CN210558775U - Simple movable material receiving platform installed in construction elevator cage - Google Patents
Simple movable material receiving platform installed in construction elevator cage Download PDFInfo
- Publication number
- CN210558775U CN210558775U CN201920860704.4U CN201920860704U CN210558775U CN 210558775 U CN210558775 U CN 210558775U CN 201920860704 U CN201920860704 U CN 201920860704U CN 210558775 U CN210558775 U CN 210558775U
- Authority
- CN
- China
- Prior art keywords
- cage
- bottom plate
- platform
- connect
- receiving platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 title claims abstract description 48
- 238000010276 construction Methods 0.000 title claims abstract description 29
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 28
- 239000010959 steel Substances 0.000 claims abstract description 28
- 239000000725 suspension Substances 0.000 claims description 17
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 238000013016 damping Methods 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 238000004891 communication Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 6
- 230000035939 shock Effects 0.000 description 3
- 238000002360 preparation method Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 239000002390 adhesive tape Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229920002635 polyurethane Polymers 0.000 description 1
- 239000004814 polyurethane Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses an install simple and easy removal in construction elevator cage and connect material platform, a serial communication port, including a bottom plate, the both sides of bottom plate are equipped with the guardrail, and the edge of bottom plate bottom one side is equipped with at least one and is used for the hinge of being connected with the cage bottom plate. The utility model discloses utilize cage floor and structural plane as supporting, the material and the interim platform that passes of personnel of setting up, when passing, will remove and connect material platform upset 90, the steel sheet is laid on the structural plane, form aerial passageway, when the cage moves, remove and connect the material platform 90 entering cages of overturning again, need not to set up the tradition and connect the material platform, it connects simple manufacture to remove to connect the material platform, alone can operate, both can save a large amount of materials, reduce the labour input, can accelerate the construction progress again, and the production efficiency is improved, and safety and reliability, thereby reach and reduce construction cost, guarantee the safe purpose of construction.
Description
Technical Field
The utility model relates to a construction elevator connects material platform, in particular to cage and major structure interval less than or equal to 600mm connect material platform belongs to construction technical field.
Background
Along with the rapid development of the building industry, high-rise buildings are more and more, how to reduce non-operation time and construction cost in the construction process is particularly important, the material receiving platform of the construction elevator is a main channel for secondary structures, decoration and finishing, installation engineering and personnel, and the traditional method is to adopt a profile steel cantilever scaffold as a carrier to set up a fixed material receiving platform.
The traditional construction method needs to consume a large amount of turnover materials and safety protection materials, needs to invest a large amount of labor, and has the defects of high labor intensity of workers, slow construction progress, low production efficiency, large potential safety hazard of high-altitude operation, high construction cost and the like.
Disclosure of Invention
The utility model discloses the technical problem that will solve is: the utility model provides a be applicable to when construction elevator cage and building structure distance are not more than 600, install the simple and easy removal in the cage and connect material platform, the convenient easy operation of this platform construction, lightly nimble, use safe and reliable, the cost of manufacture is low.
In order to solve the technical problem, the technical scheme of the utility model a simple and easy removal of installing in construction elevator cage connects material platform is provided, a serial communication port, including a bottom plate, the both sides of bottom plate are equipped with the guardrail, and the edge of bottom plate bottom one side is equipped with at least one and is used for the hinge of being connected with the cage bottom plate. The hinge is mainly used for fixing the movable material receiving platform, one end of the hinge is fixed on a steel plate, and the other end of the hinge is fixed on the bottom of the suspension cage, so that the movable material receiving platform can turn over by 90 degrees. The position of the hinge must ensure that the cage door can be smoothly opened when the movable material receiving platform is retracted.
Preferably, a first damping strip is arranged on one side of the guardrail, which is in contact with the bottom plate of the suspension cage; and a second damping strip is arranged at the bottom of one side of the bottom plate connected with the building. The first shock-absorbing strip can reduce impact force between the guardrail and the suspension cage floor in the process of moving the material receiving platform in a reverse rotating mode. The second damping strip can reduce the impact force between the bottom plate and the structural plane in the process of moving the material receiving platform in a reversing mode, and can slow down the instability of the platform caused by local unevenness of the structural plane. The first damping strip is made of flexible materials such as hard sponge or polyurethane and is fixed on the vertical rod through double-faced adhesive tape. The second damping strip is a rubber strip and is fixed below the shelving steel plate, so that impact force on the structure in the platform placing process is reduced, friction force between the bottom plate and the structure is increased, and the fixing method adopts bolt fixing.
Preferably, two reinforcing angle steels arranged in the width direction are arranged on the bottom plate along the length direction. The reinforcing angle steel can reduce the thickness of the bottom plate on the basis of ensuring the rigidity of the movable material receiving platform, so that the weight of the movable material receiving platform is reduced, and the operation is facilitated. When the span of the bottom plate of the movable material receiving platform is larger than 200mm, the bottom plate is easy to deform, the rigidity of the bottom plate can be increased by the aid of the reinforcing angle steel, the angle steel is made of 30-80-degree equal-edge angle steel (the specification of the angle steel is determined according to the span size), two edges of the reinforcing angle steel are fully welded with the steel plate, the length of the reinforcing angle steel is equal to that of the steel plate, the end portion of the angle steel is processed by adopting a 45-degree cutting angle, and damage to vehicles and personnel.
Preferably, the length of the bottom plate is 20mm smaller than the inner diameter of the suspension cage, and the width of the bottom plate is 150mm larger than the distance between the suspension cage and the building. The width is less than 20mm of the inner diameter of the suspension cage, the platform can be turned flexibly, the length is greater than 150mm of the net distance between the suspension cage and the building, the width of the suspension cage on the structure is ensured to be more than 100mm, and the suspension cage enters 50 mm. The bottom plate adopts the steel sheet, and the steel sheet adopts rhombus steel sheet preparation, and the specification of steel sheet is confirmed according to the distance of cage and building, generally chooses for use 3.5 ~ 5 mm's steel sheet, and during operation one end is fixed on the cage floor, and the other end is shelved on structural surface, shelves length and is not less than 100 mm.
Preferably, the guardrail is formed by welding a plurality of vertical rods and horizontal rods at the top, the height of the vertical rods is more than 900mm, and the distance is less than 150 mm. The guardrail lower extreme horizon bar adopts the mode of weld to enclose to fix firmly with the steel sheet, plays safety protection's effect, and the guardrail has also increased the rigidity of bottom plate, and the guardrail is as removing the handle of holding that connects the material platform upset, and the clear distance 50 ~ 70mm that stands the wall with the cage ensures the safe distance that hand and cage found the wall when using. The horizontal rods and the vertical rods are made of square steel tubes with the diameters of 16mm multiplied by 1.2 mm.
The utility model discloses utilize cage floor and structural plane as supporting, the material and the interim platform that passes of personnel of setting up, when passing, will remove and connect material platform upset 90, the steel sheet is laid on the structural plane, form aerial passageway, when the cage moves, remove and connect the material platform 90 entering cages of overturning again, need not to set up the tradition and connect the material platform, it connects simple manufacture to remove to connect the material platform, alone can operate, both can save a large amount of materials, reduce the labour input, can accelerate the construction progress again, and the production efficiency is improved, and safety and reliability, thereby reach and reduce construction cost, guarantee the safe purpose of construction.
Drawings
Fig. 1 is a front view of the simple movable material receiving platform provided by the present invention;
FIG. 2 is a side view of FIG. 1;
FIG. 3 is a top view of FIG. 1;
fig. 4 is a front view of the simple movable material receiving platform provided by the present invention when in use;
FIG. 5 is a side view of FIG. 4;
FIG. 6 is a top view of FIG. 4;
fig. 7 is a front view of the simple movable material receiving platform provided by the present invention when not in use;
FIG. 8 is a side view of FIG. 7;
fig. 9 is a top view of fig. 7.
Detailed Description
In order to make the present invention more comprehensible, preferred embodiments are described in detail below with reference to the accompanying drawings.
Examples
Fig. 1-3 are the utility model provides a pair of install simple and easy removal in construction elevator cage and connect material platform's structural schematic diagram, it includes a bottom plate 1, two rows of guardrails 2 that adopt the square steel pipe preparation, guardrail 2 is formed by many pole settings and two horizon bars girdling, is equipped with shock attenuation strip one 3 in the pole setting that contacts with cage bottom plate 7, and the bottom edge of bottom plate 1 with building B contact is equipped with shock attenuation strip two 4. Two reinforcing angle steels 5 (parallel to the width direction) are arranged on the bottom plate 1 along the length direction, the reinforcing angle steels 5 divide the bottom plate 1 into three parts, and each part is connected with a suspension cage bottom plate 7 through a hinge 6, so that the platform can rotate by 90 degrees.
Wherein the size of the base plate 1 is determined according to the size of the cage A and the distance between the cage A and the building B, and in principle, the width of the base plate 1 is 20mm smaller than the inner diameter of the cage A, and the length is increased by 150mm compared with the clear distance between the cage A and the building B. The fixed position of hinge 6 is 50mm apart from cage A edge, ensures that cage A's guard gate can normally open when the removal meets material platform to rise. The height of guardrail 2 is 900mm, and when the platform used, the height of guardrail 2 can satisfy the safety requirement. The quantity of strengthening angle steel 5 increases and decreases according to the interval of cage A and building B, satisfies the rigidity requirement when the removal connects the material platform to use, avoids bottom plate 1 to warp, and shock attenuation strip one 3 and two 4 primary functions are for reducing the removal to connect the impact force of material platform to cage A and building B when overturning.
Firstly, a mobile material receiving platform is manufactured according to the size of a suspension cage A and the distance between the suspension cage A and a building B, and the mobile material receiving platform is installed in the suspension cage A of the construction elevator through a hinge 6, as shown in figures 4-6.
When the elevator moves, the bottom plate 1 is vertically placed to reach a target floor, a hanging basket door of the cage A is opened, the guardrail 2 is grasped, the movable material receiving platform is overturned by 90 degrees, the bottom plate of the movable material receiving platform is placed on a structural surface to form a construction platform, and construction materials and personnel can enter and exit the cage A and the building B through the platform, as shown in figures 7-9. After the material receiving is finished, the guardrail 2 is grasped, the material receiving platform is overturned and moved by 90 degrees, the material receiving platform is moved to enter the suspension cage A, the suspension cage door is put down, and the construction elevator runs as shown in figures 4-6.
Claims (5)
1. The utility model provides an install simple and easy removal in construction elevator cage and connect material platform which characterized in that, includes a bottom plate (1), and the both sides of bottom plate (1) are equipped with guardrail (2), and the edge of bottom plate (1) bottom one side is equipped with at least one hinge (6) that are used for being connected with cage bottom plate (7).
2. The simple movable receiving platform installed in the suspension cage of the construction elevator as claimed in claim 1, wherein a first damping strip (3) is provided at one side of the guardrail (2) contacting with the suspension cage bottom plate (7); and a second damping strip (4) is arranged at the bottom of one side of the bottom plate (1) connected with the building (B).
3. The simple movable receiving platform installed in the cage of a construction elevator according to claim 1, characterized in that two reinforcing angle steels (5) arranged in the width direction are arranged on the bottom plate (1) along the length direction.
4. A simple mobile receiving platform to be installed in a construction elevator cage according to claim 1 wherein the base plate (1) has a length 20mm less than the inner diameter of the cage and a width 150mm greater than the distance between the cage and the building.
5. The simple movable receiving platform installed in the cage of a construction elevator as claimed in claim 1, wherein the guardrail (2) is composed of a plurality of vertical rods and horizontal rods at the top by welding, the height of the vertical rods is above 900mm, and the distance is below 150 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920860704.4U CN210558775U (en) | 2019-06-06 | 2019-06-06 | Simple movable material receiving platform installed in construction elevator cage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920860704.4U CN210558775U (en) | 2019-06-06 | 2019-06-06 | Simple movable material receiving platform installed in construction elevator cage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210558775U true CN210558775U (en) | 2020-05-19 |
Family
ID=70632616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920860704.4U Expired - Fee Related CN210558775U (en) | 2019-06-06 | 2019-06-06 | Simple movable material receiving platform installed in construction elevator cage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210558775U (en) |
-
2019
- 2019-06-06 CN CN201920860704.4U patent/CN210558775U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202787928U (en) | Construction device for steel plate wall | |
KR100777937B1 (en) | Construcion safety working cage with scaffold | |
CN213329955U (en) | Flower basket diagonal rod type overhanging scaffold | |
CN210558775U (en) | Simple movable material receiving platform installed in construction elevator cage | |
CN209760872U (en) | Diagonal draw bar for supporting-free formwork | |
CN218541451U (en) | Isolation protection mechanism climbing along with climbing frame | |
CN218715257U (en) | Construction platform of unloading | |
CN209011528U (en) | A kind of all steel attachment type raise scaffold | |
CN206346524U (en) | Portable job shop | |
CN202850470U (en) | Construction platform for installation of corner connecters of curtain wall | |
CN210013362U (en) | Assembled oblique roofing construction structures | |
CN213837668U (en) | Auxiliary support suitable for hanging flower basket | |
CN210239201U (en) | Cart type elevator wellhead and hoistway protection device | |
CN212535007U (en) | Cantilever platform for dismantling cantilever frame in segmented mode | |
CN203440913U (en) | Supporting structure for reinforced concrete corridor construction | |
CN209989034U (en) | A hoisting frame for factory building piping erection | |
CN209339578U (en) | It is a kind of be built in hoistway packaged type protection and operating platform | |
CN220150833U (en) | Anti-falling hanging basket for constructional engineering | |
CN213573124U (en) | Simple and easy integration entrance to a cave protector | |
CN216076429U (en) | Equipment faces limit protection barrier device | |
CN212802113U (en) | Movable metal partition | |
CN218668473U (en) | Two-way regulation strutting arrangement in clear water brick curtain I-steel entrance to a cave | |
CN215978556U (en) | Building outer wall whitewashes safety protection network for building engineering | |
CN213508384U (en) | Pulley platform device for navigation wall maintenance | |
CN215212247U (en) | Protective platform for installation and operation of corridor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200519 |