CN210482283U - Waterproof device for pile head of cast-in-place pile - Google Patents
Waterproof device for pile head of cast-in-place pile Download PDFInfo
- Publication number
- CN210482283U CN210482283U CN201921132378.1U CN201921132378U CN210482283U CN 210482283 U CN210482283 U CN 210482283U CN 201921132378 U CN201921132378 U CN 201921132378U CN 210482283 U CN210482283 U CN 210482283U
- Authority
- CN
- China
- Prior art keywords
- pile
- cast
- groove
- waterproof
- place
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a waterproof device for the pile head of a cast-in-place pile, which comprises a cast-in-place pile and pile foundation concrete, the pile foundation concrete is poured on both sides of the cast-in-place pile, a groove is arranged on the surface of the outer side of the cast-in-place pile, a sealing waterproof rubber strip No. two is fixedly connected inside the groove No. one, a side plate is arranged on one side of the sealing waterproof rubber strip No. two, the side plate is fixedly connected inside the groove No. one through a fastening bolt No. two, a groove is arranged on the upper end surface of the pile foundation concrete, a sealing waterproof rubber strip No. one is fixedly connected inside the groove No. two, a bottom plate is arranged above the sealing waterproof rubber strip No. one, the bottom plate is fixedly connected inside the groove No. two through the fastening bolt, the utility model discloses a waterproof rubber strip No. one, a waterproof rubber strip No. two, a side plate and, a pile head peripheral sealing system is formed, and the problem that the pile head is easy to seep water is thoroughly solved.
Description
Technical Field
The utility model relates to a bored concrete pile specifically is a bored concrete pile head watertight fittings.
Background
The cast-in-place pile has the advantages of no vibration, no soil squeezing, low noise, suitability for dense urban building areas and the like during construction, and is widely applied to construction. The cast-in-place piles can be classified into cast-in-place piles for dry-work hole forming, cast-in-place piles for slurry retaining wall hole forming, cast-in-place piles for manual hole digging, and the like according to the difference of hole forming processes. The drilling and pouring means that a pile hole is drilled by a drilling machine and concrete is poured into the hole to form a pile. The method is divided into two methods, namely slurry wall protection hole forming and dry operation hole forming, according to whether a drill bit of the drilling machine is constructed in an aquifer of soil. The pipe sinking cast-in-place refers to a pile formed by sinking a steel sleeve with a valve type pile tip or a prefabricated reinforced concrete pile shoe into the soil by a hammering pile-in-place method or a vibration pile-in-place method, and then hammering or vibrating while pulling out a pipe while pouring concrete, wherein the former is called a hammering pipe-sinking cast-in-place pile, and the latter is called a vibration pipe-sinking cast-in-place pile. The pile forming process of the immersed tube cast-in-place pile comprises the following steps: the pile driver is in place → pipe sinking by hammering → loading → pipe pulling while hammering, and concrete is continuously poured → the steel reinforcement cage is put down, concrete is continuously poured and pipe pulling → pile forming is carried out. The manual hole digging indicates that a pile hole is formed by adopting a manual digging method, then a steel reinforcement cage is placed, and concrete is poured to form the pile. In order to ensure the safety of the manual hole digging pile in the construction process, the phenomena of hole wall collapse and sand running must be prevented during construction, reasonable wall protection measures are made, and the construction process flow of the manual hole digging pile is explained by taking the application of wider cast-in-place concrete segmented wall protection as an example. The explosion-expanded cast-in-place pile is characterized in that holes are formed by drilling and explosion expansion, explosives are placed at the bottom of the holes, then a proper amount of concrete is poured in the holes, then the holes are detonated, expanded heads are formed at the bottom of the holes, then a reinforcement cage is placed in the holes, and pile body concrete is poured.
However, the existing pile head waterproof method only treats the pile body with simple waterproof materials, an effective waterproof whole cannot be formed, the pile head and the bottom plate are not uniformly settled or the joint part is not properly treated, and underground water permeates into the bottom plate along the joint part, so that the structural safety and the use function are influenced. Therefore, the waterproof device for the pile head of the cast-in-place pile is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bored concrete pile head watertight fittings to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a bored concrete pile head watertight fittings, includes bored concrete pile and pile foundation concrete, pile foundation concrete has all been pour to bored concrete pile both sides, the recess has been seted up on bored concrete pile outside surface, No. two sealed waterproof rubber strips of the inside fixedly connected with of recess, No. two sealed waterproof rubber strip one side is provided with the curb plate, the curb plate ties fixed connection inside No. one recess through No. two fastenings, No. two recesses have been seted up on pile foundation concrete upper end surface, No. two sealed waterproof rubber strips of the inside fixedly connected with of recess, a sealed waterproof rubber strip top is provided with the bottom plate, the bottom plate ties fixed connection inside No. two recesses through No. one fastening, the waterproof glue has been pour to the junction between curb plate and the bottom plate, the cement mortar protective layer has been pour to pile foundation concrete upper end surface.
Preferably, the inside fixedly connected with pile head reinforcing bar of bored concrete pile, pile head reinforcing bar one end extends to the bored concrete pile top, the pile head waterproof layer has been pour to bored concrete pile upper end surface.
Preferably, waterproof sealing materials are poured at the joint of the side plate and the first groove and the joint of the bottom plate and the second groove.
Preferably, the surfaces of the side plates and the bottom plate are provided with through holes.
Preferably, the cast-in-place pile is a cast-in-place pile with a cylindrical structure.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a be provided with waterproof adhesive tape, No. two waterproof adhesive tape, curb plate and bottom plate for bored concrete pile and pile foundation concrete junction possess fine waterproof sealing nature, make bored concrete pile head form a pile head sealing system all around, thoroughly solved the problem that the pile head seeps water easily.
2. The utility model discloses a be provided with pile head reinforcing bar and pile head waterproof layer, the pile head reinforcing bar conveniently carries out the cushion cap construction and the pile head waterproof layer can be fine make the top of pile head possess fine waterproof nature.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic top view of the present invention;
fig. 3 is a schematic view of the connection structure of the side plate and the bottom plate of the present invention.
In the figure: 1 bored concrete pile, 2 pile head waterproof layers, 3 pile head reinforcing bars, No. 4 recesses, 5 curb plates, 6 bottom plates, 7 pile foundation concretes, No. 8 waterproof sealing rubber strips, No. 9 recesses, No. 10 waterproof sealing rubber strips, No. 11 fastening bolt, 12 cement mortar protective layer, 13 waterproof glue, No. 14 fastening bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a waterproof device for a pile head of a cast-in-place pile comprises a cast-in-place pile 1 and pile foundation concrete 7, wherein the pile foundation concrete 7 is cast on two sides of the cast-in-place pile 1, the outer side surface of the cast-in-place pile 1 is provided with a first groove 4, a second sealing waterproof rubber strip 10 is fixedly connected inside the first groove 4, a side plate 5 is arranged on one side of the second sealing waterproof rubber strip 10, the side plate 5 is fixedly connected inside the first groove 4 through a second fastening bolt 14, a second groove 9 is formed on the upper end surface of the pile foundation concrete 7, a first sealing waterproof rubber strip 8 is fixedly connected inside the second groove 9, a bottom plate 6 is arranged above the first sealing waterproof rubber strip 8, the bottom plate 6 is fixedly connected inside the second groove 9 through a first fastening bolt 11, waterproof glue 13 is poured at the joint between the side plate 5 and the bottom plate 6, and a cement mortar protective layer 12 is poured on the surface of the upper end of the pile foundation concrete 7.
Further, 1 inside fixedly connected with pile head reinforcing bar 3 of bored concrete pile, 3 one ends of pile head reinforcing bar extend to 1 top of bored concrete pile, pile head waterproof layer 2 has been pour to 1 upper end surface of bored concrete pile, and pile head reinforcing bar 3 conveniently carries out the cushion cap construction and the top that makes the pile head that pile head waterproof layer 2 can be fine possesses fine waterproof nature.
Furthermore, waterproof sealing materials are filled at the joints of the side plates 5 and the first groove 4 and the joints of the bottom plate 6 and the second groove 9, so that the sealing performance is improved, and the side plates have good waterproof performance.
Furthermore, the surfaces of the side plate 5 and the bottom plate 6 are provided with through holes, so that the first fastening bolt 11 and the second fastening bolt 14 can be conveniently fixed.
Furthermore, the cast-in-place pile 1 is of a cylindrical structure, and construction is facilitated.
Specifically, during the use, pour bored concrete pile 1 and pile foundation concrete 7 jointly, then at 1 outside surface of bored concrete pile and pile foundation concrete 7 upper end surface's a recess 4 and No. two recess 9 insides install No. two sealing waterproof rubber strip 10 and a sealing waterproof rubber strip 8 respectively, fix curb plate 5 and bottom plate 6 through No. two gim peg 14 and a gim peg 11 respectively again, and pour waterproof material around curb plate 5 and bottom plate 6, make it sealed, then beat waterproof glue 13 with the junction of 5 boards of side and bottom plate 6, at last pour cement mortar protective layer 12 at pile foundation concrete 7 upper end.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a bored concrete pile head watertight fittings, includes bored concrete pile (1) and pile foundation concrete (7), its characterized in that have all been pour to bored concrete pile (1) both sides: a first groove (4) is formed in the outer side surface of the cast-in-place pile (1), a second sealing waterproof rubber strip (10) is fixedly connected inside the first groove (4), a side plate (5) is arranged on one side of the second sealing waterproof rubber strip (10), the side plate (5) is fixedly connected inside the first groove (4) through a second fastening bolt (14), the upper end surface of the pile foundation concrete (7) is provided with a second groove (9), a first sealing waterproof rubber strip (8) is fixedly connected inside the second groove (9), a bottom plate (6) is arranged above the first sealing waterproof rubber strip (8), the bottom plate (6) is fixedly connected inside the second groove (9) through a first fastening bolt (11), waterproof glue (13) is poured at the joint between the side plate (5) and the bottom plate (6), and a cement mortar protective layer (12) is poured on the upper end surface of the pile foundation concrete (7).
2. The pile head waterproof device for the cast-in-place pile of claim 1, which is characterized in that: bored concrete pile (1) inside fixedly connected with pile head reinforcing bar (3), pile head reinforcing bar (3) one end extends to bored concrete pile (1) top, bored concrete pile (1) upper end surface has pour pile head waterproof layer (2).
3. The pile head waterproof device for the cast-in-place pile of claim 1, which is characterized in that: and waterproof sealing materials are poured at the joint of the side plate (5) and the first groove (4) and the joint of the bottom plate (6) and the second groove (9).
4. The pile head waterproof device for the cast-in-place pile of claim 1, which is characterized in that: through holes are formed in the surfaces of the side plate (5) and the bottom plate (6).
5. The pile head waterproof device for the cast-in-place pile of claim 1, which is characterized in that: the cast-in-place pile (1) is a cast-in-place pile with a cylindrical structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921132378.1U CN210482283U (en) | 2019-07-18 | 2019-07-18 | Waterproof device for pile head of cast-in-place pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921132378.1U CN210482283U (en) | 2019-07-18 | 2019-07-18 | Waterproof device for pile head of cast-in-place pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210482283U true CN210482283U (en) | 2020-05-08 |
Family
ID=70533436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921132378.1U Expired - Fee Related CN210482283U (en) | 2019-07-18 | 2019-07-18 | Waterproof device for pile head of cast-in-place pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210482283U (en) |
-
2019
- 2019-07-18 CN CN201921132378.1U patent/CN210482283U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11214938B2 (en) | Construction method for pouring concrete in karst cave | |
CN101614020B (en) | Flexible bladder type anticorrosion device, anticorrosion pile and construction method using same | |
CN105780763B (en) | Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile | |
CN108677924B (en) | Double-row miniature steel pipe pile grouting wall-forming partition structure and method | |
KR101051965B1 (en) | Panel joint for underground continuous wall construction and underground continuous wall construction method | |
CN203034467U (en) | Combined steel pile cofferdam with water-proof fore shafts | |
CN101358453A (en) | Composite boxed cofferdam and building method thereof | |
CN201089893Y (en) | Foundation pit circle shield prefabricated driven pile | |
CN102900089A (en) | Combined steel pile cofferdam provided with water swellable waterproof rubber fore shaft | |
CN110306593A (en) | A kind of station construction method | |
CN102002945B (en) | Capsule type anti-corrosion device with pile shoe and anti-corrosion pile using same and construction method | |
CN207862925U (en) | A kind of slip casting casing device | |
CN104074197A (en) | Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof | |
CN210482283U (en) | Waterproof device for pile head of cast-in-place pile | |
CN104452776B (en) | Meet with the one construction Treatment Methods of diaphragm wall during boulder | |
CN207109804U (en) | A kind of quick spreading structure configuration of soft soil foundation bored concrete pile | |
KR200362565Y1 (en) | Earth Retaining Wall Structure Using Precast Concrete Pile and Construction Method Thereof | |
CN107012792B (en) | A kind of construction method of bridge substructure | |
CN214497488U (en) | Splicing structure for final-setting cast-in-place pile | |
CN107476293A (en) | A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method | |
CN113585223A (en) | Construction method of barrel-type PVC concrete cast-in-place pile in saturated saline soil area | |
CN110424488A (en) | A kind of construction method of diaphram wall | |
CN112411590A (en) | Underground diaphragm wall structure and construction method | |
CN109763518A (en) | A kind of construction method of basement post-pouring zone | |
CN110206563A (en) | A kind of full packet waterproof composite lining structure resistant to pressure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200508 Termination date: 20210718 |