CN211714280U - Curtain is kept apart to steel construction convenient to equipment - Google Patents

Curtain is kept apart to steel construction convenient to equipment Download PDF

Info

Publication number
CN211714280U
CN211714280U CN201922132990.5U CN201922132990U CN211714280U CN 211714280 U CN211714280 U CN 211714280U CN 201922132990 U CN201922132990 U CN 201922132990U CN 211714280 U CN211714280 U CN 211714280U
Authority
CN
China
Prior art keywords
bolt
connecting plate
fixed
curtain
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922132990.5U
Other languages
Chinese (zh)
Inventor
黄雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xudi Machinery Co ltd
Original Assignee
Xudi Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xudi Machinery Co ltd filed Critical Xudi Machinery Co ltd
Priority to CN201922132990.5U priority Critical patent/CN211714280U/en
Application granted granted Critical
Publication of CN211714280U publication Critical patent/CN211714280U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a steel construction isolation curtain convenient to equipment, including two division boards, two are the symmetry setting from top to bottom, be provided with the connecting plate between the relative one side in division board positive surface, the middle-end on division board positive surface is seted up flutedly, the draw-in groove has all been seted up to the both sides of the opposite one side of division board, the opposite one side of division board is provided with the diaphragm, the inner chamber of draw-in groove is provided with first bolt, one side of first bolt is run through to the outside of diaphragm and the cover is equipped with the nut. The utility model discloses a cooperation from board, first connecting hole, first connecting plate, recess, second connecting plate, draw-in groove, second bolt, first bolt, diaphragm, nut, fixed cover, riser, fixed screw and fixed orifices is used, has solved current steel construction and has kept apart the inconvenient equipment of curtain, has taken a large amount of spaces at the in-process of installation curtain installation transportation, does not put the problem of just transporting it.

Description

Curtain is kept apart to steel construction convenient to equipment
Technical Field
The utility model relates to a building engineering technical field specifically is a curtain is kept apart to steel construction convenient to equipment.
Background
The building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation activities of lines, pipes and equipment matched with them, wherein the building buildings include roof, beam column, wall, foundation and engineering capable of forming internal space to meet the requirements of people for production, living, study and public activities, the exterior of the existing building is generally provided with curtain walls which are the outer wall enclosure of the building and do not bear load, and are hung on the curtain wall like curtain cloth, so the building engineering is also called as curtain wall which is a light wall with decorative effect commonly used by modern large and high-rise buildings, is composed of panels and supporting structure systems, can have certain displacement capacity relative to the main structure or self deformation capacity and does not bear the building peripheral structure or decorative structure acted by the main structure, and the isolating steel structure is widely used nowadays, the curtain is kept apart to current steel construction is inconvenient assembles, has taken a large amount of spaces at the in-process of installation curtain installation transportation, does not put and just transports it.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a curtain is kept apart to steel construction convenient to equipment possesses the advantage of convenient equipment, has solved current steel construction and has kept apart the inconvenient equipment of curtain, has taken a large amount of spaces at the in-process of installation curtain installation transportation, does not put the problem of just transporting it.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel construction isolation curtain convenient to equipment, includes two division boards, and two division boards are the symmetry setting from top to bottom, be provided with the connecting plate between the relative one side in division board positive surface, the middle-end on division board positive surface is seted up flutedly, the draw-in groove has all been seted up to the both sides of the opposite one side of division board, the opposite one side of division board is provided with the diaphragm, the inner chamber of draw-in groove is provided with first bolt, one side of first bolt is run through to the outside of diaphragm and the cover is equipped with the nut, and the both sides of division board all are provided with the riser, the top and the fixed cover of the equal fixedly connected with in bottom of riser, the fixed orifices has been seted up to one side of fixed cover, the middle-end fixedly connected with.
Preferably, the number of the connecting plates is three, the top and the bottom of the front surface of each connecting plate are provided with fixing screws in a penetrating mode, and the back sides of the fixing screws penetrate through the interiors of the upper isolation plate and the lower isolation plate respectively.
Preferably, the number of the grooves is three, and the grooves are uniformly distributed.
Preferably, one end of the transverse plate penetrates through the inner cavity of the fixing hole, a second bolt penetrates through the front surface of the fixing sleeve, and the back side of the second bolt penetrates through the inner cavity of the fixing hole and is in close contact with the transverse plate.
Preferably, the diaphragm and the riser are far away from equal fixedly connected with first connecting plate in the middle-end of division board one side, two at least first connecting holes have been seted up on the obverse surface of first connecting plate.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a cooperation from board, first connecting hole, first connecting plate, recess, second connecting plate, draw-in groove, second bolt, first bolt, diaphragm, nut, fixed cover, riser, fixed screw and fixed orifices is used, has solved current steel construction and has kept apart the inconvenient equipment of curtain, has taken a large amount of spaces at the in-process of installation curtain installation transportation, does not put the problem of just transporting it.
2. The utility model discloses a cooperation of mounting panel and fixed plate is used, is convenient for install the division board, through the use of fixed screw, is convenient for fix the second connecting plate on the division board to the convenience links together two division boards, conveniently dismantles simultaneously, uses through the cooperation of first connecting plate and first connecting hole, is convenient for connect each division board.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a partial left side view of the present invention;
FIG. 3 is a rear view of the present novel use;
fig. 4 is a schematic diagram of the structure of the novel isolation board.
In the figure: 1 division board, 2 first connecting holes, 3 first connecting plates, 4 recesses, 5 second connecting plates, 6 draw-in grooves, 7 second bolts, 8 first bolts, 9 diaphragm, 10 nut, 11 fixed cover, 12 risers, 13 fixed screw, 14 fixed orificess, 15 mounting panels, 16 fixed plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model discloses a division board 1, first connecting hole 2, first connecting plate 3, second connecting plate 5, second bolt 7, first bolt 8, diaphragm 9, nut 10, fixed cover 11, riser 12, fixed screw 13, mounting panel 15 and fixed plate 16, the part is the part that general standard or technical staff in the field know, and its structure and principle all are this technical staff's accessible technical manual learn or learn through conventional experimental method.
Referring to fig. 1-4, a steel structure isolation curtain wall convenient for assembly comprises two isolation plates 1, wherein the two isolation plates 1 are arranged symmetrically up and down, a connecting plate 5 is arranged between one side of the front surface of each isolation plate 1, the number of the connecting plates 5 is three, fixing screws 13 are arranged at the top and the bottom of the front surface of each connecting plate 5 in a penetrating manner, the back sides of the fixing screws 13 respectively penetrate through the insides of the upper isolation plate 1 and the lower isolation plate 1, the second connecting plate 5 is conveniently fixed on the isolation plates 1 through the use of the fixing screws 13, so that the two isolation plates 1 are conveniently connected together and can be conveniently disassembled, the middle ends of the front surfaces of the isolation plates 1 are provided with grooves 4, the grooves 4 are three and are uniformly distributed, the two sides of the opposite surfaces of the isolation plates 1 are provided with clamping grooves 6, the opposite surfaces of the isolation plates 1 are provided with transverse plates 9, the middle ends of the transverse plates 9 and the vertical plates 12 far away from the sides of, the front surface of the first connecting plate 3 is provided with at least two first connecting holes 2, each isolation plate 1 is convenient to connect through the matching use of the first connecting plate 3 and the first connecting holes 2, the inner cavity of the clamping groove 6 is provided with a first bolt 8, one side of the first bolt 8 penetrates to the outer side of the transverse plate 9 and is sleeved with a nut 10, two sides of the isolation plate 1 are provided with vertical plates 12, the top and the bottom of each vertical plate 12 are fixedly connected with a fixing sleeve 11, one side of the fixing sleeve 11 is provided with a fixing hole 14, one end of the transverse plate 9 penetrates to the inner cavity of the fixing hole 14, the front surface of the fixing sleeve 11 is provided with a second bolt 7, the back side of the second bolt 7 penetrates to the inner cavity of the fixing hole 14 and is tightly contacted with the transverse plate 9, the middle end of the back surface of the isolation plate 1 is fixedly connected with a fixing plate 16, the back surface of the fixing, be convenient for install division board 1, through from board 1, first connecting hole 2, first connecting plate 3, recess 4, second connecting plate 5, draw-in groove 6, second bolt 7, first bolt 8, diaphragm 9, nut 10, fixed cover 11, riser 12, the cooperation of fixed screw 13 and fixed orifices 14 is used, the current inconvenient equipment of assembling of steel construction isolation curtain has been solved, a large amount of spaces have been taken at the in-process of installation curtain installation transportation, do not put the problem of just transporting it.
During the use, place two division boards 1 from top to bottom, and place second connecting plate 5 in the junction of two division boards 1, fix two division boards 1 together through set screw 13, place two diaphragms 9 respectively in top and bottom between them, place first bolt 8 in draw-in groove 6, rotate nut 10, make diaphragm 9 and division board 1 fixed connection, place riser 12 respectively in the both sides of two division boards 1, and overlap fixed cover 11 on the surface of diaphragm 9, rotate second bolt 7, make riser 12 and division board 1 fixed connection, connect other division boards 1 that have assembled through first connecting hole 2 and first connecting plate 3, install it through mounting panel 15.
In summary, the following steps: this curtain is kept apart to steel construction convenient to equipment, through from board 1, first connecting hole 2, first connecting plate 3, recess 4, second connecting plate 5, draw-in groove 6, second bolt 7, first bolt 8, diaphragm 9, nut 10, fixed cover 11, riser 12, the cooperation of fixed screw 13 and fixed orifices 14 is used, the current inconvenient equipment of assembling of curtain is kept apart to the steel construction of having solved, a large amount of spaces have been taken at the in-process of installation curtain installation transportation, do not put the problem of just transporting it.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a curtain is kept apart to steel construction convenient to equipment, includes two division boards (1), its characterized in that: the two partition boards (1) are symmetrically arranged from top to bottom, a connecting plate (5) is arranged between one side of the opposite surfaces of the partition boards (1), a groove (4) is formed in the middle end of the front surface of the partition board (1), clamping grooves (6) are formed in two sides of one side of the partition board (1) opposite to each other, a transverse plate (9) is arranged on one side of the partition board (1) opposite to each other, a first bolt (8) is arranged in an inner cavity of the clamping groove (6), one side of the first bolt (8) penetrates through the outer side of the transverse plate (9) and is sleeved with a nut (10), vertical plates (12) are arranged on two sides of the partition board (1), fixed sleeves (11) are fixedly connected to the tops and the bottoms of the vertical plates (12), fixed holes (14) are formed in one side of the fixed sleeves (11), and fixed plates (16) are fixedly connected to, the back of the fixed plate (16) is fixedly connected with a mounting plate (15).
2. The steel structure insulation curtain wall convenient to assemble of claim 1, wherein: the quantity of connecting plate (5) is three, and the top and the bottom on connecting plate (5) positive surface all run through and are provided with fixed screw (13), the inside to two upper and lower division boards (1) is run through respectively to the dorsal part of fixed screw (13).
3. The steel structure insulation curtain wall convenient to assemble of claim 1, wherein: the number of the grooves (4) is three, and the grooves are uniformly distributed.
4. The steel structure insulation curtain wall convenient to assemble of claim 1, wherein: one end of the transverse plate (9) penetrates through the inner cavity of the fixing hole (14), a second bolt (7) penetrates through the front surface of the fixing sleeve (11), and the back side of the second bolt (7) penetrates through the inner cavity of the fixing hole (14) and is in close contact with the transverse plate (9).
5. The steel structure insulation curtain wall convenient to assemble of claim 1, wherein: diaphragm (9) and riser (12) keep away from equal fixedly connected with first connecting plate (3) of middle-end on one side of division board (1), at least two first connecting holes (2) have been seted up on the positive surface of first connecting plate (3).
CN201922132990.5U 2019-12-02 2019-12-02 Curtain is kept apart to steel construction convenient to equipment Expired - Fee Related CN211714280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922132990.5U CN211714280U (en) 2019-12-02 2019-12-02 Curtain is kept apart to steel construction convenient to equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922132990.5U CN211714280U (en) 2019-12-02 2019-12-02 Curtain is kept apart to steel construction convenient to equipment

Publications (1)

Publication Number Publication Date
CN211714280U true CN211714280U (en) 2020-10-20

Family

ID=72816208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922132990.5U Expired - Fee Related CN211714280U (en) 2019-12-02 2019-12-02 Curtain is kept apart to steel construction convenient to equipment

Country Status (1)

Country Link
CN (1) CN211714280U (en)

Similar Documents

Publication Publication Date Title
CN108824648B (en) Space modularized house
CN111456250B (en) A quick assembled house
CN212053318U (en) Assembled building wall
CN211714280U (en) Curtain is kept apart to steel construction convenient to equipment
CN213015082U (en) Prefabricated composite wall panel convenient to installation
CN210460334U (en) Combined door base sleeve
CN214994645U (en) Energy-saving heat-insulating light steel assembled house
CN217379390U (en) Integrated wall structure of standard section member bar
CN214117199U (en) Assembled furred ceiling curtain
CN212956981U (en) Anti-seismic energy-saving environment-friendly movable board house
CN212405556U (en) Prefabricated wall for prefabricated building
CN211690784U (en) Universal module for public space building
CN217680152U (en) Prefabricated building fire prevention side fascia
CN214884737U (en) Quick installation can bear floor board component node
CN221372589U (en) Modularized design structure of oversized glass curtain wall
CN222009264U (en) Mounting structure of assembled building enclosure wall
CN215563522U (en) Energy-saving assembled building wall
CN214941438U (en) Dry-hanging composite decorative board
CN212376076U (en) A kind of wall connecting and fixing part of wooden house
CN114908907B (en) Corner curtain wall unit and curtain wall system
CN221481116U (en) Detachable prefabricated partition plate
CN219365044U (en) Prefabricated steel structure integrated assembled green building component
CN223088684U (en) PVC wallboard convenient to equipment
CN211396082U (en) Green energy-saving assembly type building wall
CN217204880U (en) Energy-conserving thermal-insulated wall body that keeps warm of assembled building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201020