CN210439730U - A instrument room integrates for dam construction - Google Patents

A instrument room integrates for dam construction Download PDF

Info

Publication number
CN210439730U
CN210439730U CN201920984916.3U CN201920984916U CN210439730U CN 210439730 U CN210439730 U CN 210439730U CN 201920984916 U CN201920984916 U CN 201920984916U CN 210439730 U CN210439730 U CN 210439730U
Authority
CN
China
Prior art keywords
frame
plate
construction
bottom plate
dam construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920984916.3U
Other languages
Chinese (zh)
Inventor
王艳伟
王新平
吴燕林
陈孟超
王鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201920984916.3U priority Critical patent/CN210439730U/en
Application granted granted Critical
Publication of CN210439730U publication Critical patent/CN210439730U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model belongs to the technical field of water conservancy water and electricity construction equipment, concretely relates to instrument house integrates for dam construction. Constitute by frame, roof, bottom plate and curb plate, roof and bottom plate be one, the curb plate be four, roof, bottom plate and curb plate pass through the tool room that the frame enclosed into the cuboid form jointly, four angles of frame upper end on be equipped with an annular lug respectively, use the utility model discloses a tool room can be placed required instrument and material in the work progress wherein, has solved construction equipment and material and has stacked the confusion, influences the problem of engineering progress and construction quality.

Description

A instrument room integrates for dam construction
Technical Field
The utility model belongs to the technical field of water conservancy water and electricity construction equipment, concretely relates to instrument house integrates for dam construction.
Background
The hydropower station dam mainly comprises civil engineering and metal structure installation construction, a working face needs to be frequently transferred in the concrete pouring construction process, and part of construction machinery, materials and the like need to be shared. In the prior art, a standard tool room is not available, so that construction equipment and materials are stacked disorderly, and the engineering progress and the construction quality are seriously influenced. In order to improve the construction efficiency and promote safe and civilized construction, an integrated tool room for dam construction needs to be manufactured, so that required machinery, materials and the like are gathered in the tool room, the required machinery, materials and the like can be transferred along with a construction surface, and the dam construction requirement is met.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the not enough of prior art, provide an instrument room integrates for dam construction.
The utility model discloses a realize through following technical scheme:
an integrated tool room for dam construction comprises a frame, a top plate, a bottom plate and side plates, wherein the top plate and the bottom plate are respectively one, the number of the side plates is four, the top plate, the bottom plate and the side plates form a rectangular tool room through the frame, four corners of the upper end of the frame are respectively provided with an annular lifting lug, the bottom of the frame is provided with a supporting seat, and the supporting seat is provided with a fixing hole; the side plate is provided with a door opening, the bottom and the top of the door opening are provided with sliding rails, and a door plate is slidably arranged on the sliding rails.
The lower surface of the top plate is also provided with a plurality of hooks.
The thickness of the top plate, the bottom plate and the side plate is 0.5-1 mm.
The frame on one side of the door opening is also provided with a bolt opening, and the door plate is provided with a bolt corresponding to the bolt opening.
The frame in still be equipped with the strengthening rib, roof, bottom plate and curb plate all pass through the strengthening rib welding on the frame.
Compared with the prior art, the utility model provides an integrated tool room for dam construction, which can be used for placing tools and materials required in the construction process, and solves the problems of disordered stacking of construction equipment and materials and influence on the engineering progress and the construction quality; when the working face is transferred, the tool house is locked through the bolt, the tool house is lifted to a preset position through the lifting lugs by utilizing lifting machinery, the U-shaped clamp is fixed on the template operation platform through the fixing hole, after construction is completed, the U-shaped clamp is taken out and lifted to a new construction position, and the tool house is very convenient to use.
Drawings
Figure 1 is a schematic structural diagram of the present invention,
in the figure: 1-frame, 2-reinforcing rib, 3-top plate, 4-side plate, 5-hook, 6-bottom plate, 7-bolt, 8-bolt opening, 9-door frame, 10-door plate, 11-slide rail, 12-lifting lug, 13-supporting seat and 14-fixing hole.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and examples, but the scope of the present invention is not limited by the examples.
Example 1
An integrated tool room for dam construction comprises a frame, a top plate, a bottom plate and side plates, wherein the top plate and the bottom plate are respectively one, the number of the side plates is four, the top plate, the bottom plate and the side plates form a rectangular tool room through the frame, four corners of the upper end of the frame are respectively provided with an annular lifting lug, the bottom of the frame is provided with a supporting seat, and the supporting seat is provided with a fixing hole; the side plate is provided with a door opening, the bottom and the top of the door opening are provided with sliding rails, and a door plate is slidably arranged on the sliding rails.
The lower surface of the top plate is also provided with a plurality of hooks.
The thickness of the top plate, the bottom plate and the side plate is 0.5-1 mm.
The frame on one side of the door opening is also provided with a bolt opening, and the door plate is provided with a bolt corresponding to the bolt opening.
The frame in still be equipped with the strengthening rib, roof, bottom plate and curb plate all pass through the strengthening rib welding on the frame.
By using the tool house of the utility model, tools and materials required in the construction process can be placed in the tool house, thus solving the problems that construction equipment and materials are disordered and the progress of the project and the construction quality are influenced; when the working face is transferred, the tool house is locked through the bolt, the tool house is lifted to a preset position through the lifting lugs by utilizing lifting machinery, the U-shaped clamp is fixed on the template operation platform through the fixing hole, after construction is completed, the U-shaped clamp is taken out and lifted to a new construction position, and the tool house is very convenient to use.

Claims (5)

1. An integrated tool house for dam construction comprises a frame, a top plate, a bottom plate and side plates, wherein the top plate and the bottom plate are one, the number of the side plates is four, and the top plate, the bottom plate and the side plates form a rectangular tool house through the frame; the side plate is provided with a door opening, the bottom and the top of the door opening are provided with sliding rails, and a door plate is slidably arranged on the sliding rails.
2. An integrated tool house for dam construction as claimed in claim 1, wherein said top plate is further provided with a plurality of hooks on its lower surface.
3. An integrated tool house for dam construction as claimed in claim 1, wherein the thickness of said top, bottom and side plates is 0.5-1 mm.
4. An integrated tool house for dam construction as claimed in claim 1, wherein the frame at one side of the door opening is further provided with a bolt hole, and the door panel is provided with a bolt corresponding to the bolt hole.
5. An integrated tool house for dam construction as claimed in claim 1, wherein the frame is further provided with reinforcing ribs, and the top plate, the bottom plate and the side plates are welded to the frame through the reinforcing ribs.
CN201920984916.3U 2019-06-27 2019-06-27 A instrument room integrates for dam construction Active CN210439730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920984916.3U CN210439730U (en) 2019-06-27 2019-06-27 A instrument room integrates for dam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920984916.3U CN210439730U (en) 2019-06-27 2019-06-27 A instrument room integrates for dam construction

Publications (1)

Publication Number Publication Date
CN210439730U true CN210439730U (en) 2020-05-01

Family

ID=70404661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920984916.3U Active CN210439730U (en) 2019-06-27 2019-06-27 A instrument room integrates for dam construction

Country Status (1)

Country Link
CN (1) CN210439730U (en)

Similar Documents

Publication Publication Date Title
CN206233102U (en) A kind of packaged type faces side operation work platform
CN201592318U (en) Steel plate butt welding permanent magnet levelling device
CN202742087U (en) Member positioning device for universal radial drill
CN210288350U (en) A shaped steel positioner for SMW worker method stake
CN210439730U (en) A instrument room integrates for dam construction
CN103046451A (en) Roadbed box for large crawler crane
CN215861488U (en) Be used for novel concrete foundation
CN109518960B (en) Shaping mold capable of realizing turnover of reserved hole of cast-in-situ roof and construction method of shaping mold
CN202447878U (en) Simple aligning line rack for installation centre line of detachable equipment
CN101898622B (en) Jig frame tooling component for longitudinal bulkhead segmented general assembling construction
CN203128972U (en) Roadbed box for large-scale crawler crane
CN212127269U (en) Steel sheet lifts by crane hoist for construction
CN201136020Y (en) Punching apparatus for tube of timber support
CN203271769U (en) Concrete pipe piece steel mould with box structure
CN216766768U (en) Molding clamping mechanism for early-dismantling formwork production of post-cast strip
CN203791687U (en) Positioning tool set for horizontal adjustable hinge base drill hole
CN202559710U (en) Dismountable anchoring device for overhanging type steel-steel beam
CN206046267U (en) A kind of wet electrical dust precipitator anode module support
CN206084419U (en) Equipment alignment translation device
CN211895689U (en) Pushing structure for moving power equipment
CN214785838U (en) Multifunctional elevator shaft operating platform device
CN210763875U (en) Integrated hoisting tool for improving efficiency of cable crane
CN218174400U (en) Clamp for cement brick production
CN205382503U (en) Open caisson back cover bed course concrete operation platform for joint bar
CN218265832U (en) Auxiliary positioning device for down-the-hole drill drilling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant