CN210755454U - Steel band scrap shearing and collecting system - Google Patents

Steel band scrap shearing and collecting system Download PDF

Info

Publication number
CN210755454U
CN210755454U CN201921396071.2U CN201921396071U CN210755454U CN 210755454 U CN210755454 U CN 210755454U CN 201921396071 U CN201921396071 U CN 201921396071U CN 210755454 U CN210755454 U CN 210755454U
Authority
CN
China
Prior art keywords
waste
waste material
shearing
steel strip
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921396071.2U
Other languages
Chinese (zh)
Inventor
卢威
戴泽辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Hongwang Industrial Co Ltd
Original Assignee
Shandong Hongwang Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Hongwang Industrial Co Ltd filed Critical Shandong Hongwang Industrial Co Ltd
Priority to CN201921396071.2U priority Critical patent/CN210755454U/en
Application granted granted Critical
Publication of CN210755454U publication Critical patent/CN210755454U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a steel strip waste shearing and collecting system, which comprises a first pinch roll device, a shearing device, a second pinch roll device, a waste collecting device and a third pinch roll device, wherein the waste collecting device comprises a frame, two cross beams, a conveying mechanism, a displacement sensor, a waste blocking mechanism, a waste positioning structure and a lifting and transporting device, the two cross beams are arranged on the frame in parallel, the conveying mechanism comprises a rolling type conveying component which is arranged on each cross beam in a relative movable manner, the displacement sensor is arranged at the input end of the frame, a length for detecting the steel band waste material, waste material stop mechanism sets up in the frame output for the activity blocks the steel band waste material, and waste material location structure includes two locating plates and linking arm, and two locating plates are respectively through linking arm fixed connection on two crossbeams, and lift conveyer sets up under two locating plates. The system can effectively collect the waste materials and improve the production efficiency.

Description

Steel band scrap shearing and collecting system
Technical Field
The utility model relates to a cold rolling trade of stainless steel, in particular to collection system is cuted to steel band waste material.
Background
The current stainless steel market competition is very fierce, for cold-rolled sheets, the precision and performance of products are only one of the most basic requirements, the competition is more concentrated on the surface quality and the plate type of a steel belt, the scratch length of the scratch is about 4.8 meters because the scratch of the head and the tail of the steel belt at present can bring great influence to the quality of the whole steel belt, and therefore the head and the tail of the steel belt need to be cut off. But the production line is cuted to current belted steel waste material sets up reasonable inadequately, leads to machining efficiency lower to belted steel is cuted the back, can not carry out reasonable effectual processing to the waste material that the shearing in-process produced, thereby makes the waste material pile up at will in the both sides of production line, has occupied great ground usable floor area, and the waste material is stacked at will, takes place fish tail staff's danger easily.
SUMMERY OF THE UTILITY MODEL
In view of the above, the utility model provides a collection system is cuted to steel band waste material, this collection system is cuted to steel band waste material can carry out effectual collection and improve production efficiency to the waste material that the shearing in-process produced.
The utility model relates to a technical solution:
a steel strip waste shearing and collecting system comprises a first pinch roll device, a shearing device, a second pinch roll device, a waste collecting device and a third pinch roll device, wherein the waste collecting device comprises a rack, two cross beams, a conveying mechanism, a displacement sensor, a waste blocking mechanism, a waste positioning structure and a lifting and conveying device, the two cross beams are parallelly arranged on the rack, the conveying mechanism comprises rolling type conveying components which are oppositely and movably arranged on each cross beam, each rolling type conveying component can be opened relative to two sides of a steel strip, the displacement sensor is arranged at the input end of the rack and is used for detecting the length of the steel strip waste so as to allow the shearing device to shear the waste with a preset length, the waste blocking mechanism is arranged at the output end of the rack and is used for movably blocking the steel strip waste, the waste positioning structure comprises two positioning plates and a connecting arm, the two positioning plates are, and the two positioning plates are positioned under the conveying mechanism, and the lifting and conveying device is arranged under the two positioning plates and is used for bearing the steel belt waste.
Furthermore, the waste collecting device also comprises two guide columns and a screw rod, the two guide columns are erected on the rack in parallel through a supporting seat, and the screw rod is rotatably installed on the rack through a bearing seat and is positioned between the two guide columns.
Furthermore, the garbage collection device is still including adjusting the driving piece, and each crossbeam is equipped with three lug, and the lug of both sides is equipped with the through-hole, and middle lug is equipped with the screw hole, and each guide pillar is worn to locate in the through-hole that two crossbeams are relative, and the lead screw is worn to locate in the screw hole that two crossbeams are relative, adjusts the driving piece and installs in the frame for the drive lead screw is rotatory.
Further, the rolling type conveying assembly comprises a supporting rod and a plurality of rollers arranged on the supporting rod.
Further, the conveying mechanism also comprises a driving device for driving the two rolling type conveying assemblies to be respectively opened outwards so as to discharge the steel strip waste.
Furthermore, the driving device comprises two swing arms rotatably mounted on each cross beam and a telescopic driving piece mounted on the swing arms and used for driving the swing arms to swing, the telescopic ends of the telescopic driving pieces are hinged with the swing arms, and the lower ends of the swing arms are connected with the supporting rod.
Furthermore, the driving device further comprises a rotating shaft arranged below each cross beam, a shaft hole is formed in the upper end of each swing arm, each swing arm is sleeved on the rotating shaft through the shaft hole, and each swing arm can rotate around the rotating shaft in a positive and negative mode.
Furthermore, the waste material blocking mechanism comprises a blocking plate hinged to the rack and a blocking driving piece arranged on the rack and used for driving the blocking plate to swing.
Further, the lifting and transporting device comprises a rail, a carrying vehicle, four lifting rods, a supporting table and a lifting driving piece, wherein the rail is fixed in a groove formed in the ground plane, the carrying vehicle can be arranged on the rail in a reciprocating manner, the four lifting rods are hinged in a pairwise crossing manner, the bottom end of each lifting rod is hinged to the carrying vehicle, the top end of each lifting rod is hinged to the supporting table, the body end of the lifting driving piece is hinged to the carrying vehicle, and the telescopic end of the lifting driving piece is hinged to the supporting table.
The utility model discloses collection system is cuted to steel band waste material through set up the garbage collection device behind shearing mechanism, and the garbage collection device includes frame, two crossbeams, conveying mechanism, displacement sensor, waste material stop mechanism, waste material location structure and lift conveyer. After displacement sensor detects the length of steel band waste material, start shearing mechanism and cut the steel band waste material down, and simultaneously, waste material blocking mechanism removes the tip for blockking the steel band waste material, support on two roll formula conveyor components completely as the steel band waste material, and the tip of steel band waste material supports when holding in waste material blocking mechanism, two roll formula conveyor components are opened relatively and are dropped to the lifting transport device after supplying the steel band waste material to two locating plates on, after the steel band waste material when lifting transport device piles up certain thickness, lifting transport device drives the descending of steel band waste material and breaks away from the locating plate, and shift out to the frame outside, in order to supply to transport away the steel band waste material. So, can collect the waste material that the shearing in-process produced effectively, be favorable to the safety in production to do not influence the normal operating of production line, be favorable to improving production efficiency.
Drawings
FIG. 1 is a schematic structural view of the steel strip scrap shearing and collecting system in a front view in a use state;
FIG. 2 is a schematic front view of a scrap collecting device of the steel strip scrap shearing and collecting system of the present invention;
fig. 3 is a schematic view of the local overhead structure of the scrap collecting device of the steel strip scrap shearing and collecting system of the present invention.
Detailed Description
The technical solution in the embodiment of the present invention is clearly and completely described below with reference to the drawings in the embodiment of the present invention. It should be understood that the specific embodiments described herein are merely illustrative of the present invention and are not intended to limit the scope of the invention.
Referring to fig. 1 to 3, the utility model provides a steel strip scrap shearing and collecting system, which comprises a first pinch roll device 1, a shearing device 2, a second pinch roll device 3, a scrap collecting device 4 and a third pinch roll device 5, which are arranged in sequence along the steel strip conveying direction. The first pinch roll device 1, the second pinch roll device 3 and the third pinch roll device 5 are all used for clamping steel strips to be conveyed. The waste collecting device 4 includes a frame 41, two cross beams 42, a conveying mechanism 43, a displacement sensor, a waste blocking mechanism 44, a waste positioning structure 40, and a lifting and transporting device 45. The two beams 42 are mounted on the frame 41 in parallel along the conveying direction of the steel belt, and the conveying mechanism 43 includes a rolling type conveying component movably disposed on each beam 42 relatively, so that two sides of the steel belt can be supported on the rolling type conveying component in a rolling manner for conveying. Each rolling type conveying component can be opened relative to two sides of the steel belt so as to enable the sheared steel belt waste to fall off. The displacement sensor is mounted at the input end of the frame 41 and is used for detecting the length of the steel strip waste material, so that the shearing device 2 can shear the waste material with a preset length. The scrap blocking mechanism 44 is disposed at the output end of the frame 41 and is used for movably blocking the steel strip scrap. The scrap positioning structure 40 comprises two positioning plates 401 and a connecting arm 402, the two positioning plates 401 are respectively fixedly connected to the two cross beams 42 through the connecting arm 402, and the two positioning plates 401 are located under the conveying mechanism 43 to position the falling steel strip scrap. The lifting and transporting device 45 is arranged under the two positioning plates 401 and is used for bearing steel belt waste materials falling through the two positioning plates 401.
In order to adapt to the production of steel strips with different widths, two cross beams 42 can be arranged on the frame 41 with a relative distance. The garbage collection device 4 further comprises two guide posts 46, a screw rod 47 and an adjusting driving member, wherein the two guide posts 46 are erected on the frame 41 in parallel through a supporting seat, and the screw rod 47 is rotatably installed on the frame 41 through a bearing seat and is located between the two guide posts 46. Each cross beam 42 is provided with three lugs 421, the lugs 421 on the two sides are provided with through holes, the lug 421 in the middle is provided with a threaded hole, each guide post 46 is arranged in the through holes opposite to the two cross beams 42 in a penetrating manner, and the screw rod 47 is arranged in the threaded holes opposite to the two cross beams 42 in a penetrating manner. The adjusting driving member is mounted on the frame 41 and is used for driving the screw rod 47 to rotate so as to adjust the distance between the two beams 42.
The rolling conveyor assembly includes a support rod 431 and a plurality of rollers 432 mounted on the support rod 431. In this embodiment, a plurality of rollers 432 are disposed on both sides of the supporting rod 431. It is understood that a plurality of rollers 432 may be provided only on one side of the support rod 431.
The conveyor mechanism 43 further comprises drive means for driving the two rolling conveyor assemblies to open respectively to the outside for discharging the scrap strip. The driving device comprises two swing arms 433 rotatably mounted on each cross beam 42 and a telescopic driving member 434 mounted on the swing arms 433 and used for driving the swing arms 433 to swing, the telescopic end of the telescopic driving member 434 is hinged to the swing arms 433, and the lower end of each swing arm 433 is connected with the supporting rod 431. Telescopic drive 434 may be an air cylinder, a hydraulic cylinder, or an electric cylinder.
In a preferred embodiment, the driving device further includes a rotating shaft 435 installed below each cross member 42, an axial hole is formed at an upper end of each swing arm 433, each swing arm 433 is sleeved on the rotating shaft 435 through the axial hole, and each swing arm 433 can rotate around the rotating shaft 435 in a forward and backward direction.
The waste material blocking mechanism 44 includes a blocking plate 441 hinged to the frame 41, and a blocking driving member 442 mounted on the frame 41 for driving the blocking plate 441 to swing. The blocking driving member 442 may be a cylinder, and a telescopic end of the cylinder is hinged to the blocking plate 441.
An accommodating space is formed between the two positioning plates 401, and an inclined surface is formed on the upper side of the positioning plates 401 so as to guide the steel strip waste to slide down into the accommodating space and be supported on the top surface of the lifting and transporting device 45.
The lifting and transporting device 45 comprises a track 451, a carrying vehicle 452, lifting rods 453, a supporting platform 454 and a lifting driving piece 455, wherein the track 451 is fixed in a groove formed in the ground level, the carrying vehicle 452 is arranged on the track 451 in a reciprocating manner, four lifting rods 453 are arranged and hinged together in a pairwise crossing manner, the bottom end of each lifting rod 453 is hinged to the carrying vehicle 452, the top end of each lifting rod 453 is hinged to the supporting platform 454, the body end of the lifting driving piece 455 is hinged to the carrying vehicle 452, and the telescopic end of the lifting driving piece 455 is hinged to the supporting platform 454.
The support table 454 is relatively provided with a sorting cylinder 456 and an alignment plate 457, the telescopic end of the sorting cylinder 456 is provided with a push plate 458, and the sorting cylinder 456 is positioned at one end between the two positioning plates 401 so that two ends of the steel strip waste are positioned between the alignment plate 457 and the push plate 458. In use, the spacing between the push plate 458 and the alignment plate 457 is slightly larger than the length of the steel strip scrap, and the arrangement air cylinder 456 drives the push plate 458 to move towards the alignment plate 457 at regular intervals so as to align the steel strip scrap along one end of the alignment plate 457.
The utility model discloses collection system is cuted to steel band waste material still includes control system for control each moving part's action.
The utility model discloses control method of steel band scrap shearing collection system, including following step:
the steel band gets into from first pinch roll device 1 and begins to carry, if need cut the steel band waste material, open displacement sensor in advance, after detecting that the steel band carries predetermined length to conveying mechanism 43, start shearing mechanism 2 and cut down the steel band waste material, and simultaneously, waste material blocking mechanism 44 removes the tip that supplies to block the steel band waste material, when the steel band waste material supports on two roll formula conveying component completely, and the tip of steel band waste material supports when holding in waste material blocking mechanism 44, two roll formula conveying component are opened relatively and are supplied to the steel band waste material to drop to elevating conveyor 45 between two locating plates 401, after the steel band waste material on elevating conveyor 45 piles up certain thickness, elevating conveyor 45 drives the steel band waste material and descends and breaks away from two locating plates 401, and shift out to the frame 41 outside, in order to transport away the steel band waste material. If no strip scrap is to be cut, the displacement sensor is switched off and the scrap stop mechanism 44 is moved out of the blocking position to allow the strip to be fed from the third pinch roll unit 5 to the coiler.
The utility model discloses collection system is cuted to steel band waste material through set up garbage collection device 4 behind shearing mechanism 2, and garbage collection device 4 includes frame 41, two crossbeams 42, conveying mechanism 43, displacement sensor, waste material stop mechanism 44, waste material location structure 40 and lift conveyer 45. After displacement sensor detects the length of steel band waste material, start shearing mechanism 2 and cut the steel band waste material, simultaneously, waste material blocking mechanism 44 removes the tip for blockking the steel band waste material, support on two roll formula conveyor components completely as the steel band waste material, and the tip of steel band waste material supports when holding in waste material blocking mechanism 44, two roll formula conveyor components open relatively and drop to lifting transport device 45 behind two locating plates 401 for the steel band waste material, after certain thickness is piled up to the steel band waste material on lifting transport device 45, lifting transport device 45 drives the descending of steel band waste material and breaks away from locating plate 401, and shift out to the frame 41 outside, in order to transport away the steel band waste material. So, can collect the waste material that the shearing in-process produced effectively, be favorable to the safety in production to do not influence the normal operating of production line, be favorable to improving production efficiency.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all utilize the equivalent structure or equivalent flow transformation that the content of the specification does, or directly or indirectly use in other related technical fields, all including in the same way the patent protection scope of the present invention.

Claims (9)

1. A steel strip waste shearing and collecting system comprises a first pinch roll device (1), a shearing device (2), a second pinch roll device (3) and a third pinch roll device (5), and is characterized in that a waste collecting device (4) is arranged between the second pinch roll device (3) and the third pinch roll device (5), the waste collecting device (4) comprises a rack (41), two cross beams (42), a conveying mechanism (43), a displacement sensor, a waste blocking mechanism (44), a waste positioning structure (40) and a lifting and conveying device (45), the two cross beams (42) are arranged on the rack (41) in parallel, the conveying mechanism (43) comprises rolling type conveying components which are relatively movably arranged on each cross beam (42), each rolling type conveying component can be opened relative to two sides of a steel strip, and the displacement sensor is arranged at the input end of the rack (41), a length for detecting steel band waste material, with the waste material that supplies shearing mechanism (2) to cut down predetermined length, waste material blocking mechanism (44) sets up in frame (41) output, be used for the activity to block the steel band waste material, waste material location structure (40) include two locating plates (401) and linking arm (402), two locating plates (401) are respectively through linking arm (402) fixed connection on two crossbeams (42), and two locating plates (401) are located conveying mechanism (43) under, lift conveyer (45) set up under two locating plates (401), be used for bearing the steel band waste material.
2. The steel strip scrap shearing and collecting system according to claim 1, wherein the scrap collecting device (4) further comprises two guide posts (46) and a screw (47), the two guide posts (46) are parallelly erected on the frame (41) through a support seat, and the screw (47) is rotatably installed on the frame (41) through a bearing seat and is located between the two guide posts (46).
3. The steel strip scrap shearing and collecting system according to claim 2, wherein the scrap collecting device (4) further comprises an adjusting drive member, each cross beam (42) is provided with three lugs (421), the lugs (421) at two sides are provided with through holes, the lug (421) at the middle is provided with a threaded hole, each guide post (46) is arranged in the through holes opposite to the two cross beams (42), the screw rod (47) is arranged in the threaded holes opposite to the two cross beams (42), and the adjusting drive member is mounted on the frame (41) and is used for driving the screw rod (47) to rotate.
4. A steel strip scrap shear collection system according to claim 1 wherein said rolling conveyor assembly comprises a support bar (431) and a plurality of rollers (432) mounted on the support bar (431).
5. A steel strip scrap shear collection system according to claim 1 wherein the conveyor means (43) further comprises drive means for driving the two rolling conveyor assemblies respectively open to the outside for discharging steel strip scrap.
6. The steel strip scrap shearing and collecting system according to claim 5, wherein the driving device comprises two swing arms (433) rotatably mounted on each cross beam (42), and a telescopic driving member (434) mounted on the swing arms (433) for driving the swing arms (433) to swing, the telescopic end of the telescopic driving member (434) is hinged with the swing arms (433), and the lower end of each swing arm (433) is connected with the supporting rod (431).
7. The steel strip scrap shearing and collecting system according to claim 6, wherein the driving device further comprises a rotating shaft (435) installed below each cross beam (42), an axial hole is formed in the upper end of each swing arm (433), each swing arm (433) is sleeved on the rotating shaft (435) through the axial hole, and each swing arm (433) can rotate around the rotating shaft (435) in a forward and reverse direction.
8. The steel strip scrap shearing and collecting system according to claim 1, wherein the scrap stopping mechanism (44) comprises a stopping plate (441) hinged to the frame (41), and a stopping driving member (442) mounted on the frame (41) for driving the stopping plate (441) to swing.
9. The steel strip scrap shearing and collecting system according to claim 1, wherein the lifting and transporting device (45) comprises a rail (451), a carrying vehicle (452), four lifting rods (453), a supporting platform (454) and a lifting driving member (455), the rail (451) is fixed in a groove formed in the ground level, the carrying vehicle (452) is arranged on the rail (451) in a reciprocating manner, the four lifting rods (453) are respectively hinged in a pairwise crossing manner, the bottom end of each lifting rod (453) is hinged to the carrying vehicle (452), the top end of each lifting rod (453) is hinged to the supporting platform (454), the body end of the lifting driving member (455) is hinged to the carrying vehicle (452), and the telescopic end of the lifting driving member (455) is hinged to the supporting platform (454).
CN201921396071.2U 2019-08-26 2019-08-26 Steel band scrap shearing and collecting system Active CN210755454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921396071.2U CN210755454U (en) 2019-08-26 2019-08-26 Steel band scrap shearing and collecting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921396071.2U CN210755454U (en) 2019-08-26 2019-08-26 Steel band scrap shearing and collecting system

Publications (1)

Publication Number Publication Date
CN210755454U true CN210755454U (en) 2020-06-16

Family

ID=71050162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921396071.2U Active CN210755454U (en) 2019-08-26 2019-08-26 Steel band scrap shearing and collecting system

Country Status (1)

Country Link
CN (1) CN210755454U (en)

Similar Documents

Publication Publication Date Title
CN103401027B (en) Automatic stacking machine for pole plates
CN210755455U (en) Waste collecting device for steel belt waste shearing and collecting system
CN209988670U (en) Bar conveying device
JPS628918A (en) Facility for automatically stacking and regularly arranging panel pack having different size
CN109465646B (en) Full-automatic positioning conveying type steel plate processing system
EP0252084B1 (en) Fabrication system for the automatic working of metal workpieces
CN110465763B (en) Cell panel and bus bar welding equipment
CN215625097U (en) A in bank rack for shaped steel is transported
CN109205239B (en) Automatic pipe cutter feeding device
CN112427713A (en) Steel strip waste shearing and collecting system and control method thereof
CN210755454U (en) Steel band scrap shearing and collecting system
CN113479652A (en) Intelligent automatic production line for sawing, stacking and conveying
CN110877206B (en) Reinforcing rib cold roll forming production line
CN210548464U (en) Full-automatic unloading sign indicating number material production line of car leaf spring
CN111071803A (en) Automatic stacking device
CN110540027A (en) Intelligent conveying system and method
CN215696005U (en) Steel conveying device with short ruler removing function and section collecting system
JPH0764431B2 (en) Conveying device for storing punched sheets in the stacker
KR100476327B1 (en) A wire pad bending machine
CN210208106U (en) Automatic short rod separating device
CN210682211U (en) Intelligent conveying system
CN104210803A (en) High-speed cut band steel conveying device
CN110459645B (en) Welding method of battery plate and bus bar
CN111085724A (en) But continuous production's feeder
CN213496862U (en) Automatic feeding and discharging hydraulic fine shearing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant