CN210389612U - Cement duct production process is with solidification accelerating device - Google Patents

Cement duct production process is with solidification accelerating device Download PDF

Info

Publication number
CN210389612U
CN210389612U CN201920915318.0U CN201920915318U CN210389612U CN 210389612 U CN210389612 U CN 210389612U CN 201920915318 U CN201920915318 U CN 201920915318U CN 210389612 U CN210389612 U CN 210389612U
Authority
CN
China
Prior art keywords
cement
mounting ring
production process
heating device
cement culvert
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920915318.0U
Other languages
Chinese (zh)
Inventor
钟运福
舒展海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ganzhou Fuhai Building Materials Co Ltd
Original Assignee
Ganzhou Fuhai Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ganzhou Fuhai Building Materials Co Ltd filed Critical Ganzhou Fuhai Building Materials Co Ltd
Priority to CN201920915318.0U priority Critical patent/CN210389612U/en
Application granted granted Critical
Publication of CN210389612U publication Critical patent/CN210389612U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model belongs to the technical field of the cement duct solidification technique with higher speed and specifically relates to a cement duct production process is with solidification equipment with higher speed, include: the mounting ring comprises a mounting ring body, fixing blocks, fixing bolts, connecting rods, a heating device and electric heating elements, wherein the outer wall of the mounting ring body is evenly provided with the three fixing blocks, the fixing blocks are movably connected with the mounting ring body through the fixing bolts, the inner wall of the mounting ring body is provided with the heating device, the heating device is fixedly connected with the inner wall of the mounting ring body through the three connecting rods, and one side of the heating device is fixedly connected with the six electric heating elements. This practicality is through setting up heating device, makes cement culvert production process can heat the cement culvert pipe with solidification equipment with higher speed, makes the cement culvert pipe solidify with higher speed, and the structure is simple relatively, and the cost is low, is convenient for promote on a large scale.

Description

Cement duct production process is with solidification accelerating device
Technical Field
The utility model relates to a cement duct technical field particularly, relates to a cement duct production process is with solidification equipment with higher speed.
Background
The cement culvert pipe is a pipeline buried under the ground surface, is formed by casting reinforced concrete and is commonly called as a cement pipe. The small culvert pipe is also made of metal materials. Under the full-section cofferdam, a diversion pipeline is used, and under the ordinary condition, a water delivery pipeline is used. At present, water supply and drainage pipelines in most cities in China are provided with cement pipes as culvert pipes;
in the cement culvert pipe production process, if the cement culvert pipe can not be solidified in time, the production efficiency is low, and the cement culvert pipe which is not solidified is very easy to damage, so that an accelerated solidification device for the cement culvert pipe production process is urgently needed.
SUMMERY OF THE UTILITY MODEL
Problem (A)
To sum up, the utility model relates to a cement duct production process is with solidification equipment with higher speed through structure and functional improvement to solve the above-mentioned in cement culvert pipe production process, if the cement culvert pipe can not obtain timely solidification, not only production efficiency is low, and does not have the cement culvert pipe problem of damaging very easily that solidifies.
(II) technical scheme
The utility model provides a cement duct production process is with solidification equipment with higher speed, include: mounting ring, fixed block, fixing bolt, connecting rod, heating device and electric heating element, its characterized in that: the mounting ring is characterized in that three fixing blocks are evenly arranged on the outer wall of the mounting ring and are movably connected with the mounting ring through fixing bolts, a heating device is arranged on the inner wall of the mounting ring and is fixedly connected with the inner wall of the mounting ring through three connecting rods, and six electric heating elements are fixedly connected to one side of the heating device.
Preferably, the heating device and the mounting ring are both of circular ring structures.
Preferably, the inner surface of the fixed block is of a cambered surface structure.
Preferably, the fixing bolt may be fixed through the mounting ring.
Preferably, the length of the electric heating element is equal to that of the cement culvert.
(III) advantageous effects
1. The utility model discloses a set up heating device, make cement duct production process can heat the cement culvert pipe with solidification equipment with higher speed, make the cement culvert pipe solidify with higher speed, the structure is simple relatively, and the cost is low, is convenient for promote on a large scale.
2. The utility model has the advantages of through setting up the fixed block, make cement duct production process with solidification equipment with higher speed, can solidify with higher speed the cement culvert pipe of different diameters.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the mounting ring structure of the present invention.
Fig. 3 is an overall plan view of the present invention.
In fig. 1 to 3, the corresponding relationship between the part names or lines and the reference numbers is:
the device comprises a mounting ring-1, a fixing block-2, a fixing bolt-201, a connecting rod-3, a heating device-4 and an electric heating element-401.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention.
Referring to fig. 1-3, the present invention provides an accelerated setting device for cement duct production process, comprising: the mounting ring comprises a mounting ring 1, fixing blocks 2, fixing bolts 201, connecting rods 3, a heating device 4 and electric heating elements 401, wherein the three fixing blocks 2 are evenly arranged on the outer wall of the mounting ring 1, the fixing blocks 2 are movably connected with the mounting ring 1 through the fixing bolts 201, the heating device 4 is arranged on the inner wall of the mounting ring 1, the heating device 4 is fixedly connected with the inner wall of the mounting ring 1 through the three connecting rods 3, and six electric heating elements 401 are fixedly connected to one side of the heating device 4.
Wherein, heating device 4 and collar 1 are the ring structure, and when cement duct production process was with the operation of solidification equipment with accelerating, heating device 4 and collar 1 were put into cement culvert intraduct simultaneously.
Wherein, 2 internal surfaces of fixed block are cambered surface structure, and when cement duct production process was with the operation of solidification equipment with accelerating, fixed block 2 can laminate cement culvert pipe outer wall.
Wherein, fixing bolt 201 can pass through collar 1 and fix, when cement duct production process is with the operation of solidification equipment with higher speed, fixing block 2 can be installed the cement duct production process with solidification equipment with higher speed and carry out the operation on the cement culvert pipe of different diameters.
Wherein, electric heating element 401 length equals the length of cement culvert pipe, when cement culvert production process is with the operation of solidification equipment with accelerating, heats the inside cement culvert pipe, makes the cement culvert pipe inner wall be heated evenly.
The implementation scheme is as follows:
electrifying the accelerated solidification device used in the production process of the cement duct;
at first install cement culvert one end with solidification equipment with higher speed with cement culvert production process, with inside electric heating element 401 gos deep into the cement culvert, go into cement culvert inside with collar 1 card, install fixed block 2 at the cement culvert outer wall, screw up fixing bolt 201, make three fixed block 2 fix cement culvert production process with solidification equipment with higher speed in cement culvert one end, when cement culvert production process is with solidification equipment operation with higher speed, electric heating element 401 sends the heat and heats the cement culvert inside, gu fix the clearance between 1 and the heating device 4, make the steam that produces with the cement culvert flow away along with the natural wind from the clearance.

Claims (5)

1. An accelerated setting device for a cement duct production process, comprising: collar (1), fixed block (2), fixing bolt (201), connecting rod (3), heating device (4) and electric heating element (401), its characterized in that: the utility model discloses a heating installation structure, including collar (1), mounting ring (1), fixing bolt (201), heating device (4), mounting ring (1), one side fixed connection of heating device (4) is equipped with six electric heating element (401).
2. The setting accelerating apparatus for cement culvert production process of claim 1, characterized in that: the heating device (4) and the mounting ring (1) are both in a circular ring structure.
3. The setting accelerating apparatus for cement culvert production process of claim 1, characterized in that: the inner surface of the fixed block (2) is of a cambered surface structure.
4. The setting accelerating apparatus for cement culvert production process of claim 1, characterized in that: the fixing bolt (201) can pass through the mounting ring (1) for fixing.
5. The setting accelerating apparatus for cement culvert production process of claim 1, characterized in that: the length of the electric heating element (401) is equal to that of the cement culvert.
CN201920915318.0U 2019-06-18 2019-06-18 Cement duct production process is with solidification accelerating device Expired - Fee Related CN210389612U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920915318.0U CN210389612U (en) 2019-06-18 2019-06-18 Cement duct production process is with solidification accelerating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920915318.0U CN210389612U (en) 2019-06-18 2019-06-18 Cement duct production process is with solidification accelerating device

Publications (1)

Publication Number Publication Date
CN210389612U true CN210389612U (en) 2020-04-24

Family

ID=70349592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920915318.0U Expired - Fee Related CN210389612U (en) 2019-06-18 2019-06-18 Cement duct production process is with solidification accelerating device

Country Status (1)

Country Link
CN (1) CN210389612U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111844405A (en) * 2020-09-02 2020-10-30 陈成任 Drying and shaping process for cement culvert pipe
CN111906912A (en) * 2020-09-02 2020-11-10 陈成任 Drying and shaping equipment for cement culvert pipe after molding

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111844405A (en) * 2020-09-02 2020-10-30 陈成任 Drying and shaping process for cement culvert pipe
CN111906912A (en) * 2020-09-02 2020-11-10 陈成任 Drying and shaping equipment for cement culvert pipe after molding

Similar Documents

Publication Publication Date Title
CN210389612U (en) Cement duct production process is with solidification accelerating device
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN204491666U (en) A kind of steel corrugated sheet Urban Underground pipe gallery
CN103278394B (en) Comprehensive test device for joint sealing and hydraulic circulating of pipe body
CN203298939U (en) Comprehensive test device for pipe interface sealing and hydraulic circulation
CN204787428U (en) Utilize dirty water source heat pump system of waste water
CN200940346Y (en) Support mould for pipeline mounting and filling holes
CN203463804U (en) Conical nodular cast iron pipe
CN104213628B (en) Jacking mechanism for underground pipe culvert engineering
CN206859366U (en) A kind of municipal drainage pipeline
CN103697287B (en) A kind of making method of deep water wet type thermal insulation anode pipe
CN207714372U (en) Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail
CN207621557U (en) Deformed thermal-insulating pipe
CN208074268U (en) A kind of prefabricated mat piece of municipal pipeline
CN206875023U (en) A kind of spigot-and-socket fibre cement pipe joint
CN206571068U (en) A kind of anti-clogging roof rain water drainage arrangement
CN206608617U (en) The heat-insulated fixed support of heat-net-pipeline
CN205399478U (en) City underground steel utility tunnel's anti structure of floating
CN221806363U (en) Fixing device of cable calandria and cable well
CN201395936Y (en) Floor pipe pre-arranged holes plugging mould plate
CN218883228U (en) Cement pipeline convenient to it is clean
CN211690346U (en) Pipeline engineering is coupling for slip casting construction
CN205206337U (en) Top module system core section of thick bamboo wall body spraying system all
CN103438290A (en) Water pipe lined with thin-wall stainless steel pipe inside and fabrication method thereof
CN204464920U (en) PCCP electric power piping lane inwall swelled ring support base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200424

Termination date: 20210618

CF01 Termination of patent right due to non-payment of annual fee