CN213480588U - Copper wing gas-fired hot water boiler - Google Patents
Copper wing gas-fired hot water boiler Download PDFInfo
- Publication number
- CN213480588U CN213480588U CN202022621983.4U CN202022621983U CN213480588U CN 213480588 U CN213480588 U CN 213480588U CN 202022621983 U CN202022621983 U CN 202022621983U CN 213480588 U CN213480588 U CN 213480588U
- Authority
- CN
- China
- Prior art keywords
- gas
- copper
- hot water
- wing
- water boiler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 42
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 title claims abstract description 24
- 229910052802 copper Inorganic materials 0.000 title claims abstract description 24
- 239000010949 copper Substances 0.000 title claims abstract description 24
- 238000010438 heat treatment Methods 0.000 claims abstract description 33
- 238000002485 combustion reaction Methods 0.000 claims description 18
- 238000007789 sealing Methods 0.000 claims description 6
- 238000005507 spraying Methods 0.000 claims description 5
- 238000003780 insertion Methods 0.000 claims description 4
- 230000037431 insertion Effects 0.000 claims description 4
- 239000000779 smoke Substances 0.000 claims 1
- 239000007789 gas Substances 0.000 abstract description 40
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 abstract description 6
- 239000006096 absorbing agent Substances 0.000 abstract description 6
- 239000003546 flue gas Substances 0.000 abstract description 6
- 238000010304 firing Methods 0.000 abstract description 5
- 239000012141 concentrate Substances 0.000 description 2
- 239000002028 Biomass Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Landscapes
- Instantaneous Water Boilers, Portable Hot-Water Supply Apparatuses, And Control Of Portable Hot-Water Supply Apparatuses (AREA)
Abstract
The utility model discloses a copper wing gas-fired hot water boiler, including firing burning furnace, fire the bottom of burning furnace and install the heating jar, automobile body frame is installed to the bottom of heating jar, fire the one end of burning furnace and install the flue gas discharge pipe, fire the other end of burning furnace and install the gas jar, the combustor is installed to the one end of gas jar, the flame projecting head is installed to the one end of combustor, the mount is installed to the top of gas jar. The utility model discloses a fire the one end of burning furnace and install the gas jar, install the air feed pump in the one end of conveyer pipe, and the internally mounted who fires burning furnace has jet head, through it will be the even blowout of gas, and can directly be used in absorber plate department, through the combustor, make heat distribution comparatively concentrated, first fixed hoop is installed in the outside of combustor, installs the link in the below of first fixed hoop, and the bottom fixed connection of the one end of link and gas jar, easy to assemble dismantlement.
Description
Technical Field
The utility model relates to a boiler correlation field specifically is a copper wing gas boiler.
Background
The boiler is divided into a steam boiler, a hot water boiler, a steam-water dual-purpose boiler and an organic heat carrier boiler according to media, and the hot water boiler can be divided into a coal-fired hot water boiler, an oil-fired hot water boiler, a gas-fired hot water boiler and a biomass hot water boiler according to fuels.
The vacuum hot water boiler is a furnace body in a closed negative pressure state, and hot water in the heat exchanger is heated by hot medium water to generate hot water supply.
The copper-wing gas-fired hot water boiler at the present stage has various defects, for example, the gas distribution is not uniform enough, the combustion range is influenced, the heat is not concentrated enough, the heat is wasted, the hot water supply is inconvenient, and the hot water heating efficiency is low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a copper wing gas-fired hot water boiler to the gas distribution that proposes among the solution above-mentioned background art is not even enough, influences the scope of burning, leads to the heat to concentrate inadequately, makes the heat comparatively extravagant, and hot water supply is inconvenient, leads to the problem of hot water heating inefficiency.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a copper wing gas-fired hot water boiler, includes fires burning furnace, fire burning furnace's bottom and install the heating jar, automobile body frame is installed to the bottom of heating jar, fire burning furnace's one end is installed the flue gas discharge pipe, fire burning furnace's the other end is installed the gas jar, the combustor is installed to the one end of gas jar, the flame projecting head is installed to the one end of combustor, the mount is installed to the top of gas jar, the internally mounted of heating jar has the copper wing heat-transfer pipe, the absorber plate is installed to the one end of copper wing heat-transfer pipe, the sealed dish is installed on the top of heating jar, be provided with the jack on the sealed dish, and the copper wing.
In a further embodiment, a gas pipe is installed at the top of the gas tank, a gas supply pump is installed at one end of the gas pipe, and a gas nozzle is arranged at the top of the inner side wall of the combustion furnace and connected with the gas supply pump.
In a further embodiment, a water distribution pipe is installed on the front surface of the heating tank, and one end of the water distribution pipe is provided with a connecting flange.
In a further embodiment, a connector is arranged on one side of the bottom of the combustion furnace, and the top end of the heating tank is fixedly connected with the connector.
In a further embodiment, a first fixing hoop is installed on the outer side of the burner, a connecting frame is installed below the first fixing hoop, and one end of the connecting frame is fixed with a bottom bolt of the gas tank.
In a further embodiment, a hanging rod is installed on one side of the bottom of the fixed frame, a second fixed hoop is installed at the bottom end of the hanging rod, and the second fixed hoop is fixedly connected with the combustion furnace.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a fire the one end of burning furnace and install the gas jar, and the gas-supply pipe is installed at the top of gas jar, installs the air feed pump in the one end of conveyer pipe, and the internally mounted who fires burning furnace has the jet head, through it will be can the gas even blowout, and can directly act on in absorber plate department, through the combustor, make heat distribution comparatively concentrate.
2. The utility model discloses a first fixed hoop is installed in the outside of combustor, installs the link in the below of first fixed hoop, and the one end of link and the bottom fixed connection of gas jar, and easy to assemble dismantles, installs the jib in bottom one side of mount, installs the fixed hoop of second in the bottom of jib, can hang the reinforcement to the burning furnace through the fixed hoop of second.
3. The utility model discloses an internally mounted of heating jar has the copper wing heat-transfer pipe, installs the absorber plate at the top of copper wing heat-transfer pipe, can absorb the inside heat of combustion furnace through the absorber plate to evenly transmit to in the heating jar, make it can heat hot water, make heat transfer even.
Drawings
Fig. 1 is a schematic structural view of a copper-wing gas-fired hot water boiler according to the present invention;
FIG. 2 is a front view of the copper fin tube of the present invention;
fig. 3 is a top view of the heating tank of the present invention;
fig. 4 is a schematic structural view of the fixing frame of the present invention.
In the figure: 1. a first fixing collar; 2. a combustion engine; 3. a connecting frame; 4. a gas tank; 5. a gas delivery pipe; 6. an air supply pump; 7. a gas showerhead; 8. a fixed mount; 9. a boom; 10. a flame projecting head; 11. a heat absorbing plate; 12. a flue gas discharge pipe; 13. a combustion furnace; 14. a second securing strap; 15. a connector; 16. a heating tank; 17. a water distribution pipe; 18. a vehicle body frame; 19. sealing the disc; 20. a jack; 21. copper fin heat-transfer pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides an embodiment: the utility model provides a copper wing gas-fired hot water boiler, including firing burning furnace 13, fire burning furnace 13's bottom and install heating tank 16, heating tank 16 is used for heating, automobile body frame 18 is installed to heating tank 16's bottom, automobile body frame 18 makes things convenient for controlling means's removal, fire burning furnace 13's one end and installs flue gas discharge pipe 12, flue gas discharge pipe 12 conveniently derives the flue gas, fire burning furnace 13's the other end and installs gas jar 4, gas jar 4 is used for supplying with the gas, combustor 2 is installed to gas jar 4's one end, combustor 2 is used for carrying out the flame projecting processing in firing burning furnace 13, flame projecting head 10 is installed to combustor 2's one end, mount 8 is installed to gas jar 4's top, mount 8 can hang gas jar.
Further, gas-supply pipe 5 is installed at the top of gas jar 4, and air feed pump 6 is installed to the one end of gas-supply pipe 5, and the inside wall top of firing burning furnace 13 is provided with jet head 7, and jet head 7 is connected with air feed pump 6, is used for carrying the gas to jet head 7 through gas-supply pipe 5, spouts the gas into firing burning furnace 13 in through jet head 7.
Further, a water distribution pipe 17 is installed on the front surface of the heating tank 16, and a connecting flange is installed at one end of the water distribution pipe 17, and the water distribution pipe 17 is used for supplying hot water to life.
Furthermore, a connector 15 is arranged on one side of the bottom of the combustion furnace 13, and the top end of the heating tank 16 is fixedly connected with the connector 15, so that the heating tank 16 can be conveniently installed through the connector 15.
Further, a first fixing hoop 1 is installed on the outer side of the combustor 2, a connecting frame 3 is installed below the first fixing hoop 1, and one end of the connecting frame 3 is fixed with a bottom bolt of the gas tank 4.
Furthermore, a hanger rod 9 is installed at one side of the bottom of the fixed frame 8, a second fixed hoop 14 is installed at the bottom end of the hanger rod 9, the second fixed hoop 14 is fixedly connected with the combustion furnace 13, and the second fixed hoop 14 can be hung and fixed through the hanger rod 9.
Further, the heating tank 16 is internally provided with a copper wing heat transfer pipe 21, the absorber plate 11 is installed at one end of the copper wing heat transfer pipe 21, the sealing disc 19 is installed at the top end of the heating tank 16, the insertion hole 20 is formed in the sealing disc 19, the copper wing heat transfer pipe 21 is inserted into the heating tank 16 through the insertion hole 20, and the copper wing heat transfer pipe 21 is conveniently inserted into the heating tank 16 through the sealing disc 19.
The working principle is as follows: when the burner is used, the second fixing hoop 14 is connected with the combustion furnace 13, the combustion furnace 13 is hung and reinforced by the suspender 9, the burner 2 is used for spraying fire into the combustion furnace 13 through the fire spraying head 10, meanwhile, the gas in the gas tank 4 is sprayed out through the air spraying head 7 under the action of the air supply pump 6, the gas is heated on the heat absorbing plate 11 after being combusted, the heat is absorbed by the heat absorbing plate 11 and then is transmitted into the copper wing heat transfer pipe 21, the water in the heating tank 16 is heated through the copper wing heat transfer pipe 21, the hot water is supplied for daily use through the water distribution pipe 17, and the combustion gas is discharged through the gas discharge pipe 12.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. A copper wing gas-fired hot water boiler, includes burning furnace (13), its characterized in that: a heating tank (16) is arranged at the bottom of the combustion furnace (13), a vehicle body frame (18) is arranged at the bottom of the heating tank (16), a smoke discharge pipe (12) is arranged at one end of the combustion furnace (13), a gas tank (4) is arranged at the other end of the combustion furnace (13), a burner (2) is installed at one end of the gas tank (4), a flame projecting head (10) is installed at one end of the burner (2), a fixed frame (8) is arranged above the gas tank (4), a copper wing heat transfer pipe (21) is arranged in the heating tank (16), a heat absorbing plate (11) is arranged at one end of the copper wing heat transfer pipe (21), a sealing disc (19) is arranged at the top end of the heating tank (16), an insertion hole (20) is arranged on the sealing disc (19), and the copper fin heat transfer pipe (21) is inserted into the heating tank (16) through the insertion hole (20).
2. The copper-wing gas-fired hot water boiler according to claim 1, wherein: the gas tank is characterized in that a gas pipe (5) is installed at the top of the gas tank (4), a gas supply pump (6) is installed at one end of the gas pipe (5), a gas spraying head (7) is arranged at the top of the inner side wall of the combustion furnace (13), and the gas spraying head (7) is connected with the gas supply pump (6).
3. The copper-wing gas-fired hot water boiler according to claim 1, wherein: the front surface of the heating tank (16) is provided with a water distribution pipe (17), and one end of the water distribution pipe (17) is provided with a connecting flange.
4. The copper-wing gas-fired hot water boiler according to claim 1, wherein: a connector (15) is arranged on one side of the bottom of the combustion furnace (13), and the top end of the heating tank (16) is fixedly connected with the connector (15).
5. The copper-wing gas-fired hot water boiler according to claim 1, wherein: first fixed hoop (1) is installed in the outside of combustor (2), link (3) are installed to the below of first fixed hoop (1), and the one end of link (3) is fixed with the bottom bolt of gas jar (4).
6. The copper-wing gas-fired hot water boiler according to claim 1, wherein: a hanging rod (9) is installed on one side of the bottom of the fixed frame (8), a second fixed hoop (14) is installed at the bottom end of the hanging rod (9), and the second fixed hoop (14) is fixedly connected with the combustion furnace (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022621983.4U CN213480588U (en) | 2020-11-13 | 2020-11-13 | Copper wing gas-fired hot water boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022621983.4U CN213480588U (en) | 2020-11-13 | 2020-11-13 | Copper wing gas-fired hot water boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213480588U true CN213480588U (en) | 2021-06-18 |
Family
ID=76354928
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022621983.4U Expired - Fee Related CN213480588U (en) | 2020-11-13 | 2020-11-13 | Copper wing gas-fired hot water boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213480588U (en) |
-
2020
- 2020-11-13 CN CN202022621983.4U patent/CN213480588U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112503500A (en) | Energy-saving device of gas steam boiler | |
CN107328095B (en) | Coal-fired boiler of even and environmental protection of heating | |
CN213480588U (en) | Copper wing gas-fired hot water boiler | |
CN205048731U (en) | Novel fire vapour vacuum hot water boiler | |
CN210951257U (en) | Environment-friendly steam boiler | |
CN203848261U (en) | Oil-gas fired boiler | |
CN205641511U (en) | Poultry is slaughtered and imitates boiler with simple and easy high fever | |
CN205481729U (en) | High -efficient energy -saving pot stove of vertical extreme misery pipe | |
CN201401633Y (en) | Liquefied gas secondary gasifying energy saver | |
CN213631036U (en) | Diversified heat exchange reactor without open fire | |
CN209341293U (en) | A kind of boiler preheating device | |
CN203928382U (en) | A kind of combustion gas vacuum hot water unit | |
CN113685850A (en) | Hydrogen-mixed energy-saving stove | |
CN207815688U (en) | A kind of energy-saving wall-hung boiler | |
CN210772754U (en) | Novel boiler combination combustion chamber structure | |
CN206556446U (en) | Combustion heat-exchange device | |
CN209246046U (en) | A kind of high-efficiency environment friendly steam generator | |
CN205842616U (en) | A kind of waste gas fuel combination boiler | |
CN218523765U (en) | Waste heat boiler capable of efficiently utilizing energy | |
CN214536247U (en) | High-efficient boiler pulse soot blower | |
CN212746412U (en) | Combustion boiler with high energy utilization rate | |
CN204062977U (en) | A kind of shell boiler | |
CN216592234U (en) | Intelligent environment-friendly coal-fired boiler | |
CN211876351U (en) | Methanol boiler | |
CN211650754U (en) | Gas blast big boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210618 |
|
CF01 | Termination of patent right due to non-payment of annual fee |