CN210507325U - Temporary channel for quickly installing and guiding flood and overflow of reservoir - Google Patents

Temporary channel for quickly installing and guiding flood and overflow of reservoir Download PDF

Info

Publication number
CN210507325U
CN210507325U CN201920924862.1U CN201920924862U CN210507325U CN 210507325 U CN210507325 U CN 210507325U CN 201920924862 U CN201920924862 U CN 201920924862U CN 210507325 U CN210507325 U CN 210507325U
Authority
CN
China
Prior art keywords
fixing frame
baffle
overflow
clamping
flood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920924862.1U
Other languages
Chinese (zh)
Inventor
张志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Dingheng Construction Engineering Co Ltd
Original Assignee
Sichuan Dingheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Dingheng Construction Engineering Co Ltd filed Critical Sichuan Dingheng Construction Engineering Co Ltd
Priority to CN201920924862.1U priority Critical patent/CN210507325U/en
Application granted granted Critical
Publication of CN210507325U publication Critical patent/CN210507325U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Barrages (AREA)

Abstract

The utility model provides a reservoir flood control overflow installs water conservancy diversion fast and constructs the canal temporarily, include: the fixing frame, the fixing seat, the baffle, the clamping block and the clamping groove are arranged on the fixing frame; the fixed seat is arranged on one side of the bottom end of the fixed frame and is connected with the fixed frame in a welding mode; the baffle is arranged in the middle of the fixing frame and is connected with the fixing frame in a clamping manner; the fixture block is arranged at the left end of the fixing frame, and the fixture block and the fixing frame are of an integrated structure; the draw-in groove sets up the right-hand member at the mount, and draw-in groove and mount formula structure as an organic whole, the utility model discloses a to the improvement of mount and baffle, have convenient quick aggregate erection, effectively block to change the flood flow direction, it is convenient during the dismantlement, the advantage of the transportation of being convenient for to effectual problem appearing and not enough in having solved current device.

Description

Temporary channel for quickly installing and guiding flood and overflow of reservoir
Technical Field
The utility model relates to an engineering technical field, more specifically the utility model specifically says, especially relates to reservoir flood control overflow installs the interim canal that founds of water conservancy diversion fast.
Background
With the increasingly worsening of the environment, extreme weather such as heavy rain and the like frequently occurs, a reservoir is full of waterfall, in order to avoid serious disasters caused by flood overflow or collapse of reservoir dams and dams, the sluice is opened to drain water to a downstream flood discharge area, the loss is strived to be reduced to the minimum, a temporary diversion channel needs to be constructed to drain the flood in the reservoir to a required place, and the phenomena of waterlogging, flood irrigation, flooding and the like caused by flowing into a field or a lower area in a city are avoided.
The current channel is built temporarily to quick installation water conservancy diversion of reservoir flood control overflow has that flood comes temporary installation rate slow, and the structure is insecure, and the flood comes fiercely and washes out easily, has not changed the direction of flood, destroys ecological environment, and the flood moves back the back, dismantles the problem such as inconvenient.
In view of this, carry out research improvement to current problem, provide one kind and make up the installation fast conveniently, effectively block to change the flood flow direction, convenient during the dismantlement, the reservoir flood control overflow quick installation water conservancy diversion of being convenient for transport constructs the canal temporarily, aim at through this technique, reach the purpose of solving the problem and improving practical value nature.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy diversion is installed fast and is found the canal temporarily to solve the flood that proposes in the above-mentioned background art and come the time installation rate slow, the structure is insecure, and the flood comes the fierce easy washout of violence, has not changed the direction of flood, destroys ecological environment, and the flood moves back, dismantles inconvenient problem and not enough.
In order to achieve the above object, the utility model provides a reservoir flood control overflow installs water conservancy diversion fast and constructs the canal temporarily, is reached by following specific technological means:
reservoir flood control overflow installs water conservancy diversion temporarily and constructs the canal fast, includes: the fixing frame, the fixing seat, the baffle, the mounting seat, the bracket, the clamping block and the clamping groove are arranged on the fixing frame; the fixed seat is arranged on one side of the bottom end of the fixed frame and is connected with the fixed frame in a welding mode; the baffle is arranged in the middle of the fixing frame and is connected with the fixing frame in a clamping manner; the mounting seat is arranged at the back of the baffle and is connected with the baffle in a welding mode; the bracket is arranged in the middle of the mounting seat and is connected with the mounting seat through a rotating shaft; the fixture block is arranged at the left end of the fixing frame, and the fixture block and the fixing frame are of an integrated structure; the clamping groove is arranged at the right end of the fixing frame, and the clamping groove and the fixing frame are of an integrated structure.
As this technical scheme's further optimization, the utility model discloses reservoir flood control overflow installs the water conservancy diversion fast and constructs the canal temporarily the mount is the U type form, and offers the T shape block groove that is used for placing the baffle on the inner wall of mount both sides.
As a further optimization of this technical scheme, the utility model discloses the canal is found to quick installation water conservancy diversion of reservoir flood control overflow the baffle is the I shape form, and the back of baffle is provided with the mount pad of U type form.
As this technical scheme's further optimization, the utility model discloses the ditch is found temporarily to quick installation water conservancy diversion of reservoir flood control overflow the support is the bar form, and the bottom welding of support has rectangle form mounting panel.
As this technical scheme's further optimization, the utility model discloses the canal is found to quick installation water conservancy diversion of reservoir flood control overflow the fixture block is the U type form with the draw-in groove, and the fixture block is connected through the block mode with the draw-in groove.
Because of above-mentioned technical scheme's application, compared with the prior art, the utility model have the following advantage:
1. the utility model discloses reservoir flood control overflow installs the water conservancy diversion fast and constructs the canal temporarily, carries out block concatenation installation with the mount through fixture block and draw-in groove, goes into the mount with the baffle card again in to make the device make things convenient for the fast assembly installation.
2. The utility model discloses the interim canal that founds of water conservancy diversion is installed fast to reservoir flood control overflow, supports through support and baffle ninety degrees to make support and baffle can effectually block the flood, change the trickling direction of flood, prevent to flow into village or city and cause the loss.
3. The utility model discloses the canal is found temporarily to quick installation water conservancy diversion of reservoir flood control overflow, and the device passes through block mode concatenation equipment, passes through the bolt fastening with the mount bottom to the bottom surface that needs the water conservancy diversion to make the flood water conservancy diversion convenient quick through the device, the device dismantles conveniently after the flood moves away, the transportation of being convenient for.
4. The utility model discloses a to the improvement of mount and baffle, have convenient quick aggregate erection, effectively block to change the flood flow direction, it is convenient during the dismantlement, the advantage of the transportation of being convenient for, thereby effectual solution the utility model discloses the problem of proposing in background art one with not enough.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
fig. 1 is a schematic structural view of a temporary channel for fast installation and diversion of reservoir flood control and overflow water of the utility model;
FIG. 2 is a schematic view of the structure of the fixing frame for the temporary channel for fast installation and diversion of reservoir flood control and overflow;
fig. 3 is the utility model discloses the baffle structure sketch map of the interim canal that founds of quick installation water conservancy diversion of reservoir flood control overflow.
In the figure: the fixing device comprises a fixing frame 1, a fixing seat 2, a baffle 3, a mounting seat 4, a bracket 5, a clamping block 101 and a clamping groove 102.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
It is to be noted that, in the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Please refer to fig. 1 to 3, the utility model provides a concrete technical implementation scheme of temporary canal construction for fast installation and diversion of reservoir flood control and overflow:
reservoir flood control overflow installs water conservancy diversion temporarily and constructs the canal fast, includes: the device comprises a fixed frame 1, a fixed seat 2, a baffle 3, a mounting seat 4, a bracket 5, a fixture block 101 and a clamping groove 102; the fixed seat 2 is arranged on one side of the bottom end of the fixed frame 1, and the fixed seat 2 is connected with the fixed frame 1 in a welding mode; the baffle 3 is arranged in the middle of the fixed frame 1, and the baffle 3 is connected with the fixed frame 1 in a clamping way; the mounting seat 4 is arranged at the back of the baffle 3, and the mounting seat 4 is connected with the baffle 3 in a welding mode; the bracket 5 is arranged in the middle of the mounting seat 4, and the bracket 5 is connected with the mounting seat 4 through a rotating shaft; the fixture block 101 is arranged at the left end of the fixing frame 1, and the fixture block 101 and the fixing frame 1 are of an integrated structure; the clamping groove 102 is arranged at the right end of the fixing frame 1, and the clamping groove 102 and the fixing frame 1 are of an integrated structure.
Specifically, mount 1 is the U type form, and offers the T shape block groove that is used for placing baffle 3 on the inner wall of mount 1 both sides, conveniently pegs graft the block with baffle 3.
Specifically, the baffle 3 is I-shaped, the back of the baffle 3 is provided with a U-shaped mounting seat 4, and two ends of the baffle 3 are provided with sealing rubber strips.
Specifically, support 5 is the bar form, and the bottom welding of support 5 has the rectangle form mounting panel, is favorable to supporting fixed stop, prevents that the flood is violent to be rushed down.
Specifically, the clamping block 101 and the clamping groove 102 are both in a U shape, and the clamping block 101 and the clamping groove 102 are connected in a clamping mode, so that splicing and assembling are facilitated.
The method comprises the following specific implementation steps:
when the device is used, the diversion direction is selected firstly, the fixing frame 1 is fixed to the ground needing diversion through the fixing seat 2 by using the bolts, then the clamping block 101 and the clamping groove 102 on the fixing frame 1 are utilized for splicing and fixing, and finally the baffle 3 is inserted into the fixing frame 1 from top to bottom to be clamped, so that flood is effectively blocked, and the flow direction of the flood is changed.
In summary, the following steps: this ditch is built temporarily to quick installation water conservancy diversion of reservoir flood prevention overflow, carry out block concatenation installation through passing through fixture block and draw-in groove with the mount, go into the mount with the baffle card again, support through support and baffle ninety degrees, thereby make support and baffle can effectually block flood, change the trickling direction of flood, the device passes through block mode concatenation equipment, pass through the bolt fastening with the mount bottom to the bottom surface that needs the water conservancy diversion, thereby it is convenient quick to make the flood water conservancy diversion through the device, the device dismantles conveniently after the flood moves back, it is slow to have solved the flood time-spent installation rate, the sound construction is insecure, flood comes fiercely and destroys easily, the direction of flood can not be changed, destroy ecological environment, the flood moves back, inconvenient dismantlement problem.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. Reservoir flood control overflow installs water conservancy diversion temporarily and constructs the canal fast, includes: the fixing frame (1), the fixing seat (2), the baffle (3), the mounting seat (4), the bracket (5), the fixture block (101) and the clamping groove (102); the method is characterized in that: the fixing seat (2) is arranged on one side of the bottom end of the fixing frame (1), and the fixing seat (2) is connected with the fixing frame (1) in a welding mode; the baffle (3) is arranged in the middle of the fixing frame (1), and the baffle (3) is connected with the fixing frame (1) in a clamping manner; the mounting seat (4) is arranged at the back of the baffle (3), and the mounting seat (4) is connected with the baffle (3) in a welding mode; the bracket (5) is arranged in the middle of the mounting seat (4), and the bracket (5) is connected with the mounting seat (4) through a rotating shaft; the fixture block (101) is arranged at the left end of the fixing frame (1), and the fixture block (101) and the fixing frame (1) are of an integrated structure; the clamping groove (102) is arranged at the right end of the fixing frame (1), and the clamping groove (102) and the fixing frame (1) are of an integrated structure.
2. The rapid installation and diversion temporary construction canal for flood control and overflow of the reservoir according to claim 1, which is characterized in that: the fixing frame (1) is U-shaped, and T-shaped clamping grooves for placing the baffle plates (3) are formed in the inner walls of the two sides of the fixing frame (1).
3. The rapid installation and diversion temporary construction canal for flood control and overflow of the reservoir according to claim 1, which is characterized in that: the baffle (3) is I-shaped, and a U-shaped mounting seat (4) is arranged at the back of the baffle (3).
4. The rapid installation and diversion temporary construction canal for flood control and overflow of the reservoir according to claim 1, which is characterized in that: support (5) are the bar form, and the bottom welding of support (5) has the rectangle form mounting panel.
5. The rapid installation and diversion temporary construction canal for flood control and overflow of the reservoir according to claim 2, wherein: the clamping block (101) and the clamping groove (102) are both U-shaped, and the clamping block (101) is connected with the clamping groove (102) in a clamping mode.
CN201920924862.1U 2019-06-19 2019-06-19 Temporary channel for quickly installing and guiding flood and overflow of reservoir Active CN210507325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920924862.1U CN210507325U (en) 2019-06-19 2019-06-19 Temporary channel for quickly installing and guiding flood and overflow of reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920924862.1U CN210507325U (en) 2019-06-19 2019-06-19 Temporary channel for quickly installing and guiding flood and overflow of reservoir

Publications (1)

Publication Number Publication Date
CN210507325U true CN210507325U (en) 2020-05-12

Family

ID=70579272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920924862.1U Active CN210507325U (en) 2019-06-19 2019-06-19 Temporary channel for quickly installing and guiding flood and overflow of reservoir

Country Status (1)

Country Link
CN (1) CN210507325U (en)

Similar Documents

Publication Publication Date Title
CN211498870U (en) Deep foundation pit supporting structure
CN210507325U (en) Temporary channel for quickly installing and guiding flood and overflow of reservoir
CN208858401U (en) A kind of tunnel drainage structure
CN104563064B (en) A kind of for water remediation combination fast-assembling fiberglass check dam
CN209909315U (en) Piping lane support is used in municipal administration pipeline installation
CN204401904U (en) A kind of siphon rain pipe fastening devices
CN211231961U (en) Reinforced concrete pipe that leakproofness is good
CN211646287U (en) Bottom water stop structure of flap gate
CN211256736U (en) Bridge deceleration strip drainage device
CN204850009U (en) Modularization drainage pipe
CN207092041U (en) A kind of water conservancy construction retains part flow arrangement with current
CN218407468U (en) Waterproof structure for subway tunnel construction
CN210797834U (en) Outdoor circulating water pond
KR101775665B1 (en) Assembly floodgate
CN214833267U (en) City planning municipal drainage pipe
CN215806862U (en) Anti-seepage protective sleeve structure for tap water supply pipeline
CN218148782U (en) Town road quick drainage structures
CN216446361U (en) Municipal works are with can splicing formula flashing board
CN219571272U (en) Water supply and drainage protection structure
CN214245350U (en) High-temperature-resistant water drain pipe for bridge
CN219568759U (en) Soil collapse preventing device for two sides of river dam
KR20040097080A (en) a mold apparatus for the elbow section of watercourse
CN217710605U (en) Reservoir small watershed water conservancy diversion construction structures that dams
CN220769096U (en) Enclose fender device for hydraulic engineering barrage
CN219341889U (en) Gate for ozone contact pool water outlet channel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant