CN210418845U - Well - Google Patents

Well Download PDF

Info

Publication number
CN210418845U
CN210418845U CN201921258557.XU CN201921258557U CN210418845U CN 210418845 U CN210418845 U CN 210418845U CN 201921258557 U CN201921258557 U CN 201921258557U CN 210418845 U CN210418845 U CN 210418845U
Authority
CN
China
Prior art keywords
wallboard
standard
adjacent
wall panel
sets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921258557.XU
Other languages
Chinese (zh)
Inventor
董安国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Butian Jindao Engineering Co ltd
Original Assignee
Fujian Butian Jindao Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Butian Jindao Engineering Co ltd filed Critical Fujian Butian Jindao Engineering Co ltd
Priority to CN201921258557.XU priority Critical patent/CN210418845U/en
Application granted granted Critical
Publication of CN210418845U publication Critical patent/CN210418845U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a special equipment technical field especially relates to a well, the well includes the standard festival of two sets of and above end-to-end concatenations, first wallboard is equipped with on the standard festival, the hookup location of the stand on the adjacent two sets of standard festival of first wallboard correspondence is equipped with the breach, is located the stand of breach department and is equipped with the second wallboard. The utility model discloses compare in the connection structure and the installation step of traditional standard festival and wallboard, improved the connection structure and the installation order of wallboard and standard festival, improved the efficiency of field installation, alleviateed installer's work load, guaranteed the installation quality.

Description

Well
Technical Field
The utility model relates to a special equipment technical field especially relates to a well.
Background
When the well is added to the outer layer of the original building and the elevator equipment is installed again, installation personnel are needed to splice the standard sections on site, the adjacent standard sections are fixedly connected through glue and high-strength bolts, and the wall plates on the standard sections are installed on the standard sections through bolts. At present, installation personnel cannot improve the building efficiency of a well because connection between standard sections and installation of a wallboard can not be carried out synchronously in the field installation process, great manpower and installation time need to be consumed, the difficulty of field installation is increased, and the shaft installation quality and safety are not favorably ensured.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model aims to solve the technical problem of providing a well that can improve on-the-spot installation effectiveness and quality.
In order to solve the technical problem, the utility model discloses a technical scheme be: the utility model provides a well, the well includes the standard festival of two sets of and above end-to-end concatenations, first wallboard is equipped with on the standard festival, the hookup location of the stand that first wallboard corresponds on two sets of adjacent standard festival is equipped with the breach, is located to be equipped with the second wallboard on the stand of breach department.
In an optional embodiment, the first wall plate comprises an upper wall plate and a lower wall plate which are respectively installed on two adjacent groups of standard joints, the upper wall plate is provided with a first notch corresponding to the connecting position of the upright posts on the two adjacent groups of standard joints, and the lower wall plate is provided with a second notch corresponding to the connecting position of the upright posts on the two adjacent groups of standard joints.
In an optional embodiment, the first wall plate includes single plates installed between two adjacent upright posts on one group of standard joints, two adjacent single plates are perpendicular to each other, third notches are formed in the connecting positions of the two adjacent single plates corresponding to the upright posts on the two adjacent groups of standard joints, and the cross section of the second wall plate is in an L shape.
In an alternative embodiment, the projection width of the upright post on the single plate is smaller than the width of the third notch.
In alternative embodiments, the shape of the single plate is polygonal, circular or irregular.
In an alternative embodiment, two columns on two adjacent groups of standard sections are fixedly connected through high-strength bolts, and the columns are fixedly connected with the first wall plate and the second wall plate through the high-strength bolts respectively.
In an alternative embodiment, a layer of glue is provided between the first and second wall panels.
In an optional embodiment, the first wall board and the second wall board are made of the same material, and the material of the first wall board is a metal material, an inorganic non-metal material or a polymer material.
In an alternative embodiment, the upright is made of steel.
The beneficial effects of the utility model reside in that: the utility model provides a well, before the use, the back is spliced promptly when dispatching from the factory to standard festival and first wallboard, the hookup location that corresponds the stand on two sets of standard festival on first wallboard reserves the breach for the installation, it is more convenient when installing two sets of standard festival at the scene when using the installer like this, the installation time has been saved, the installer carries out after bolt fastening and rubberizing through the installation breach, only need again with second wallboard and stand fixed can, compare in the connection structure and the installation procedure of traditional standard festival and wallboard, it is more swift and safety.
Drawings
Fig. 1 is a schematic structural diagram of a hoistway according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a standard knot according to an embodiment of the present invention;
fig. 3 is a front view of a standard section according to a second embodiment of the present invention;
fig. 4 is a front view of a standard section according to a third embodiment of the present invention;
description of reference numerals:
1-standard section; 11-upright post;
2-a first wall panel; 21-a notch; 22-upper wallboard; 221-a first gap; 23-lower wall panel; 231-a second gap; 24-a single plate; 241-a third notch;
and 3-a second wallboard.
Detailed Description
In order to explain the technical content, the objects and the effects of the present invention in detail, the following description is made with reference to the accompanying drawings in combination with the embodiments.
Please refer to fig. 1 to 4, the well of the present invention includes two or more sets of standard sections spliced end to end, a first wall board is installed on the standard section, the connecting position of the first wall board corresponding to the upright on the two adjacent sets of standard sections is provided with a notch, and a second wall board is installed on the upright located at the notch.
From the above description, the beneficial effects of the present invention are: before the use, the standard festival is spliced with first wallboard when leaving the factory promptly, the hookup location that corresponds the stand on two sets of standard festival on first wallboard reserves the breach for the installation, it is more convenient when using the installation to install two sets of standard festival on the scene like this, installation time has been saved, after installer carries out bolt fastening and rubberizing through the installation breach, only need again with second wallboard and stand fixed can, compare in the traditional connection structure and the installation procedure of standard festival and wallboard, the connection structure and the installation order of wallboard and standard festival have been improved, the efficiency of field installation has been improved, installer's work load has been alleviateed, installation quality has been guaranteed.
Further, first wallboard is including installing last wallboard and lower wallboard on adjacent two sets of standard festival respectively, the hookup location of the stand on the last wallboard corresponding adjacent two sets of standard festival is equipped with first breach, the hookup location of the stand on the corresponding adjacent two sets of standard festival of wallboard is equipped with the second breach down.
From the above description, the first wall plate on each group of standard knots is assembled when leaving the factory, so that when the wall plate is installed on site, an installer can install two corresponding upright posts on the two groups of standard knots through the installation gap formed by the first gap and the second gap.
Furthermore, the first wallboard comprises single plates arranged between two adjacent upright posts on one group of standard joints, the two adjacent single plates are mutually perpendicular, third notches are arranged at the connecting positions of the two adjacent single plates corresponding to the upright posts on the two adjacent groups of standard joints, and the cross section of the second wallboard is L-shaped.
As can be known from the above description, each group of standard knots all includes four sides wallboard, and the wallboard on each side all is equipped with the third breach in the hookup location of stand, is convenient for installer to install from different angles like this.
Further, the projection width of the upright post on the single plate is smaller than the width of the third notch.
From the above description, it can be known that the width of the reserved third gap should be greater than the projection width of the upright post on the single board, so that the installation is convenient for the installer
Further, the shape of the veneer is polygonal, circular or irregular.
From the above description, the shape of the veneer can be different shapes of the plate material according to the installation and design requirements.
Further, two columns on two adjacent groups of standard sections are fixedly connected through high-strength bolts, and the columns are respectively fixedly connected with the first wallboard and the second wallboard through the high-strength bolts.
As can be seen from the above description, the high-strength bolt is used to ensure the stability of the installation structure between the standard joints and between the first wall panel and the second wall panel.
Furthermore, a glue layer is arranged between the first wallboard and the second wallboard.
As can be seen from the above description, the first wall panel and the second wall panel are sealed and connected by the glue layer.
Furthermore, the first wallboard is made of the same material as the second wallboard, and the first wallboard is made of a metal material, an inorganic non-metal material or a high polymer material.
From the above description, the material of the first wall board and the second wall board can be selected independently according to the installation and design requirements.
Furthermore, the upright post is made of steel.
As can be seen from the above description, the columns are I-shaped steel columns and are fixedly connected with each other through steel beams.
Referring to fig. 1 to 4, a first embodiment of the present invention is: the utility model provides a well, the well includes standard festival 1 of two sets of and above end-to-end concatenations, first wallboard 2 is equipped with on the standard festival 1, the hookup location that first wallboard 2 corresponds stand 11 on two sets of adjacent standard festival 1 is equipped with breach 21, is located and is equipped with second wallboard 3 on the stand 11 of breach 21 department.
Referring to fig. 1 to fig. 3, a second embodiment of the present invention is: the utility model provides a well, the well includes standard festival 1 of two sets of and above end-to-end concatenations, first wallboard 2 is equipped with on the standard festival 1, the hookup location that first wallboard 2 corresponds stand 11 on two sets of adjacent standard festival 1 is equipped with breach 21, is located and is equipped with second wallboard 3 on the stand 11 of breach 21 department.
First wallboard 2 is including installing last wallboard 22 and lower wallboard 23 on adjacent two sets of standard festival 1 respectively, the hookup location of stand 11 that last wallboard 22 corresponds adjacent two sets of standard festival 1 is equipped with first breach 221, the hookup location that stand 11 on wallboard 23 corresponds adjacent two sets of standard festival 1 is equipped with second breach 231. Two columns 11 on two adjacent groups of standard sections 1 are fixedly connected through high-strength bolts, and the columns 11 are respectively fixedly connected with the first wallboard 2 and the second wallboard 3 through the high-strength bolts. And a glue layer is arranged between the first wallboard 2 and the second wallboard 3. The first wallboard 2 and the second wallboard 3 are made of the same material, and the first wallboard 2 is made of a metal material, an inorganic non-metal material or a high polymer material. The upright post 11 is made of steel.
Referring to fig. 1, 2 and 4, the difference between the third embodiment and the second embodiment of the present invention is: first wallboard 2 is including installing veneer 24 between two adjacent stands 11 on a set of standard festival 1, adjacent two veneer 24 mutually perpendicular, adjacent two veneer 24 all is equipped with third breach 241 at the hookup location of stand 11 on corresponding adjacent two sets of standard festival 1, the height of third breach 241 is 300mm, the width of third breach 241 on every face of well is 300mm, the cross sectional shape of second wallboard 3 is L shape. The projection width of the upright post 11 on the single plate 24 is smaller than the width of the third gap 241. The shape of the single plate 24 is polygonal, circular or irregular.
To sum up, the utility model provides a well, before the use, the back has been spliced promptly to standard festival and first wallboard when dispatching from the factory, the hookup location reservation of the stand on corresponding two sets of standard festival on first wallboard has the breach for the installation, it is more convenient when installing two sets of standard festival at the scene when using the installation like this, the installation time has been saved, the installer carries out after bolt fastening and rubberizing through the installation breach, only need again with the second wallboard with the stand fixed can, compare in the connection structure and the installation procedure of traditional standard festival and wallboard, the connection structure and the installation order of wallboard with the standard festival have been improved, the efficiency of field installation has been improved, the work load of installer has been alleviateed, installation quality has been guaranteed.
The above mentioned is only the embodiment of the present invention, and not the limitation of the patent scope of the present invention, all the equivalent transformations made by the contents of the specification and the drawings, or the direct or indirect application in the related technical field, are included in the patent protection scope of the present invention.

Claims (9)

1. The utility model provides a well, its characterized in that, the well includes the standard festival of two sets of and above end-to-end concatenation, first wallboard is equipped with on the standard festival, the hookup location of the stand on the adjacent two sets of standard festival of first wallboard correspondence is equipped with the breach, is located the stand of breach department and is equipped with the second wallboard.
2. The hoistway of claim 1, wherein the first wall panel comprises an upper wall panel and a lower wall panel respectively mounted on two adjacent sets of standard knots, the upper wall panel is provided with a first notch corresponding to the connecting position of the vertical columns on the two adjacent sets of standard knots, and the lower wall panel is provided with a second notch corresponding to the connecting position of the vertical columns on the two adjacent sets of standard knots.
3. The hoistway of claim 1, wherein the first wall plate comprises single plates installed between two adjacent columns on one set of standard knots, two adjacent single plates are perpendicular to each other, the connecting positions of the two adjacent single plates corresponding to the columns on two adjacent sets of standard knots are provided with third notches, and the cross section of the second wall plate is L-shaped.
4. The hoistway of claim 3, wherein a projected width of the column on the single board is less than a width of the third gap.
5. The hoistway of claim 3, wherein the veneer is polygonal, circular or irregular in shape.
6. The hoistway of claim 1, wherein two columns on two adjacent groups of standard sections are fixedly connected through high-strength bolts, and the columns are fixedly connected with the first wall plate and the second wall plate through high-strength bolts respectively.
7. The hoistway of claim 1, wherein a layer of glue is disposed between the first wall panel and the second wall panel.
8. The hoistway of claim 1, wherein the first wall panel and the second wall panel are made of the same material, and the first wall panel is made of a metal material, an inorganic non-metal material or a polymer material.
9. The hoistway of claim 1, wherein the columns are made of steel.
CN201921258557.XU 2019-08-05 2019-08-05 Well Expired - Fee Related CN210418845U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921258557.XU CN210418845U (en) 2019-08-05 2019-08-05 Well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921258557.XU CN210418845U (en) 2019-08-05 2019-08-05 Well

Publications (1)

Publication Number Publication Date
CN210418845U true CN210418845U (en) 2020-04-28

Family

ID=70384727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921258557.XU Expired - Fee Related CN210418845U (en) 2019-08-05 2019-08-05 Well

Country Status (1)

Country Link
CN (1) CN210418845U (en)

Similar Documents

Publication Publication Date Title
CN102913002B (en) Integral steel structure prefabricated house and mounting method thereof
CN105003090B (en) Temporary support frame for mounting assembly type steel structure
CN206174138U (en) Joint construction suitable for steel house room externally -hanging wallboard and major structure
CN113152664A (en) Steel structural framework and modularized additional elevator
CN105155828A (en) Lifting platform and four-upright guide rail bracket thereof
CN111058555A (en) Windproof fireproof heat-preservation type quick-dismantling assembly building steel structure and splicing method thereof
CN202220434U (en) Aluminum-alloy building formwork component
CN210418845U (en) Well
CN212866793U (en) Assembled construction elevator stops layer platform
CN106894625B (en) Modularized external hanging scaffold
CN211523693U (en) Vertical lines curtain system of cell cube aluminum plate
CN110565941A (en) PC aluminum formwork system for prefabricated building and construction method thereof
CN110284594B (en) Full-bolt connection assembly type floor composite beam steel pipe column frame joint and forming method thereof
CN108487621A (en) Assembled movement shield cage and its construction method
CN109881781B (en) Recycled concrete fire-resistant based laminated wood frame system and construction method thereof
CN110965684A (en) Small cell body aluminum plate vertical line curtain wall system and installation method thereof
CN110778094A (en) High-altitude large-span dragline net operating platform and construction method
CN213296656U (en) Firm profiled steel structure beam column of factory building
CN211523694U (en) Vertical lines curtain steelframe system of cell cube aluminum plate
CN210289158U (en) Temporary support device for connecting laminated plate with beam or wall
CN108999318B (en) Unit curtain wall side buried single pendant structure, unit body with side buried single pendant and unit curtain wall mounting method
CN2362919Y (en) Fastener for combination frame of moveable storeys building
CN209942195U (en) Construction operation platform of high-rise hollow area
CN215828135U (en) Guardrail mounting structure at upper end part and lower end part of escalator
CN218597689U (en) Board is chosen in construction of high-rise building vestibule outer wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200428

Termination date: 20210805