CN210637112U - Cable towing device for tunnel construction - Google Patents

Cable towing device for tunnel construction Download PDF

Info

Publication number
CN210637112U
CN210637112U CN202020141523.9U CN202020141523U CN210637112U CN 210637112 U CN210637112 U CN 210637112U CN 202020141523 U CN202020141523 U CN 202020141523U CN 210637112 U CN210637112 U CN 210637112U
Authority
CN
China
Prior art keywords
cable
connecting rod
guide groove
steel wire
towing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020141523.9U
Other languages
Chinese (zh)
Inventor
秦萍
王建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020141523.9U priority Critical patent/CN210637112U/en
Application granted granted Critical
Publication of CN210637112U publication Critical patent/CN210637112U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a cable towing device for tunnel construction, which comprises upright posts arranged at intervals along one side of a tunnel, wherein a steel wire rope is connected between the upright posts, and a plurality of towing cable components are movably connected on the steel wire rope; the towing cable assembly comprises a pulley hung on the steel wire rope, two sides of the pulley are respectively connected with a horizontally arranged cantilever, and the front end of the cantilever is U-shaped; a V-shaped connecting rod is hooked between the two cantilevers, a guide groove for bearing a cable is formed in the lower end of the connecting rod, and a gap for the cable to pass through is reserved between the guide groove and the connecting rod; the guide way is the elbow form, and the both sides of guide way are articulated mutually with the connecting rod, and are equipped with the mounting plate that is used for compressing tightly the cable at the both ends of guide way. The cable can be manually moved by an operator through the device, the operation is simple and convenient, the phenomena that the cable drags the ground and the like are effectively avoided, and the efficiency of tunnel construction is greatly improved.

Description

Cable towing device for tunnel construction
Technical Field
The utility model belongs to the technical field of the construction auxiliary device, concretely relates to cable towing device for tunnel construction.
Background
The tunnel construction mainly depends on a heading machine for operation, a power supply cable of the heading machine needs to be led in from the outside of the tunnel, and the cable also needs to be synchronously followed when the heading machine tunnels inwards. Along with the continuous increase of tunnel tunnelling degree of depth, the management degree of difficulty of cable also grow gradually, if manage not good, often can appear the cable and receive the extrusion and drag the ground phenomenon for cable wearing and tearing lead to the cable to damage easily, not only influence the construction progress, also have the potential safety hazard simultaneously. In addition, after the tunnel is run through, the recovery difficulty is also higher due to the staggered joints of the cable coils.
SUMMERY OF THE UTILITY MODEL
The utility model provides a cable towing device for tunnel construction, the difficult problem of cable follow-up and recovery in the current tunnel construction of aim at.
Therefore, the utility model adopts the following technical scheme:
a cable towing device for tunnel construction comprises upright posts arranged at intervals along one side of a tunnel, wherein steel wire ropes are connected between the upright posts, and a plurality of towing cable assemblies are movably connected to the steel wire ropes;
the towing cable assembly comprises a pulley hung on a steel wire rope, two sides of the pulley are respectively connected with a horizontally arranged cantilever, and the front end of the cantilever is U-shaped; a V-shaped connecting rod is hooked between the two cantilevers, a guide groove for bearing a cable is formed in the lower end of the connecting rod, and a gap for the cable to pass through is reserved between the guide groove and the connecting rod; the guide way is the elbow form, and the both sides of guide way are articulated mutually with the connecting rod, and are equipped with the mounting plate that is used for compressing tightly the cable at the both ends of guide way.
Furthermore, the fastening piece is C-shaped, connecting lugs are arranged on the fastening piece and the guide groove, and the fastening piece and the guide groove are connected through a screw.
Further, the rubber gasket is padded in the guide groove, and the rubber gasket is padded in the fastening piece.
The beneficial effects of the utility model reside in that: the cable can be manually moved by an operator through the device, the operation is simple and convenient, the phenomena that the cable drags the ground and the like are effectively avoided, and the efficiency of tunnel construction is greatly improved.
Drawings
Fig. 1 is a side view of the structure of the present invention;
fig. 2 is a schematic structural view of the guide groove of the present invention;
in the figure: the device comprises a pulley 1, a cantilever 2, a connecting rod 3, a hinge rod 4, a guide groove 5, a fastening piece 6 and a connecting lug 7.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings:
as shown in figures 1 and 2, the cable towing device for tunnel construction comprises stand columns which are arranged at intervals along one side of a tunnel, the interval between every two adjacent stand columns is 2-3 m, a steel wire rope is connected between the stand columns, and a plurality of towing components used for hanging cables are movably connected onto the steel wire rope.
The towing assembly component comprises a pulley 1 hung on a steel wire rope, two sides of the pulley 1 are respectively connected with a horizontally arranged cantilever 2, the cantilever 2 and the pulley 1 are hinged through a pin shaft, and the front end of the cantilever 2 is U-shaped. Collude between two cantilevers 2 and be equipped with the connecting rod 3 of V-arrangement, the lower extreme of connecting rod 3 is equipped with two vertical L shape articulated rods 4, and articulated between two articulated rods 4 have a guide way 5 that is used for accepting the cable, leaves the clearance that supplies the cable to pass between guide way 5 and the connecting rod 3. The guide groove 5 is in a bent pipe shape, and fastening pieces 6 used for compressing the cable are arranged at two ends of the guide groove 5. Fastening plate 6 is C shape, all is equipped with engaging lug 7 on fastening plate 6 and the guide way 5, passes through the screw rod between stationary blade and the guide way 5 and is connected. In order to prevent scratching of the cable, rubber pads are lined in both the guide groove 5 and the fixing sheet.
The working principle of the utility model is as follows:
when the device is used, the upright posts are firstly arranged along one side of the tunnel, and the steel wire ropes are bound and fixed on the upright posts. And reasonably arranging towing cable assemblies on the two adjacent upright posts according to the length of the steel wire rope between the two adjacent upright posts, wherein the interval between the two adjacent towing cable assemblies is generally 40-50 cm. Then pass the cable guide way 5 to use the stationary blade fastening to fix the cable, collude connecting rod 3 on cantilever 2 again, the cable is hung promptly and is established in tunnel one side. When the cable needs to move forwards, the pulley 1 is dragged along the steel wire rope, and when the upright posts are added forwards and the cable needs to move forwards, the pulley is pulled forwards. Firstly, a pulley 1 is added on a newly-added steel wire brush, then a connecting rod 3 on a rear side sliding wheel 1 is taken down and hung on the pulley 1 at the front end.
It should be noted that the above are only some embodiments of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and substitutions can be made without departing from the technical principle of the present invention, and these modifications and substitutions should also be regarded as the protection scope of the present invention.

Claims (3)

1. A cable towing device for tunnel construction is characterized by comprising upright columns which are arranged at intervals along one side of a tunnel, wherein steel wire ropes are connected between the upright columns, and a plurality of towing cable assemblies are movably connected onto the steel wire ropes;
the towing cable assembly component comprises a pulley (1) hung on a steel wire rope, two sides of the pulley (1) are respectively connected with a horizontally arranged cantilever (2), and the front end of the cantilever (2) is U-shaped; a V-shaped connecting rod (3) is hooked between the two cantilevers (2), a guide groove (5) for bearing a cable is formed in the lower end of the connecting rod (3), and a gap for the cable to pass through is reserved between the guide groove (5) and the connecting rod (3); the guide groove (5) is in a bent pipe shape, two sides of the guide groove (5) are hinged to the connecting rod (3), and fastening pieces (6) used for compressing the cable are arranged at two ends of the guide groove (5).
2. The cable towing device for tunnel construction according to claim 1, wherein the fastening tab (6) is C-shaped, the fastening tab (6) and the guide slot (5) are both provided with connecting lugs (7), and the fastening tab and the guide slot (5) are connected by a screw.
3. The cable streamer device for tunnel construction according to claim 1, wherein the guide channel (5) is lined with a rubber mat and the fastening tab (6) is also lined with a rubber mat.
CN202020141523.9U 2020-01-22 2020-01-22 Cable towing device for tunnel construction Expired - Fee Related CN210637112U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020141523.9U CN210637112U (en) 2020-01-22 2020-01-22 Cable towing device for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020141523.9U CN210637112U (en) 2020-01-22 2020-01-22 Cable towing device for tunnel construction

Publications (1)

Publication Number Publication Date
CN210637112U true CN210637112U (en) 2020-05-29

Family

ID=70795977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020141523.9U Expired - Fee Related CN210637112U (en) 2020-01-22 2020-01-22 Cable towing device for tunnel construction

Country Status (1)

Country Link
CN (1) CN210637112U (en)

Similar Documents

Publication Publication Date Title
CN211046264U (en) Threading construction device for building electrical engineering
CN204823450U (en) Automatic device that pulls of coal -winning machine cable based on steel -cable drawing
CN205687285U (en) A kind of cable drawing machine
CN210637112U (en) Cable towing device for tunnel construction
CN215221561U (en) Tail-end electrical engineering cable laying device
CN205921300U (en) Combine and dig cable self -advancing device
CN202395407U (en) Cable dragging suspension device for heading machine
CN201590623U (en) Well mouth cable protector
CN211018061U (en) Multi-connected cable pulley block
CN212210411U (en) Bridge device for network engineering comprehensive wiring
CN202772538U (en) Integrated excavator cable hanging device
CN104242142A (en) Installation method of suspension type tubular busbar
CN209881363U (en) Heading machine cable towing device
CN211790454U (en) Thread burying device for water conservancy and hydropower engineering
CN207047853U (en) Low clearance pile-drawing machine
CN209455823U (en) A kind of combined type pay off rack for electric wire
CN209818062U (en) Cable dragging device of tunneling machine
CN108999760B (en) Saddle device for fan twisting cable
CN218560962U (en) Mining prop pulling winch
CN202997427U (en) Portable electric cable pay-off rack
CN213027401U (en) Boiler room coal scuttle dolly power lead draw gear
CN217720518U (en) Cable pulling and moving auxiliary device
CN113107482B (en) Coal-winning machine electric clamping plate tractor for large-dip angle fully-mechanized coal face and using method thereof
CN116031820B (en) Overhead insulated cable installation support column frame
CN211790684U (en) Cable towing device of roadheader

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200529

Termination date: 20210122