CN210530178U - Roof boarding fortune equipment - Google Patents

Roof boarding fortune equipment Download PDF

Info

Publication number
CN210530178U
CN210530178U CN201920538939.1U CN201920538939U CN210530178U CN 210530178 U CN210530178 U CN 210530178U CN 201920538939 U CN201920538939 U CN 201920538939U CN 210530178 U CN210530178 U CN 210530178U
Authority
CN
China
Prior art keywords
roof
roof panel
bracket
roller
equipment according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920538939.1U
Other languages
Chinese (zh)
Inventor
严琼望
杨建波
朱学福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Hujiang Construction Engineering Co ltd
Original Assignee
Shanghai Hujiang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Hujiang Construction Engineering Co ltd filed Critical Shanghai Hujiang Construction Engineering Co ltd
Priority to CN201920538939.1U priority Critical patent/CN210530178U/en
Application granted granted Critical
Publication of CN210530178U publication Critical patent/CN210530178U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a roof boarding fortune equipment, including support (2) that are used for placing the roof boarding to and fix and be used for cylinder (1) with the roof boarding fortune in support (2) bottom surface. Compared with the prior art, the utility model discloses a from relying on the manpower completely to carry to the transformation of borrowing mechanical tool to transport, greatly reduced intensity of labour, promoted the safety guarantee, improved the efficiency of construction, also reduced the damage to the material in the handling simultaneously.

Description

Roof boarding fortune equipment
Technical Field
The utility model relates to a construction equipment especially relates to a roof boarding fortune equipment.
Background
At present, the door type light steel logistics warehouse and part of industrial plants basically adopt vertical lock seam metal roof boards, the processing process of the roof boards is to transport forming equipment to a construction site by containers, and after the equipment is debugged, the pressed long boards are stacked to a specified height according to calculated board length on-site pressing boards. The physical distribution warehouse has a large span, generally about 100 meters, and the half span plate is about 50 meters long.
At present, the conventional method is that before the roof panels are constructed and laid, stacked and bundled roof panels are hung on roof purlins by a crane and limited by the length of a cantilever of the crane, long panels hung on the roof can only be placed near a gable of the roof, a warehouse is generally long, and the length of some roof purlins reaches 200 meters.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a roof boarding fortune equipment in order to overcome the defect that above-mentioned prior art exists.
The purpose of the utility model can be realized through the following technical scheme:
a roof panel transporting device comprises a support for placing a roof panel and a roller fixed on the bottom surface of the support for transporting the roof panel.
Further, the rollers are arranged at two ends of the bottom surface of the support in parallel.
Furthermore, the roller is fixed on the bottom surface of the support through a bearing with a seat, so that the roller can roll flexibly in the operation process and is labor-saving in operation.
Further, the seated bearing is fixed to the bottom surface of the bracket by bolts.
Furthermore, the length of the roller is more than twice of the distance between two adjacent roof purlines, so that the safety and the stability of equipment operation during construction operation are ensured.
Furthermore, the height from the upper surface of the support to the lowest point of the roller is 250-350mm, so that the roof panel can be conveniently unloaded from the support.
Furthermore, a protection bracket for protecting the roof panel is welded on one side of the bracket.
Furthermore, the support is welded into a whole by adopting hot rolled angle steel, so that the sufficient integral rigidity and strength of the support are ensured.
Furthermore, the upper surface of the support is also provided with an anti-skid friction pad, and a rubber anti-skid pad is adopted, so that the roof panel is prevented from sliding off.
Furthermore, a brake pad is further arranged on the roller and connected with a brake pedal.
During construction, the transfer equipment is lifted to a roof by a crane and is horizontally placed on an upper flange of a roof purline, the number of the transfer equipment is calculated according to the length of a roof panel, and the roof panel is transferred by 4 transfer equipment at least when the length of 50m of the roof panel is 50m in consideration of the dead weight of the roof panel and the rigidity of the stacked roof panel. The conveying equipment is arranged perpendicular to the roof purline, a plurality of conveying equipment need to be arranged on a line, a brake pedal is stepped down, and a brake pad is tightly attached to the roller. When the roof panel is hoisted from the ground, the roof panel is directly placed on a support of the transporting equipment which is placed on the roof in advance, after the roof panel and the transporting equipment are firmly fixed, a plurality of workers stand behind the protective support, and simultaneously push the transporting equipment to transport the roof panel to a required position.
Compared with the prior art, the utility model discloses a from relying on the manpower completely to carry to the transformation of borrowing mechanical tool to transport, greatly reduced intensity of labour, promoted the safety guarantee, improved the efficiency of construction, also reduced the damage to the material in the handling simultaneously.
Drawings
Fig. 1 is a schematic view of the 3D structure of the present invention;
fig. 2 is a schematic view of the installation of the utility model on the roof purline;
FIG. 3 is a schematic view of the structure of the middle roller of the present invention;
FIG. 4 is a schematic view of the structure of the bracket of the present invention;
fig. 5 is a side view of the bracket of the present invention;
FIG. 6 is a schematic view of a center bearing with a seat according to the present invention;
FIG. 7 is a schematic view of the present invention with a friction non-slip mat installed;
fig. 8 is a schematic structural view of the drum with brake pads according to the present invention.
The reference numbers in the figures indicate:
1. the device comprises a roller, 2, a support, 3, a bearing with a seat, 4, a protective support, 5, a roof purline, 6, an anti-skid friction pad, 7, a brake pad, 8 and a brake pedal.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
Examples
A roof boarding transfer apparatus, as shown in fig. 1, includes a supporting frame 2 (fig. 4 to 5) for placing a roof boarding, and a drum 1 (fig. 3) fixed to the bottom surface of the supporting frame 2 for transferring the roof boarding. The rollers 1 are arranged at two ends of the bottom surface of the bracket 2 in parallel. The roller 1 is fixed on the bottom surface of the bracket 2 through a bearing 3 with a seat (figure 6), and the roller can roll flexibly in the operation process and save labor in operation. The seated bearing 3 is fixed on the bottom surface of the bracket 2 through a bolt. As shown in fig. 2, the length of the roller 1 is more than twice of the distance between two adjacent roof purlins 5, so that the safety and stability of the operation of the equipment during construction operation are ensured. The height from the upper surface of the support 2 to the lowest point of the roller 1 is 250-350mm, so that the roof panel can be conveniently unloaded from the support 2. And a protective bracket 4 for protecting the roof panel is welded on one side of the bracket 2. The bracket 2 is welded into a whole by adopting hot rolled angle steel, so that the enough integral rigidity and strength of the bracket 2 are ensured. The upper surface of the bracket 2 is also provided with an anti-skid friction pad 6 to prevent the roof panel from sliding down (figure 7). The roller 1 is also provided with a brake pad 7, and the brake pad 7 is connected with a brake pedal 8 (figure 8).
During construction, the conveying equipment is lifted to a roof by a crane and is horizontally placed on an upper flange of a roof purline 5, the number of the conveying equipment is calculated according to the length of a roof panel, and the roof panel is conveyed by four conveying equipment at the same time when the length of the 50-meter roof panel is at least 50 meters in consideration of the dead weight of the roof panel and the rigidity of the stacked roof panel. The conveying equipment is arranged perpendicular to the roof purline 5, a plurality of conveying equipment need to be arranged on a line, the brake pedal 8 is stepped down, and the brake block 7 is tightly attached to the roller. When the roof panel is hoisted from the ground, the roof panel is directly placed on the support 2 of the transporting equipment which is placed on the roof in advance, after the roof panel and the transporting equipment are firmly fixed, a plurality of workers stand behind the protective support 4 and simultaneously push the transporting equipment to transport the roof panel to a required position.
The embodiments described above are intended to facilitate the understanding and use of the invention by those skilled in the art. It will be readily apparent to those skilled in the art that various modifications to these embodiments may be made, and the generic principles described herein may be applied to other embodiments without the use of the inventive faculty. Therefore, the present invention is not limited to the above embodiments, and those skilled in the art should make improvements and modifications within the scope of the present invention according to the disclosure of the present invention.

Claims (7)

1. The roof panel transporting equipment is characterized by comprising a bracket (2) for placing a roof panel and a roller (1) fixed on the bottom surface of the bracket (2) and used for transporting the roof panel;
the length of the roller (1) is more than twice of the distance between two adjacent roof purlines (5);
the height from the upper surface of the bracket (2) to the lowest point of the roller (1) is 250-350 mm.
2. A roof plate handling equipment according to claim 1, characterised in that the rollers (1) are arranged in parallel at both ends of the bottom surface of the supporting frame (2).
3. A roof panel handling equipment according to claim 1, characterised in that the rollers (1) are fixed to the underside of the supporting frame (2) by means of pedestal bearings (3).
4. A roof plate handling equipment according to claim 3, characterised in that the seated bearings (3) are bolted to the underside of the supporting frame (2).
5. A roof plate handling equipment according to claim 1, characterised in that a protective bracket (4) for protecting the roof plate is welded to one side of the bracket (2).
6. A roof panel handling equipment according to claim 1, characterised in that the upper surface of the supporting frame (2) is also provided with anti-skid friction pads (6).
7. A roof plate conveying equipment according to claim 1, characterized in that the drum (1) is further provided with brake pads (7), and the brake pads (7) are connected with brake pedals.
CN201920538939.1U 2019-04-19 2019-04-19 Roof boarding fortune equipment Active CN210530178U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920538939.1U CN210530178U (en) 2019-04-19 2019-04-19 Roof boarding fortune equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920538939.1U CN210530178U (en) 2019-04-19 2019-04-19 Roof boarding fortune equipment

Publications (1)

Publication Number Publication Date
CN210530178U true CN210530178U (en) 2020-05-15

Family

ID=70592603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920538939.1U Active CN210530178U (en) 2019-04-19 2019-04-19 Roof boarding fortune equipment

Country Status (1)

Country Link
CN (1) CN210530178U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111874064A (en) * 2020-06-04 2020-11-03 湖北精工工业建筑系统有限公司 Horizontal transportation movable support for metal roof board
CN115559539A (en) * 2022-10-28 2023-01-03 中国二十冶集团有限公司 Horizontal transporting device for large-area logistics factory building roof boards

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111874064A (en) * 2020-06-04 2020-11-03 湖北精工工业建筑系统有限公司 Horizontal transportation movable support for metal roof board
CN111874064B (en) * 2020-06-04 2022-03-18 湖北精工工业建筑系统有限公司 Horizontal transportation movable support for metal roof board
CN115559539A (en) * 2022-10-28 2023-01-03 中国二十冶集团有限公司 Horizontal transporting device for large-area logistics factory building roof boards

Similar Documents

Publication Publication Date Title
CN210530178U (en) Roof boarding fortune equipment
CN103754539A (en) Rubbish container changing device in rubbish transfer station
US4614251A (en) Load raising vehicle and method
CN201753190U (en) Ground rail vehicle for production workshop
CN206554524U (en) A kind of construction discharging platform
CN203699114U (en) Waste container replacing device of waste transfer station
CN206953203U (en) Thick bamboo tube automatic charging device
CN107792789A (en) The mobile dress building machine of one kind
CN215055466U (en) Discharging platform for high-rise building
CN206244262U (en) Bearing cap finished product frame pallet
CN214696949U (en) Intelligent self-climbing discharging platform
NO770916L (en) TRANSPORT, STORAGE AND SORTING SYSTEM FOR LARGE METAL SHEETS
CN202099311U (en) Backing ring assembling platform for four-point suspension type mammoth converter
CN213738242U (en) Horizontal installation utility tool for internal parts of large tower
CN208716705U (en) It is a kind of to apply to the transfer tool for being mounted on small space oil cooler
CN202099312U (en) Elevated bracket for installation of four-point suspension type mammoth converter
CN202543243U (en) Special assembling platform for hanging backing ring of four-point suspension type mammoth converter
CN217731554U (en) Transportation, installation and dismounting device
US3384285A (en) Coordinated system for laying parallel pipes
CN110761545A (en) Correcting device for attached lifting scaffold guide rail
CN217805188U (en) Novel material receiving platform
CN218539107U (en) Equipment installation device applied to narrow chamber
CN213621683U (en) Carrier for carrying rails and steel plates
CN210713871U (en) Self-moving support frame of discharging platform
CN217230172U (en) Rail moving tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant