CN210598152U - Split bolt assembly - Google Patents

Split bolt assembly Download PDF

Info

Publication number
CN210598152U
CN210598152U CN201921009932.7U CN201921009932U CN210598152U CN 210598152 U CN210598152 U CN 210598152U CN 201921009932 U CN201921009932 U CN 201921009932U CN 210598152 U CN210598152 U CN 210598152U
Authority
CN
China
Prior art keywords
split bolt
mounting plate
bolt assembly
pull rod
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921009932.7U
Other languages
Chinese (zh)
Inventor
刁海明
麦颂广
张辉春
陈泽伟
马嘉伟
蔡天宝
胡亚宗
林志毅
黄智明
李家乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Yijian Construction Group Co ltd
Original Assignee
Guangzhou Yijian Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yijian Construction Group Co ltd filed Critical Guangzhou Yijian Construction Group Co ltd
Priority to CN201921009932.7U priority Critical patent/CN210598152U/en
Application granted granted Critical
Publication of CN210598152U publication Critical patent/CN210598152U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a split bolt component, which comprises a screw rod, a nut, a buckle, a pull rod and a mounting plate, wherein the nut and the buckle are screwed on the screw rod; the pull rod is fixedly connected with the screw rod; the mounting plate is fixedly connected to the pull rod; and a plurality of mounting holes are formed in the mounting plate. The utility model discloses simple structure not only can reach the effect of conventional split bolt, and installation operation process is also simple relatively simultaneously, can not produce the taut concrete defect problem of handling of iron wire after the form removal yet, has great practicality.

Description

Split bolt assembly
Technical Field
The utility model relates to a construction technical field especially relates to a split bolt subassembly.
Background
In the construction process of the concrete in the building field, the template is a key process for enabling the concrete to be in a line according to the designed shape, and in order to enable the concrete to achieve the effects of smooth surface, no slurry leakage and no formwork leakage after formwork removal, the installation and fixation of the template play a decisive role. In the current building construction, the split bolt is used for the drawknot between the inner and outer templates of the wall or beam body to bear the lateral pressure and other loads of concrete, so as to ensure that the space between the inner and outer templates can meet the design requirements, and is also the fulcrum of the template and the supporting structure thereof. The split screw is generally arranged at the part of the beam template which needs to be reinforced, and can play a good fixing effect on the template installation of the structural member with a larger section. For the installation of the template of the structural member with a smaller section, the split bolt is not suitable for being adopted, and the cost and the labor force are increased. Especially for the fixing of the upper opening of the beam mould, the position is not suitable for the reason that only one side of the position can be fixed by punching, and the two sides of the common split screw rod are fixed by punching, so the method is not suitable.
At present, the upper opening of the beam formwork is generally fixed by tightening an iron wire, but the tightening and fixing of the iron wire requires that an operator has good operation proficiency, and the iron wire is easy to pull to cause damage to the surface of concrete in the form removal process to affect the quality.
SUMMERY OF THE UTILITY MODEL
In order to overcome at least one defect of the prior art, the utility model provides a split bolt subassembly.
The utility model discloses a solve the technical scheme that its problem adopted and be:
the utility model provides a split bolt subassembly, includes lead screw, nut, buckle, pull rod and mounting panel, wherein:
the nut and the buckle are screwed on the screw rod;
the pull rod is fixedly connected with the screw rod;
the mounting plate is fixedly connected to the pull rod;
and a plurality of mounting holes are formed in the mounting plate.
The utility model provides a pair of split bolt subassembly seals beam mold board, board template and reinforcing bar installation at building major structure and accomplishes the back, and the elevation department that seals the position of suitable for reading of beam mold board and board template punches, and the mounting panel in the split bolt subassembly passes through screw fixed mounting on the board template, and the lead screw in the split bolt subassembly passes the beam mold board and fixes through the nut lock. When the later-stage template is detached, the protruding part of the screw rod is cut and leveled by a hand grinding tool. This split bolt subassembly simple structure not only can reach conventional split bolt's effect, and installation operation process is also simple relatively simultaneously, can not produce the taut concrete defect problem of handling of iron wire after the form removal yet.
Furthermore, the diameter range of the screw rod is 8-14 mm.
The diameter of the wire rod is selected to be determined by the cross-sectional dimensions of the structural member.
Further, the pull rod is a round steel bar.
Because the reinforcing bar waste material that the job site produced is more, so this split bolt subassembly can be with the reinforcing bar waste material recovery of on-the-spot production of recycling to reduced the manufacturing cost of split bolt subassembly, also improved the efficiency of construction on-the-spot simultaneously.
Furthermore, the diameter range of the pull rod is 6-14 mm.
The diameter of the pull rod is selected based on the cross-sectional dimensions of the structural member.
Further, the pull rod is welded on the position, close to the end, of the screw rod.
Further, the mounting plate is a square iron sheet.
Further, the external dimensions of the mounting plate are: 40mm by 40 mm.
Furthermore, the mounting plate is welded on the position, close to the end, of the pull rod and is parallel to the pull rod.
Further, still include a waterstop piece, the waterstop piece sets up on the lead screw.
Through setting up the stagnant water piece, can effectively prevent the seepage along lead screw and concrete junction such as aqueous vapor, and the stagnant water effect in the work progress is better.
To sum up, the utility model provides a pair of split bolt subassembly has following technological effect:
1) the utility model provides a to drawing bolt assembly, simple structure not only can reach conventional effect to drawing bolt, and installation operation process is also simple relatively simultaneously, can not produce the taut concrete defect problem of handling of iron wire after the form removal yet, has great practicality.
2) The utility model provides a to drawing bolt assembly can retrieve the reinforcing bar waste material that the scene produced and make the pull rod to greatly reduced the manufacturing cost to drawing bolt assembly, also improved the efficiency of construction on-the-spot simultaneously.
Drawings
Fig. 1 is a schematic structural view of a split bolt assembly of the present invention;
fig. 2 is a use state diagram of the split bolt assembly of the present invention.
Wherein the reference numerals have the following meanings:
the split bolt assembly comprises a split bolt assembly 1, a lead screw 11, a pull rod 12, a mounting plate 13, a mounting hole 131, a water stop sheet 14, a buckle 15, a nut 16, a beam template 2, a plate template 3 and a steel bar main body 4.
Detailed Description
For better understanding and implementation, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.
Referring to fig. 1, the utility model discloses a split bolt assembly 1, which comprises a screw rod 11, a nut 16, a buckle 15, a pull rod 12 and a mounting plate 13, wherein the screw rod 11 has a diameter of 8mm in the embodiment; the nut 16 and the buckle 15 are matched with the screw rod 11 in size and are screwed on one side of the screw rod 11; the other side of the screw rod 11 is also fixedly connected with a pull rod 12, in this embodiment, the pull rod 12 is a round steel bar, and the diameter is 8 mm; the fixing mode is welding. The position of the pull rod 12 close to the end is also fixedly connected with a mounting plate 13, and the mounting plate 13 and the pull rod 12 are parallel to each other. In the present embodiment, the mounting plate 13 is a square iron sheet, and its outer dimension is 40mm × 40 mm; the fixing means is also welding. The mounting plate 13 is provided with a plurality of mounting holes for being fixedly mounted on the plate formwork 3, and in this embodiment, the mounting plate 13 is fixedly mounted on one side of the plate formwork 3 close to the beam formwork 2. In addition, this split bolt subassembly 1 still includes a waterstop 14, and this waterstop 14 sets up on lead screw 11, sets up waterstop 11 and can effectively prevent aqueous vapor etc. and follow the lead screw 11 and concrete junction seepage, and the stagnant water effect is better in the work progress.
Referring to fig. 2, the installation method of the split bolt assembly of the present invention is as follows:
step A: mounting a beam template 2, a plate template 3 and a steel bar main body 4 of a building main body structure, and after the mounting is finished, punching holes at the elevations of the beam template 2 and the plate template 3 on the side edges;
and B: a mounting plate 13 in the split bolt assembly 1 is fixedly mounted on one side, close to the beam template 2, of the plate template 3 through fasteners such as screws, and a screw rod 11 in the split bolt assembly 1 penetrates through the beam template 2 and is locked and fixed through screwing a nut 16;
and C: when the later-stage template is removed, the protruding part of the screw rod 11 is cut and leveled by a hand grinding tool.
The technical means disclosed by the scheme of the present invention is not limited to the technical means disclosed by the above embodiments, but also includes the technical scheme formed by the arbitrary combination of the above technical features. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, several improvements and modifications can be made, and these improvements and modifications are also considered as the protection scope of the present invention.

Claims (8)

1. A split bolt assembly (1) comprising a lead screw (11), a nut (16), a buckle (15), a tie rod (12) and a mounting plate (13), wherein:
the nut (16) and the buckle (15) are screwed on the screw rod (11);
the pull rod (12) is fixedly connected with the screw rod (11);
the mounting plate (13) is fixedly connected to the pull rod (12);
the mounting plate (13) is provided with a plurality of mounting holes (131).
2. A split bolt assembly (1) according to claim 1, wherein the tie rod (12) is a round rebar.
3. A split bolt assembly (1) according to claim 2, wherein the diameter of the tie rod (12) is in the range of 6-14 mm.
4. A split bolt assembly (1) according to claim 3, wherein said tie rod (12) is welded to said screw (11) near the end.
5. A split bolt assembly (1) according to claim 1, characterized in that the mounting plate (13) is a square iron sheet.
6. A split bolt assembly (1) according to claim 5, characterized in that the mounting plate (13) has external dimensions of: 40mm by 40 mm.
7. A split bolt assembly (1) according to claim 6, wherein said mounting plate (13) is welded to said tie rod (12) near the ends and parallel to the tie rod (12).
8. A split bolt assembly (1) according to any one of claims 1 to 7, further comprising a water stop tab (14), said water stop tab (14) being provided on the lead screw (11).
CN201921009932.7U 2019-06-28 2019-06-28 Split bolt assembly Active CN210598152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921009932.7U CN210598152U (en) 2019-06-28 2019-06-28 Split bolt assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921009932.7U CN210598152U (en) 2019-06-28 2019-06-28 Split bolt assembly

Publications (1)

Publication Number Publication Date
CN210598152U true CN210598152U (en) 2020-05-22

Family

ID=70711412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921009932.7U Active CN210598152U (en) 2019-06-28 2019-06-28 Split bolt assembly

Country Status (1)

Country Link
CN (1) CN210598152U (en)

Similar Documents

Publication Publication Date Title
CN204590634U (en) For pouring into a mould the feed arrangement of constructional column
CN205400043U (en) Constructional column is funnel combination tool for concreting
CN106337561B (en) A kind of formwork reinforcement method of shear wall body external corner and door opening position
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN206233579U (en) A kind of shear wall formwork is to drawing connector and its formwork reinforcement structure
CN210598152U (en) Split bolt assembly
CN110388054A (en) One kind exempting from aperture building engineering structure template system and construction technology
CN205000643U (en) Wall stagnant water bolt is worn to waterproof concrete shear force wall
CN210713827U (en) Internal and external corner template reinforcing device
CN211279058U (en) Prefabricated assembled concrete structure fast-assembling sleeve built-in fitting
CN204676885U (en) A kind of steel concrete column template fast pacifies the system of tearing open
CN217353554U (en) Reinforcing mechanism of building peripheral boundary beam side template
CN205531319U (en) Prefabricated wallboard and precast beam piece plugging device and block structure
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN211640368U (en) Hollow slab template suitable for ultra-wide pedestal
CN105971269A (en) Wallboard structure with template screw hole positions standardized
CN208486550U (en) A kind of assembled architecture floor support plate bracket mould
CN204252171U (en) The rubber fastening band at basement shrinkage joint installs fixing special tool
CN205577401U (en) External rectangular cross section concrete column template fastener of pull rod
CN218176647U (en) Building has water room to end water platform regularization template reinforcing tool
CN202299432U (en) Waterproof concrete shear wall tool type water-stopping split bolt
CN211622638U (en) Concrete wall beam template is to drawing structure
CN218541543U (en) Concrete wall pouring template fixing water-stop screw structure
CN217326441U (en) Can have enough to meet need, anti-bank concrete form reinforcing tool of fast ann quick detach
CN215331468U (en) Brickwork corner constructional column template design reinforcing apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant