CN204644075U - Immigration settling town domestic sewage treatment system - Google Patents
Immigration settling town domestic sewage treatment system Download PDFInfo
- Publication number
- CN204644075U CN204644075U CN201520311039.5U CN201520311039U CN204644075U CN 204644075 U CN204644075 U CN 204644075U CN 201520311039 U CN201520311039 U CN 201520311039U CN 204644075 U CN204644075 U CN 204644075U
- Authority
- CN
- China
- Prior art keywords
- tank
- pond
- biological treatment
- domestic sewage
- sewage treatment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000010865 sewage Substances 0.000 title claims abstract description 48
- 238000004659 sterilization and disinfection Methods 0.000 claims abstract description 16
- 230000029087 digestion Effects 0.000 claims abstract description 13
- 239000010802 sludge Substances 0.000 claims abstract description 13
- 238000005273 aeration Methods 0.000 claims abstract description 8
- 230000031018 biological processes and functions Effects 0.000 claims description 15
- 230000001954 sterilising effect Effects 0.000 claims description 11
- 239000000945 filler Substances 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 7
- 230000000694 effects Effects 0.000 abstract description 3
- 230000001105 regulatory effect Effects 0.000 abstract 3
- 238000004062 sedimentation Methods 0.000 abstract 3
- 238000000034 method Methods 0.000 description 10
- 238000012423 maintenance Methods 0.000 description 3
- 239000002351 wastewater Substances 0.000 description 3
- BAVYZALUXZFZLV-UHFFFAOYSA-N Methylamine Chemical compound NC BAVYZALUXZFZLV-UHFFFAOYSA-N 0.000 description 2
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 239000001301 oxygen Substances 0.000 description 2
- 238000002203 pretreatment Methods 0.000 description 2
- 238000006424 Flood reaction Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000003344 environmental pollutant Substances 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 231100000719 pollutant Toxicity 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000035484 reaction time Effects 0.000 description 1
- SUKJFIGYRHOWBL-UHFFFAOYSA-N sodium hypochlorite Chemical compound [Na+].Cl[O-] SUKJFIGYRHOWBL-UHFFFAOYSA-N 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000006228 supernatant Substances 0.000 description 1
- 238000004065 wastewater treatment Methods 0.000 description 1
Landscapes
- Treatment Of Biological Wastes In General (AREA)
Abstract
The utility model discloses a domestic sewage treatment system for immigration arrangement town gathering, which belongs to the technical field of sewage treatment and comprises a septic tank, a grid tank, a pre-aeration regulating tank and buried integrated equipment, wherein the septic tank, the grid tank, the pre-aeration regulating tank and the buried integrated equipment are connected in sequence; the buried integrated equipment comprises an anaerobic biological treatment tank, an aerobic biological treatment tank, a sludge digestion tank, a secondary sedimentation tank and a disinfection tank, wherein one end of the anaerobic biological treatment tank is communicated with a pre-aeration regulating tank through a sewage lift pump, and the other end of the anaerobic biological treatment tank is sequentially connected with the aerobic biological treatment tank, the secondary sedimentation tank and the disinfection tank. This technical scheme is through arranging anaerobism biological treatment pond, aerobe treatment pond, sedimentation tank, sludge digestion pond, disinfection pond equipartition inside integrated treatment facility, buries in the underground, subaerial only need build the fan room can, save and take up an area of, pollution-free to the ground environment, solve and move the people and settle district domestic sewage treatment problem, reach the effect of protection reservoir area quality of water.
Description
Technical field
The utility model belongs to technical field of sewage, relates to immigration relocation in Hydraulic and Hydro-Power Engineering and forms the sanitary sewage disposal of living area, especially relate to a kind of resettlement of affected residents town domestic sewage treatment system.
Background technology
Hydraulic and Hydro-Power Engineering floods soil, causes immigration relocation, needs to carry out Relocation and Settlement to immigrant, for the engineering that some immigrant's numbers are more, often needs to build some resettlement of affected residents market towns or concentrated settlement.Because large water conservancy hydroelectric engineering is generally within mountain area, resettlement of affected residents market town is often flooded more than water level in reservoir area and is selected nearby, if do not processed the sanitary sewage that it produces, will pollute reservoir area water quality, therefore must process immigrant's town domestic sewage, discharge after reaching respective standard.
To the process of resettlement of affected residents town domestic sewage, in prior art, there is kinds of schemes such as adopting septic tank, methane-generating pit, artificial swamp, integrated facility.Septic tank process sanitary sewage only can reach " integrated wastewater discharge standard " (GB8978-1996) grade III Standard, does not meet direct emission request; Area needed for artificial swamp is comparatively large, and some larger immigrant market town exists the problem of land used difficulty, is not suitable for artificial wet land treating method; Methane-generating pit operational management requires higher, and maintenance cost is also higher, is not suitable for life-time service; Adopt integrated facility can reach good effect, but there is its singularity in immigrant market town compared with cities and towns, sewage generation is little, drain time Relatively centralized, need intermittent type process, and inorganics is less, and often professional operational management is undermanned.
Utility model content
In order to solve the problem, the utility model provides a kind of resettlement of affected residents town domestic sewage treatment system, can reach first discharge standard, protection reservoir area water quality, simultaneously can intermittent type process sanitary sewage, and the running maintenance personnel of needs are few, floor space is little.
The utility model is achieved by following technical solution.
A kind of resettlement of affected residents town domestic sewage treatment system, comprise septic tank, grating tank, preaeration equalizing tank and buried type integrated equipment, described septic tank, grating tank, preaeration equalizing tank, buried type integrated equipment connect successively; Described buried type integrated equipment comprises anaerobic biological treatment pond, Aerobic biological process pond, sludge digestion tank, second pond and sterilization pool, one end, described anaerobic biological treatment pond is communicated with preaeration equalizing tank by sewage pump, and the other end connects aerobic biological treatment tank, second pond and sterilization pool successively.
Further, described sludge digestion tank is communicated with anaerobic biological treatment pond, and is connected with second pond.
Further, described Aerobic biological process pond is communicated with anaerobic biological treatment pond and forms loop.
Further, described buried type integrated equipment is also provided with fan house outward, and is communicated with preaeration equalizing tank, anaerobic biological treatment pond, Aerobic biological process pond by aeration tube simultaneously.
Further, described preaeration equalizing tank top is provided with manhole.
Further, described anaerobic biological treatment pond and the plastic honeycomb inclined tube filler being provided with vertical placement in aerobic biological treatment tank.
The beneficial effects of the utility model are:
A kind of resettlement of affected residents town domestic sewage treatment system described in the utility model; by anaerobic biological treatment pond, Aerobic biological process pond, settling tank, sludge digestion tank, sterilization pool are arranged in close-coupled processing facility inside; be embedded in underground; only need on the ground to build Ventilator Room; save and take up an area; to ground environmental nonpollution, solve Zone of Arranging Immigration sanitary sewage disposal problem, protection reservoir area water quality.Working process both controlled to control the nodes such as the time of sewage disposal to pipeline valve by artificial, implemented to control again by automation system, had laid technical foundation for realizing unmanned control completely in the future; And for the less resettlement of affected residents market town of population size or concentrated settlement, native system can also periodic running, to realize its scientific and effective utilization, extend the bulk life time of system.
Accompanying drawing explanation
Fig. 1 is the structural representation of resettlement of affected residents town domestic sewage treatment system;
Fig. 2 is the process flow sheet of resettlement of affected residents town domestic sewage process.
In figure: 1-septic tank, 2-grating tank, 3-preaeration equalizing tank, 4-aeration tube, 5-buried type integrated equipment, 51-anaerobic biological treatment pond, 52-Aerobic biological process pond, 53-second pond, 54-sludge digestion tank, 55-sterilization pool, 6-fan house, 7-manhole.
Embodiment
The technical solution of the utility model is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 1 and Figure 2, a kind of resettlement of affected residents town domestic sewage treatment system described in the utility model, comprise septic tank 1, grating tank 2, preaeration equalizing tank 3 and buried type integrated equipment 5, described septic tank 1, grating tank 2, preaeration equalizing tank 3, buried type integrated equipment 5 connect successively; Described buried type integrated equipment 5 comprises anaerobic biological treatment pond 51, Aerobic biological process pond 52, sludge digestion tank 54, second pond 53 and sterilization pool 55, one end, described anaerobic biological treatment pond 51 is communicated with preaeration equalizing tank 2 by sewage pump, and the other end connects aerobic biological treatment tank 52, second pond 53 and sterilization pool 55 successively; Described sludge digestion tank 54 is communicated with anaerobic biological treatment pond 51, and is connected with second pond 53; Described Aerobic biological process pond 52 is communicated with anaerobic biological treatment pond 51 and forms loop; Described anaerobic biological treatment pond 51 and the plastic honeycomb inclined tube filler being provided with vertical placement in aerobic biological treatment tank 52, for ensureing filter effect, this filler is changed once for 2 ~ 3 years.
Described buried type integrated equipment 5 is outer is also provided with fan house 6, and is communicated with preaeration equalizing tank 3, anaerobic biological treatment pond 51, Aerobic biological process pond 52 by aeration tube 4 simultaneously.
Described preaeration equalizing tank 3 top is provided with manhole 7, so that carry out regular maintenance and cleaning in pond.
Embodiment
Pengshui Hydropower Station resettlement of affected residents market town all have employed native system, and its algorithm is as follows:
A. pre-treatment: sanitary sewage is collected through sewage network, import septic tank 1, stop 12h ~ 24h at normal temperatures, the residence time is determined according to outside temperature, outside temperature height then the residence time short, the outside temperature low then residence time is long;
B. detect: sanitary sewage is by after septic tank 1 pre-treatment, detect the sewage at septic tank 1 relief outlet place, see and whether reach " integrated wastewater discharge standard " (GB8978-1996) grade III Standard, if reach above-mentioned standard, then direct by discharge of pipes to grating tank 2; If do not reach this standard above-mentioned, then extend the residence time 6h ~ 10h of sewage in septic tank, and every two hours detect once, until sewage reaches above-mentioned standard, then by discharge of pipes to grating tank 2;
C. preaeration: sanitary sewage, by after grating tank 2, enters preaeration equalizing tank 3 by pipeline, and stop 8 ~ 10h in preaeration equalizing tank 3, the residence time is determined according to temperature, temperature height then the residence time short, the temperature low then residence time is long; Therebetween, start fan house 6 and work, the blower fan in fan house 6 to be ventilated oxygen supply by aeration tube 4 in preaeration equalizing tank 3;
D. secondary treatment: by sewage pump, by the sewage transport in preaeration equalizing tank 3 in buried type integrated equipment 5, control drainage flow speed, sewage slowly flows through anaerobic biological treatment pond 51 successively, Aerobic biological process pond 52, second pond 53, enter sterilization pool 55, meanwhile, by the blower fan in fan house 6 simultaneously to anaerobic biological treatment pond 51, to ventilate in Aerobic biological process pond 52 oxygen supply, anaerobic biological treatment pond 51, Aerobic biological process pond 52, the mud precipitated in second pond 53 enters in sludge digestion tank 54, and again participate in reaction by the supernatant liquor obtained after precipitation in the nitrification liquid produced in Aerobic biological process pond 52 and sludge digestion tank 54 importing anaerobic biological treatment pond 51, while mud enters sludge digestion tank 54 from second pond 53, air lift is carried out to the sewage in second pond 53, to reduce the methylamine content in sewage,
E. secondary detection and discharge: circulate above technological process, after sewage enters sterilization pool 55, add NaClO or CaClO in proportion, to sewage disinfection, secondary detection is carried out to the water outlet in sterilization pool 55 exit, reach the backward outer discharge of " integrated wastewater discharge standard " (GB8978-1996) first discharge standard, if do not reach this standard, then extend the stop of sewage in sterilization pool 55 and at least 2 hours reaction times, and every 2 hours detect once, until its up to standard after discharge again." urban wastewater treatment firm pollutant emission standard " one-level B emission standard can be reached through monitoring effluent quality.The technical program can be applicable to the sanitary sewage disposal in existing villages and small towns simultaneously.
Claims (6)
1. a resettlement of affected residents town domestic sewage treatment system, comprise septic tank (1), grating tank (2), preaeration equalizing tank (3) and buried type integrated equipment (5), described septic tank (1), grating tank (2), preaeration equalizing tank (3), buried type integrated equipment (5) connect successively; It is characterized in that: described buried type integrated equipment (5) comprises anaerobic biological treatment pond (51), Aerobic biological process pond (52), sludge digestion tank (54), second pond (53) and sterilization pool (55), described anaerobic biological treatment pond (51) one end is communicated with preaeration equalizing tank (2) by sewage pump, and the other end connects aerobic biological treatment tank (52), second pond (53) and sterilization pool (55) successively.
2. a kind of resettlement of affected residents town domestic sewage treatment system according to claim 1, is characterized in that: described sludge digestion tank (54) is communicated with anaerobic biological treatment pond (51), and is connected with second pond (53).
3. a kind of resettlement of affected residents town domestic sewage treatment system according to claim 1, is characterized in that: described Aerobic biological process pond (52) is communicated with anaerobic biological treatment pond (51) and forms loop.
4. a kind of resettlement of affected residents town domestic sewage treatment system according to claim 1, it is characterized in that: described buried type integrated equipment (5) is also provided with fan house (6) outward, and be communicated with preaeration equalizing tank (3), anaerobic biological treatment pond (51), Aerobic biological process pond (52) by aeration tube (4) simultaneously.
5. a kind of resettlement of affected residents town domestic sewage treatment system according to claim 1, is characterized in that: described preaeration equalizing tank (3) top is provided with manhole (7).
6. a kind of resettlement of affected residents town domestic sewage treatment system according to claim 1, is characterized in that: described anaerobic biological treatment pond (51) and the plastic honeycomb inclined tube filler being provided with vertical placement in aerobic biological treatment tank (52).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520311039.5U CN204644075U (en) | 2015-05-14 | 2015-05-14 | Immigration settling town domestic sewage treatment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520311039.5U CN204644075U (en) | 2015-05-14 | 2015-05-14 | Immigration settling town domestic sewage treatment system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204644075U true CN204644075U (en) | 2015-09-16 |
Family
ID=54096839
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520311039.5U Expired - Fee Related CN204644075U (en) | 2015-05-14 | 2015-05-14 | Immigration settling town domestic sewage treatment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204644075U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104909512A (en) * | 2015-05-14 | 2015-09-16 | 中国电建集团贵阳勘测设计研究院有限公司 | Immigration settlement town domestic sewage treatment system and method |
WO2017130037A1 (en) * | 2016-01-26 | 2017-08-03 | Fernandez, Leonardo Daniel | Effluent treatment plant |
CN108529829A (en) * | 2018-05-23 | 2018-09-14 | 北京华明广远环境科技有限公司 | Buried sewage treatment equipment and sewage disposal system |
-
2015
- 2015-05-14 CN CN201520311039.5U patent/CN204644075U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104909512A (en) * | 2015-05-14 | 2015-09-16 | 中国电建集团贵阳勘测设计研究院有限公司 | Immigration settlement town domestic sewage treatment system and method |
WO2017130037A1 (en) * | 2016-01-26 | 2017-08-03 | Fernandez, Leonardo Daniel | Effluent treatment plant |
CN108529829A (en) * | 2018-05-23 | 2018-09-14 | 北京华明广远环境科技有限公司 | Buried sewage treatment equipment and sewage disposal system |
CN108529829B (en) * | 2018-05-23 | 2024-03-29 | 北京华明广远环境科技有限公司 | Buried sewage treatment equipment and sewage treatment system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104909512A (en) | Immigration settlement town domestic sewage treatment system and method | |
Bdour et al. | Perspectives on sustainable wastewater treatment technologies and reuse options in the urban areas of the Mediterranean region | |
CN101928097B (en) | Domestic sewage treatment system for ecological residential quarter | |
US10988397B2 (en) | Integrated greening device and method for recycling wastewater | |
CN202558739U (en) | Rural life wastewater resource processing device | |
CN102701448B (en) | Rural domestic sewage reutilization treatment device | |
CN203668180U (en) | Sewage treatment system for temporary biotope | |
CN203946997U (en) | A kind of life in the countryside rubbish and Sewage treatment systems | |
CN104532939A (en) | Ecological and energy-saving rainwater reuse system | |
CN201864641U (en) | Housing estate domestic sewage ecological treatment system | |
CN104710021A (en) | Filler for buried sewage treatment apparatus and solar sewage treatment apparatus | |
CN204644075U (en) | Immigration settling town domestic sewage treatment system | |
CN203270691U (en) | Green building system capable of supplying power and water and recycling water | |
CN104925951A (en) | Rotatable solar wetland sewage disposal system and method thereof | |
CN202246328U (en) | Integrated buried equipment for sewage treatment | |
CN104671619B (en) | Ecological treatment device for domestic sewage combining purification tank | |
CN204325092U (en) | A kind of container type sewage treatment equipment | |
CN105401743A (en) | Ecological environment-friendly house system and structure | |
CN103979681A (en) | Nitrification/denitrification integrated rural domestic sewage treatment system | |
CN205035228U (en) | Rural town domestic sewage treatment system | |
CN202482178U (en) | Solar driven ecological sewage treatment system | |
CN203768187U (en) | Continuous loop aerated domestic sewage treatment device | |
CN203781915U (en) | Nitrification and denitrification integrated rural domestic sewage treatment system | |
CN206033377U (en) | Low -energy -consumption sewage treatment device | |
CN104671408A (en) | Scattered small integrated sewage processing device for rural areas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150916 Termination date: 20180514 |
|
CF01 | Termination of patent right due to non-payment of annual fee |