CN210524338U - Positioning structure of steel pipe - Google Patents

Positioning structure of steel pipe Download PDF

Info

Publication number
CN210524338U
CN210524338U CN201921620189.9U CN201921620189U CN210524338U CN 210524338 U CN210524338 U CN 210524338U CN 201921620189 U CN201921620189 U CN 201921620189U CN 210524338 U CN210524338 U CN 210524338U
Authority
CN
China
Prior art keywords
positioning
steel pipe
support frame
head
chuck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921620189.9U
Other languages
Chinese (zh)
Inventor
曲杰
熊东锋
潘东东
曹俊野
王洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Qianjiang Robot Co ltd
Original Assignee
Zhejiang Qianjiang Robot Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Qianjiang Robot Co ltd filed Critical Zhejiang Qianjiang Robot Co ltd
Priority to CN201921620189.9U priority Critical patent/CN210524338U/en
Application granted granted Critical
Publication of CN210524338U publication Critical patent/CN210524338U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manipulator (AREA)

Abstract

The utility model provides a location structure of steel pipe belongs to steel pipe processing technology field. It has solved the problem of current steel pipe positioning inefficiency. This location structure of steel pipe includes the chuck, is equipped with the support frame on the chuck, sets up the constant head tank that the opening upwards just supplied the work piece embedding on the support frame, and location structure still includes that setting element and support frame are formed with the centre gripping clearance that is used for the centre gripping work piece between, is equipped with on the support frame to link firmly the setting element and can drive the driving piece that the setting element removed. This location structure of steel pipe has the efficient advantage of location.

Description

Positioning structure of steel pipe
Technical Field
The utility model belongs to the technical field of steel pipe processing, a location structure of steel pipe is related to.
Background
The cutting main body of the mower is a steel pipe, flanges are arranged at two ends of the steel pipe, an installing head is fixedly connected to the outer sides of the flanges, and a plurality of blades for mowing are fixedly connected to the outer wall of the mowing column. In the prior art, the blade is fixed on the mowing column in a welding mode, so that a steel pipe needs to be positioned in the blade welding process.
In the prior art, the positioning of the steel pipe is usually performed by two-end positioning, for example, chinese patent document discloses a steel pipe flange assembling insertion positioning device [ patent No.: 201711143687.4, respectively; application publication No.: CN107962339A ], including the supporting seat of two relative settings, all be equipped with the chuck that has the locating hole on two supporting seats, be equipped with three jack catchs that can support by the work piece on the chuck.
The positioning device can clamp the steel pipe of the mower. When the steel pipe is positioned, the steel pipe is firstly required to be placed, when the structure is placed, the distance between the two supporting seats is required to be adjusted by one person, and the other person supports the steel pipe and embeds the end part of the steel pipe into the positioning hole of the chuck. After the steel pipe was placed, by three jack catch positions on the manual regulation chuck again, make the jack catch support and lean on the steel pipe, fix a position the jack catch then to realize the location at steel pipe both ends. However, in order to realize the positioning of the steel pipe, the structure needs manual intervention on one hand, and on the other hand, the adjustment of the positioning device in the positioning process is complicated, so that the positioning efficiency of the steel pipe is low.
Disclosure of Invention
The utility model aims at the above-mentioned problem that exists among the prior art, provide a location structure of steel pipe, the technical problem of solution is the location efficiency who how to improve the steel pipe.
The purpose of the utility model can be realized by the following technical proposal: the utility model provides a location structure of steel pipe, includes the chuck, be equipped with the support frame on the chuck, its characterized in that, set up the constant head tank that the opening upwards just supplied the work piece embedding on the support frame, location structure still includes that the centre gripping clearance that is used for the centre gripping work piece is formed between setting element and the support frame, be equipped with on the support frame and link firmly the setting element and can drive the driving piece that the setting element removed.
The steel pipe of the existing mower can be positioned by the positioning structure of the steel pipe, and the steel pipe of the mower is provided with the flange and the mounting head, and the support frame is provided with the positioning groove which is provided with an upward opening and is used for embedding the workpiece, so the distance between the groove walls of the positioning groove can be set to be slightly larger than the diameter of the mounting head, and the steel pipe can be placed on the support frame from the opening of the positioning groove above the support frame by a manipulator. After the steel pipe is placed, the groove wall of the positioning groove has a limiting effect on the mounting head, so that the steel pipe can be conveniently positioned on the support frame in a follow-up manner, and the positioning efficiency of the steel pipe is improved. A clamping gap for clamping a workpiece is formed between the positioning piece and the support frame, namely whether the limiting plate is positioned between the positioning piece and the support frame is the key for positioning the steel pipe. Because of the driving piece can drive the setting element and remove, make the position of setting element controllable, if the steel pipe is not leaning on the support frame placing the back flange, remove by driving piece drive setting element this moment, the removal of setting element provides the space of stepping down for the axial displacement of flange, and then can make the flange can paste and lean on the support frame through promoting current steel pipe, pastes when the flange and leans on behind the support frame, the setting element of driving piece secondary drive removes, makes the flange be located between setting element and the support frame. In other words, the positioning of the workpiece by the positioning structure can be realized only by controlling the output of the driving part, so that manual intervention is avoided, and the positioning efficiency is further improved.
In the above-mentioned location structure of a steel pipe, the support frame includes the backup pad, the outside of backup pad is for supplying the work piece to paste the face of leaning on, paste and seted up above-mentioned constant head tank on the face. Because of pasting and having seted up the constant head tank on the face, after installation head embedding constant head tank, the flange pastes and paste to carry on spacingly to the axial of steel pipe, improves the precision of placing of steel pipe, and the subsequent location of the steel pipe of being convenient for improves location efficiency from this.
In the above positioning structure for a steel pipe, the positioning member includes a positioning rod, a positioning head is screwed on the positioning rod, and the clamping gap is formed between the positioning head and the contact surface. Because the clamping gap is formed between the positioning head and the abutting surface, the positioning head is screwed on the positioning rod, and the clamping gap can be adjusted by moving the positioning head. In other words, the clamping gap can be pre-adjusted according to the thickness of the workpiece to ensure positioning stability.
In the above-mentioned location structure of a steel pipe, the driving piece is the revolving cylinder who is fixed in the backup pad, the setting element is including being long banding follow-up block, the one end of follow-up block links firmly with revolving cylinder's output shaft, and the other end links firmly with the locating lever, revolving cylinder's output shaft and locating lever parallel arrangement. Because of revolving cylinder's output shaft and locating lever all connect the follow-up block, and revolving cylinder is fixed in the backup pad, make the power of revolving cylinder output pass through the follow-up block and can drive the locating lever fast and rotate, improve location efficiency. Because of revolving cylinder's output shaft and locating lever parallel arrangement, so revolving cylinder drives the locating lever rotatory, reduces the change in centre gripping clearance as far as to guarantee positioning stability.
In the above positioning structure for the steel tube, the positioning rod is further screwed with a nut, the nut is located between the follower block and the positioning head, and the nut can be attached to the positioning head. Because of the nut spiro union is on the locating lever, and the nut can paste and lean on the locating head, makes the nut play spacing left and right sides to the locating head, guarantees positioning stability.
In the location structure of foretell steel pipe, the constant head tank runs through the inboard of backup pad, the support frame is still including the base of connecting the chuck, the base links firmly with the backup pad and is formed with the space of stepping down that supplies the manipulator embedding between the inboard of base and backup pad. Because of the inboard that the backup pad was run through to the constant head tank, the manipulator can imbed the space of stepping down of intercommunication constant head tank, makes the manipulator can assist steel pipe embedding constant head tank, and steadily places the steel pipe of centre gripping in the constant head tank, avoids the adjustment after the steel pipe is placed, improves positioning efficiency from this.
In the above positioning structure for the steel pipe, the number of the positioning members is two, and the positioning groove is located between the two positioning members. The arrangement positions of the two positioning parts further ensure that the steel pipe is firmly positioned between the supporting plate and the positioning parts.
In the above positioning structure of the steel pipe, the positioning groove is U-shaped. The U-shaped positioning groove enables the steel pipe to be conveniently embedded, the placing speed of the steel pipe is improved, and therefore the positioning efficiency is improved.
Compared with the prior art, the utility model provides a pair of location structure of steel pipe has following advantage:
1. on the support frame that can place the steel pipe through the decline of manipulator, rethread revolving cylinder drive setting element rotates and can fix a position the flange of steel pipe tip, avoided artificial intervention among the positioning process to the steel pipe, and the location step is few, improves the location efficiency of steel pipe from this.
2. In the process of placing the steel pipe on the support frame, the manipulator is embedded into the abdicating space, so that the embedding of the steel pipe is guided, the placing speed of the steel pipe is further improved, and the positioning efficiency of the steel pipe is further improved.
Drawings
Fig. 1 is a schematic structural view of the positioning structure of the present steel pipe.
Fig. 2 is a schematic structural view of the support frame of fig. 1.
Fig. 3 is a schematic view of an application structure of the positioning structure of the steel pipe.
In the figure, 1, chuck; 2. a support frame; 21. a support plate; 211. positioning a groove; 212. a contact surface; 22. a base; 23. a space of abdicating; 3. a positioning member; 31. positioning a rod; 32. positioning the head; 33. a follower block; 34. a nut; 4. a drive member; 5. a positioning table; 6. a support block; 7. a lifting cylinder; 8. a steel pipe; 81. a flange; 82. and (5) mounting the head.
Detailed Description
The following are specific embodiments of the present invention and the accompanying drawings are used to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
As shown in fig. 1, the positioning structure of the steel pipe includes a chuck 1, a support frame 2, and a positioning member 3.
As shown in fig. 1, the supporting frame 2 includes a supporting plate 21, an outer side of the supporting plate 21 is a contact surface 212 for contacting a workpiece, the contact surface 212 is provided with positioning slots 211 having an upward opening, the number of the positioning elements 3 is two, and the positioning slots 211 are located between the two positioning elements 3. The positioning groove 211 is U-shaped and penetrates through the inner side of the support plate 21, the support frame 2 further comprises a base 22 connected with the chuck 1, the base 22 and the support plate 21 are of an integrated structure, and a yielding space 23 communicated with the positioning groove 211 is formed between the inner sides of the base 22 and the support plate 21.
The supporting plate 21 is provided with a rotary cylinder which is fixedly connected with the positioning part 3 and can drive the positioning part 3 to move. As shown in fig. 2, the positioning element 3 includes a following block 33 and a positioning rod 31, the positioning rod 31 is perpendicular to the contact surface 212, one end of the following block 33 is fixedly connected to an output shaft of the rotary cylinder, the other end of the following block is fixedly connected to the positioning rod 31, and the output shaft of the rotary cylinder is parallel to the positioning rod 31.
The positioning rod 31 is screwed with a positioning head 32 and a nut 34, the nut 34 is positioned between the follow-up block 33 and the positioning head 32, the nut 34 can abut against the positioning head 32, and a clamping gap is formed between the positioning head 32 and the abutting surface 212.
As shown in fig. 3, the positioning structure further includes two positioning seats oppositely disposed, each positioning seat is provided with a chuck 1, and the chuck 1 is provided with a supporting plate 21. The positioning structure further comprises a positioning table 5 positioned between the two positioning seats, a supporting block 6 is arranged on the positioning table 5, the supporting block 6 is provided with a supporting groove with an upward opening, and the positioning structure further comprises a lifting cylinder 7 for driving the positioning table 5 to lift. Lifting cylinder 7 in this application and revolving cylinder are existing product among the prior art, can choose suitable cylinder model according to actual need among the practical application.
In the prior art, workpieces are generally conveyed by a manipulator, and the position of the positioning groove 211 is determined, so that the position of the manipulator for clamping the steel pipe 8 can also be determined, and the moving path of the manipulator can be preset in advance for realizing automatic placement. When the steel pipe 8 is placed by the manipulator, the manipulator moves downwards according to the preset path of the moving rod, and the manipulator is embedded into the abdicating space 23, so that the mounting heads 82 at the two ends of the steel pipe 8 are stably placed on the support frame 2, and the groove wall of the positioning groove 211 is used for roughly positioning the steel pipe 8. The output of the lifting cylinder 7 enables the wall of the open slot to be attached to the middle of the steel tube 8, and the support block 6 has the function of coarse positioning on the steel tube 8. After the steel pipe 8 is placed, the rotating cylinder outputs to enable the positioning head 32 to move towards the flange 81 of the steel pipe 8, and then the flange 81 of the steel pipe 8 is positioned between the positioning head 32 and the abutting surface 212, so that the steel pipe 8 can be positioned on the support frame 2.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein may be made by those skilled in the art without departing from the spirit of the invention or exceeding the scope of the invention as defined in the accompanying claims.
Although the terms of the chuck 1, the support frame 2, the support plate 21, the positioning groove 211, the abutting surface 212, the base 22, the relief space 23, the positioning member 3, the positioning rod 31, the positioning head 32, the follower block 33, the nut 34, the driving member 4, the positioning table 5, the holder block 6, the lifting cylinder 7, the steel pipe 8, the flange 81, the mounting head 82, etc. are used more herein, the possibility of using other terms is not excluded. These terms are used merely to more conveniently describe and explain the nature of the present invention; they are to be construed in a manner that is inconsistent with the spirit of the invention.

Claims (8)

1. The utility model provides a location structure of steel pipe, includes chuck (1), be equipped with support frame (2) on chuck (1), its characterized in that, set up opening constant head tank (211) that upwards just supply the work piece embedding on support frame (2), location structure still includes that setting element (3) and support frame (2) are formed with the centre gripping clearance that is used for the centre gripping work piece between, be equipped with driving piece (4) that link firmly setting element (3) and can drive setting element (3) and remove on support frame (2).
2. The positioning structure of the steel tube according to claim 1, wherein the supporting frame (2) comprises a supporting plate (21), the outer side of the supporting plate (21) is a contact surface (212) against which a workpiece is contacted, and the positioning groove (211) is formed in the contact surface (212).
3. The steel pipe positioning structure according to claim 2, wherein the positioning member (3) comprises a positioning rod (31), a positioning head (32) is screwed on the positioning rod (31), and the clamping gap is formed between the positioning head (32) and the abutting surface (212).
4. The steel pipe positioning structure according to claim 3, wherein the driving member (4) is a rotary cylinder fixed to the support plate (21), the positioning member (3) includes a following block (33) having an elongated shape, one end of the following block (33) is fixedly connected to an output shaft of the rotary cylinder, the other end of the following block is fixedly connected to the positioning rod (31), and the output shaft of the rotary cylinder is parallel to the positioning rod (31).
5. The positioning structure of the steel tube according to claim 4, wherein a nut (34) is further screwed on the positioning rod (31), the nut (34) is located between the follower block (33) and the positioning head (32), and the nut (34) can abut against the positioning head (32).
6. The positioning structure of the steel pipe according to any one of claims 2 to 5, wherein the positioning groove (211) penetrates through the inner side of the support plate (21), the support frame (2) further comprises a base (22) connected with the chuck (1), the base (22) is fixedly connected with the support plate (21), and an abdicating space (23) for a manipulator to be embedded is formed between the base (22) and the inner side of the support plate (21).
7. The positioning structure of the steel pipe according to any one of claims 1 to 5, wherein the number of the positioning members (3) is two, and the positioning groove (211) is located between the two positioning members (3).
8. The positioning structure of a steel pipe as set forth in any one of claims 1 to 5, wherein the positioning groove (211) is U-shaped.
CN201921620189.9U 2019-09-26 2019-09-26 Positioning structure of steel pipe Active CN210524338U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921620189.9U CN210524338U (en) 2019-09-26 2019-09-26 Positioning structure of steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921620189.9U CN210524338U (en) 2019-09-26 2019-09-26 Positioning structure of steel pipe

Publications (1)

Publication Number Publication Date
CN210524338U true CN210524338U (en) 2020-05-15

Family

ID=70606806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921620189.9U Active CN210524338U (en) 2019-09-26 2019-09-26 Positioning structure of steel pipe

Country Status (1)

Country Link
CN (1) CN210524338U (en)

Similar Documents

Publication Publication Date Title
CN210236721U (en) Cable take-up device
CN211708483U (en) Welding platform for sheet metal part machining
CN210524338U (en) Positioning structure of steel pipe
CN113618316A (en) Chuck device
CN219113422U (en) Part clamping device for chamfering mechanical parts
CN218903695U (en) Surface drilling positioning device for piston machining
CN218534120U (en) Clamping device is used in processing of steam turbine accessory
CN107813010B (en) A kind of automatic feed sheet cutting machine
CN215919955U (en) Inner hole deburring mechanism
CN210817994U (en) Composite machining center for metal parts
CN114985846A (en) Horizontal type tooth broaching equipment for transmission gear of isolator
CN210615130U (en) Motor shaft end cutting and turning device
CN219053135U (en) Self-adaptive gear shaving bracket
CN114453932A (en) High-adaptability metal forming machine tool with high-precision fixing clamp holder
CN114054978A (en) Steel chair height numerical control cutting device and production method thereof
CN107297625B (en) A kind of wire-electrode cutting device with grinding process
CN219852287U (en) Quick grooving device for screw production
CN217492708U (en) End face driving center
CN217728516U (en) Fixing clamp for manufacturing bearing ring with outer ring step structure
CN219131574U (en) Laser instrument spare part adds clamping apparatus
CN218169580U (en) Drilling and milling clamp for exhaust manifold
CN219837336U (en) Rotating jig for laser engraving machine
CN219254539U (en) Laser welding fixture
CN218799482U (en) Cutting assembly and cutting equipment
CN219075043U (en) Machine tool turntable for machining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant