CN106111961A - A kind of continuous casting tundish and dam thereof - Google Patents

A kind of continuous casting tundish and dam thereof Download PDF

Info

Publication number
CN106111961A
CN106111961A CN201610768298.XA CN201610768298A CN106111961A CN 106111961 A CN106111961 A CN 106111961A CN 201610768298 A CN201610768298 A CN 201610768298A CN 106111961 A CN106111961 A CN 106111961A
Authority
CN
China
Prior art keywords
dam
continuous casting
molten steel
casting tundish
dam body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610768298.XA
Other languages
Chinese (zh)
Inventor
梁景玥
郭达
张学民
宁伟
赵圣功
苗金鹏
乔明
王尖锐
刘文凭
魏义胜
王玉春
张昭平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Group Co Ltd SISG
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201610768298.XA priority Critical patent/CN106111961A/en
Publication of CN106111961A publication Critical patent/CN106111961A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

This application discloses the dam of a kind of continuous casting tundish, including dam body, the profile of dam body is identical with the lower shape of the longitudinal cross-section of continuous casting tundish, and dam body offers the steel flow through hole of through dam body two sides.Dam is vertically sealingly fastened in the bottom of continuous casting tundish, and the both sides narrow end setting of the lateral cross section near continuous casting tundish, and two orifices adjacent bottom continuous casting tundish are kept apart by dam.Molten steel is after injecting in continuous casting tundish, a part through steel flow through hole by enter continuous casting tundish both sides narrow end, a molten steel part overflows the both sides narrow end into continuous casting tundish above dam, two strands of molten steel collide blending, make fluidity molten steel strengthen, and molten steel is difficult to condense, it is not susceptible to discontinuity events of casting, non-metallic inclusion in molten steel floats fully, improves Cleanliness of Molten Steel, improves casting quality.Disclosed herein as well is a kind of continuous casting tundish comprising this dam.

Description

A kind of continuous casting tundish and dam thereof
Technical field
The present invention relates to metallurgical technology field, particularly to the dam of a kind of continuous casting tundish, further relate to one and comprise The continuous casting tundish of this dam.
Background technology
Molten steel, in carrying out continuous casting production process, is sent in tundish by conticaster, to improve MOLTEN STEEL FLOW form, prevents Slag, promotes inclusion floating, finely tunes molten steel composition, controls inclusion morphology and accurately controls molten steel overheat.In tundish Molten steel after the process of tundish from multiple orifices of tundish bottom flow out, carry out next step operation.
The lateral cross section of existing continuous casting tundish is the shape that centre is wide, both sides are narrow, and the longitudinal cross-section of tundish Tapering into from top to bottom, the tundish of this structure is after injecting molten steel, and molten steel mobility in tundish is irregular, causes Easily there is dead band in the areas at both sides of tundish, and the liquid steel temperature of dead zone location is relatively low, easily causes molten steel and condenses, it is impossible to from position Flow out in the orifice of tundish two side bottom, casting discontinuity events occurs.And owing to fluidity molten steel is poor, cause non-gold Belong to inclusion floating insufficient, cause Cleanliness of Molten Steel the highest, impact casting quality.
In sum, how to solve the problem that the fluidity molten steel in continuous casting tundish is poor, become art technology Personnel's problem demanding prompt solution.
Summary of the invention
In view of this, it is an object of the invention to provide the dam of a kind of continuous casting tundish, to improve in the middle of conticaster Fluidity molten steel in bag, reduces casting discontinuity events odds, improves Cleanliness of Molten Steel.
Further object is that a kind of continuous casting tundish comprising this dam of offer, to improve in conticaster Between bag in fluidity molten steel, reduce casting discontinuity events odds, improve Cleanliness of Molten Steel.
For reaching above-mentioned purpose, the present invention provides techniques below scheme:
The dam of a kind of continuous casting tundish, including dam body, the profile of described dam body is vertical with described continuous casting tundish It coincide to the lower shape in cross section, described dam body offers the steel flow through hole of through dam body two sides.
Preferably, in above-mentioned dam, described dam body is inverted trapezoidal structure.
Preferably, in above-mentioned dam, the height of described dam body is 200mm~300mm, and the thickness of described dam body is 100mm~150mm.
Preferably, in above-mentioned dam, the quantity at least two of described steel flow through hole, and horizontal arrangement is in described On dam body.
Preferably, in above-mentioned dam, the aperture of described steel flow through hole is 90mm~110mm.
Preferably, in above-mentioned dam, described dam body is by castable and the mixing casting of lightweight corundum castable Become.
Preferably, in above-mentioned dam, described castable is (8.0 with the ratio of described lightweight corundum castable ~9.0): (1.0~1.5).
Present invention also offers a kind of continuous casting tundish, including middle inclusion, the bottom of described middle inclusion is provided with Multiple orifices, a sidewall of described middle inclusion are provided with molten steel flow straightener, also include as described in any of the above item Dam, described dam is vertically fixed on the bottom of described middle inclusion, and the base of described dam and dual-side are respectively with described Bottom surface and the side wall surface of middle inclusion seal, and described dam is arranged near the both sides narrow end of the lateral cross section of described middle inclusion, And between adjacent two described orifices.
Preferably, in above-mentioned continuous casting tundish, it is steady that described dam and described middle inclusion are provided with described molten steel One sidewall of stream device is vertical.
Preferably, in above-mentioned continuous casting tundish, described dam is sealingly fastened in described by magnesium carbon coating material In tundish body.
Compared with prior art, the invention has the beneficial effects as follows:
The dam of the continuous casting tundish that the present invention provides includes dam body, the profile of dam body and the longitudinal direction of continuous casting tundish The lower shape in cross section coincide, and dam body offers the steel flow through hole of through dam body two sides.During work, dam is the closeest Sealing is arranged near the both sides narrow end of the lateral cross section of continuous casting tundish due to the bottom of continuous casting tundish, dam, and will Two orifices adjacent bottom continuous casting tundish are kept apart.Molten steel is after injecting in continuous casting tundish, and molten steel is a part of Entering the both sides narrow end of continuous casting tundish through steel flow through hole by dam, a molten steel part covers dam, from dam Side enters the both sides narrow end of continuous casting tundish, and two strands of molten steel collide blending, so that fluidity molten steel enhancing, molten steel is not Easily condense, reduce the accident risk that casting is interrupted, simultaneously as the mobility of molten steel strengthens, the nonmetal inclusion in molten steel Thing floats fully, improves Cleanliness of Molten Steel, improves casting quality.
The continuous casting tundish that the present invention provides have employed the dam in the application, therefore, enhances the mobility of molten steel, Non-metallic inclusion in molten steel floats fully, improves Cleanliness of Molten Steel, improves casting quality.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to The accompanying drawing provided obtains other accompanying drawing.
The structural representation of the dam of a kind of continuous casting tundish that Fig. 1 provides for the embodiment of the present invention;
The schematic top plan view of a kind of continuous casting tundish that Fig. 2 provides for the embodiment of the present invention;
The side, sectional view of a kind of continuous casting tundish that Fig. 3 provides for the embodiment of the present invention.
In Fig. 1-Fig. 3,1 it is dam, 11 is dam body, 12 is steel flow through hole, 2 is middle inclusion, 3 is orifice, 4 is Molten steel flow straightener.
Detailed description of the invention
The core of the present invention there is provided the dam of a kind of continuous casting tundish, enhances the molten steel in continuous casting tundish Mobility, reduces casting discontinuity events odds, improves Cleanliness of Molten Steel.
The present invention also provides for a kind of continuous casting tundish comprising this dam, enhances the steel flow in continuous casting tundish Dynamic property, reduces casting discontinuity events odds, improves Cleanliness of Molten Steel.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Refer to Fig. 1-Fig. 3, embodiments provide the dam of a kind of continuous casting tundish, hereinafter referred to as dam 1, Including dam body 11, the profile of dam body 11 is identical with the lower shape of the longitudinal cross-section of continuous casting tundish, is used for being sealingly fastened in The bottom of continuous casting tundish, dam body 11 offers the steel flow through hole 12 of through dam body 11 two sides.
The operation principle of this dam 1 is, during work, dam 1 is vertically sealingly fastened in the bottom of continuous casting tundish, gear Dam 1 is arranged near the both sides narrow end of the lateral cross section of continuous casting tundish, and by two notes adjacent bottom continuous casting tundish Discharge orifice 3 is kept apart.Molten steel is after injecting in continuous casting tundish, and molten steel part steel flow through hole 12 in dam 1 enters Entering the both sides narrow end of continuous casting tundish, a molten steel part covers dam 1, enters the two of continuous casting tundish above dam 1 Side narrow end, two strands of molten steel collide blending, so that fluidity molten steel strengthens, molten steel is difficult to condense, and reducing casting and interrupting Accident risk, simultaneously as the mobility of molten steel strengthens, non-metallic inclusion in molten steel floats fully, improves molten steel Cleanliness factor, improves casting quality.
Specifically, as it is shown in figure 1, in the present embodiment, dam body 11 is inverted trapezoidal structure, and certainly, dam body 11 can also be Other shape, depending on the lower shape of the longitudinal cross-section of continuous casting tundish, as long as can seal in the middle of stop conticaster The base section height of bag.
Preferably, in the present embodiment, the height of dam body 11 is 200mm~300mm, the thickness of dam body 11 be 100mm~ 150mm, it is highly preferred that the height of dam body 11 is 250mm, the thickness of dam body 11 is 120mm.
In the present embodiment, the quantity at least two of steel flow through hole 12, and horizontal arrangement is on dam body 11, specifically may be used Think two, three, four etc., be configured according to the size of dam body 11.
As optimization, the aperture of steel flow through hole 12 is 90mm~110mm, more preferably 100mm, for this size, then The quantity of steel flow through hole 12 is two.Ensure that steel flow is clear and coherent smooth.
In the present embodiment, dam body 11 is formed by castable and lightweight corundum castable mixing casting, lightweight corundum Castable can improve high temperature resistant, the decay resistance of dam body 11, improves structural strength and the thermal shock resistance of dam body 11.
Preferably, castable is (8.0~9.0) with the ratio of lightweight corundum castable: (1.0~1.5), more preferably For 8.7:1.3, the dam body 11 being cast into is made to have the most high temperature resistant, corrosion resistance, higher structural strength and thermal shock resistance.
As shown in Figures 2 and 3, the embodiment of the present invention additionally provides a kind of continuous casting tundish, including middle inclusion 2 and gear Dam 1, the bottom of middle inclusion 2 is provided with multiple orifice 3, a sidewall of middle inclusion 2 is provided with molten steel flow straightener 4, The flow regime of molten steel flow straightener 4 molten steel for being adjusted into, to reduce directly washing away middle inclusion 2, dam 1 be with Upper dam 1 described by whole embodiments, dam 1 is vertically fixed on the bottom of middle inclusion 2, and the base of dam 1 and both sides Limit bottom surface and side wall surface with middle inclusion 2 respectively seals, and dam 1 sets near the both sides narrow end of the lateral cross section of middle inclusion 2 Put, and between adjacent two orifices 3.
During casting, dam 1 is vertically sealingly fastened in the bottom of middle inclusion 2, and dam 1 is near the transverse cutting of middle inclusion 2 The both sides narrow end in face is arranged, and is kept apart by two adjacent orifices 3 bottom middle inclusion 2.Molten steel is in injecting middle inclusion 2 After, molten steel part steel flow through hole 12 in dam 1 enters the both sides narrow end of middle inclusion 2, and a molten steel part covers Dam 1, enter above dam 1 in the middle of the both sides narrow end of inclusion 2, two strands of molten steel collide blending, so that MOLTEN STEEL FLOW Property strengthen, molten steel be difficult to condense, reduce casting interrupt accident risk, simultaneously as molten steel mobility strengthen, in molten steel Non-metallic inclusion float fully, improve Cleanliness of Molten Steel, improve casting quality.
Further, in the present embodiment, the sidewall that dam 1 and middle inclusion 2 are provided with molten steel flow straightener 4 hangs down Directly, the molten steel owing to entering from molten steel flow straightener 4 is relatively big to the impulsive force of this sidewall, therefore, in order to improve dam 1 and this sidewall Fixing intensity, dam 1 is perpendicular to this sidewall.
In order to improve fixing intensity and the sealing property of dam 1 further, the dam 1 in the present embodiment is coated with by magnesium carbonaceous Skinning loam is sealingly fastened in middle inclusion 2.
In this specification, each embodiment uses the mode gone forward one by one to describe, and what each embodiment stressed is and other The difference of embodiment, between each embodiment, identical similar portion sees mutually.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses the present invention. Multiple amendment to these embodiments will be apparent from for those skilled in the art, as defined herein General Principle can realize without departing from the spirit or scope of the present invention in other embodiments.Therefore, the present invention It is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein and features of novelty phase one The widest scope caused.

Claims (10)

1. the dam of a continuous casting tundish, it is characterised in that including dam body (11), the profile of described dam body (11) is with described The lower shape of the longitudinal cross-section of continuous casting tundish coincide, and described dam body (11) offers through described dam body (11) both sides The steel flow through hole (12) in face.
Dam the most according to claim 1, it is characterised in that described dam body (11) is inverted trapezoidal structure.
Dam the most according to claim 1, it is characterised in that the height of described dam body (11) is 200mm~300mm, institute The thickness stating dam body (11) is 100mm~150mm.
Dam the most according to claim 1, it is characterised in that the quantity at least two of described steel flow through hole (12), And horizontal arrangement is on described dam body (11).
Dam the most according to claim 1, it is characterised in that the aperture of described steel flow through hole (12) be 90mm~ 110mm。
Dam the most according to claim 1, it is characterised in that described dam body (11) is watered by castable and lightweight corundum Material feeding mixing casting forms.
Dam the most according to claim 6, it is characterised in that described castable and described lightweight corundum castable Ratio is (8.0~9.0): (1.0~1.5).
8. a continuous casting tundish, including middle inclusion (2), the bottom of described middle inclusion (2) is provided with multiple orifice (3), a sidewall of described middle inclusion (2) is provided with molten steel flow straightener (4), it is characterised in that also include that right such as is wanted Seeking the dam (1) described in any one of 1-7, described dam (1) is vertically fixed on the bottom of described middle inclusion (2), and described gear The base on dam (1) and dual-side seal with the bottom surface of described middle inclusion (2) and side wall surface respectively, and described dam (1) is near institute The both sides narrow end of the lateral cross section stating middle inclusion (2) is arranged, and is positioned between adjacent two described orifices (3).
Continuous casting tundish the most according to claim 8, it is characterised in that described dam (1) and described middle inclusion (2) The sidewall being provided with described molten steel flow straightener (4) is vertical.
Continuous casting tundish the most according to claim 8, it is characterised in that described dam (1) passes through magnesium carbon coating material It is sealingly fastened in described middle inclusion (2).
CN201610768298.XA 2016-08-30 2016-08-30 A kind of continuous casting tundish and dam thereof Pending CN106111961A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610768298.XA CN106111961A (en) 2016-08-30 2016-08-30 A kind of continuous casting tundish and dam thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610768298.XA CN106111961A (en) 2016-08-30 2016-08-30 A kind of continuous casting tundish and dam thereof

Publications (1)

Publication Number Publication Date
CN106111961A true CN106111961A (en) 2016-11-16

Family

ID=57275686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610768298.XA Pending CN106111961A (en) 2016-08-30 2016-08-30 A kind of continuous casting tundish and dam thereof

Country Status (1)

Country Link
CN (1) CN106111961A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100813194B1 (en) * 2006-10-18 2008-03-13 주식회사 포스코 Continuous casting machine for tundish
CN101474664A (en) * 2009-01-19 2009-07-08 莱芜钢铁股份有限公司 Flow control device for tundish in special-shaped billet continuous casting machine
KR20100035821A (en) * 2008-09-29 2010-04-07 현대제철 주식회사 Tundish
CN203343422U (en) * 2013-07-01 2013-12-18 莱芜钢铁集团有限公司 Continuous casting tundish slag stop dam
CN103990786A (en) * 2014-05-16 2014-08-20 莱芜钢铁集团有限公司 Device and method for removing molten steel slag inclusion in tundish of double-flow slab caster
CN104959585A (en) * 2015-06-09 2015-10-07 南京钢铁股份有限公司 Tundish of small square billet continuous caster and mounting method of slag dam of tundish
CN205949845U (en) * 2016-08-30 2017-02-15 山东钢铁股份有限公司 Package in middle of conticaster and keep off dam thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100813194B1 (en) * 2006-10-18 2008-03-13 주식회사 포스코 Continuous casting machine for tundish
KR20100035821A (en) * 2008-09-29 2010-04-07 현대제철 주식회사 Tundish
CN101474664A (en) * 2009-01-19 2009-07-08 莱芜钢铁股份有限公司 Flow control device for tundish in special-shaped billet continuous casting machine
CN203343422U (en) * 2013-07-01 2013-12-18 莱芜钢铁集团有限公司 Continuous casting tundish slag stop dam
CN103990786A (en) * 2014-05-16 2014-08-20 莱芜钢铁集团有限公司 Device and method for removing molten steel slag inclusion in tundish of double-flow slab caster
CN104959585A (en) * 2015-06-09 2015-10-07 南京钢铁股份有限公司 Tundish of small square billet continuous caster and mounting method of slag dam of tundish
CN205949845U (en) * 2016-08-30 2017-02-15 山东钢铁股份有限公司 Package in middle of conticaster and keep off dam thereof

Similar Documents

Publication Publication Date Title
CN103990787B (en) A kind of for removing the device and method of molten steel inclusion in continuous casting production
US8397793B2 (en) Steel continuous casting method
CN202845761U (en) Novel tundish for highly purified liquid steel
CN103990772B (en) A kind of metallurgical plant removing double flow tray billet continuous casting machine tundish inclusion
CN104107905A (en) Slab continuous casting tundish
KR20170072871A (en) Impact pad, tundish and apparatus including the impact pad, and method of using same
CN205949845U (en) Package in middle of conticaster and keep off dam thereof
KR20140037869A (en) Impact pad
CN106111961A (en) A kind of continuous casting tundish and dam thereof
KR101453354B1 (en) Conbined Welding Method of Electro Gas Welding and Flux Cored Arc Welding
CN210587148U (en) Integral tundish impact area prefabricated part
CN103357831A (en) Tundish multifunctional steady-flow impacting barrel and building method thereof
CN204094086U (en) A kind of continuous casting production slag blocking wall
CN104624995A (en) Device for inhibiting mold level fluctuation at high drawing speed
CN208276165U (en) A kind of pouring ladle
CN204449241U (en) The device of liquid level fluctuation of crystallizer is suppressed under a kind of high pulling rate
CN203284423U (en) Die for producing ferroaluminium compound deoxidant block
CN105328172A (en) Aluminium alloy circular ingot cast shunting plate
CN201603853U (en) Quadripuntal submersed nozzle used for pouring conventional plate blank and preventing molten steel turbulence
CN105665667A (en) Steel splashing accident prevention pendulum groove for continuous casting tundish and manufacturing method of pendulum groove
CN103862010B (en) A kind of continuous casting production guiding device and preparation method thereof
CN204035501U (en) A kind of continuous casting production guiding device
CN101837449A (en) Liquid-level-liquid-flow distributing funnel manufactured by ingot casting of aluminum alloy
CN205834201U (en) Tundish impact area reinforcement type porous slag blocking wall
RU2296647C2 (en) Steel casting ladle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication