CN210507746U - Drainage system with regulation facility - Google Patents

Drainage system with regulation facility Download PDF

Info

Publication number
CN210507746U
CN210507746U CN201921072307.7U CN201921072307U CN210507746U CN 210507746 U CN210507746 U CN 210507746U CN 201921072307 U CN201921072307 U CN 201921072307U CN 210507746 U CN210507746 U CN 210507746U
Authority
CN
China
Prior art keywords
frame
water inlet
drainage system
delivery port
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921072307.7U
Other languages
Chinese (zh)
Inventor
赵来生
陈方泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921072307.7U priority Critical patent/CN210507746U/en
Application granted granted Critical
Publication of CN210507746U publication Critical patent/CN210507746U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a drainage system with regulation facility, including regulation pond, water inlet, frame, ground and activity frame, subaerial regulation pond and the water inlet of having excavated, and communicate each other through first delivery port and regulation pond on the water inlet, and install first valve on the first delivery port, the avris of frame passes through the pouring fixed block to be fixed at the upper surface of water inlet, and the upper surface intermediate position department pouring of frame has the otter board, the upper surface pouring of activity frame has the through-rod, and the position of through-rod and the position of otter board are corresponding, and the through-rod faces the through-hole on the otter board, and the symmetry cross-under of the four corners position department of activity frame has the connection rope, and the one end that the connection rope deviates from the activity frame is fixed with the stay cord, and the stay cord is located the upper surface of. The utility model discloses, simple structure, it is convenient to use, is convenient for clear up the rubbish that blocks up on the water inlet otter board, improves work efficiency, reduces personnel's intensity of labour.

Description

Drainage system with regulation facility
Technical Field
The utility model relates to a drainage technical field specifically is a drainage system with regulation facility.
Background
The drainage means that the flow direction of water is artificially controlled and the water is artificially drained. And removing and treating excessive water. The drainage of farmland is one of the important measures for improving agricultural production conditions and ensuring high and stable yield of crops, a drainage system consisting of a field drainage adjusting net, a drainage channel, an intercepting ditch, a drainage gate, a drainage pump station, a drainage leakage area and the like is well established, managed and applied, at present, the drainage system of cities and building groups is usually comprehensively treated aiming at domestic sewage and rainwater, generally, flow dividing equipment such as a flow dividing well is used for dividing the rainwater into middle and later stage rainwater and initial stage rainwater, and the initial stage rainwater is discharged to a sewage treatment plant for treatment, so that the treatment of water is realized.
However, when raining, no matter the initial stage rainwater or the middle and later stage rainwater, more garbage is often mixed in when surface runoff, especially when the urban rainfall, the road surface garbage blocks the filter screen on the water inlet along the water inlet of the inflow drainage system, if the filter screen is not cleaned in time, the urban drainage efficiency is affected, even waterlogging may be caused, the garbage blocked on the water inlet has no good treatment measures, and the garbage can be slowly cleaned only by grabbing with hands and the like, and the efficiency is extremely low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a drainage system with regulation facility, possess simple structure, it is convenient to use, be convenient for clear up the rubbish that blocks up on the water inlet otter board, improve work efficiency, reduce personnel's intensity of labour's advantage, but solve when the rainfall, no matter be initial stage rainwater or middle and later stage rainwater, it often sneakes into more rubbish when the surface runoff, especially during the urban rainfall, road surface rubbish is in the inlet that flows into drainage system, the filter screen jam on the water inlet, if not in time clear up it, can influence urban drainage efficiency, probably cause the waterlogging even, there is not fine treatment to these rubbish stifled on the water inlet, can only slowly clear up through modes such as hand grab, the problem that efficiency is extremely low.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a drainage system with regulation facility, includes regulation pond, water inlet, frame, ground and movable frame, subaerial excavation has regulation pond and water inlet, and communicates each other through first delivery port and regulation pond on the water inlet, and installs first valve on the first delivery port, the avris of frame is fixed at the upper surface of water inlet through the pouring fixed block, and the pouring of the upper surface intermediate position department of frame has the otter board, the upper surface pouring of movable frame has the pole of penetrating, and the symmetry cross-under of the four corners position department of movable frame has the connecting rope, and the one end that the connecting rope deviates from the movable frame is fixed with the stay cord, and the stay cord is located the upper surface of frame.
Preferably, the water inlet is communicated with the third water outlet, and the third water outlet is provided with a third valve.
Preferably, the regulation and storage tank is communicated with the second water outlet, and the second water outlet is provided with a second valve.
Preferably, the upper surface of the frame is provided with a pull groove matched with the pull rope.
Preferably, the position of the through rod corresponds to the position of the screen plate, and the through rod is opposite to the through hole on the screen plate.
Preferably, the height of the penetrating rod is larger than the thickness of the mesh plate.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a drainage system with regulation facility is in the use, the rainwater converges and gets into the water inlet, get into the regulation pond through first delivery port, rivers in the regulation pond can get into sewage treatment plant through the second delivery port and handle, simultaneously, rivers in the inlet can overflow to the river in the middle of through the third delivery port, when rivers get into the water inlet, when the rivers get into the water inlet, big rubbish jam that carries in rivers is on the otter board, can drag the stay cord, the stay cord drives the connecting rope and removes and then drive the movable frame and shift up, the movable frame drives the through-rod and shifts up, the through-rod pegs graft and dredge in the through-hole of otter board, make the through-rod ejecting the rubbish that blocks up on the otter board, facilitate the clearance of clearance personnel to rubbish, after the clearance is accomplished, only need to put down the stay cord, the movable frame resumes original position under the effect of self gravity, the water inlet mesh plate cleaning machine is convenient to use, is convenient to clean garbage blocked on the water inlet mesh plate, improves the working efficiency and reduces the labor intensity of personnel.
Drawings
FIG. 1 is a schematic view of the structure of a drainage frame of the present invention;
FIG. 2 is a schematic sectional view of the water inlet of the present invention;
fig. 3 is a schematic view of the overlooking structure of the water inlet of the present invention.
In the figure: 1. a second valve; 2. a regulation and storage tank; 3. a first water outlet; 4. a water inlet; 5. a first valve; 6. a second water outlet; 7. a third valve; 8. a third water outlet; 9. a fixed block; 10. pulling a rope; 11. a screen plate; 12. groove drawing; 13. a frame; 14. a ground surface; 15. connecting ropes; 16. a penetrating rod; 17. a movable frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to fig. 3, the present invention provides an embodiment: the utility model provides a drainage system with regulation facility, including regulation pond 2, water inlet 4, frame 13, ground 14 and movable frame 17, it has regulation pond 2 and water inlet 4 to excavate on the ground 14, and communicate each other with regulation pond 2 through first delivery port 3 on the water inlet 4, and install first valve 5 on the first delivery port 3, in the use, the rainwater converges and gets into water inlet 4, get into in regulation pond 2 through first delivery port 3, regulation pond 2 communicates each other with second delivery port 6, and install second valve 1 on the second delivery port 6, rivers accessible second delivery port 6 in the regulation pond 2 gets into sewage treatment plant and handles, and simultaneously, water inlet 4 communicates each other with third delivery port 8, and install third valve 7 on the third delivery port 8, rivers accessible third delivery port 8 in the water inlet 4 overflows in the middle of the river.
The side of the frame 13 is fixed on the upper surface of the water inlet 4 through a pouring fixed block 9, a mesh plate 11 is poured in the middle position of the upper surface of the frame 13, a transparent rod 16 is poured on the upper surface of the movable frame 17, connecting ropes 15 symmetrically penetrate through the four corners of the movable frame 17, a pull rope 10 is fixed at one end of each connecting rope 15 departing from the corresponding movable frame 17, the pull rope 10 is located on the upper surface of the frame 13, when water flow enters the water inlet 4 and large garbage carried in the water flow is blocked on the mesh plate 11, the pull rope 10 can be pulled to drive the connecting ropes 15 to move and further drive the movable frame 17 to move upwards, the movable frame 17 drives the transparent rod 16 to move upwards, the position of the transparent rod 16 corresponds to the position of the mesh plate 11, the transparent rod 16 faces a through hole in the mesh plate 11, the transparent rod 16 is inserted into the through hole in the mesh plate 11 to conduct, the height of the transparent rod 16 is greater than the thickness of the mesh, the garbage can is conveniently cleaned by cleaning personnel.
After the clearance is accomplished, only need put down stay cord 10, movable frame 17 resumes original position under the effect of self gravity, and the kerve 12 with stay cord 10 looks adaptation is seted up to the upper surface of frame 13, and in stay cord 10 got into kerve 12 again, simple structure, it is convenient to use, is convenient for clear up the rubbish that blocks up on 4 otter boards 11 of water inlet, improves work efficiency, reduces personnel's intensity of labour.
The working principle is as follows: in the use process of the drainage system with the storage facility, rainwater flows into the water inlet 4 and enters the storage tank 2 through the first water outlet 3, water flow in the storage tank 2 can enter a sewage treatment plant through the second water outlet 6 for treatment, meanwhile, water flow in the water inlet 4 can overflow into a river through the third water outlet 8, when water flow enters the water inlet 4 and large garbage carried in the water flow blocks on the screen plate 11, the pull rope 10 can be pulled, the pull rope 10 drives the connecting rope 15 to move so as to drive the movable frame 17 to move upwards, the movable frame 17 drives the through rod 16 to move upwards, the through rod 16 is inserted into the through hole of the screen plate 11 for dredging, so that the through rod 16 ejects the garbage blocked on the screen plate 11, cleaning personnel can conveniently clean the garbage, after cleaning is finished, only the pull rope 10 needs to be put down, the movable frame 17 recovers the original position under the action of self gravity, the pull cord 10 reenters the pull groove 12.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a drainage system with regulation facility, includes regulation pond (2), water inlet (4), frame (13), ground (14) and movable frame (17), its characterized in that: excavation has regulation pond (2) and water inlet (4) on ground (14), and communicates each other through first delivery port (3) and regulation pond (2) on water inlet (4), and installs first valve (5) on first delivery port (3), the avris of frame (13) is fixed at the upper surface of water inlet (4) through pouring fixed block (9), and the upper surface intermediate position department pouring of frame (13) has otter board (11), the upper surface pouring of activity frame (17) has penetrating rod (16), and the four corners position department symmetry cross-under of activity frame (17) has connection rope (15), and the one end that deviates from activity frame (17) in connection rope (15) is fixed with stay cord (10), and stay cord (10) are located the upper surface of frame (13).
2. A drainage system with a storage facility according to claim 1, wherein: the water inlet (4) is communicated with the third water outlet (8), and the third water outlet (8) is provided with a third valve (7).
3. A drainage system with a storage facility according to claim 1, wherein: the regulation pond (2) and the second delivery port (6) are communicated with each other, and the second valve (1) is installed on the second delivery port (6).
4. A drainage system with a storage facility according to claim 1, wherein: the upper surface of the frame (13) is provided with a pull groove (12) matched with the pull rope (10).
5. A drainage system with a storage facility according to claim 1, wherein: the position of the transparent rod (16) corresponds to the position of the screen plate (11), and the transparent rod (16) is right opposite to the through hole on the screen plate (11).
6. A drainage system with a storage facility according to claim 1, wherein: the height of the penetrating rod (16) is larger than the thickness of the net plate (11).
CN201921072307.7U 2019-07-10 2019-07-10 Drainage system with regulation facility Expired - Fee Related CN210507746U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921072307.7U CN210507746U (en) 2019-07-10 2019-07-10 Drainage system with regulation facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921072307.7U CN210507746U (en) 2019-07-10 2019-07-10 Drainage system with regulation facility

Publications (1)

Publication Number Publication Date
CN210507746U true CN210507746U (en) 2020-05-12

Family

ID=70582176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921072307.7U Expired - Fee Related CN210507746U (en) 2019-07-10 2019-07-10 Drainage system with regulation facility

Country Status (1)

Country Link
CN (1) CN210507746U (en)

Similar Documents

Publication Publication Date Title
CN211285506U (en) Environmental protection irrigation canals and ditches debris retention device
CN212835236U (en) Ecological revetment structure for reducing water and soil loss of slope vegetation construction
CN210507746U (en) Drainage system with regulation facility
CN209798667U (en) Ecological bank protection of hydraulic engineering
CN210857475U (en) Water storage device for municipal garden
CN211571912U (en) Urban rainwater collection water level control system
CN211158891U (en) Improved generation is drain pipe for municipal garden
CN219908842U (en) Ecological farmland drainage ditch
CN113529660A (en) Multi-functional ecological landscape irrigation canals and ditches structure
CN221030566U (en) Municipal works drainage structures
CN212270873U (en) Fence for hydraulic engineering
CN217298966U (en) Soil and water conservation side slope nursing structure
CN215165320U (en) Sluice with floater interception structure
CN216713265U (en) Slope greening drainage structure
CN219195840U (en) Water conservancy drainage canal
CN220210959U (en) Purple potato cultivation land block
CN216787047U (en) Channel dredging device
CN217000052U (en) Filtration formula municipal drainage structures
CN215712470U (en) Step purification system
CN217104921U (en) Ecological slope protection for water and soil conservation
CN219033092U (en) Novel ecological protection structure of river side slope
CN216664442U (en) Sewage well blocks dirty clear device of dragging for
CN211523113U (en) Automatic device of decontaminating of ditch for hydraulic engineering
CN217232175U (en) Drainage structures in view gardens
CN214061928U (en) Cleaning device for underground pipeline filtering sludge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200512

Termination date: 20210710