CN216840731U - Quick fixed frock of assembled trompil steel sheet shear force wall - Google Patents

Quick fixed frock of assembled trompil steel sheet shear force wall Download PDF

Info

Publication number
CN216840731U
CN216840731U CN202220311796.2U CN202220311796U CN216840731U CN 216840731 U CN216840731 U CN 216840731U CN 202220311796 U CN202220311796 U CN 202220311796U CN 216840731 U CN216840731 U CN 216840731U
Authority
CN
China
Prior art keywords
plate
screw
bottom plate
seted
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220311796.2U
Other languages
Chinese (zh)
Inventor
曲峰
胡绪刚
王永革
陈平
潘建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Qiancheng Lvjie Prefabricated Construction Technology Co ltd
Original Assignee
Qingdao Qiancheng Lvjie Prefabricated Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Qiancheng Lvjie Prefabricated Construction Technology Co ltd filed Critical Qingdao Qiancheng Lvjie Prefabricated Construction Technology Co ltd
Priority to CN202220311796.2U priority Critical patent/CN216840731U/en
Application granted granted Critical
Publication of CN216840731U publication Critical patent/CN216840731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a quick fixed frock of assembled trompil steel sheet shear force wall, including vertical board, right-hand member one side fixedly connected with bottom plate of vertical board, first screw has been seted up to the inside of bottom plate, first elliptical aperture has been seted up to the inside of bottom plate, one side fixedly connected with loading board of bottom plate, one side fixedly connected with swash plate of loading board, the second screw has been seted up to one side of swash plate, the second elliptical aperture has been seted up to one side of swash plate. The above structure is adopted in the utility model, through setting up vertical board, horizontal plate, bottom plate, swash plate, the fixed frock of loading board formation, because multiunit third screw and fourth screw have been seted up on vertical board and the horizontal plate respectively, pass through screw fixed mounting with the wallboard on vertical board, horizontal floor passes through the fix with screw on the horizontal plate to conveniently install fixedly, save dead time, improve machining efficiency, practice thrift the work piece cost, it is suitable for effectually.

Description

Quick fixed frock of assembled trompil steel sheet shear force wall
Technical Field
The utility model belongs to the technical field of the shear force wall is fixed, in particular to quick fixed frock of assembled trompil steel sheet shear force wall.
Background
The shear wall is a structural unit resisting lateral force, and is very commonly applied to most high-rise buildings due to high rigidity and high bearing capacity. The structural system developed in China for high-rise residential buildings is a prefabricated assembled concrete shear wall structure. The prefabricated assembled concrete shear wall structure is characterized in that part or all of components of the prefabricated assembled concrete shear wall structure are prefabricated and finished in advance in a factory, then the prefabricated assembled concrete shear wall structure is transported to a construction site, and the components are assembled into a whole in a reliable connection mode.
At present in the site operation, shear force wallboard is after the installation, and before the welding, need strengthen fixedly, current shear force wall is the fixed knot structure through bracing piece class more, and it is inconvenient to use, wastes time and energy, has reduced fixed efficiency, and extravagant work piece is more, can not satisfy current user demand.
SUMMERY OF THE UTILITY MODEL
To the problem mentioned in the background art, the utility model aims at providing a quick fixed frock of assembled trompil steel sheet shear force wall to solve current shear force wall and all pass through the fixed knot structure of bracing piece class more, use inconvenient, and extravagant work piece is more, can not satisfy current user demand's problem.
The above technical purpose of the present invention can be achieved by the following technical solutions:
the utility model provides a quick fixed frock of assembled trompil steel sheet shear force wall, includes vertical board, right-hand member one side fixedly connected with bottom plate of vertical board, first screw has been seted up to the inside of bottom plate, first elliptical aperture has been seted up to the inside of bottom plate, one side fixedly connected with loading board of bottom plate, one side fixedly connected with swash plate of loading board, the second screw has been seted up to one side of swash plate, the second elliptical aperture has been seted up to one side of swash plate, one side of loading board and one side fixed connection of vertical board, the top fixedly connected with horizontal plate of swash plate and vertical board, vertical board is equipped with coupling assembling with one side of horizontal plate, one side of loading board is equipped with the assistance and decides the subassembly.
Through adopting above-mentioned technical scheme, form fixed frock through setting up vertical board, horizontal plate, bottom plate, swash plate, loading board, because seted up multiunit third screw and fourth screw on vertical board and the horizontal plate respectively, pass through screw fixed mounting with the wallboard on vertical board, horizontal floor passes through the fix with screw on the horizontal plate to conveniently install fixedly, save dead time, improve machining efficiency, practice thrift the work piece cost, it is suitable for effectually.
Further, as preferred technical scheme, coupling assembling includes third screw and fourth screw, the third screw is seted up in the inside of vertical board, the fourth screw is seted up in the inside of horizontal plate.
Through adopting above-mentioned technical scheme, pass through screw fixed mounting with the wallboard on vertical board, horizontal floor passes through the fix with screw on the horizontal plate to conveniently install fixedly, save dead time, improve machining efficiency.
Further, as a preferred technical scheme, the auxiliary assembly comprises a protruding block, the protruding block is fixedly installed on one side of the vertical plate, and a fifth screw hole is formed in the protruding block.
Through adopting above-mentioned technical scheme, through setting up the lug on one side of the vertical board, the fifth screw is seted up to the lug, conveniently assists fixedly through the screw.
Furthermore, as a preferred technical scheme, a sixth screw hole is formed in one side of the bearing plate, and a third elliptical hole is formed in one side of the bearing plate.
Through adopting above-mentioned technical scheme, through setting up sixth screw and the third elliptical aperture on the loading board, also be convenient for assist fixedly through the screw.
Further, as a preferable aspect, one side of the bottom plate is formed in a slope shape.
Through adopting above-mentioned technical scheme, through setting up bottom plate one side and for the slope form, make things convenient for the wallboard to put into.
Furthermore, as a preferred technical scheme, a plurality of groups of third screw holes and fourth screw holes are formed, and the inner diameters of the third screw holes and the fourth screw holes are equal.
Through adopting above-mentioned technical scheme, it is the same through the aperture that sets up third screw and fourth screw, conveniently installs wallboard and horizontal floor.
To sum up, the utility model discloses mainly have following beneficial effect:
firstly, a fixing tool is formed by arranging a vertical plate, a horizontal plate, a bottom plate, an inclined plate and a bearing plate, and a plurality of groups of third screw holes and fourth screw holes are respectively formed in the vertical plate and the horizontal plate, so that a wallboard is fixedly arranged on the vertical plate through screws, and a horizontal floor plate is fixedly arranged on the horizontal plate through screws, thereby facilitating installation and fixation, saving fixing time, improving processing efficiency, saving workpiece cost and having good application effect;
secondly, the auxiliary fixing assembly is arranged, so that the fixing assisting effect can be achieved, the auxiliary installation is facilitated, and the application range of the fixing tool is widened;
and thirdly, the first elliptical hole, the second elliptical hole and the third elliptical hole are formed in the fixing tool, the circular holes of the waist-shaped holes are higher in screw adaptability, and the requirement on installation accuracy is not high.
Drawings
Fig. 1 is a perspective view of the present invention;
fig. 2 is a schematic structural diagram of the present invention;
fig. 3 is a side view of the present invention;
fig. 4 is a top view of the present invention.
Reference numerals are as follows: 1. vertical board, 2, bottom plate, 21, first screw, 22, first elliptical hole, 3, swash plate, 31, second screw, 32, second elliptical hole, 4, horizontal plate, 5, coupling assembling, 51, third screw, 52, fourth screw, 6, loading board, 7, assistance subassembly, 71, lug, 72, fifth screw, 73, sixth screw, 74, third elliptical hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-4, the tool for quickly fixing an assembled perforated steel plate shear wall in the embodiment includes a vertical plate 1, a bottom plate 2 is fixedly connected to one side of the right end of the vertical plate 1, one side of the bottom plate 2 is set to be a slope, a wall plate is conveniently placed in the bottom plate, a first screw hole 21 is formed in the bottom plate 2, a first elliptical hole 22 is formed in the bottom plate 2, a bearing plate 6 is fixedly connected to one side of the bottom plate 2, a sloping plate 3 is fixedly connected to one side of the bearing plate 6, a second screw hole 31 is formed in one side of the sloping plate 3, a second elliptical hole 32 is formed in one side of the sloping plate 3, one side of the bearing plate 6 is fixedly connected to one side of the vertical plate 1, a horizontal plate 4 is fixedly connected to the top ends of the sloping plate 3 and the vertical plate 1, a connecting assembly 5 is arranged on one side of the vertical plate 1 and the horizontal plate 4, an auxiliary assembly 7 is arranged on one side of the bearing plate 6, through setting up vertical board 1, horizontal plate 4, bottom plate 2, swash plate 3, loading board 6 forms fixed frock, because multiunit third screw 51 and fourth screw 52 have been seted up on vertical board 1 and the horizontal plate 4 respectively, pass through screw fixed mounting on vertical board 1 with the wallboard, horizontal floor passes through the fix with screw on horizontal plate 4, the model of mounting screw is M12 1.75, thereby conveniently install fixedly, save the dead time, and the machining efficiency is improved, and the saving work piece cost, and is suitable for effectually.
Example 2
Referring to fig. 1, 3 and 4, on the basis of embodiment 1, in order to achieve the purpose of connecting a wall panel and a horizontal floor slab, the present embodiment has an innovative design on a connecting assembly 5, specifically, the connecting assembly 5 includes a third screw hole 51 and a fourth screw hole 52, the third screw hole 51 is opened inside a vertical plate 1, and the fourth screw hole 52 is opened inside a horizontal plate 4; pass through screw fixed mounting with the wallboard on vertical board 1, horizontal floor passes through the fix with screw on horizontal plate 4 to conveniently install fixedly, save dead time, improve machining efficiency.
Referring to fig. 1, 3 and 4, in order to achieve the purpose of convenient use, in the present embodiment, a plurality of groups of third screw holes 51 and fourth screw holes 52 are respectively formed, and the inner diameters of the third screw holes 51 and the fourth screw holes 52 are equal; the apertures of the third screw hole 51 and the fourth screw hole 52 are the same, so that the wallboard and the horizontal floor slab are convenient to install.
Example 3
Referring to fig. 1-2, in the present embodiment, on the basis of embodiment 1, in order to achieve the purpose of auxiliary fixing, an innovative design is performed on the auxiliary assembly 7 of the present embodiment, specifically, the auxiliary assembly 7 includes a protrusion 71, the protrusion 71 is fixedly installed on one side of the vertical plate 1, a fifth screw hole 72 is formed inside the protrusion 71, a sixth screw hole 73 is formed on one side of the bearing plate 6, and a third elliptical hole 74 is formed on one side of the bearing plate 6; through setting up the lug 71 of vertical board 1 one side, lug 71 sets up fifth screw 72, conveniently passes fifth screw 72 through the screw and assists fixedly, through setting up sixth screw 73 and third elliptical aperture 74 on the loading board 6, also is convenient for pass sixth screw 73 and third elliptical aperture 74 through the screw and assists fixedly.
The use principle and the advantages are as follows: through setting up vertical board 1, horizontal plate 4, bottom plate 2, swash plate 3, loading board 6 forms fixed frock, because multiunit third screw 51 and fourth screw 52 have been seted up on vertical board 1 and horizontal plate 4 respectively, pass through the screw fixed mounting with the wallboard in the third screw 51 on vertical board 1, horizontal floor passes through in the fourth screw 52 of fix with screw on horizontal plate 4, and through swash plate 3, loading board 6, bottom plate 2 carries out the auxiliary fixation, thereby conveniently install fixedly, save dead time, improve machining efficiency, save work piece cost, and is suitable for effectually.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a quick fixed frock of assembled trompil steel sheet shear force wall which characterized in that: comprises a vertical plate (1), one side of the right end of the vertical plate (1) is fixedly connected with a bottom plate (2), a first screw hole (21) is arranged inside the bottom plate (2), a first elliptical hole (22) is arranged inside the bottom plate (2), one side of the bottom plate (2) is fixedly connected with a bearing plate (6), one side of the bearing plate (6) is fixedly connected with an inclined plate (3), one side of the inclined plate (3) is provided with a second screw hole (31), one side of the inclined plate (3) is provided with a second elliptical hole (32), one side of the bearing plate (6) is fixedly connected with one side of the vertical plate (1), the top ends of the inclined plate (3) and the vertical plate (1) are fixedly connected with a horizontal plate (4), one side of vertical board (1) and horizontal plate (4) is equipped with coupling assembling (5), one side of loading board (6) is equipped with assistance decides subassembly (7).
2. The quick fixing tool for the assembled perforated steel plate shear wall according to claim 1, characterized in that: coupling assembling (5) include third screw (51) and fourth screw (52), the inside in vertical board (1) is seted up in third screw (51), the inside in horizontal plate (4) is seted up in fourth screw (52).
3. The quick fixing tool for the assembled perforated steel plate shear wall according to claim 1, characterized in that: the auxiliary assembly (7) comprises a convex block (71), the convex block (71) is fixedly installed on one side of the vertical plate (1), and a fifth screw hole (72) is formed in the convex block (71).
4. The quick fixing tool for the assembled perforated steel plate shear wall according to claim 1, characterized in that: a sixth screw hole (73) is formed in one side of the bearing plate (6), and a third elliptical hole (74) is formed in one side of the bearing plate (6).
5. The quick fixing tool for the assembled perforated steel plate shear wall according to claim 1, characterized in that: one side of the bottom plate (2) is in a slope shape.
6. The quick fixing tool for the assembled perforated steel plate shear wall according to claim 2, characterized in that: and a plurality of groups of third screw holes (51) and fourth screw holes (52) are formed, and the inner diameters of the third screw holes (51) and the fourth screw holes (52) are equal.
CN202220311796.2U 2022-02-16 2022-02-16 Quick fixed frock of assembled trompil steel sheet shear force wall Active CN216840731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220311796.2U CN216840731U (en) 2022-02-16 2022-02-16 Quick fixed frock of assembled trompil steel sheet shear force wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220311796.2U CN216840731U (en) 2022-02-16 2022-02-16 Quick fixed frock of assembled trompil steel sheet shear force wall

Publications (1)

Publication Number Publication Date
CN216840731U true CN216840731U (en) 2022-06-28

Family

ID=82088961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220311796.2U Active CN216840731U (en) 2022-02-16 2022-02-16 Quick fixed frock of assembled trompil steel sheet shear force wall

Country Status (1)

Country Link
CN (1) CN216840731U (en)

Similar Documents

Publication Publication Date Title
CN110805129A (en) Prefabricated assembled concrete structure energy dissipation node
CN207079724U (en) A kind of steel construction primary and secondary beam connecting node
CN216840731U (en) Quick fixed frock of assembled trompil steel sheet shear force wall
CN213773848U (en) T-shaped concrete filled steel tube column and steel beam connecting node structure
CN213114957U (en) Assembled low-rise building structure
CN213296679U (en) Shear wall for enhancing shear resistance
CN211621959U (en) Special-shaped column beam column connecting node of assembled steel structure building
CN213773849U (en) L-shaped concrete filled steel tube column and steel beam bolted welding connection node structure
CN207974241U (en) A kind of combined box-shaped building formed steel construction system
CN206971482U (en) A kind of top connection card of assembled wall
CN216380252U (en) Prefabricated reinforced concrete beam member
CN212552483U (en) Welding positioning device for intelligent environment-friendly toilet frame
CN214574723U (en) Steel construction assembled wallboard node
CN214574943U (en) Assembled modularization lightweight steel construction wall body
CN215253495U (en) Light steel house building structure coupling assembling
CN213979318U (en) A connection structure for prefabricated air conditioner board of prefabricated building
CN215330551U (en) Connection reinforcement and beam-beam connection node adopting same
CN216446415U (en) Wallboard connecting piece with adjustable
CN216276122U (en) Bolt connection structure of box plate type building and box plate type steel structure building
CN219508915U (en) Assembled sound insulation partition plate of fast-assembling connection
CN212224296U (en) Prefabricated autoclaved aerated concrete door and wall panel structure system
CN215857521U (en) Become ditch machine track connecting device
CN214941275U (en) Steel construction wall structure based on energy-conserving assembled
CN209874241U (en) Connection buckling structure of assembled wallboard
CN219909469U (en) Prefabricated steel structure's green building element of assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant