CN210772754U CN201921317119.6U CN201921317119U CN210772754U CN 210772754 U CN210772754 U CN 210772754U CN 201921317119 U CN201921317119 U CN 201921317119U CN 210772754 U CN210772754 U CN 210772754U
Authority
CN
China
Prior art keywords
combustion chamber
boiler
water tank
heat transfer
supporting leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921317119.6U
Other languages
Chinese (zh)
Inventor
唐剑峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Yineng Machinery Co ltd
Original Assignee
Changshu Yineng Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changshu Yineng Machinery Co ltd filed Critical Changshu Yineng Machinery Co ltd
Priority to CN201921317119.6U priority Critical patent/CN210772754U/en
Application granted granted Critical
Publication of CN210772754U publication Critical patent/CN210772754U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a novel boiler combination combustion chamber structure, including boiler main body, the guardrail is installed on boiler main body's top, install the gas jar between the supporting leg, the base is installed to the bottom of supporting leg, boiler main body's internally mounted has electric case, combustion chamber, fire row structure, heat transfer plate and water tank of striking sparks, and electric case, combustion chamber, fire row structure, heat transfer plate and water tank are installed by left to right in proper order. The utility model discloses a boiler main part sets up to integrated configuration, through the integrative structure that electric box, combustion chamber, fire row structure, heat transfer plate and water tank are constituteed, and installs the gas pump joint in one side of combustion chamber, through its installation that makes things convenient for the gas pump, and installs the supporting leg in boiler main part's bottom, installs the gas jar between the supporting leg, through its automatic feed that makes things convenient for the gas, cooperates the convenient automatic processing of striking sparks of electric box.

Description

Novel boiler combination combustion chamber structure
Technical Field
The utility model relates to a combustion chamber technical field specifically is a novel boiler combination combustion chamber structure.
Background
The water heater is a device which raises the temperature of cold water to hot water within a certain time by various physical principles, and can be divided into an electric water heater, a gas water heater, a solar water heater, a magnetic energy water heater, an air energy water heater, a heating water heater and the like according to different principles. The original meaning of a boiler refers to a water container heated on a fire, a furnace refers to a place where fuel is burned, and a boiler providing hot water is called a hot water boiler and is mainly used for life and has a small amount of application in industrial production.
The structure of the combustion chamber of the boiler at present has many disadvantages, such as low heat utilization rate, uneven heat distribution, and single hot water supply position.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel boiler combination combustion chamber structure to the thermal utilization ratio who proposes among the solution above-mentioned background art is low, and heat distribution is not enough even, and the position of hydrothermal supply is too single scheduling problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a novel boiler combination combustion chamber structure, includes boiler main body, the guardrail is installed on boiler main body's top, the supporting leg is installed to boiler main body's bottom, install the gas jar between the supporting leg, the base is installed to the bottom of supporting leg, boiler main body's internally mounted has electric case, combustion chamber, fire row structure, heat transfer plate and water tank of striking sparks, and electric case, combustion chamber, fire row structure, heat transfer plate and water tank are installed from left to right in proper order.
Preferably, the front surface of the combustion chamber is provided with a gas pump joint, and the gas pump joint is provided with a gas pump.
Preferably, the heat recovery pipe is installed in the outside of fire grate structure, the flame projecting head is installed to the one end of fire grate structure.
Preferably, a heated plate is installed at one end of the heat transfer plate, and a water tank is installed at the other end of the heat transfer plate.
Preferably, a hot water shunt pipe is installed on one side of the water tank, and a water adding head is installed at one end of the water tank.
Preferably, the hot water shunt pipes are provided with six, and the six hot water shunt pipes are respectively connected with hot water pipelines of domestic water.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a boiler main part sets up to integrated configuration, through the electricity case of striking sparks, the combustion chamber, fire row's structure, the integrative structure that heat transfer plate and water tank are constituteed, and install the gas pump joint in one side of combustion chamber, through its installation that makes things convenient for the gas pump, and install the supporting leg in boiler main part's bottom, install the gas jar between the supporting leg, through its automatic feed that makes things convenient for the gas, the convenient automatic processing of striking sparks of cooperation electricity case of striking sparks, and it has the heat recovery pipe to coil in the outside of fire row's structure, can carry out recycle to the heat in the fire row structure outside through it, make the heat by make full use of, install the hot water shunt tubes in one side of water tank, can distribute hot water to domestic water through the hot water shunt tubes, be applicable to the hot water supply.
Drawings
FIG. 1 is a schematic structural view of a novel boiler combined combustion chamber structure of the present invention;
FIG. 2 is a front view of the water tank of the present invention;
fig. 3 is a side view of the gas pump of the present invention.
In the figure: 1. a guardrail; 2. an electric ignition box; 3. a boiler main body; 4. a combustion chamber; 5. a gas pump coupling; 6. a fire grate structure; 7. a heat recovery pipe; 8. a flame projecting head; 9. a heated plate; 10. a heat transfer plate; 11. a water tank; 12. a hot water shunt tube; 13. supporting legs; 14. a gas tank; 15. a base; 16. a fuel pump.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: the utility model provides a novel boiler combination combustion chamber structure, including boiler main body 3, guardrail 1 is installed on boiler main body 3's top, supporting leg 13 is installed to boiler main body 3's bottom, supporting leg 13 conveniently rises to support boiler main body 3, install gas jar 14 between the supporting leg 13, gas jar 14 is used for storing the gas, base 15 is installed to supporting leg 13's bottom, boiler main body 3's internally mounted has electric box 2 of striking sparks, combustion chamber 4, fire row structure 6, heat transfer plate 10 and water tank 11, and electric box 2 of striking sparks, combustion chamber 4, fire row structure 6, heat transfer plate 10 and water tank 11 are installed by left to right in proper order.
Further, the front of combustion chamber 4 is installed gas pump and is connected 5, installs gas pump 16 on the gas pump connects 5, connects 5 through the gas pump and makes things convenient for the installation of gas pump 16, conveniently carries the gas to the combustion chamber 4 in by gas jar 14 through gas pump 16 in, makes its cooperation electric fire box 2 accomplish the processing of striking sparks.
Further, heat recovery pipe 7 is installed in the outside of fire grate structure 6, and flame projecting head 8 is installed to the one end of fire grate structure 6, and fire grate structure 6 conveniently evenly spouts the fire through flame projecting head 8.
Further, a heat receiving plate 9 is installed at one end of the heat transfer plate 10, and a water tank 11 is installed at the other end of the heat transfer plate 10, so that cold water in the water tank 11 is heated by transferring heat into the water tank 11.
Further, hot water shunt tubes 12 are installed to one side of water tank 11, and the tap is installed to the one end of water tank 11, conveniently shunts hot water to the life through hot water shunt tubes 12 and uses.
Furthermore, six hot water shunt pipes 12 are arranged, and the six hot water shunt pipes 12 are respectively connected with hot water pipelines of domestic water.
The working principle is as follows: when the device is used, the water tank 11 is filled with cold water, the gas in the gas tank 14 is conveyed into the combustion chamber 4 under the action of the gas pump 16, meanwhile, the electric ignition box 2 is used for ignition to trigger combustion, so that the gas is combusted in the combustion chamber 4, the combusted flame penetrates through the fire grate structure 6 and is sprayed out from the fire head 8 at one end of the fire grate structure 6, the heat outside the fire grate structure 6 can be recovered through the heat recovery pipe 7 outside the fire grate structure 6, the flame is sprayed out from the fire head 8 and acts on the heated plate 9, the heated plate 9 uniformly disperses the heat into the water tank 11 through the heat transfer plate 10, so that the cold water in the water tank 11 is rapidly heated, the hot water is separated into the water heater through the hot water shunt pipe 12, and part of the hot water is directly conveyed to life for use.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a novel boiler combination combustion chamber structure, includes boiler main part (3), its characterized in that: guardrail (1) is installed on the top of boiler main body (3), supporting leg (13) are installed to the bottom of boiler main body (3), install gas jar (14) between supporting leg (13), base (15) are installed to the bottom of supporting leg (13), the internally mounted of boiler main body (3) has electric box (2), combustion chamber (4), fire row structure (6), heat transfer plate (10) and water tank (11), and electric box (2), combustion chamber (4), fire row structure (6), heat transfer plate (10) and water tank (11) of striking sparks are installed by left to right side in proper order.
2. The new boiler combined combustion chamber structure as claimed in claim 1, characterized in that: the front surface of the combustion chamber (4) is provided with a gas pump joint (5), and the gas pump joint (5) is provided with a gas pump (16).
3. The new boiler combined combustion chamber structure as claimed in claim 1, characterized in that: heat recovery pipe (7) are installed in the outside of fire grate structure (6), fire jet (8) are installed to the one end of fire grate structure (6).
4. The new boiler combined combustion chamber structure as claimed in claim 1, characterized in that: and a heated plate (9) is arranged at one end of the heat transfer plate (10), and a water tank (11) is arranged at the other end of the heat transfer plate (10).
5. The novel combined combustion chamber structure of the boiler as claimed in claim 4, wherein: a hot water shunt pipe (12) is installed on one side of the water tank (11), and a water adding head is installed at one end of the water tank (11).
6. The novel combined combustion chamber structure of the boiler as claimed in claim 5, wherein: six hot water shunt pipes (12) are arranged, and the six hot water shunt pipes (12) are respectively connected with a hot water pipeline of domestic water.
CN201921317119.6U 2019-08-14 2019-08-14 Novel boiler combination combustion chamber structure Active CN210772754U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921317119.6U CN210772754U (en) 2019-08-14 2019-08-14 Novel boiler combination combustion chamber structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921317119.6U CN210772754U (en) 2019-08-14 2019-08-14 Novel boiler combination combustion chamber structure

Publications (1)

Publication Number Publication Date
CN210772754U true CN210772754U (en) 2020-06-16

Family

ID=71059682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921317119.6U Active CN210772754U (en) 2019-08-14 2019-08-14 Novel boiler combination combustion chamber structure

Country Status (1)

Country Link
CN (1) CN210772754U (en)

Similar Documents

Publication Publication Date Title
CN210772754U (en) Novel boiler combination combustion chamber structure
CN201285080Y (en) Energy-saving environment-friendly apparatus for acquiring extra-high temperature by co-combustion of hydrogen producing fuel
CN201522091U (en) Horizontal flashback coal burning boiler
CN104154514B (en) A kind of gas steam generator
CN206257800U (en) Thimble-tube boiler
CN204693804U (en) A kind of intermediate frequency vacuum electric heating boiler plant
CN206257801U (en) Bearing hot water boiler
KR20170023689A (en) Burner burner system using pyrolysis
CN204678673U (en) A kind of high-efficiency energy-saving boiler
CN204880221U (en) Heating stove with vapourizing unit
CN204478444U (en) A kind of device for utilizing waste of boiler
CN202561724U (en) Novel steam heating furnace
CN205102090U (en) Steam power plant uses boiler
CN2556564Y (en) Solar heating gas compensating device
CN105258095B (en) A kind of fuel-oil waste-gas combined boiler of energy instantaneously producing steam
CN213577418U (en) Energy-saving gas steam generator
CN204611758U (en) A kind of gas burner
CN105157067A (en) Coal combustion type energy-saving cooking stove
CN204358777U (en) A kind of Household boiler with honeycomb briquette as fuel
CN209944739U (en) High-power full-premix module floor furnace
CN211876351U (en) Methanol boiler
CN213480588U (en) Copper wing gas-fired hot water boiler
CN202166033U (en) Combustor heat exchange device
CN212864131U (en) Heat-conducting oil-free methanol hydrogen production device
CN203549918U (en) Heat-trapped energy-saving stove

Legal Events

Date Code Title Description
GR01 Patent grant