- CN210738124U CN210738124U CN201921277736.8U CN201921277736U CN210738124U CN 210738124 U CN210738124 U CN 210738124U CN 201921277736 U CN201921277736 U CN 201921277736U CN 210738124 U CN210738124 U CN 210738124U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- floor
- elevator
- steel pipes
- vertical steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model relates to a protector of floor installation is hugged closely to lift installs between lift operation region's upper and lower floor. At least two vertical steel pipes are respectively installed on two sides of a running channel of the elevator, the upper end and the lower end of each vertical steel pipe are respectively pressed on floors, a plurality of horizontal steel pipes are fixedly connected between the vertical steel pipes on the same side, a safe dense net is installed, the horizontal steel pipe located at the lowest position is higher than the position of a floor bottom plate, a plurality of oblique steel pipes are erected between the wall corner of the bottom plate and the horizontal steel pipe located at the lowest position of each floor, and wood boards are paved on the oblique steel pipes. The utility model discloses a set up vertical steel pipe in lift operation passageway both sides to with horizontal steel pipe, slant steel pipe interconnect, overall structure is firm, for constructor business turn over lift provides safety protection, has reduced the potential safety hazard.
Description
Technical Field
The utility model relates to a protector of floor installation is hugged closely to lift belongs to construction mounting means and improves technical field.
Background
At present, with the rapid development of modern building industry, the building construction method is continuously updated, the construction technology is continuously optimized, and vertical transportation equipment is continuously developed. The construction elevator or the material elevator is an indispensable tool for the current vertical transportation, a certain distance is reserved between the conventional elevator and a building structure when the conventional elevator is installed, and a landing scaffold is erected between the building structure and the elevator or an overhanging scaffold is adopted at the upper part of the building structure as a connecting channel. At present, more and more installation modes of the elevator are installed by being attached to a building structure, and a connecting wood plate is laid between the elevator and a floor to be used for construction personnel to go in and out, so that the cost for setting a floor frame or an overhanging frame scaffold can be greatly saved, but certain potential safety hazards exist in the mode.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a protector that floor installation was hugged closely to the lift is provided, between installation lift operational area's the floor, makes things convenient for constructor to get into construction floor and safe and reliable.
In order to solve the above problem, the utility model discloses a technical scheme as follows:
a protection device for a lift to be installed close to floors is installed between floors in a running area of the lift,
at least two vertical steel pipes are respectively arranged on two sides of the running channel of the elevator, the upper end and the lower end of each vertical steel pipe are respectively pressed on floors, a plurality of horizontal steel pipes are fixedly connected between the vertical steel pipes on the same side, a safety dense net is arranged, the horizontal steel pipe at the lowest position is higher than the position of a floor bottom plate,
and a plurality of oblique steel pipes are erected between the corner of the bottom plate and the lowest horizontal steel pipe of each floor, and wood boards are laid on the oblique steel pipes.
Further, the top end of the vertical steel pipe is provided with a jacking support.
Further, the inclination angle of slant steel pipe is 15.
Furthermore, the number of the elevator operation channels is two, and a wooden sizing net piece is installed at a position corresponding to the elevator stop position on the vertical steel pipe between the two elevator operation channels.
Furthermore, the top of the safe dense mesh net is level with the top end of the protective door when the elevator is stopped, and the height of the safe dense mesh net is larger than that of the protective door.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. the utility model discloses a set up vertical steel pipe in lift operation passageway both sides to with horizontal steel pipe, slant steel pipe interconnect, overall structure is firm, for constructor business turn over lift provides safety protection, has reduced the potential safety hazard.
2. The utility model discloses well top support and slant steel pipe combined action have improved the stability of vertical steel pipe.
3. The utility model discloses simple to operate, strong adaptability can install according to the different floor height of floor and form.
4. The utility model discloses need not set up the intercommunication passageway that falls to the ground the scaffold frame or encorbelment the scaffold frame, make the construction progress obtain improving.
5. The utility model discloses but dismantle back reuse, the turnover rate improves, can reduce engineering cost.
Drawings
Fig. 1 is a front elevation view of a preferred embodiment of the present invention.
Fig. 2 is a schematic cross-sectional view of a preferred embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the following drawings and specific embodiments. The objects, aspects and advantages of the present invention will become more apparent from the following description. It should be understood that the described embodiments are presently preferred, but not all embodiments of the invention.
Referring to fig. 1 and 2, a protection device for an elevator installed in close proximity to floors is installed between upper and lower floors 1 in an elevator traveling area. At least two vertical steel pipes 3 are respectively installed on two sides of the elevator running channel 2, the upper end and the lower end of each vertical steel pipe 3 are respectively pressed on the floors 1, a plurality of horizontal steel pipes 4 are fixedly connected between the vertical steel pipes 3 on the same side, a safe dense mesh net 5 is further installed between the vertical steel pipes 3, and the horizontal steel pipe 4 located at the lowest position is higher than the position of the floor bottom plate.
And a plurality of oblique steel pipes 6 are erected between the corner of the bottom plate and the lowest horizontal steel pipe 4 of each floor, and a wood plate 7 is laid on each oblique steel pipe 6. The inclined angle of the inclined steel pipe 6 is preferably 15 degrees, and the wood plate 7 is in a slope with a high outer part and a low inner part.
And the top end of the vertical steel pipe 3 is provided with a jacking 8. The combined action that 8 and the slant steel pipe 6 of top support supported can improve the stability of vertical steel pipe 3.
When the number of the elevators 10 used for constructing the floors is two, in order to ensure safety, a wooden sizing net piece 9 is arranged between the vertical steel pipes 3 of the two elevator operation channels 2 at the position corresponding to the elevator stop.
Preferably, the top of the safety screen 5 is level with the top of the protection door 10a when the elevator 10 stops, and the height of the safety screen 5 is greater than that of the protection door 10 a.
When the utility model is installed and used, the vertical steel pipe 3, the horizontal steel pipe 4 and the oblique steel pipe 6 are firstly installed, the vertical steel pipe 3 is stably fixed between floors 1 through the jacking 8, and the board 7 is laid on the oblique steel pipe 6; and secondly, installing a safe dense mesh net 5 and a wooden sizing net piece 9 on the vertical steel pipe 3.
The utility model discloses a set up vertical steel pipe 3 in lift operation passageway both sides to with horizontal steel pipe 4, 6 interconnect of slant steel pipe, overall structure is firm, for constructor business turn over lift 10 provides safety protection, has reduced the potential safety hazard.
The above description is only for the purpose of illustration of the preferred embodiments of the present invention, and it is not intended to limit the scope of the present invention, and it is obvious that any person skilled in the art can easily conceive of alterations and modifications to obtain other embodiments based on the above embodiments, and these should be covered by the scope of the present invention.
Claims (5)
1. The utility model provides a protector that floor installation is hugged closely to lift, installs between the floor of lift service area, its characterized in that:
at least two vertical steel pipes are respectively arranged on two sides of the running channel of the elevator, the upper ends and the lower ends of the vertical steel pipes are respectively pressed on floors, a plurality of horizontal steel pipes are fixedly connected between the vertical steel pipes on the same side, a safe dense net is arranged, the position of the horizontal steel pipe at the lowest position is higher than the floor bottom plate,
and a plurality of oblique steel pipes are erected between the corner of the bottom plate and the lowest horizontal steel pipe of each floor, and wood boards are laid on the oblique steel pipes.
2. The elevator installation against floor guard of claim 1 wherein:
and the top end of the vertical steel pipe is provided with a jacking support.
3. The elevator installation against floor guard of claim 1 wherein:
the inclination angle of the oblique steel pipe is 15 degrees.
4. The elevator installation against floor guard of claim 1 wherein:
the elevator operation channels are two, and a wooden sizing net piece is arranged between the vertical steel pipes of the two elevator operation channels at the position corresponding to the elevator stop.
5. The elevator installation against floor guard of claim 1 wherein:
the top of the safe dense mesh net is level with the top end of the protective door when the elevator is stopped, and the height of the safe dense mesh net is larger than that of the protective door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921277736.8U CN210738124U (en) | 2019-08-07 | 2019-08-07 | Protection device for installation of elevator clings to floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921277736.8U CN210738124U (en) | 2019-08-07 | 2019-08-07 | Protection device for installation of elevator clings to floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210738124U true CN210738124U (en) | 2020-06-12 |
Family
ID=71008312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921277736.8U Active CN210738124U (en) | 2019-08-07 | 2019-08-07 | Protection device for installation of elevator clings to floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210738124U (en) |
-
2019
- 2019-08-07 CN CN201921277736.8U patent/CN210738124U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203531344U (en) | Tool type scaffold | |
US10309094B2 (en) | Building access system and a method for providing a building with such a building access system | |
CN106121255A (en) | Apparatus installed by a kind of Super High glass curtain wall | |
CN102502378A (en) | Climbing elevator for building construction | |
CN205591231U (en) | Steel shotcrete dropout prevention means | |
CN201649604U (en) | I-steel overhanging type scaffold for floor corner construction | |
CN210738124U (en) | Protection device for installation of elevator clings to floor | |
CN210152194U (en) | Scaffold for house building construction | |
CN206969947U (en) | Stagnant empty formula construction elevator | |
CN214738257U (en) | Telescopic type sump structure for fire elevator foundation pit | |
CN206189886U (en) | Construction elevator protector | |
CN209583342U (en) | A kind of building hoist assembled large chassis | |
CN203769322U (en) | Overhanging type feeding and discharging device | |
CN210369035U (en) | Subway station structure | |
CN210239201U (en) | Cart type elevator wellhead and hoistway protection device | |
CN204304374U (en) | For laying the cable passage of transformer station's outlet high-tension cable | |
CN114165034A (en) | Telescopic elevator construction platform easy to disassemble and construction method thereof | |
CN210655915U (en) | Connecting device for climbing frame and tower crane | |
CN217708444U (en) | Protection device for construction elevator | |
CN207194534U (en) | A kind of spliced new computer room | |
CN209908002U (en) | Corridor type additional elevator structure with good adaptability for multi-storey residential building | |
CN207553715U (en) | Communication iron tower and computer room combined type base station | |
CN206267444U (en) | A kind of built-in stair system suitable for box-type room | |
CN105155832A (en) | Hanging basket device and moving method thereof | |
CN202899593U (en) | Integral lifting work platform for elevator shaft construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |