CN210787517U - Production line for on-site recycling treatment of mobile construction waste - Google Patents

Production line for on-site recycling treatment of mobile construction waste Download PDF

Info

Publication number
CN210787517U
CN210787517U CN201921410914.XU CN201921410914U CN210787517U CN 210787517 U CN210787517 U CN 210787517U CN 201921410914 U CN201921410914 U CN 201921410914U CN 210787517 U CN210787517 U CN 210787517U
Authority
CN
China
Prior art keywords
case
production line
fixed mounting
crushing
broken
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921410914.XU
Other languages
Chinese (zh)
Inventor
张山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Fangchi Heavy Industry Equipment Co ltd
Original Assignee
Wuhan Fangchi Heavy Industry Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Fangchi Heavy Industry Equipment Co ltd filed Critical Wuhan Fangchi Heavy Industry Equipment Co ltd
Priority to CN201921410914.XU priority Critical patent/CN210787517U/en
Application granted granted Critical
Publication of CN210787517U publication Critical patent/CN210787517U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction waste retrieves technical field, and discloses a production line of portable construction waste on-spot recovery processing is including handling the case, the interior diapire fixed mounting who handles the case has broken case, the top intercommunication of broken case has the inlet pipe, the top of inlet pipe extends to the top of handling the case, the left side fixed mounting of broken case has two driving motor. This on-spot recovery processing's of portable construction waste production line, lead to the broken incasement through the inlet pipe with pending construction waste, start two driving motor simultaneously, drive two crushing rollers through driving motor and rotate, the brick simultaneously, the stone, qualified waste materials such as concrete enter into the second lifting machine through first connecting pipe, thereby smash system sand in leading-in system sand machine with it through the impurity recycling bin, last finished product passes through the discharging pipe and derives, thereby reached more efficient and handled construction waste, improve its utilization ratio environmental pollution's purpose.

Description

Production line for on-site recycling treatment of mobile construction waste
Technical Field
The utility model relates to a construction waste retrieves technical field, specifically is a production line of on-spot recovery processing of portable construction waste.
Background
Along with the acceleration of industrialization and urbanization processes, the construction industry is rapidly developed at the same time, along with the increase of the generated construction wastes, the quantity of the Chinese construction wastes accounts for more than 1/3 of the total quantity of the urban wastes, and as far as 2011, the stock of the Chinese urban solid domestic wastes reaches 70 hundred million tons, the total quantity of the construction wastes can be calculated to be 21 hundred million to 28 hundred million tons, and the newly generated construction wastes are more than 3 hundred million tons every year, if a simple stacking mode is adopted for treatment, the treatment of newly added construction wastes accounts for 1.5 hundred million to 2 hundred million square meters every year, China is in a high-speed development period of economic construction, inevitably generates hundreds of millions of tons of construction wastes every year, and if the construction wastes are not treated and utilized in time, the construction wastes inevitably bring adverse effects to the society, the environment and.
The construction waste in the prior art is generally transported to a designated position in a centralized manner for being placed in the open air or being buried in a collective manner, the construction waste is not treated in any way, and the construction waste contains more materials which can be recycled for sand making and the like, so that the environment is greatly polluted if the construction waste is buried without being treated, and resources are wasted, so that a movable production line for on-site recycling treatment of the construction waste is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a portable construction waste on-spot recovery processing's production line, possess more efficient and handle construction waste, improve advantages such as its utilization ratio environmental pollution, the construction waste of having solved among the prior art is generally concentrated to transport to the assigned position and put or collective landfill in the open, this kind of mode does not do any processing to construction waste, contain more recoverable material as system sand etc. in addition in the construction waste, if not handle just to carry out the landfill and can cause great pollution for the environment, the while is the problem to the waste of resource.
(II) technical scheme
In order to realize that above-mentioned more efficient handles building rubbish, improves its utilization ratio environmental pollution's purpose, the utility model provides a following technical scheme: a production line for on-site recycling treatment of mobile construction waste comprises a treatment box, wherein a crushing box is fixedly mounted on the inner bottom wall of the treatment box, the top of the crushing box is communicated with an inlet pipe, the top end of the inlet pipe extends to the top of the treatment box, two driving motors are fixedly mounted on the left side of the crushing box, two crushing rollers are arranged inside the crushing box, fixed shafts are fixedly mounted at the two ends of the crushing rollers, one ends, far away from the crushing rollers, of the left sides of the fixed shafts penetrate through the crushing box and are fixedly connected with the output ends of the driving motors, a plurality of crushing blocks are fixedly mounted on the surfaces of the crushing rollers, an inclined plate is fixedly mounted at the bottom of the crushing box, a second connecting pipe is communicated with the bottom of the right side of the crushing box, the second connecting pipe is located at the top of the inclined plate, a screening box is fixedly, the inside fixed mounting of screening case has the shale shaker, the right side intercommunication of screening case has first connecting pipe, the discharge gate has been seted up to the bottom of screening case, the below that handles the interior diapire of case and be located the screening case is provided with the impurity recovery case, the right side fixed mounting who handles the interior diapire of case and be located the screening case has the system sand machine, the bottom intercommunication on system sand machine right side has the discharging pipe.
Preferably, a fixed plate is fixedly mounted on the left side of the crushing box, and the two driving motors are fixedly mounted at the top of the fixed plate.
Preferably, a crushing cavity is formed between the two crushing rollers, and the two groups of crushing blocks are arranged in a staggered mode.
Preferably, the left side and the right side of the inner wall of the crushing box are both fixedly provided with two bearings, and the four fixing shafts are respectively and fixedly connected to inner rings of the four bearings.
Preferably, the treatment box is provided with a first lifting machine on the inner bottom wall and is positioned between the crushing box and the screening box, the right end of the second connecting pipe is fixedly connected to the left bottom of the first lifting machine, a first material guide pipe is fixedly arranged on the top of the right side of the first lifting machine, and the first material guide pipe is positioned above the screening box.
Preferably, the inner bottom wall of the treatment box is fixedly provided with a second lifting machine between the screening box and the sand making machine, the right end of the first connecting pipe is fixedly connected to the left bottom of the second lifting machine, the top on the right side of the second lifting machine is fixedly provided with a second material guide pipe, and the second material guide pipe is positioned above the sand making machine.
(III) advantageous effects
Compared with the prior art, the utility model provides a portable construction waste on-spot recovery processing's production line possesses following beneficial effect:
1. the production line for the on-site recycling treatment of the mobile construction waste guides the construction waste to be treated into the crushing box through the feeding pipe, the two driving motors are started simultaneously, the two crushing rollers are driven to rotate by the driving motors, and the construction waste is crushed by the two crushing rollers and the crushing blocks, so that the larger construction waste is crushed into smaller blocks, the subsequent processing is more convenient, then screening the waste materials through a vibrating screen, so that the unqualified waste materials such as sand and the like fall into an impurity recovery box through a discharge hole for collection, meanwhile, qualified waste materials such as bricks, stones, concrete and the like enter the second lifter through the first connecting pipe, thereby leading the impurities into a sand making machine through an impurity recovery box for crushing and making sand, leading out the final finished product through a discharge pipe, therefore, the purposes of treating the construction waste more efficiently and improving the utilization rate and environmental pollution are achieved.
2. This on-spot recovery processing's of portable construction waste production line, fix driving motor through the fixed plate, avoid it to drop in the use, make breakage more meticulous through staggered arrangement's two sets of broken fragments, increase broken efficiency simultaneously, then more conveniently through first lifting machine with broken incasement processing the material after accomplishing leading-in to the screening incasement carry out further processing, more conveniently through first lifting machine with the screening incasement processing the material after accomplishing leading-in to the system sand machine in further processing of advancing, very big improvement work efficiency, thereby reached more efficient and handled construction waste, improve its utilization ratio environmental pollution's purpose.
Drawings
FIG. 1 is a front view of the overall structure of the present invention;
FIG. 2 is a front sectional view of the crushing box of the present invention;
FIG. 3 is a top cross-sectional view of the crushing box of the present invention;
figure 4 is the front cross-sectional view of the screening box of the utility model.
In the figure: 1. a treatment tank; 2. a crushing box; 3. a fixing plate; 4. a drive motor; 5. a feed pipe; 6. a first hoist; 7. a second hoist; 8. a sand making machine; 9. a discharge pipe; 10. a first connecting pipe; 11. an impurity recovery tank; 12. a screening box; 13. a second connecting pipe; 14. a fixed shaft; 15. breaking the fragments; 16. a crushing roller; 17. a sloping plate; 18. vibrating screen; 19. and (4) a discharge port.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a mobile production line for on-site recycling treatment of construction waste comprises a treatment tank 1, a crushing tank 2 is fixedly installed on the inner bottom wall of the treatment tank 1, a feeding pipe 5 is communicated with the top of the crushing tank 2, the top end of the feeding pipe 5 extends to the top of the treatment tank 1, two driving motors 4 are fixedly installed on the left side of the crushing tank 2, two crushing rollers 16 are arranged inside the crushing tank 2, fixed shafts 14 are fixedly installed at both ends of the crushing rollers 16, one end of the left fixed shaft 14, far away from the crushing rollers 16, penetrates through the crushing tank 2 and is fixedly connected with the output ends of the driving motors 4, a plurality of crushing blocks 15 are fixedly installed on the surface of the crushing rollers 16, an inclined plate 17 is fixedly installed at the bottom of the crushing tank 2, a second connecting pipe 13 is communicated with the bottom on the right side of the crushing tank 2, the second connecting pipe 13 is located at the top of the inclined plate 17, the inside fixed mounting of screening case 12 has shale shaker 18, the right side of screening case 12 communicates with first connecting pipe 10, the bottom of screening case 12 is seted up the discharge gate 19, the interior diapire of processing case 1 is located the below of screening case 12 and is provided with impurity recycling bin 11, the interior diapire of processing case 1 is located the right side fixed mounting of screening case 12 and is made sand machine 8, the bottom on the right side of making sand machine 8 communicates with discharging pipe 9, when using, the building rubbish of treating is introduced into crushing case 2 through inlet pipe 5, start two driving motor 4 simultaneously, drive two crushing roller 16 rotations through driving motor 4, at this moment, the effect through two crushing roller 16 and crushing piece 15 is broken to the building rubbish, thereby break into less cubic with bigger building rubbish, more convenient subsequent processing, then introduce the broken building rubbish into first lifting machine 6 from second connecting pipe 13 through swash plate 17, then the waste materials are guided into a screening box 12 through a first lifting machine 6, and then the waste materials are screened through a vibrating screen 18, so that unqualified waste materials such as sand and soil fall into an impurity recovery box 11 through a discharge port 19 for collection, and meanwhile qualified waste materials such as bricks, stones, concrete and the like enter a second lifting machine 7 through a first connecting pipe 10, so that the waste materials are guided into a sand making machine 8 through the impurity recovery box 11 for crushing and making sand, and finally finished products are guided out through a discharge pipe 9, so that the purposes of treating construction waste more efficiently and improving the utilization rate and environmental pollution are achieved, wherein the first lifting machine 6, the second lifting machine 7 and the sand making machine 8 are the prior art, and are not described in detail herein, the models of the first lifting machine 6 and the second lifting machine 7 can both be Z-TS01, and the model of the sand making machine 8 can both be PFL-750B.
Specifically, the left side fixed mounting of broken case 2 has fixed plate 3, and two equal fixed mounting of driving motor 4 are in the top of fixed plate 3, fix driving motor 4 through fixed plate 3, avoid it to drop in the use.
Specifically, a crushing cavity is formed between the two crushing rollers 16, the two groups of crushed pieces 15 are staggered, and the two groups of crushed pieces 15 which are staggered enable crushing to be more precise and increase crushing efficiency.
Specifically, the equal fixed mounting in left side and the right side of broken case 2 inner wall has two bearings, and four fixed axle 14 are fixed connection in the inner circle of four bearings respectively, make crushing roller 16's rotation more convenient through the bearing, improve crushing efficiency.
Specifically, handle the interior diapire of case 1 and be located fixed mounting between broken case 2 and the screening case 12 and have first lifting machine 6, the right-hand member fixed connection of second connecting pipe 13 is in the left bottom of first lifting machine 6, the top fixed mounting on 6 right sides of first lifting machine has first passage, first passage is located the top of screening case 12, it is further processed in the leading-in screening case 12 of the material after the processing is accomplished in 2 with broken case more convenient through first lifting machine 6, the work efficiency of very big improvement.
Specifically, handle the interior diapire of case 1 and be located between screening case 12 and the system sand machine 8 fixed mounting have second lifting machine 7, the right-hand member fixed connection of first connecting pipe 10 is in the left bottom of second lifting machine 7, the top fixed mounting on second lifting machine 7 right side has the second passage, the second passage is located the top of system sand machine 8, more for the convenience with the material after the processing completion in the screening case 12 leading-in to carrying out further processing in the system sand machine 8 through first lifting machine 6, very big work efficiency that improves.
The working principle is as follows: when the garbage crusher is used, construction garbage to be treated is guided into the crushing box 2 through the feeding pipe 5, the two driving motors 4 are simultaneously started, the two crushing rollers 16 are driven to rotate through the driving motors 4, at the moment, the construction garbage is crushed through the two crushing rollers 16 and the crushing blocks 15, so that large construction garbage is crushed into smaller blocks, the subsequent processing is more convenient, the crushed construction garbage is guided into the first lifting machine 6 from the second connecting pipe 13 through the inclined plate 17, then is guided into the screening box 12 through the first lifting machine 6, is screened through the vibrating screen 18 at the moment, so that unqualified waste materials such as sand and soil fall into the impurity recovery box 11 through the discharge port 19 to be collected, and qualified waste materials such as bricks, stones, concrete and the like enter the second lifting machine 7 through the first connecting pipe 10, so that the qualified waste materials are guided into the sand making machine 8 through the impurity recovery box 11 to be crushed and made sand, and finally, the finished product is led out through a discharge pipe 9, so that the aims of treating the construction waste more efficiently and improving the utilization rate and environmental pollution are fulfilled.
To sum up, the production line for on-site recycling treatment of mobile construction wastes guides construction wastes to be treated into the crushing box 2 through the feeding pipe 5, simultaneously starts the two driving motors 4, drives the two crushing rollers 16 to rotate through the driving motors 4, crushes the construction wastes through the action of the two crushing rollers 16 and the crushing block 15, thereby crushing larger construction wastes into smaller blocks, facilitating subsequent processing, screens the smaller blocks through the vibrating screen 18, enables unqualified wastes such as sand and soil to fall into the impurity recycling box 11 through the discharge port 19 for collection, simultaneously enables qualified wastes such as bricks, stones, concrete and the like to enter the second hoister 7 through the first connecting pipe 10, guides the larger blocks into the sand making machine 8 through the impurity recycling box 11 for crushing and making sand, and finally leads out finished products through the discharge pipe 9, thereby achieving more efficient treatment of the construction wastes, improving the utilization rate and environmental pollution.
And, fix driving motor 4 through fixed plate 3, avoid it to drop in the use, two sets of broken fragments 15 through staggered arrangement make the breakage more meticulous, increase broken efficiency simultaneously, then more conveniently carry out further processing in screening case 12 with the material after the processing is accomplished in broken case 2 through first lifting machine 6, more for making things convenient for the material after the processing is accomplished in screening case 12 to lead to and carry out further processing in system sand machine 8 through first lifting machine 6, very big work efficiency that improves, thereby reached more efficient and handled building rubbish, improve its utilization ratio environmental pollution's purpose.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a production line of on-spot recovery processing of portable construction waste, is including handling case (1), its characterized in that: the utility model discloses a crushing device, including processing case (1), broken case (2) is installed to the inner diapire fixed mounting who handles case (1), the top intercommunication of broken case (2) has inlet pipe (5), the top of inlet pipe (5) extends to the top of handling case (1), the left side fixed mounting of broken case (2) has two driving motor (4), the inside of broken case (2) is provided with two crushing roller (16), the equal fixed mounting in both ends of crushing roller (16) has fixed axle (14), and the left side the one end that crushing roller (16) were kept away from to fixed axle (14) runs through broken case (2) and with driving motor's (4) output fixed connection, the fixed surface of crushing roller (16) installs a plurality of broken piece (15), the bottom fixed mounting of broken case (2) has swash plate (17), the bottom intercommunication on broken case (2) right side has second connecting pipe (13), second connecting pipe (13) are located the top of swash plate (17), the right side fixed mounting who handles the interior diapire of case (1) and be located broken case (2) has screening case (12), the inside fixed mounting who screens case (12) has shale shaker (18), the right side intercommunication of screening case (12) has first connecting pipe (10), discharge gate (19) have been seted up to the bottom of screening case (12), the below that handles the interior diapire of case (1) and be located screening case (12) is provided with impurity recovery case (11), the right side fixed mounting who handles the interior diapire of case (1) and be located screening case (12) has system sand machine (8), the bottom intercommunication on system sand machine (8) right side has discharging pipe (9).
2. The production line of claim 1, wherein the production line comprises: the left side fixed mounting of broken case (2) has fixed plate (3), two equal fixed mounting in the top of fixed plate (3) of driving motor (4).
3. The production line of claim 1, wherein the production line comprises: a crushing cavity is formed between the two crushing rollers (16), and the two groups of crushing blocks (15) are arranged in a staggered mode.
4. The production line of claim 1, wherein the production line comprises: two bearings are fixedly mounted on the left side and the right side of the inner wall of the crushing box (2), and the fixed shafts (14) are fixedly connected to inner rings of the four bearings respectively.
5. The production line of claim 1, wherein the production line comprises: handle the interior diapire of case (1) and be located between broken case (2) and screening case (12) fixed mounting have first lifting machine (6), the right-hand member fixed connection of second connecting pipe (13) is in the left bottom of first lifting machine (6), the top fixed mounting on first lifting machine (6) right side has first passage, first passage is located the top of screening case (12).
6. The production line of claim 1, wherein the production line comprises: handle the interior diapire of case (1) and be located between screening case (12) and the system sand machine (8) fixed mounting have second lifting machine (7), the right-hand member fixed connection of first connecting pipe (10) is in the left bottom of second lifting machine (7), the top fixed mounting on second lifting machine (7) right side has the second passage, the second passage is located the top of system sand machine (8).
CN201921410914.XU 2019-08-28 2019-08-28 Production line for on-site recycling treatment of mobile construction waste Active CN210787517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921410914.XU CN210787517U (en) 2019-08-28 2019-08-28 Production line for on-site recycling treatment of mobile construction waste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921410914.XU CN210787517U (en) 2019-08-28 2019-08-28 Production line for on-site recycling treatment of mobile construction waste

Publications (1)

Publication Number Publication Date
CN210787517U true CN210787517U (en) 2020-06-19

Family

ID=71236196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921410914.XU Active CN210787517U (en) 2019-08-28 2019-08-28 Production line for on-site recycling treatment of mobile construction waste

Country Status (1)

Country Link
CN (1) CN210787517U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112159136A (en) * 2020-09-23 2021-01-01 广西大学 Movable type integrated modular machine-made reclaimed sand device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112159136A (en) * 2020-09-23 2021-01-01 广西大学 Movable type integrated modular machine-made reclaimed sand device

Similar Documents

Publication Publication Date Title
CN110605160A (en) Device and method for crushing building waste blocks and recovering metals
CN110560235A (en) Building rubbish reducing mechanism with dustproof and metal recycle
CN208177502U (en) One kind can remove iron construction waste disintegrating apparatus
CN211099263U (en) Construction waste block crushing and metal recycling device
CN111905869A (en) Old room of building demolishs rubbish recovery unit
CN102974596B (en) Construction waste co-extrusion harmless treatment system and method thereof
CN210675338U (en) Civil engineering construction waste treatment device
CN110394225B (en) Brick-concrete separation comprehensive disposal process for construction waste
CN211677952U (en) Construction waste treatment device
CN210787517U (en) Production line for on-site recycling treatment of mobile construction waste
CN106694157B (en) A kind of novel building refuse disposal installation
CN203076319U (en) Innocent treatment system for construction waste by united extrusion
CN212018899U (en) Building rubbish sorting device for building
CN211677894U (en) Impurity removing equipment for construction waste
CN217830274U (en) Waste collection device for building rubbish desulfurization ash treatment
CN208131118U (en) A kind of storing unit stacked for building waste
CN213134450U (en) Environment-friendly construction waste treatment device
CN212681273U (en) A building waste recovery device for high-rise building
CN212237422U (en) A trimmer for building rubbish recycled aggregate
CN212142996U (en) Construction waste treatment equipment
CN210230107U (en) Building rubbish collecting and treating pool
CN203972452U (en) One way of life refuse disposal installation
CN112121908A (en) Engineering garbage recycling and treating equipment used in building field
CN216987889U (en) Civil engineering house building waste treatment device
CN211160149U (en) Multistage sorting unit of building rubbish

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant