CN210621924U - Assembled concrete building node connection structure - Google Patents
Assembled concrete building node connection structure Download PDFInfo
- Publication number
- CN210621924U CN210621924U CN201921508069.XU CN201921508069U CN210621924U CN 210621924 U CN210621924 U CN 210621924U CN 201921508069 U CN201921508069 U CN 201921508069U CN 210621924 U CN210621924 U CN 210621924U
- Authority
- CN
- China
- Prior art keywords
- groove
- draw
- roof beam
- beam body
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model discloses an assembled concrete building node connection structure, including the cylinder and the roof beam body, both sides are provided with the baffle around the cylinder top, the inboard of baffle is equipped with first draw-in groove, the top of cylinder is located the central fixedly connected with body of rod of first draw-in groove, second draw-in groove has all been seted up to both sides around the middle part of the roof beam body lateral wall, the middle part of roof beam body lateral wall imbeds the inner chamber of first draw-in groove and laminates with the inside wall of first draw-in groove, the lateral wall of baffle imbeds the inner chamber of second draw-in groove and laminates with the inside wall of second draw-in groove, the central department of roof beam body sets up the through-hole with body of rod looks adaptation; the utility model discloses a first bolt is fixed diaphragm and baffle and roof beam body, with the inner chamber of the first holding tank of supporting shoe embedding and second holding tank, fixes the bottom and the cylinder of supporting shoe through the second bolt, through the bottom fixed connection of third bolt and roof beam body to reach fixed effectual purpose.
Description
Technical Field
The utility model relates to an assembly type structure technical field specifically is an assembly type concrete building nodal connection structure.
Background
The building assembled by prefabricated parts on the construction site is called as an assembly type building, and is divided into five types of building block buildings, plate buildings, box type buildings, framework plate buildings, lifting plate and rise buildings and the like according to the form and construction method of prefabricated parts, wherein the assembly type building parts comprise assembly type beams and columns, and a building node connecting structure is required to be used when the beams and columns are connected.
When current building node connection structure uses, fixed effect is poor, connects the unstability like this, appears the skew easily between the beam column, and the connecting piece that uses can't be fine hides, and unnecessary part exposes outside the beam column, brings inconvenience for the construction, for this reason, provides an assembled concrete building node connection structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled concrete building nodal connection structure to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an assembled concrete structure node connection structure, includes the cylinder and the roof beam body, both sides all are provided with the baffle around the cylinder top, the inboard of baffle is equipped with first draw-in groove, the top of cylinder and the center fixedly connected with body of rod that is located first draw-in groove, the second draw-in groove has all been seted up to both sides around the roof beam body lateral wall middle part, the middle part of roof beam body lateral wall imbed the inner chamber of first draw-in groove and laminate with the inside wall of first draw-in groove, the lateral wall of baffle imbed the inner chamber of second draw-in groove and laminate with the inside wall of second draw-in groove, the center department of the roof beam body set up with the through-hole of body.
As further preferable in the present technical solution: first holding tank has been seted up at the top of the cylinder left and right sides, the left and right sides of roof beam body bottom and the left and right sides that is located the cylinder have all seted up the second holding tank.
As further preferable in the present technical solution: third holding tank has all been seted up to the both sides and the left and right sides that are located the second draw-in groove around the roof beam body lateral wall, fourth holding tank has all been seted up to the both sides around the baffle lateral wall.
As further preferable in the present technical solution: the inner cavities of the third accommodating groove and the fourth accommodating groove are both fixedly connected with a transverse plate through a first bolt.
As further preferable in the present technical solution: the outer side wall of the rod body is embedded into the inner cavity of the through hole and is attached to the inner side wall of the through hole.
As further preferable in the present technical solution: the inner side wall of the first accommodating groove is fixedly connected with a supporting block through a second bolt, and the top of the supporting block is embedded into an inner cavity of the second accommodating groove and is fixedly connected with the inner side wall of the second accommodating groove through a third bolt.
Compared with the prior art, the beneficial effects of the utility model are that:
the first accommodating groove, the second accommodating groove, the third accommodating groove and the fourth accommodating groove are used in a matched mode, the transverse plate, the supporting block, the first bolt, the second bolt and the third bolt are installed and concealed, and therefore the purpose of good concealing effect is achieved;
two, the utility model discloses a first bolt is fixed diaphragm and baffle and roof beam body, with the inner chamber of the first holding tank of supporting shoe embedding and second holding tank, fixes the bottom and the cylinder of supporting shoe through the second bolt, through the bottom fixed connection of third bolt and roof beam body to reach fixed effectual purpose.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the supporting block of the present invention;
fig. 3 is a schematic view of the bottom structure of the supporting block of the present invention;
fig. 4 is a schematic top view of the beam body of the present invention.
In the figure: 1. a cylinder; 2. a beam body; 3. a baffle plate; 4. a first card slot; 5. a rod body; 6. a second card slot; 7. a through hole; 8. a first accommodating groove; 9. a second accommodating groove; 10. a third accommodating groove; 11. a fourth accommodating groove; 12. a transverse plate; 13. a support block; 14. a first bolt; 15. a second bolt; 16. and a third bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The components of the present invention are all standard components or components known to those skilled in the art, and the structure and principle thereof can be known by the technical manual or by the conventional experimental method.
Examples
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides an assembled concrete building nodal connection structure, includes cylinder 1 and roof beam body 2, both sides all are provided with baffle 3 around the 1 top of cylinder, the inboard of baffle 3 is equipped with first draw-in groove 4, the top of cylinder 1 and the center that is located first draw-in groove 4 locate the fixedly connected with body of rod 5, second draw-in groove 6 has all been seted up to both sides around the 2 lateral wall middle parts of the roof beam body, the middle part of the 2 lateral walls of the roof beam body imbed the inner chamber of first draw-in groove 4 and laminate with the inside wall of first draw-in groove 4, the lateral wall of baffle 3 imbed the inner chamber of second draw-in groove 6 and laminate with the inside wall of second draw-in groove 6, the center department of the roof beam body 2 sets up the through-hole 7.
In this embodiment, specifically: first holding tank 8 has been seted up at the top of the 1 left and right sides of cylinder, second holding tank 9 has all been seted up to the left and right sides of 2 bottoms of roof beam bodies and the left and right sides that is located cylinder 1, and the inner chamber of first holding tank 8 of supporting shoe 13 embedding and second holding tank 9 for install supporting shoe 13.
In this embodiment, specifically: third holding tank 10 has all been seted up to both sides and the left and right sides that is located second draw-in groove 6 around the 2 lateral walls of roof beam body, fourth holding tank 11 has all been seted up to both sides around the 3 lateral walls of baffle, with the inner chamber of diaphragm 12 embedding third holding tank 10 and fourth holding tank 11 for install diaphragm 12.
In this embodiment, specifically: the inner cavities of the third accommodating groove 10 and the fourth accommodating groove 11 are fixedly connected with a transverse plate 12 through a first bolt 14, and the transverse plate 12 is fixed with the baffle 3 and the beam body 2 through the first bolt 14.
In this embodiment, specifically: the lateral wall embedding through-hole 7's of the body of rod 5 inner chamber and with the laminating of the inside wall of through-hole 7, through with the body of rod 5 embedding through-hole 7 in, fix the roof beam body 2.
In this embodiment, specifically: the inside wall of first holding tank 8 passes through second bolt 15 fixedly connected with supporting shoe 13, the top embedding of supporting shoe 13 second holding tank 9's inner chamber and through third bolt 16 and second holding tank 9's inside wall fixed connection, fix the bottom and the cylinder 1 of supporting shoe 13 through second bolt 15, through the bottom fixed connection of third bolt 16 and roof beam body 2.
Theory of operation or structure, in use, the user is through in the first draw-in groove 4 with the roof beam body 2 embedding cylinder 1 top, through with in the body of rod 5 embedding through-hole 7, fix the roof beam body 2, through with in baffle 3 embedding second draw-in groove 6, then with the inner chamber of diaphragm 12 embedding third holding tank 10 and fourth holding tank 11, fix diaphragm 12 and baffle 3 and roof beam body 2 through first bolt 14, with the inner chamber of the first holding tank 8 of supporting shoe 13 embedding and second holding tank 9, fix the bottom of supporting shoe 13 with cylinder 1 through second bolt 15, bottom fixed connection through third bolt 16 and roof beam body 2, thereby reach the mesh that fixed effect is good.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an assembled concrete building node connection structure, includes cylinder (1) and roof beam body (2), its characterized in that: both sides all are provided with baffle (3) around cylinder (1) top, the inboard of baffle (3) is equipped with first draw-in groove (4), the top of cylinder (1) just is located the center fixedly connected with body of rod (5) of first draw-in groove (4), second draw-in groove (6) have all been seted up to both sides around roof beam body (2) lateral wall middle part, the middle part of roof beam body (2) lateral wall imbeds the inner chamber of first draw-in groove (4) and laminates with the inside wall of first draw-in groove (4), the lateral wall of baffle (3) imbeds the inner chamber of second draw-in groove (6) and laminates with the inside wall of second draw-in groove (6), the center department of roof beam body (2) sets up through-hole (7) with body of rod (5) looks adaptation.
2. The fabricated concrete building node connection structure of claim 1, wherein: first holding tank (8) have been seted up at the top of cylinder (1) left and right sides, second holding tank (9) have all been seted up to the left and right sides of roof beam body (2) bottom and the left and right sides that is located cylinder (1).
3. The fabricated concrete building node connection structure of claim 1, wherein: third holding tank (10) have all been seted up to both sides and the left and right sides that is located second draw-in groove (6) around the roof beam body (2) lateral wall, fourth holding tank (11) have all been seted up to both sides around baffle (3) lateral wall.
4. An assembled concrete building node connection structure according to claim 3, wherein: the inner cavities of the third accommodating groove (10) and the fourth accommodating groove (11) are fixedly connected with a transverse plate (12) through a first bolt (14).
5. The fabricated concrete building node connection structure of claim 1, wherein: the outer side wall of the rod body (5) is embedded into the inner cavity of the through hole (7) and attached to the inner side wall of the through hole (7).
6. An assembled concrete building node connection structure according to claim 2, wherein: the inner side wall of the first accommodating groove (8) is fixedly connected with a supporting block (13) through a second bolt (15), and the top of the supporting block (13) is embedded into an inner cavity of the second accommodating groove (9) and is fixedly connected with the inner side wall of the second accommodating groove (9) through a third bolt (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921508069.XU CN210621924U (en) | 2019-09-11 | 2019-09-11 | Assembled concrete building node connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921508069.XU CN210621924U (en) | 2019-09-11 | 2019-09-11 | Assembled concrete building node connection structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210621924U true CN210621924U (en) | 2020-05-26 |
Family
ID=70759202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921508069.XU Expired - Fee Related CN210621924U (en) | 2019-09-11 | 2019-09-11 | Assembled concrete building node connection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210621924U (en) |
-
2019
- 2019-09-11 CN CN201921508069.XU patent/CN210621924U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SG10201710094VA (en) | Building frame structure having edge beam, and construction method thereof | |
CN211735781U (en) | Modular assembly type steel structure house body | |
CN210032109U (en) | Can dismantle fixed connection structure for board house | |
CN210621924U (en) | Assembled concrete building node connection structure | |
CN205314900U (en) | Pin -connected panel door leaf | |
CN207633573U (en) | A kind of novel anti-buckling combined steel plate shearing force wall | |
CN214884724U (en) | Building curtain wall structure with drainage structures | |
CN109296078B (en) | Assembled bamboo-wood beam-column joint connecting device | |
CN207419867U (en) | Steel house panel splicing module | |
CN210685065U (en) | Energy-saving assembled building wall | |
CN216664646U (en) | Assembled building curtain | |
CN211714280U (en) | Curtain is kept apart to steel construction convenient to equipment | |
CN212295245U (en) | Assembled floor frame construction | |
CN206034636U (en) | Modular assembly formula steel construction system | |
CN211114360U (en) | Ceiling keel device capable of preventing side swing | |
CN216840731U (en) | Quick fixed frock of assembled trompil steel sheet shear force wall | |
CN220521218U (en) | Preassembled glass flood control wall | |
CN214696215U (en) | Prevention of seepage water wall body for building | |
CN213508955U (en) | Beam column node connecting piece | |
CN212641799U (en) | Damp-proof building wall | |
CN103334539B (en) | Combined wall board, combined wall board and crossbeam mount unit and combined wall board and beam connecting structure | |
CN217896912U (en) | Light prefabricated assembled floor | |
CN215673063U (en) | Metal connecting component for building material furniture product | |
CN208719086U (en) | A kind of screw fixed structure of lock panel | |
CN216840181U (en) | Green building engineering is with durable recycled concrete porous brick that excels in |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200526 Termination date: 20210911 |