CN211790454U - Thread burying device for water conservancy and hydropower engineering - Google Patents

Thread burying device for water conservancy and hydropower engineering Download PDF

Info

Publication number
CN211790454U
CN211790454U CN202020276695.7U CN202020276695U CN211790454U CN 211790454 U CN211790454 U CN 211790454U CN 202020276695 U CN202020276695 U CN 202020276695U CN 211790454 U CN211790454 U CN 211790454U
Authority
CN
China
Prior art keywords
guide
pulley
guide wheel
pillar
frame plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020276695.7U
Other languages
Chinese (zh)
Inventor
张建芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Tongtu Assembly Construction Technology Co ltd
Original Assignee
Xuzhou Tongtu Assembly Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Tongtu Assembly Construction Technology Co ltd filed Critical Xuzhou Tongtu Assembly Construction Technology Co ltd
Priority to CN202020276695.7U priority Critical patent/CN211790454U/en
Application granted granted Critical
Publication of CN211790454U publication Critical patent/CN211790454U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Abstract

The utility model belongs to bury the traditional thread binding putting field, specifically be hydraulic and hydroelectric engineering with burying traditional thread binding putting, including paying out machine, paying out machine includes frame plate, universal wheel, handrail, motor, drive pulley, the frame plate bottom is equipped with the universal wheel, frame plate one side is equipped with the handrail, the frame plate inside wall is equipped with the motor, be equipped with on the motor output shaft drive pulley, drive pulley side below is equipped with from the driven pulleys, from the driven pulleys with the drive pulley outside is equipped with the drive belt, from the driven pulleys rear portion has through the key connection and holds together a line section of thick bamboo, the last conveying mechanism and the clean mechanism that are equipped with of paying out machine, conveying mechanism includes guide pulley pillar one, guide pulley, pivot, guide pulley pillar two, the frame plate top is equipped with guide pulley pillar one. The utility model discloses a conveying mechanism to can roll the friction that the delivery cable reduced with the cable, can not harm the cable like this.

Description

Thread burying device for water conservancy and hydropower engineering
Technical Field
The utility model belongs to the wire burying device field specifically relates to a hydraulic and hydroelectric engineering is with wire burying device.
Background
Water conservancy and hydropower engineering equipment is along with the lapse of time, and the demand of maintenance extension enlarges gradually, and the circuit that hydraulic engineering construction was used also need diversified extension to be connected, in hydraulic engineering construction, needs bury the pipeline underground in the pipeline.
The existing wire embedding device for the hydraulic and hydroelectric engineering cannot stably convey cables or can damage the cables due to large friction between the cables and wire separating measures.
It is noted that the information disclosed in this background section of the invention is only for enhancement of understanding of the general background of the invention, and should not be taken as an acknowledgement or any form of suggestion that this information constitutes prior art already known to a person skilled in the art.
SUMMERY OF THE UTILITY MODEL
For solving the problem that exists among the prior art, the utility model discloses a conveying mechanism to can roll the friction that the transmission cable reduces with the cable, can not harm the cable like this.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the wire burying device for the hydraulic and hydroelectric engineering comprises a wire releasing mechanism, wherein the wire releasing mechanism comprises a frame plate, universal wheels, a handrail, a motor and a driving belt wheel, the universal wheels are arranged at the bottom of the frame plate, the handrail is arranged on one side of the frame plate, the motor is arranged on the inner side wall of the frame plate, the driving belt wheel is arranged on an output shaft of the motor, a driven belt wheel is arranged below the side of the driving belt wheel, a driving belt is arranged on the outer side of the driven belt wheel and the outer side of the driving belt wheel, a wire collecting barrel is connected to the rear part of the driven belt wheel through a key, a conveying mechanism and a cleaning mechanism are arranged on the wire releasing mechanism, the conveying mechanism comprises a guide wheel support I, a guide wheel, a rotating shaft and a guide wheel support II, the top of the frame plate is provided with the guide wheel support I, one side, the guide wheel is welded on the rotating shaft.
On the basis of the technical scheme, the cleaning mechanism comprises a brush cylinder support and a brush cylinder I, the brush cylinder support is arranged between the guide wheel support I and the wire gathering cylinder, and the brush cylinder I is formed on the brush cylinder support.
On the basis of the technical scheme, the cleaning mechanism comprises a brush cylinder supporting rod and a brush cylinder II, the brush cylinder supporting rod is welded between the guide wheel supporting rod I and the wire gathering cylinder, and the brush cylinder supporting rod is welded at the top end of the brush cylinder supporting rod.
On the basis of the technical scheme, the first guide wheel support is vertically arranged, and supports the guide wheel and the rotating shaft to rotate and convey the cable.
On the basis of the technical scheme, the second guide wheel support is horizontally arranged, and supports the rotating shaft and the guide wheel to rotate.
On the basis of the technical scheme, one guide wheel is arranged on each guide wheel strut I, two guide wheels are arranged on each guide wheel strut II, and the guide wheels can rotate to convey cables.
Compared with the prior art, the beneficial effects of the utility model are that:
under the condition that many electric wires were laid simultaneously, take the cable on guide pulley pillar one, then pass between two guide pulleys on the guide pulley pillar two, can play the condition of dividing the groove discharge to it like this, avoid the electric wire when the discharge is laid, cause the crisscross condition of confusion to take place, more effectual the result of use of having guaranteed the device to can not rub the damage cable.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
fig. 1 is an axonometric view of an embodiment 1 of the wire burying device for water conservancy and hydropower engineering of the utility model;
fig. 2 is a schematic structural view of a brush holder bracket in embodiment 1 of the wire burying device for water conservancy and hydropower engineering of the present invention;
fig. 3 is a schematic view of a guide wheel structure in the embodiment 1 of the wire burying device for water conservancy and hydropower engineering of the present invention;
figure 4 is embodiment 2 axonometric view of the utility model discloses a thread burying device for hydraulic and hydroelectric engineering.
The reference numerals are explained below:
1. a pay-off mechanism; 101. a frame plate; 102. a universal wheel; 103. a handrail; 104. a motor; 105. a driving pulley; 106. a transmission belt; 107. a driven pulley; 108. a wire collecting cylinder; 2. a conveying mechanism; 201. a first guide wheel support; 202. a guide wheel; 203. a rotating shaft; 204. a second guide wheel support; 3. a cleaning mechanism; 301. a brush holder; 302. a first brush cylinder; 303. a brush holder support rod; 304. and a second brush cylinder.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1
Referring to fig. 1-3, the present invention provides a technical solution: the wire burying device for the water conservancy and hydropower engineering comprises a paying-off mechanism 1, wherein the paying-off mechanism 1 comprises a frame plate 101, a universal wheel 102, a handrail 103, a motor 104 and a driving pulley 105, the universal wheel 102 is arranged at the bottom of the frame plate 101, the handrail 103 is arranged on one side of the frame plate 101, the motor 104 is arranged on the inner side wall of the frame plate 101, the driving pulley 105 is arranged on an output shaft of the motor 104, a driven pulley 107 is arranged below the driving pulley 105, a transmission belt 106 is arranged outside the driven pulley 107 and the driving pulley 105, the rear part of the driven pulley 107 is connected with a wire collecting cylinder 108 through a key, a conveying mechanism 2 and a cleaning mechanism 3 are arranged on the paying-off mechanism 1, the conveying mechanism 2 comprises a guide wheel strut one 201, a guide wheel 202, a rotating shaft 203, two guide wheel struts 204 and 205, a guide wheel strut 201 is arranged at the top, a second guide wheel support 204 is arranged on one side of the frame plate 101, the second guide wheel support 204 is horizontally arranged, the second guide wheel support 204 supports the rotating shaft 203 and the guide wheel 202 to rotate, the rotating shaft 203 is rotatably connected to the top of the first guide wheel support 201 and the second guide wheel support 204, the guide wheel 202 is welded on the rotating shaft 203, a guide wheel 202 is arranged on each first guide wheel support 201, two guide wheels 202 are arranged on each second guide wheel support 204, and the guide wheel 202 can rotate to convey cables.
On the basis of the above-described embodiment: the cleaning mechanism 3 comprises a brush cylinder bracket 301 and a brush cylinder I302, the brush cylinder bracket 301 is arranged between the guide wheel support I201 and the wire gathering cylinder 108, and the brush cylinder I302 is formed on the brush cylinder bracket 301.
The utility model discloses a theory of operation and use flow: when in use, the starting motor 104 drives the driving belt wheel 105, the transmission belt 106, the driven belt wheel 107 and the wire collecting cylinder 108 to rotate, therefore, the cable can be pulled at a constant speed by constructors, so that the electric wires coiled on the surface of the wire gathering cylinder 108 can be automatically laid outwards, thereby effectively saving the labor intensity of constructors, avoiding excessive occupation of the constructors, playing a role of cleaning and wiping the surface of the passing electric wire through the bristles on the inner side of the first brush barrel 302, effectively removing dust and impurities on the surface of the electric wire, in the case of laying a plurality of wires simultaneously, the cable is lapped on the guide wheel 202 on the guide wheel strut one 201, and then passes between the two guide wheels 202 on the second guide wheel support 204, so that the condition of slotted discharge can be realized, avoid the electric wire when the discharge is laid, cause the crisscross condition of confusion to be anti-emergence, more effectual the result of use of having guaranteed the device to can not rub and damage the cable.
Example 2
Referring to fig. 4, the difference between the embodiment 2 and the embodiment 1 is that the cleaning mechanism 3 includes a brush cylinder support rod 303 and a brush cylinder two 304, the brush cylinder support rod 303 is welded between the guide wheel support rod one 201 and the wire gathering cylinder 108, and the brush cylinder two 304 is welded on the top end of the brush cylinder support rod 303, when in use, the starting motor 104 drives the driving pulley 105, the transmission belt 106, the driven pulley 107 and the wire gathering cylinder 108 to rotate, so that the electric wires coiled on the surface of the wire gathering cylinder 108 can be automatically laid outwards in cooperation with the uniform pulling of the cable by the constructor, the labor intensity of the constructor is effectively saved, the excessive occupation of the constructor is avoided, the surface of the passing electric wires is cleaned by the bristles inside of the brush cylinder two 304, the dust impurities on the surface of the electric wires can be effectively removed, and the cable is lapped on the guide wheel 202 on the guide wheel support rod one 201 under the condition that a plurality of electric wires are laid, then, the cable passes through the space between the two guide wheels 202 on the second guide wheel support 204, so that the condition of groove-dividing discharge can be realized, the situation that the electric wires are disordered and staggered when being discharged and laid is avoided, the using effect of the device is more effectively ensured, and the cable cannot be damaged by friction.
Although some specific embodiments of the present invention have been described in detail by way of illustration, it should be understood by those skilled in the art that the above illustration is only for purposes of illustration and is not intended to limit the scope of the invention. It will be appreciated by those skilled in the art that modifications may be made to the above embodiments without departing from the scope and spirit of the invention. The scope of the invention is defined by the appended claims.

Claims (6)

1. Hydraulic water and electricity engineering is with device of sunkening cord, including paying out machine structure (1), paying out machine structure (1) is including frame board (101), universal wheel (102), handrail (103), motor (104), driving pulley (105), frame board (101) bottom is equipped with universal wheel (102), frame board (101) one side is equipped with handrail (103), frame board (101) inside wall is equipped with motor (104), be equipped with on motor (104) output shaft driving pulley (105), driving pulley (105) side below is equipped with driven pulley (107), driven pulley (107) with driving pulley (105) outside is equipped with drive belt (106), driven pulley (107) rear portion has wire gathering section of thick bamboo (108), its characterized in that through the key connection: be equipped with conveying mechanism (2) and clean mechanism (3) on paying out machine structure (1), conveying mechanism (2) include guide pulley pillar (201), guide pulley (202), pivot (203), guide pulley pillar two (204), frame plate (101) top is equipped with guide pulley pillar (201), frame plate (101) one side is equipped with guide pulley pillar two (204), guide pulley pillar one (201) top with all rotate on guide pulley pillar two (204) and be connected with pivot (203), the welding has on pivot (203) guide pulley (202).
2. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the cleaning mechanism (3) comprises a brush cylinder support (301) and a brush cylinder I (302), the brush cylinder support (301) is arranged between the guide wheel support I (201) and the wire gathering cylinder (108), and the brush cylinder support (301) is formed with the brush cylinder I (302).
3. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: clean mechanism (3) are including a brush section of thick bamboo branch (303), a brush section of thick bamboo two (304), guide pulley pillar one (201) with it has to hold together between the line section of thick bamboo (108) brush section of thick bamboo branch (303), the welding of brush section of thick bamboo branch (303) top has a brush section of thick bamboo two (304).
4. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the guide wheel strut I (201) is vertically arranged.
5. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the second guide wheel support (204) is horizontally arranged.
6. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: each guide wheel strut I (201) is provided with one guide wheel (202), and each guide wheel strut II (204) is provided with two guide wheels (202).
CN202020276695.7U 2020-03-09 2020-03-09 Thread burying device for water conservancy and hydropower engineering Expired - Fee Related CN211790454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020276695.7U CN211790454U (en) 2020-03-09 2020-03-09 Thread burying device for water conservancy and hydropower engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020276695.7U CN211790454U (en) 2020-03-09 2020-03-09 Thread burying device for water conservancy and hydropower engineering

Publications (1)

Publication Number Publication Date
CN211790454U true CN211790454U (en) 2020-10-27

Family

ID=72938241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020276695.7U Expired - Fee Related CN211790454U (en) 2020-03-09 2020-03-09 Thread burying device for water conservancy and hydropower engineering

Country Status (1)

Country Link
CN (1) CN211790454U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112744640A (en) * 2021-01-12 2021-05-04 义乌市金明针织有限公司 Novel yarn guide device of winder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112744640A (en) * 2021-01-12 2021-05-04 义乌市金明针织有限公司 Novel yarn guide device of winder

Similar Documents

Publication Publication Date Title
CN100571905C (en) Electrical cable washer
CN210172033U (en) Cable surface cleaning device
CN211790454U (en) Thread burying device for water conservancy and hydropower engineering
CN211366616U (en) Colliery is supply cable winding and unwinding devices in pit
CN209036957U (en) Cable extruding machine
CN109399376A (en) A kind of bobbin winder device that cable deoils
CN212494262U (en) Belt cleaning device is used in wire and cable production
CN206189824U (en) Plastering machine for construction
CN210596120U (en) Steel slag cleaning and recycling device
CN218621402U (en) Fabric cleaning machine
CN209009838U (en) A kind of waste and old aluminum stranded conductor recycling bobbin winder device
CN216189956U (en) Cable recovery system with cleaning capacity
CN201168711Y (en) Cable cleaner
CN205855577U (en) A kind of old line retracting device
CN204769746U (en) Cable conductor belt cleaning device
CN215287452U (en) Wire and cable take-up device
CN210411680U (en) Belt cleaning device for cable manufacture
CN209217586U (en) A kind of power line construction cable safety hitch
CN211579417U (en) Threading construction device for building electrical engineering
CN204320697U (en) A kind of hydraulic steel wire rope soaker
CN218371663U (en) Winding device for haulage rope for electric power construction
CN211521257U (en) Cable coiling and uncoiling device for building site
CN208054640U (en) A kind of electromechanical construction take-up and pay-off device
CN204769665U (en) Cable conductor washs drying equipment
CN218621162U (en) Short fiber dividing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027

Termination date: 20210309