CN210587148U - Integral tundish impact area prefabricated part - Google Patents
Integral tundish impact area prefabricated part Download PDFInfo
- Publication number
- CN210587148U CN210587148U CN201921344442.2U CN201921344442U CN210587148U CN 210587148 U CN210587148 U CN 210587148U CN 201921344442 U CN201921344442 U CN 201921344442U CN 210587148 U CN210587148 U CN 210587148U
- Authority
- CN
- China
- Prior art keywords
- slag
- wall
- backplate
- impact
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
Abstract
The utility model relates to a ferrous metallurgy equipment field especially relates to an integral tundish impact area prefab. The utility model discloses an integral middle package strikes district's prefab, by first slag wall, the second slag wall, the third slag wall, first backplate, the second backplate, the third backplate encloses to close with the impact bottom plate and forms the face of going to seal down, go up top open-ended hexagonal prism frame structure, first slag wall, the second slag wall, the third slag wall, first backplate, the second backplate, the third backplate encloses in proper order and closes the lateral wall that forms integral middle package impact district's prefab, strike the bottom plate and form the lower bottom surface of integral middle package impact district's prefab, first slag wall, the second slag wall, the third slag wall, first backplate, the second backplate, third backplate and two liang of continuous edges that form integral middle package impact district's prefab of impact bottom plate. The utility model discloses not only easy to assemble, stable in structure is difficult for appearing the phenomenon of crack and aversion moreover.
Description
Technical Field
The utility model relates to a ferrous metallurgy equipment field especially relates to an integral tundish impact area prefab.
Background
The tundish is a refractory material container between the continuous casting ladle and the crystallizer, is a continuous metallurgical reactor and can further purify molten steel. Before molten steel enters the crystallizer through the tundish, nonmetallic inclusions in the molten steel must be removed in the tundish in a floating mode. In order to produce high-purity steel, measures such as barricading, dam adding, argon blowing, ceramic filter and the like are adopted in the tundish, so that non-metal inclusions in the steel can be greatly reduced.
The existing impact area is formed by splicing and installing a slag wall, an impact plate and a guard plate in a tundish by adopting daub or coating, and the existing impact area has the following defects: 1, in the installation process, the hoisting and splicing processes increase the labor intensity of operators; 2, because of the cement or the coating material joints between the slag-stopping wall and the protective plate and between the protective plate and the protective plate, in the using process, the joints are easy to crack, shift hidden troubles and safety risks.
Disclosure of Invention
For solving the above problem, the utility model aims at providing an integral tundish impact area prefab, not only easy to assemble, stable in structure is difficult for appearing the phenomenon of crack and aversion moreover.
In order to achieve the above object, the utility model relates to an integral tundish impact area prefabricated member, the integral tundish impact area prefabricated member is enclosed by a first slag-stopping wall, a second slag-stopping wall, a third slag-stopping wall, a first protective plate, a second protective plate, a third protective plate and an impact bottom plate to form a hexagonal prism structure with a closed lower bottom surface and an open upper top surface, the first slag-stopping wall, the second slag-stopping wall, the third slag-stopping wall, the first protective plate, the second protective plate and the third protective plate are sequentially enclosed to form a side wall of the integral tundish impact area prefabricated member, and the impact bottom plate forms a lower bottom surface of the integral tundish impact area prefabricated member; the connecting edges of the first slag blocking wall, the second slag blocking wall, the third slag blocking wall, the first protection plate, the second protection plate, the third protection plate and the impact bottom plate which are connected in pairs form the edge of the integral tundish impact area prefabricated member.
The utility model discloses an integral tundish impact area prefab forms tundish impact area with current split type concatenation and compares, the utility model discloses an integral structure, during the installation directly will the utility model discloses an integral tundish impact area prefab place in the tundish can, need not to hoist the component part alone, splice with daub or daubing material seam, obviously alleviate operation workman's intensity of labour.
As a preferred scheme, each edge of the prefabricated member of the impact area of the tundish is provided with a reinforcing part, and the reinforcing parts are arranged along the extending direction of the edge and wrap the whole edge. The strength of the edge is enhanced through the enhancing part, and the structural stability of the integral tundish impact area prefabricated part is further enhanced.
Preferably, the first slag retaining wall, the second slag retaining wall, the third slag retaining wall, the first protection plate, the second protection plate, the third protection plate, the impact bottom plate and the reinforcing part are integrally formed by casting through a mold.
Drawings
FIG. 1 is a schematic structural view of an integral tundish impact area preform of the present invention;
the components in the figures are numbered as follows: the slag-stopping device comprises a first slag-stopping wall 1, a second slag-stopping wall 2, a third slag-stopping wall 3, a first protection plate 4, a second protection plate 5, a third protection plate 6, an impact bottom plate 7 and a reinforcing part 8.
Detailed Description
For a better understanding of the present invention, reference will now be made in detail to the present invention as illustrated in the accompanying drawings and specific examples.
Referring to fig. 1, the integral tundish impact zone prefabricated member of the embodiment is enclosed by a first slag blocking wall 1, a second slag blocking wall 2, a third slag blocking wall 3, a first protection plate 4, a second protection plate 5, a third protection plate 6 and an impact bottom plate 7 to form a hexagonal prism structure with a closed lower bottom surface and an open upper top surface. The first slag retaining wall 1, the second slag retaining wall 2, the third slag retaining wall 3, the first protection plate 4, the second protection plate 5 and the third protection plate 6 are integrally formed through die casting.
In order to further increase the stability of prefab, fix reinforcing portion 8 at each connection limit (the edge of integral pouring basket impact area prefab), reinforcing portion 8 through mould pouring and first slag wall 1, second slag wall 2, third slag wall 3, first backplate 4, second backplate 5, third backplate 6 and impact bottom plate 7 integrated into one piece, reinforcing portion 8 sets up along the direction that the edge extends, and wraps up whole piece edge.
The size of the integral tundish impact area prefabricated member in the embodiment is suitable for the size of an impact area in a tundish, wherein the lengths of the second slag wall 2 and the second protection plate 5 are 500-800 mm, the lengths of the second slag wall 2 and the second protection plate 5 are 800mm, and the thicknesses of the first slag wall 1, the second slag wall 2 and the third slag wall 3 are 100-130 mm; in the embodiment, the thicknesses of the first slag blocking wall 1, the second slag blocking wall 2 and the third slag blocking wall 3 are 130mm, and the thicknesses of the first protection plate 4, the second protection plate 5 and the third protection plate 6 are 50-70 mm; in the embodiment, the thickness of the first guard plate 4, the second guard plate 5 and the third guard plate 6 is 70mm, the chamfer angle of the reinforcing part is 90-130 degrees, the radius is 20-30 mm, and the chamfer angle of the reinforcing part is 120 degrees and the radius is 30 mm.
Two steel outlet holes, namely a first steel outlet hole 11 and a second steel outlet hole 12, are formed in the first slag wall 1, the opening directions of the first steel outlet hole 11 and the second steel outlet hole 12 are perpendicular to the first slag wall 1 and incline upwards by 30-60 degrees, the distance from the central point of the first steel outlet hole 11 to the impact bottom plate 7 is 300-400mm, and the distance from the central point of the second steel outlet hole 12 to the impact bottom plate 7 is 600-700 mm.
The third slag stopping wall 3 is also provided with two steel outlet holes, namely a third steel outlet hole 31 and a fourth steel outlet hole 32, the opening directions of the third steel outlet hole 31 and the fourth steel outlet hole 32 are perpendicular to the third slag stopping wall 3 and incline upwards by 30-60 degrees, the distance from the central point of the third steel outlet hole 31 to the impact bottom plate 7 is 300-400mm, and the distance from the central point of the fourth steel outlet hole 32 to the impact bottom plate 7 is 600-700 mm.
The above-mentioned embodiments only represent some embodiments of the present invention, and the description thereof is specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several variations and modifications can be made, which are within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the appended claims.
Claims (3)
1. The integral tundish impact area prefabricated member is characterized in that the integral tundish impact area prefabricated member is surrounded by a first slag blocking wall (1), a second slag blocking wall (2), a third slag blocking wall (3), a first protection plate (4), a second protection plate (5), a third protection plate (6) and an impact bottom plate (7) to form a hexagonal prism structure with a closed lower bottom surface and an open upper top surface; the first slag blocking wall (1), the second slag blocking wall (2), the third slag blocking wall (3), the first guard plate (4), the second guard plate (5) and the third guard plate (6) sequentially enclose the side walls to form an integral tundish impact area prefabricated part, and the impact bottom plate (7) forms the lower bottom surface of the integral tundish impact area prefabricated part; the connecting edges of the first slag blocking wall (1), the second slag blocking wall (2), the third slag blocking wall (3), the first protection plate (4), the second protection plate (5), the third protection plate (6) and the impact bottom plate (7) which are connected in pairs form the edge of the integral tundish impact area prefabricated part.
2. The integral tundish impact area preform according to claim 1, wherein each edge of the tundish impact area preform is provided with a reinforcement (8), and the reinforcement (8) is arranged along the direction in which the edge extends and wraps the entire edge.
3. The integral tundish impact zone preform according to claim 2, wherein the first slag trap wall (1), the second slag trap wall (2), the third slag trap wall (3), the first shield plate (4), the second shield plate (5), the third shield plate (6), the impact floor (7) and the reinforcement (8) are integrally formed by die casting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921344442.2U CN210587148U (en) | 2019-08-19 | 2019-08-19 | Integral tundish impact area prefabricated part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921344442.2U CN210587148U (en) | 2019-08-19 | 2019-08-19 | Integral tundish impact area prefabricated part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210587148U true CN210587148U (en) | 2020-05-22 |
Family
ID=70716091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921344442.2U Active CN210587148U (en) | 2019-08-19 | 2019-08-19 | Integral tundish impact area prefabricated part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210587148U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114749648A (en) * | 2022-05-07 | 2022-07-15 | 广东韶钢松山股份有限公司 | Tundish for 1215 low-carbon high-sulfur free-cutting steel |
-
2019
- 2019-08-19 CN CN201921344442.2U patent/CN210587148U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114749648A (en) * | 2022-05-07 | 2022-07-15 | 广东韶钢松山股份有限公司 | Tundish for 1215 low-carbon high-sulfur free-cutting steel |
CN114749648B (en) * | 2022-05-07 | 2024-10-18 | 广东韶钢松山股份有限公司 | Tundish for low-carbon high-sulfur free-cutting steel 1215 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102728827B (en) | Continuous casting tundish capable of improving molten steel cleanliness | |
CN111136256A (en) | Molten steel continuous casting equipment and continuous casting method | |
CN210587148U (en) | Integral tundish impact area prefabricated part | |
CN205270835U (en) | Package be built by contract argon blowing device in middle of continuous slab casting | |
CN102632226B (en) | Ingot casting method, equipment, accessory and refining and ingot casting integrated production process | |
CN201644735U (en) | Submerged nozzle provided with lead-in device for square billet continuous casting crystallizer | |
CN106041044A (en) | Continuous casting tundish breathable ceramic tube upper nozzle brick cup and argon blowing refining method thereof | |
CN205949845U (en) | Package in middle of conticaster and keep off dam thereof | |
CN210146983U (en) | Argon protection device for mould casting ladle nozzle | |
CN209647582U (en) | A kind of induction heating tundish ladle canal | |
TWI581878B (en) | Ladle bottom and ladle | |
CN215544880U (en) | Integral tundish impact area prefabricated part | |
CN206677173U (en) | Rare earth steel and the mouth of a river used for aluminum-containing steel and middle steel ladle | |
CN207076960U (en) | A kind of stainless steel continuous casting tundish | |
CN202885542U (en) | Dip pipe for RH refining furnace | |
JPH11104814A (en) | Nozzle for casting | |
KR101175444B1 (en) | Bottom Structure of Ladle | |
RU2357832C2 (en) | Gate system | |
CN210966963U (en) | High casting ladle of security | |
CN213257073U (en) | Improved structure of brick-falling-preventing ladle opening | |
CN106111961A (en) | A kind of continuous casting tundish and dam thereof | |
JP5831138B2 (en) | Manufacturing method of high cleanliness steel slab by continuous casting | |
JP6938788B2 (en) | Collector nozzle for continuous casting | |
CN213379248U (en) | Integral type pouring ladle tire | |
CN218361911U (en) | Device for improving quality of cast product |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |