CN207987783U - A kind of middle cross beam suspension system of suspended pouring construction hanging basket - Google Patents

A kind of middle cross beam suspension system of suspended pouring construction hanging basket Download PDF

Info

Publication number
CN207987783U
CN207987783U CN201820002181.5U CN201820002181U CN207987783U CN 207987783 U CN207987783 U CN 207987783U CN 201820002181 U CN201820002181 U CN 201820002181U CN 207987783 U CN207987783 U CN 207987783U
Authority
CN
China
Prior art keywords
hanging basket
basket
middle cross
edge
cross beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820002181.5U
Other languages
Chinese (zh)
Inventor
李玲玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Original Assignee
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Cross-Channel Bridge South Engineering Co Ltd, Road and Bridge International Co Ltd filed Critical Middle Cross-Channel Bridge South Engineering Co Ltd
Priority to CN201820002181.5U priority Critical patent/CN207987783U/en
Application granted granted Critical
Publication of CN207987783U publication Critical patent/CN207987783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of middle cross beam suspension systems of suspended pouring construction hanging basket, it is respectively fixedly connected with a vertical suspending rod at middle cross beam both ends, a horizontally disposed support rail is fixed in every suspending rod, support rail is located at below the edge of a wing skid beam, and each edge of a wing skid beam is suspended in by two edge of a wing skid beam suspender belts below the bridge flange plate poured;Bracket and once bracket are fixedly mounted on one on the outside of suspending rod, one punching jack is installed at the top of upper bracket, one Hanging Basket bottom basket suspender belt sequentially passes through punching jack, upper bracket and lower bracket from top to bottom, the upper end of Hanging Basket bottom basket suspender belt protrudes from the top of punching jack, and the upper bolt-nut that is spirally connected, it is located at the position at the top of lower bracket in Hanging Basket bottom basket suspender belt to be spirally connected lower bolt-nut, lower end and the Hanging Basket bottom basket of Hanging Basket bottom basket suspender belt anchor.

Description

A kind of middle cross beam suspension system of suspended pouring construction hanging basket
Technical field
The utility model belongs to continuous beam, continuous rigid frame bridge cantilever construction engineering field, and in particular to a kind of cantilever is applied The middle cross beam suspension system of work Hanging Basket
Background technology
Continuous beam, continuous rigid frame bridge are built because its structure is with excellent mechanical property and economic performance across river valley bridge It is used widely in if, and cantilever method pouring construction technology is continuous beam, Continuous Rigid-framed Girder construction one preferred technique, Hanging Basket is then Cantilever method pouring construction necessary equipment.
As shown in Figure 1, Hanging Basket suspension system generally includes hanging basket main truss 1, Hanging Basket middle cross beam 2, edge of a wing skid beam 3 and Hanging Basket Bottom basket 4 etc..The middle cross beam 2 of traditional Hanging Basket is only used for stablizing frame body, and an outer skid beam 6 is set below bridge flange plate 5, the edge of a wing is slided Beam 3 is supported in outer skid beam 6, and when bridge cantilever pours, outer skid beam 6, Hanging Basket bottom basket are hung with suspender belt in having poured beam section On flange plate 5.When Hanging Basket moves, edge of a wing skid beam 3 is slided along outer skid beam 6.Due to outer skid beam since stand under load is larger, power converts number It is more, it often needs to use big cross section steel structure material, and since excessive load is suspended in outer skid beam, when Hanging Basket moves, the edge of a wing is slided Beam 3 slides difficulty in outer skid beam 6, influences moving ahead for entire Hanging Basket system.
Invention content
The purpose of this utility model is that, Hanging Basket sliding excessive for current suspended pouring construction hanging basket structure China and foreign countries skid beam load Difficult problem, provides a kind of middle cross beam suspension system of suspended pouring construction hanging basket, mainly by middle cross beam carry flange plate skid beam and Hanging Basket bottom basket load is slided convenient for Hanging Basket.
The technical solution of the utility model is as follows:
A kind of middle cross beam suspension system of suspended pouring construction hanging basket, including hanging basket main truss, middle cross beam, two edge of a wing skid beams, extension Basket bottom basket, the Hanging Basket middle cross beam are supported on hanging basket main truss, it is characterised in that:The cantilevered out bridge edge of a wing in wherein the middle cross beam both ends Plate certain distance is respectively fixedly connected with a vertical suspending rod at middle cross beam both ends, and it is horizontally disposed that one is fixed in every suspending rod Support rail, the support rail is located at below the edge of a wing skid beam, and each edge of a wing skid beam passes through two edge of a wing skid beam suspender belts It is suspended in below the bridge flange plate poured, the edge of a wing skid beam suspender belt upper end is anchored on bridge flange plate, lower end and the wing Edge skid beam rear end anchors;Bracket and once bracket are fixedly mounted on one on the outside of the suspending rod, is installed at the top of the upper bracket One punching jack, a Hanging Basket bottom basket suspender belt sequentially passes through the punching jack, upper bracket and lower bracket from top to bottom, described The upper end of Hanging Basket bottom basket suspender belt protrudes from the top of the punching jack, and the upper bolt-nut that is spirally connected, in Hanging Basket bottom basket suspender belt Position at the top of lower bracket is spirally connected lower bolt-nut, and lower end and the Hanging Basket bottom basket of Hanging Basket bottom basket suspender belt anchor.
The utility model is simple in structure, gives full play to rod piece stress performance, and structure stress is clear, high capacity, pacifies the side of tearing open Just.Outer skid beam is eliminated, edge of a wing skid beam and Hanging Basket bottom basket are carried by middle cross beam suspension system and Hanging Basket is driven to move integrally, is subtracted Small structural complexity, increases the stability of Hanging Basket system, is moved convenient for Hanging Basket.
Description of the drawings
Fig. 1 is existing Hanging Basket middle cross beam overhung construction schematic diagram;
Fig. 2 is the Hanging Basket middle cross beam overhung construction schematic diagram of the utility model.
Specific implementation mode
As shown in Fig. 2, the utility model includes hanging basket main truss 1, middle cross beam 2, two edge of a wing skid beams 3, Hanging Basket bottom basket 4, institute It states Hanging Basket middle cross beam 2 to be supported on hanging basket main truss 1, the cantilevered out bridge flange plate certain distance in 2 both ends of wherein the middle cross beam, in middle cross 2 both ends of beam are respectively fixedly connected with a vertical suspending rod 7, and a horizontally disposed support rail 8, institute are fixed in every suspending rod 7 It states support rail 8 and is located at 3 lower section of the edge of a wing skid beam, each edge of a wing skid beam 3 is suspended in by two edge of a wing skid beam suspender belts 9 and has been poured The lower section for the bridge flange plate 5 built, 9 upper end of edge of a wing skid beam suspender belt are anchored on bridge flange plate 5, lower end and edge of a wing skid beam 3 rear ends anchor;Bracket 10 and once bracket 11 is fixedly mounted on one in the outside of the suspending rod 7, pacifies at 10 top of the upper bracket A punching jack 12 is filled, a Hanging Basket bottom basket suspender belt 13 sequentially passes through the punching jack 12,10 and of upper bracket from top to bottom The upper end of lower bracket 11, the Hanging Basket bottom basket suspender belt 13 protrudes from the top of the punching jack 12, and the upper anchoring spiral shell that is spirally connected Mother 14, at Hanging Basket bottom, basket suspender belt 13 is located at the position at the top of lower bracket 11 and is spirally connected lower bolt-nut 15, Hanging Basket bottom basket suspender belt 13 Lower end is anchored with Hanging Basket bottom basket 4.
To keep suspending rod stable structure, can be connected between the suspending rod 7 and Hanging Basket middle cross beam 2 when specific implementation First hound 16;Between suspending rod 7 and support rail 8, the second hound 17 is connected.
When Hanging Basket moves, edge of a wing skid beam 3 will be supported on support rail 8 the utility model, and pass through 8 band of support rail It is dynamic to move ahead, to avoid edge of a wing skid beam from being moved on support rail, set that there are two fixed limited blocks on the support rail 8 18, when Hanging Basket moves ahead, edge of a wing skid beam 3 and the limited block 18 on support rail are anchored.
Segmentation pours when bridge cantilever concrete construction, often pours one section of completion, and Hanging Basket moves forward certain distance, starts Next section pours.When carrying out bridge cantilever pouring construction using the utility model, edge of a wing skid beam front end is suspended to Hanging Basket front beam On, rear end is suspended to by edge of a wing skid beam suspender belt and has been poured into a mould on block flange plate.
When Hanging Basket system needs to move forward, the edge of a wing skid beam suspender belt 9 between edge of a wing skid beam 3 and flange plate 5 is first removed, it will It falls under edge of a wing skid beam 3 on support rail 8, and is anchored securely with the limited block 18 on support rail 8, while reducing edge of a wing skid beam Front height, it is ensured that edge of a wing skid beam is in horizontality.The Hanging Basket bottom basket suspender belt 13 connected in decentralization suspending rod 7, makes Hanging Basket bottom Plate is detached with block has been poured into a mould.Check Hanging Basket each position, it is ensured that each section and poured into a mould span soap-free emulsion polymeization, movable hanging basket main couple 1 moves ahead, and Hanging Basket middle cross beam 2 can drive edge of a wing skid beam 3 and Hanging Basket bottom basket 4 to move ahead together by suspending rod 7.
When the basket suspender belt 13 of lower section Hanging Basket bottom, it can be matched by punching jack 12 and upper bolt-nut 14 and lower bolt-nut 15 It closes and carries out.It is first rotated up bolt-nut 14, away from 12 top of jack, then starting jack makes its piston stretch It is long, bolt-nut is withstood again at the top of jack, then is rotated up lower bolt-nut 15 away from certain at the top of lower bracket Then distance shrinks jack, Hanging Basket bottom basket suspender belt 13 is made to decline, such circulate operation, until will be under Hanging Basket bottom basket suspender belt 13 Drop to appropriate height.Above process reverse operating can also be such that Hanging Basket bottom basket suspender belt 13 is lifted up.

Claims (3)

1. a kind of middle cross beam suspension system of suspended pouring construction hanging basket, including hanging basket main truss, middle cross beam, two edge of a wing skid beams, Hanging Basket Bottom basket, the Hanging Basket middle cross beam are supported on hanging basket main truss, it is characterised in that:The cantilevered out bridge flange plate in wherein the middle cross beam both ends Certain distance is respectively fixedly connected with a vertical suspending rod at middle cross beam both ends, and it is horizontally disposed to fix one in every suspending rod Support rail, the support rail are located at below the edge of a wing skid beam, and each edge of a wing skid beam is outstanding by two edge of a wing skid beam suspender belts It is hung in below the bridge flange plate poured, the edge of a wing skid beam suspender belt upper end is anchored on bridge flange plate, lower end and the edge of a wing Skid beam rear end anchors;Bracket and once bracket are fixedly mounted on one on the outside of the suspending rod, one is installed at the top of the upper bracket Punching jack, a Hanging Basket bottom basket suspender belt sequentially pass through the punching jack, upper bracket and lower bracket, the extension from top to bottom The upper end of basket bottom basket suspender belt protrudes from the top of the punching jack, and the upper bolt-nut that is spirally connected, in Hanging Basket bottom basket suspender belt position Position at the top of lower bracket is spirally connected lower bolt-nut, and lower end and the Hanging Basket bottom basket of Hanging Basket bottom basket suspender belt anchor.
2. the middle cross beam suspension system of suspended pouring construction hanging basket according to claim 1, it is characterised in that:In the suspending rod Between Hanging Basket middle cross beam, the first hound is connected;Between suspending rod and support beam, it is connected with the second hound.
3. the middle cross beam suspension system of suspended pouring construction hanging basket according to claim 1, it is characterised in that:In support cross Fixed limited block there are two being set on bar.
CN201820002181.5U 2018-01-02 2018-01-02 A kind of middle cross beam suspension system of suspended pouring construction hanging basket Active CN207987783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820002181.5U CN207987783U (en) 2018-01-02 2018-01-02 A kind of middle cross beam suspension system of suspended pouring construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820002181.5U CN207987783U (en) 2018-01-02 2018-01-02 A kind of middle cross beam suspension system of suspended pouring construction hanging basket

Publications (1)

Publication Number Publication Date
CN207987783U true CN207987783U (en) 2018-10-19

Family

ID=63819797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820002181.5U Active CN207987783U (en) 2018-01-02 2018-01-02 A kind of middle cross beam suspension system of suspended pouring construction hanging basket

Country Status (1)

Country Link
CN (1) CN207987783U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109667228A (en) * 2019-01-24 2019-04-23 中铁十六局集团第五工程有限公司 A kind of straight beam formula Hanging Basket and continuous beam cantilever pouring construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109667228A (en) * 2019-01-24 2019-04-23 中铁十六局集团第五工程有限公司 A kind of straight beam formula Hanging Basket and continuous beam cantilever pouring construction method
CN109667228B (en) * 2019-01-24 2024-02-02 中铁十六局集团第五工程有限公司 Straight beam type hanging basket and continuous beam cantilever pouring construction method

Similar Documents

Publication Publication Date Title
CN102094392B (en) Lower supported hanging basket in bridge construction and application thereof
CN205934747U (en) A hang basket that is used for cantilever to pour bridge construction operation with pre -compaction structure
CN205575408U (en) Concrete precast component shedder
CN103669217A (en) Hanging basket with rear fulcrum and transverse moving method for integral range replacement of hanging basket with rear fulcrum
CN207987783U (en) A kind of middle cross beam suspension system of suspended pouring construction hanging basket
CN210151596U (en) Integrated construction system for side-span cast-in-place section and closure section of high-pier continuous beam
CN201972099U (en) Through type hanging basket in bridge construction
CN218932915U (en) Self-walking hanging basket with backstop device
CN110273432A (en) A kind of existing main structure of subway station enlarging construction method
CN206769343U (en) It is a kind of to be used for the travelling bridge that guardrail is constructed that builds a bridge
CN202000262U (en) Bridge triangular hanging basket
CN214245394U (en) Basket is hung with assembled to rigid frame bridge
CN212128879U (en) Movable formwork for bridge construction
CN214530206U (en) Portable moving die carrier bridging machine
CN210766433U (en) Trapezoidal hanging basket structure
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN211285309U (en) Traveling type hanging basket for bridge construction
CN208267865U (en) A kind of backform trolley
CN210797278U (en) Hanging basket for bridge construction
CN102004055A (en) Hanging basket static loading test device
CN110359548A (en) A kind of steel truss suspension hybrid system and construction method
CN110080121A (en) A kind of Hanging Basket up-link and construction method
CN210684492U (en) Simple tensioning operation platform
CN201811887U (en) Suspended basket static test device
CN214245395U (en) Main truss system for rigid frame bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant