CN210764851U - Utility tunnel with sewage treatment system - Google Patents

Utility tunnel with sewage treatment system Download PDF

Info

Publication number
CN210764851U
CN210764851U CN201921141547.8U CN201921141547U CN210764851U CN 210764851 U CN210764851 U CN 210764851U CN 201921141547 U CN201921141547 U CN 201921141547U CN 210764851 U CN210764851 U CN 210764851U
Authority
CN
China
Prior art keywords
utility tunnel
fixedly connected
pipe
sewage treatment
fixed mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921141547.8U
Other languages
Chinese (zh)
Inventor
冯湲洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Huanjing Ecological Engineering Co ltd
Original Assignee
Shenyang Huanjing Ecological Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Huanjing Ecological Engineering Co ltd filed Critical Shenyang Huanjing Ecological Engineering Co ltd
Priority to CN201921141547.8U priority Critical patent/CN210764851U/en
Application granted granted Critical
Publication of CN210764851U publication Critical patent/CN210764851U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a utility tunnel with sewage treatment system relates to the utility tunnel field, including the utility tunnel, the first pipeline buttress of inner bottom wall left side fixedly connected with of utility tunnel, the top fixedly connected with sewage pipe of first pipeline buttress, the inner bottom wall right side fixedly connected with second pipeline buttress of utility tunnel, utility tunnel inner wall left side bottom fixed mounting has the sewage treatment ware. The utility model discloses a set up gas pipeline, power cable collecting pipe and communication line cable collecting pipe in utility tunnel's inside, played utility tunnel's comprehensiveness, through setting up dampproofing fluorescent lamp, guaranteed the dampproofing effect in the utility tunnel, through setting up the sewage treatment ware, played utility tunnel to the treatment effect of sewage pipe, through the fixed connection who sets up second connecting pipe and well water pipe, guaranteed to flow to well water pipe behind the sewage treatment to the cyclic utilization to sewage has been played.

Description

Utility tunnel with sewage treatment system
Technical Field
The utility model relates to a utility tunnel field, in particular to utility tunnel with sewage treatment system.
Background
The utility tunnel is an underground urban pipeline utility tunnel, namely, a tunnel space is built underground in a city, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are integrated, a special overhaul port, a lifting port and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, and the utility tunnel is an important infrastructure and a lifeline for guaranteeing urban operation.
However, the utility tunnel of prior art, comprehensive nature is not strong enough, does not show the variety of piping lane, does not have utility tunnel's dampproofing effect simultaneously, and moreover, utility tunnel does not have the treatment effect to the sewage in the sewage pipe, can not play the cyclic utilization to water.
Therefore, it is necessary to develop a utility tunnel with a sewage treatment system to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a utility tunnel with sewage treatment system to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a utility tunnel with a sewage treatment system comprises a utility tunnel, wherein a first pipeline buttress is fixedly connected to the left side of the inner bottom wall of the utility tunnel, a sewage pipe is fixedly connected to the top of the first pipeline buttress, a second pipeline buttress is fixedly connected to the right side of the inner bottom wall of the utility tunnel, a sewage treatment device is fixedly mounted at the bottom of the left side of the inner wall of the utility tunnel, a second supporting frame is fixedly connected to the middle of the left side of the inner wall of the utility tunnel, a middle water pipe is fixedly mounted at the top of the second supporting frame, a first supporting frame is fixedly connected to the top of the left side of the inner wall of the utility tunnel, a third supporting frame is fixedly connected to the top of the right side of the inner wall of the utility tunnel, a fourth supporting frame is fixedly connected to the middle of the right side of the inner wall of the utility tunnel, a fifth supporting frame is fixedly connected to the bottom of the right side, the left side of the interior of the sewage treatment device is fixedly connected with an adjusting tank, the left side of the adjusting tank is spliced with a first air pipe, the top of the left side of the adjusting tank is fixedly provided with a second grid, the right side of the top of the adjusting tank is fixedly provided with a first water pump, the left side of the first water pump is fixedly connected with a water pumping pipe, the middle of the interior of the sewage treatment device is fixedly connected with an anaerobic tank, the top of the left side of the anaerobic tank is fixedly provided with a first grid, the left side of the first grid is fixedly connected with the right end of the water pumping pipe, the right side of the first grid is provided with a notch, the right side of the interior of the sewage treatment device is fixedly connected with an aerobic tank, the bottom of the aerobic tank is fixedly provided with a membrane bioreactor, the right side of the aerobic tank is spliced with a second air pipe, the right, the right side of the second water pump is fixedly connected with a second connecting pipe, the right side of the second connecting pipe is fixedly provided with a flow meter, and the top end of the second connecting pipe is fixedly connected with the bottom of the reclaimed water pipe.
Optionally, utility tunnel's top left side fixed mounting has dampproofing fluorescent lamp, utility tunnel's top right side fixed mounting has fire extinguishing apparatus.
Optionally, the top of the second pipeline buttress is fixedly connected with a rainwater pipeline, and the top of the first support frame is fixedly provided with a gas pipeline.
Optionally, the top fixed mounting of third support frame has municipal administration lighting cable line concentration pipe, the top fixed mounting of fourth support frame has power cable line concentration pipe.
Optionally, the top of the fifth supporting frame is fixedly provided with a communication cable line collecting pipe, and the middle of the first connecting pipe is fixedly provided with a first valve.
Optionally, the right end of the first connecting pipe is connected with the sewage treatment device in an inserting mode, and the left end of the first air pipe is fixedly connected with the first fan.
Optionally, the top of the regulating reservoir is fixedly connected with the right side of the bottom of the first connecting pipe, and a second valve is fixedly mounted in the middle of the second connecting pipe.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a set up gas pipeline, power cable collection pipe and communication cable collection pipe in utility tunnel's inside, played utility tunnel's comprehensiveness, through setting up rainwater pipeline and sewage pipe, strengthened utility tunnel's variety, through setting up dampproofing fluorescent lamp, guaranteed the dampproofing effect in the utility tunnel.
2. The utility model discloses a set up the sewage treatment ware, played the treatment effect of utility tunnel to the sewage pipe, through the fixed connection who sets up second connecting pipe and well water pipe, guaranteed to flow to well water pipe behind the sewage treatment to the cyclic utilization to sewage has been played.
Drawings
Fig. 1 is a schematic view of the structure of the present invention.
Fig. 2 is the right side front cut structure schematic diagram of the utility model.
Fig. 3 is a schematic structural diagram of a portion a of fig. 2 according to the present invention.
Fig. 4 is a schematic structural diagram of the point B in fig. 2 according to the present invention.
In the figure: 1. a comprehensive pipe gallery; 2. a gas pipeline; 3. a first support frame; 4. a reclaimed water pipe; 5. a second support frame; 6. a sewage pipe; 7. a sewage treatment device; 8. a first pipeline buttress; 9. a fire extinguishing apparatus; 10. a moisture-proof fluorescent lamp; 11. municipal lighting cable collection tubes; 12. a third support frame; 13. a power cable collection tube; 14. a fourth support frame; 15. a communication cable collection tube; 16. a fifth support frame; 17. a rainwater pipeline; 18. a second pipeline buttress; 19. a first valve; 20. a first connecting pipe; 21. a first fan; 22. a first grid; 23. a second connecting pipe; 24. a second valve; 25. a flow meter; 26. a second fan; 27. a second grid; 28. a regulating tank; 29. a first air tube; 30. a first water pump; 31. a water pumping pipe; 32. an anaerobic tank; 33. a notch; 34. a membrane bioreactor; 35. a second water pump; 36. a second air tube; 37. an aerobic tank.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The utility model provides a utility tunnel with sewage treatment system as shown in figures 1-4, which comprises a utility tunnel 1, a dampproof fluorescent lamp 10 is fixedly installed on the left side of the top of the utility tunnel 1, the dampproof effect in the utility tunnel 1 is ensured by arranging the dampproof fluorescent lamp 10, a fire extinguishing device 9 is fixedly installed on the right side of the top of the utility tunnel 1, a first pipeline buttress 8 is fixedly connected on the left side of the inner bottom wall of the utility tunnel 1, a sewage pipe 6 is fixedly connected on the top of the first pipeline buttress 8, a second pipeline buttress 18 is fixedly connected on the right side of the inner bottom wall of the utility tunnel 1, a rainwater pipeline 17 is fixedly connected on the top of the second pipeline buttress 18, the diversity of the utility tunnel 1 is enhanced by arranging the rainwater pipeline 17 and the sewage pipe 6, the first pipeline buttress 8 and the second pipeline buttress 18 are arranged to respectively support the sewage pipe 6 and the rainwater pipeline 17, a sewage treatment device 7 is fixedly installed at the bottom of the left side of the inner wall of the comprehensive pipe gallery 1, the sewage treatment effect of the comprehensive pipe gallery 1 on a sewage pipe 6 is achieved by arranging the sewage treatment device 7, a second support frame 5 is fixedly connected to the middle of the left side of the inner wall of the comprehensive pipe gallery 1, a reclaimed water pipe 4 is fixedly installed at the top of the second support frame 5, a first support frame 3 is fixedly connected to the top of the left side of the inner wall of the comprehensive pipe gallery 1, a gas pipeline 2 is fixedly installed at the top of the first support frame 3, a third support frame 12 is fixedly connected to the top of the right side of the inner wall of the comprehensive pipe gallery 1, a municipal lighting cable collection pipe 11 is fixedly installed at the top of the third support frame 12, a fourth support frame 14 is fixedly connected to the middle of the right side of the inner wall of the comprehensive pipe gallery 1, a power cable, the top of the fifth supporting frame 16 is fixedly provided with a communication cable collecting pipe 15, the comprehensiveness of the utility tunnel 1 is achieved by arranging the gas pipeline 2, the power cable collecting pipe 13 and the communication cable collecting pipe 15 in the utility tunnel 1, the right end of the sewage pipe 6 is fixedly provided with a first connecting pipe 20, the middle of the first connecting pipe 20 is fixedly provided with a first valve 19, the control of sewage flow is achieved by arranging the first valve 19 on the first connecting pipe 20, the right end of the first connecting pipe 20 is spliced with the sewage 7, the left side in the sewage treatment device 7 is fixedly connected with a regulating reservoir 28, the top of the regulating reservoir 28 is fixedly connected with the right side of the bottom of the first connecting pipe 20, the left side of the regulating reservoir 28 is spliced with a first air pipe 29, the left end of the first air pipe 29 is fixedly connected with a first air processor 21, and the first air pipe 21 and the regulating reservoir 28 are connected, the oxygen supply to the adjusting tank 28 can be effectively enhanced, the second grid 27 is fixedly installed at the top of the left side of the adjusting tank 28, large particles in sewage can be effectively blocked by arranging the second grid 27, the first water pump 30 is fixedly installed at the right side of the top of the adjusting tank 28, the water pumping pipe 31 is fixedly connected to the left side of the first water pump 30, the anaerobic tank 32 is fixedly connected to the middle of the interior of the sewage treatment device 7, the first grid 22 is fixedly installed at the top of the left side of the anaerobic tank 32, particles in the adjusting tank 28 can be further blocked by arranging the first grid 22, the left side of the first grid 22 is fixedly connected with the right end of the water pumping pipe 31, the right side of the first grid 22 is provided with a notch 33, the aerobic tank 37 is fixedly connected to the right side of the interior of the sewage treatment device 7, the connection between the anaerobic tank 32 and the aerobic tank 37 is realized by arranging the notch 33, and the sewage is purified, can effectively improve the multi-stage treatment of sewage, the bottom of the aerobic tank 37 is fixedly provided with a membrane bioreactor 34, the treatment of sewage can be further enhanced by arranging the membrane bioreactor 34 in the aerobic tank 37, the right side of the aerobic tank 37 is spliced with a second air pipe 36, the right end of the second air pipe 36 is fixedly connected with a second fan 26, the oxygen supply to the aerobic tank 37 can be effectively enhanced by arranging the second fan 26 and the second air pipe 36 to be connected with the aerobic tank 37, so that the treatment effect of sewage is improved, the right side of the top of the aerobic tank 37 is fixedly provided with a second water pump 35, the right side of the second water pump 35 is fixedly connected with a second connecting pipe 23, the fixed connection of the second connecting pipe 23 and the middle water pipe 4 is arranged, the sewage flows to the middle water pipe 4 after being treated, so that the sewage can be recycled, the first water pump 30 and the second water pump 35 are respectively connected with the second connecting pipe 23 and the water pumping pipe 31, the sewage is extracted, the second valve 24 is fixedly mounted in the middle of the second connecting pipe 23, the flow control after sewage treatment is guaranteed through the on-off control of the second valve 24 arranged on the second connecting pipe 23, the flow meter 25 is fixedly mounted on the right side of the second connecting pipe 23, the flow meter 25 is arranged, the flow after sewage treatment can be effectively known, and the top end of the second connecting pipe 23 is fixedly connected with the bottom of the reclaimed water pipe 4.
This practical theory of operation:
when the device works, firstly, sewage in the sewage pipe 6 flows to the regulating tank 28 in the sewage treatment device 7 through the first connecting pipe 20, wherein a second grid 27 in the sewage treatment device 7 can block slightly larger particles, the discharge amount of the sewage can be controlled by the first valve 19, then the first fan 21 is opened to supply oxygen for the regulating tank 28 through the first air pipe 29, then the first-stage sewage in the regulating tank 28 is pumped by the first water pump 30 through the water pumping pipe 31, then the first grid 22 further screens the particles in the regulating tank 28 to enter the anaerobic tank 32 for second-stage treatment of the sewage, then the sewage flows to the aerobic tank 37 through the notch 33, then the sewage is subjected to third-stage treatment by the membrane bioreactor 34, wherein the connection between the second fan 26 and the second air pipe 36 can be opened to provide sufficient oxygen for the aerobic tank 37, and finally the third-stage sewage in the aerobic tank 37 can be pumped by the second water pump 35 through the second air pipe 36, then with the connected flow direction normal water pipe 4 of the other end of second connecting pipe 23 to reach cyclic utilization's effect, but wherein the second valve 24 comes the flow of the third grade sewage in the control aerobic tank 37, also can observe flow meter 25 and know how much of sewage in sewage treatment ware 7 simultaneously, just so reached in utility tunnel 1 to the processing of sewage, put out a fire and dampproofing in utility tunnel 1 through the fire extinguishing apparatus 9 of installation and dampproofing fluorescent lamp 10, in order to improve utility tunnel 1's security.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. The utility model provides a utility tunnel with sewage treatment system, includes utility tunnel (1), its characterized in that: the utility model discloses a sewage treatment system, including utility tunnel (1), inner bottom wall left side fixedly connected with first pipeline buttress (8) of utility tunnel (1), the top fixedly connected with sewer pipe (6) of first pipeline buttress (8), the inner bottom wall right side fixedly connected with second pipeline buttress (18) of utility tunnel (1), utility tunnel (1) inner wall left side bottom fixed mounting has sewage treatment ware (7), fixedly connected with second support frame (5) in the middle of the inner wall left side of utility tunnel (1), the top fixed mounting of second support frame (5) has well water pipe (4), the inner wall left side top fixedly connected with first support frame (3) of utility tunnel (1), the inner wall right side top fixedly connected with third support frame (12) of utility tunnel (1), fixedly connected with fourth support frame (14) in the middle of the inner wall right side of utility tunnel (1), the utility model discloses a sewage treatment device, including utility tunnel (1), inner wall right side bottom fixed connection fifth support frame (16), the right-hand member fixed mounting of sewage pipe (6) has first connecting pipe (20), the inside left side fixed connection equalizing basin (28) of sewage treatment ware (7), the left side of equalizing basin (28) is pegged graft and is had first air duct (29), the left side top fixed mounting of equalizing basin (28) has second grid (27), the top right side fixed mounting of equalizing basin (28) has first water pump (30), the left side fixed connection of first water pump (30) has drinking-water pipe (31), fixedly connected with anaerobism pond (32) in the middle of the inside of sewage treatment ware (7), the left side top fixed mounting of anaerobism pond (32) has first grid (22), the left side of first grid (22) and the right-hand member fixed connection of drinking-water pipe (31), notch (33) have been seted up on the right side, the inside right side fixedly connected with aerobic tank (37) of sewage treatment ware (7), the bottom fixed mounting of aerobic tank (37) has membrane bioreactor (34), the right side of aerobic tank (37) is pegged graft and is had second air duct (36), the right-hand member fixedly connected with second fan (26) of second air duct (36), the top right side fixed mounting of aerobic tank (37) has second water pump (35), the right side fixedly connected with second connecting pipe (23) of second water pump (35), the right side fixed mounting of second connecting pipe (23) has flow meter (25), the top of second connecting pipe (23) and the bottom fixed connection of well water pipe (4).
2. The utility tunnel with sewage treatment system of claim 1, characterized in that:
the utility model discloses a fire extinguishing apparatus, including utility tunnel (1), the top left side fixed mounting of utility tunnel (1) has dampproofing fluorescent lamp (10), the top right side fixed mounting of utility tunnel (1) has fire extinguishing apparatus (9).
3. The utility tunnel with sewage treatment system of claim 1, characterized in that:
the top fixedly connected with rainwater pipeline (17) of second pipeline buttress (18), the top fixed mounting of first support frame (3) has gas pipeline (2).
4. The utility tunnel with sewage treatment system of claim 1, characterized in that:
the top fixed mounting of third support frame (12) has municipal administration lighting cable line concentration pipe (11), the top fixed mounting of fourth support frame (14) has power cable line concentration pipe (13).
5. The utility tunnel with sewage treatment system of claim 1, characterized in that:
the top fixed mounting of fifth support frame (16) has communication cable line concentration pipe (15), the centre fixed mounting of first connecting pipe (20) has first valve (19).
6. The utility tunnel with sewage treatment system of claim 1, characterized in that:
the right end of the first connecting pipe (20) is connected with a sewage processor (7) in an inserting mode, and the left end of the first air pipe (29) is fixedly connected with a first fan (21).
7. The utility tunnel with sewage treatment system of claim 1, characterized in that:
the top of the regulating reservoir (28) is fixedly connected with the right side of the bottom of the first connecting pipe (20), and a second valve (24) is fixedly arranged in the middle of the second connecting pipe (23).
CN201921141547.8U 2019-07-19 2019-07-19 Utility tunnel with sewage treatment system Active CN210764851U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921141547.8U CN210764851U (en) 2019-07-19 2019-07-19 Utility tunnel with sewage treatment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921141547.8U CN210764851U (en) 2019-07-19 2019-07-19 Utility tunnel with sewage treatment system

Publications (1)

Publication Number Publication Date
CN210764851U true CN210764851U (en) 2020-06-16

Family

ID=71065132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921141547.8U Active CN210764851U (en) 2019-07-19 2019-07-19 Utility tunnel with sewage treatment system

Country Status (1)

Country Link
CN (1) CN210764851U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111919626A (en) * 2020-08-18 2020-11-13 中铁二院工程集团有限责任公司 Ecological utility tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111919626A (en) * 2020-08-18 2020-11-13 中铁二院工程集团有限责任公司 Ecological utility tunnel
CN111919626B (en) * 2020-08-18 2022-04-12 中铁二院工程集团有限责任公司 Ecological utility tunnel
EP4133935A4 (en) * 2020-08-18 2024-01-24 China Railway Eryuan Eng Group Ecological integrated pipe gallery

Similar Documents

Publication Publication Date Title
JP4871080B2 (en) Vacuum station, vacuum sewer system
CN210764851U (en) Utility tunnel with sewage treatment system
CN105439379B (en) A kind of domestic sewage treatment process
CN210507758U (en) Energy-saving prefabricated pump station
CN210597573U (en) Integration sewage promotes pump station
CN204644075U (en) A kind of resettlement of affected residents town domestic sewage treatment system
CN206660742U (en) A kind of fire cistern pond water quality cleaning system
CN113003864B (en) Improved sewage treatment device and method by nitrogen and phosphorus removal biomembrane method
CN205348353U (en) Sewage vacuum collection processing system
CN203531442U (en) Arrangement structure of boiler supplemental water processing system
CN105198073B (en) Integrated effluent disposal system
CN210438585U (en) Natural oxygenation type sewage treatment system
CN210974302U (en) Circulating water purification system of culture pond
CN210163939U (en) Air discharge and intake system for pressure flow sewage pipeline in comprehensive pipe gallery
CN210315914U (en) 10KV cable trench manhole anti-methane automatic drainage system
CN210150797U (en) Integration MBR rainwater treatment facility
CN219072147U (en) Wastewater treatment system for grouting engineering
CN206174045U (en) Frequency conversion deep -well pump
CN110194562A (en) A kind of Integral rain processing system
CN215630363U (en) Water supply and drainage system applied to life decontamination of protection unit
CN217923897U (en) Bury formula stainless steel tank integration water supply equipment
CN213506145U (en) Water treatment facilities for environmental engineering
CN214612066U (en) Integrated sewage treatment equipment
CN216552331U (en) Cell body goes out water structure and uses its first rain regulation pond based on gravity evacuation
CN217868363U (en) Integrated sewage treatment equipment with electrical equipment room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant