support 11 is installed on the outer side of the cast-in-place section 9, the side mold support 11 is used for increasing bearing force and strengthening stability of the cast-in-place section 9, the bottom mold support 12 is installed at the bottom of the cast-in-place section 9, the bottom mold support 12 is used for strengthening stability of, the steel bar connecting straps 10 connect and fix the triangular framework 6 and the bottom die supporting frame 12, seven steel bar connecting straps 10 are arranged, two steel bar connecting straps 10 are arranged at two ends of one side of the joint of the triangular framework 6 and the bottom die supporting frame 12, the other five steel bar connecting straps 10 are arranged at two ends and the middle position of the other side of the joint of the triangular framework 6 and the bottom die supporting frame 12, upper screw rods 8 are arranged on the steel bar connecting straps 10, friction force of the upper screw rods 8 on the steel bar connecting straps 10 is increased, a jack 5 is arranged at the joint of the upper part of each upper screw rod 8 and the triangular framework 6, the bearing effect of the jack 5 on the steel bar connecting straps 10 is increased, a limiting block 4 is arranged at the top end of each upper screw rod 8, the limiting block 4 prevents the steel bar connecting straps 10 from breaking and sliding, the limiting block 4 is connected with the upper screw rods 8 in a, connecting net frame plate 16 is installed to the top of the inside of die block support frame 12, connecting net frame plate 16 increases the fastness to die block support frame 12, connecting net frame plate 16 and die block support frame 12 pass through welded connection, and the plane of connecting net frame plate 16 and the top of die block support frame 12 sets up to same horizontal plane on, and connects net frame plate 16 and set up to cross structure, V type connection curb plate 13 is installed to the both sides of the inside of die block support frame 12, V type connection curb plate 13 increases the fastness to the side of die block support frame 12.
The utility model discloses a theory of operation is: when the device is used, the track 14, the solid storage device 15 and the sliding beam 7 are fixedly installed, the track 14 is fixed on a poured bridge top end main frame, the triangular framework 6 is hung on one side of the main frame, the bottom die support frame 12 and the triangular framework 6 are fixedly connected through the steel bar connecting hanging strip 10, the poured section 9 is embedded inside the side die support 11, the poured section 9 is supported through the side die support 11, the sealing baffle 17 is installed inside the poured section 9 from two ends to be sealed, the steel bar net frame is installed in the poured section 9, and cement is poured inside the poured section 9.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. A hanging basket for bridge construction comprises a hanging basket main body (18) and is characterized in that a triangular framework (6) is installed above the hanging basket main body (18), a sliding beam (7) is installed below the inside of the triangular framework (6), a main frame (2) is installed in the middle of the upper portion of the sliding beam (7), supporting rods (3) are installed on two sides of the main frame (2), a reinforcing cross beam (1) is installed on the inner side of the main frame (2), a solid storage device (15) is installed at one end of the inside of the sliding beam (7), a rail (14) is installed below the solid storage device (15), a cast-in-place section (9) is installed in the middle of the hanging basket main body (18), a sealing baffle (17) is installed at the other end of the inside of the cast-in-place section (9), and a side mold support (11) is installed on the outer side of the cast-in-place section (9), die block support frame (12) is installed to the bottom of current pouring section (9), steel bar connection suspender (10) is installed with the both sides of the junction of triangle-shaped framework (6) in die block support frame (12), install on steel bar connection suspender (10) screw rod (8), jack (5) are installed with the junction of triangle-shaped framework (6) to the top of going up screw rod (8), stopper (4) are installed on the top of going up screw rod (8), connect net rack board (16) are installed to the top of the inside of die block support frame (12), V type connection curb plate (13) are installed to the both sides of the inside of die block support frame (12).
2. The hanging basket for bridge construction according to claim 1, wherein: the existing pouring section (9) is connected with the side die support (11) in a sliding embedding mode, and the side die support (11) is connected with the bottom die support frame (12) in a welding mode.
3. The hanging basket for bridge construction according to claim 1, wherein: a pulley is arranged in the middle of the inside of the solid storage device (15), and the solid storage device (15) is connected with the rail (14) in a sliding mode through the pulley.
4. The hanging basket for bridge construction according to claim 1, wherein: the steel bar connecting hanging strips (10) are provided with seven steel bar connecting hanging strips, two steel bar connecting hanging strips (10) are arranged at two ends of one side of the joint of the triangular framework (6) and the bottom die supporting frame (12), and in addition, five steel bar connecting hanging strips (10) are arranged at two ends and the middle position of the other side of the joint of the triangular framework (6) and the bottom die supporting frame (12).
5. The hanging basket for bridge construction according to claim 1, wherein: the connecting net rack plate (16) is connected with the bottom die support frame (12) in a welding mode, the plane above the connecting net rack plate (16) and the top die support frame (12) is arranged on the same horizontal plane, and the connecting net rack plate (16) is arranged to be of a cross structure.
6. The hanging basket for bridge construction according to claim 1, wherein: the limiting block (4) is connected with the upper screw (8) in a welding mode, and the outer side of the limiting block (4) is of a hexagonal structure.
CN201921054349.8U 2019-07-08 2019-07-08 Hanging basket for bridge construction Expired - Fee Related CN210797278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921054349.8U CN210797278U (en) 2019-07-08 2019-07-08 Hanging basket for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921054349.8U CN210797278U (en) 2019-07-08 2019-07-08 Hanging basket for bridge construction

Publications (1)

Publication Number Publication Date
CN210797278U true CN210797278U (en) 2020-06-19

Family

ID=71243441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921054349.8U Expired - Fee Related CN210797278U (en) 2019-07-08 2019-07-08 Hanging basket for bridge construction

Country Status (1)

Country Link
CN (1) CN210797278U (en)

Similar Documents

Publication Publication Date Title
KR101462202B1 (en) Form traveller for through bridge
CN201169749Y (en) Simple-mounted pin connection triangle hanging basket
CN202787928U (en) Construction device for steel plate wall
CN206902566U (en) A kind of arch rib bridge girder cantilever construction Hanging Basket
CN217517371U (en) Concrete box type arch bridge cantilever is pour with falling triangle and is hung basket
CN210797278U (en) Hanging basket for bridge construction
CN210658035U (en) Draw to one side and hang knot supporting structure
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN210766424U (en) Bridge triangle hanging basket
CN211815595U (en) Lower tower column tension and compression structure for cable tower
CN206769343U (en) It is a kind of to be used for the travelling bridge that guardrail is constructed that builds a bridge
CN109944164A (en) Jack up hollow thin-walled high pier roller die system and its construction method
CN213329975U (en) Steel pull rod hanging and pulling overhanging bearing steel beam structure
CN205663175U (en) Adjustable reinforcing pull rod formula scaffold frame of encorbelmenting
CN213951981U (en) Basket is hung with safe type to bridge construction
CN211368423U (en) Stay cable tower top lifting traction operation platform
CN209722771U (en) A kind of bridge construction Hanging Basket
CN207987783U (en) A kind of middle cross beam suspension system of suspended pouring construction hanging basket
CN210766433U (en) Trapezoidal hanging basket structure
CN113293712A (en) Cantilever beam construction is with hanging basket
CN209686686U (en) Type steel bar truss floor support plate composite structure
CN206735623U (en) Framework of steel reinforcement hanging apparatus
CN214527767U (en) Jack reversely-hanging transfer device for indoor tensioning of corrugated steel web beam box
CN210684492U (en) Simple tensioning operation platform
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200619

Termination date: 20210708