CN210369563U - Integrated variable-flange steel beam structure - Google Patents

Integrated variable-flange steel beam structure Download PDF

Info

Publication number
CN210369563U
CN210369563U CN201920842488.0U CN201920842488U CN210369563U CN 210369563 U CN210369563 U CN 210369563U CN 201920842488 U CN201920842488 U CN 201920842488U CN 210369563 U CN210369563 U CN 210369563U
Authority
CN
China
Prior art keywords
angle steel
steel
flange
angle
steel frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920842488.0U
Other languages
Chinese (zh)
Inventor
王晓涛
徐国军
田宇治
杨文若
厉建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201920842488.0U priority Critical patent/CN210369563U/en
Application granted granted Critical
Publication of CN210369563U publication Critical patent/CN210369563U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model mainly relates to an integration becomes edge of a wing girder steel structure, including I-shaped girder steel and angle steel frame, the girder steel is located wall body and floor junction, and girder steel bottom flange width is less than top flange width, and bottom flange thickness is greater than top flange thickness, and the girder steel both sides are equipped with angle steel frame through the welding, and angle steel frame includes that a plurality of angle steel welds to form, is equipped with the pipeline sleeve pipe between the angle steel frame, and the pipeline sleeve pipe is used for the later stage installation pipeline, and angle steel frame outside cover installs the decoration panel, and the gap department of decoration panel is equipped with flexible caulking material. The design part is prefabricated, produced and manufactured in a factory, high in machining precision, convenient to assemble and install on site, and capable of reserving enough space for pipeline crossing, so that the bearing capacity of the steel beam is guaranteed, massive on-site punching work is avoided, the construction quality is improved, and manpower and construction period are greatly saved.

Description

Integrated variable-flange steel beam structure
Technical Field
The utility model relates to an integration becomes edge of a wing girder steel structure belongs to building engineering technical field.
Background
In the steel structure building, vertical wall pre-buried pipeline adopts the wall fluting to inlay the dress usually, nevertheless need open a hole in the girder steel edge of a wing when meetting the girder steel and pass for the pipeline, and the bearing capacity of girder steel has been weakened in opening a hole in the edge of a wing, and the position of opening a hole simultaneously is difficult to confirm earlier stage, often needs more on-the-spot work of opening a hole in the work progress, and the standard is low, and the quality is difficult to guarantee.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides an integration becomes edge of a wing girder steel structure, this design part is by the prefabricated production processing preparation of mill, and the machining precision is high, and on-the-spot assembly simple to operate has passed through for the pipeline and has reserved sufficient space, has both guaranteed girder steel bearing capacity, avoids the work of digging a large amount of holes in the scene again, has improved construction quality, has saved manpower and time limit for a project by a wide margin.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an integration becomes edge of a wing girder steel structure, including I-shaped girder steel and angle steel frame, the girder steel is located wall body and floor junction, girder steel bottom flange width is less than top flange width, bottom flange thickness is greater than top flange thickness, the girder steel both sides are equipped with the angle steel frame through the welding, the angle steel frame includes that a plurality of angle steel welds to form, be equipped with the pipeline sleeve pipe between the angle steel frame, the pipeline sleeve pipe is used for the later stage installation pipeline, the decoration panel is installed in the cover of the angle steel frame outside, the gap department of decoration panel is equipped with flexible caulking material.
The decorative panel is fixed with the angle steel frame through self-tapping screws.
The decorative panel and the wall surface are provided with glass fiber alkali-resistant mesh cloth.
And a coating surface layer is arranged on the outer side of the glass fiber alkali-resistant mesh cloth.
The decorative panel is made of gypsum board.
And a gypsum line foot is arranged at the corner between the two decorative panels.
The width of the lower flange is less than 110 mm.
The angle steel frame comprises a first angle steel, a second angle steel, a third angle steel and a fourth angle steel, the first angle steel, the second angle steel and the third angle steel are welded to form a right-angle triangular structure, the fourth angle steel is welded to the extending end of the third angle steel, and the fourth angle steel is welded and fixed with the lower flange.
The utility model discloses following beneficial effect has:
the utility model provides an integration becomes edge of a wing girder steel structure, including I-shaped girder steel and angle steel frame, the girder steel is located wall body and floor junction, girder steel bottom flange width is less than top flange width, bottom flange thickness is greater than top flange thickness, both for pipeline headspace, girder steel bearing capacity has been guaranteed again, the girder steel both sides are equipped with the angle steel frame through the welding, the angle steel frame includes that a plurality of angle steel welds to form, be equipped with the pipeline sleeve pipe between the angle steel frame, the pipeline sleeve pipe is used for the later stage installation pipeline, the decoration panel is installed in the cover of the angle steel frame outside, the gap department of decoration panel is equipped with flexible caulking material. The design part is prefabricated, produced and manufactured in a factory, high in machining precision, convenient to assemble and install on site, and capable of reserving enough space for pipeline crossing, so that the bearing capacity of the steel beam is guaranteed, massive on-site punching work is avoided, the construction quality is improved, and manpower and construction period are greatly saved.
Drawings
FIG. 1 is a schematic cross-sectional view of the present invention;
fig. 2 is a schematic view of the angle steel frame of the present invention.
Reference numbers in the figures: 1. a steel beam; 2. an angle steel frame; 3. a wall body; 4. a floor slab; 11. a lower flange; 12. an upper flange; 21. angle steel; 5. a pipeline sleeve; 6. a decorative panel; 7. a flexible caulk material; 61. self-tapping screws; 8. glass fiber alkali-resistant mesh cloth; 9. coating a surface layer; 62. a gypsum line foot; 22. angle steel I; 23. angle steel II; 24. angle steel III; 25. and angle steel IV.
Detailed Description
As shown in fig. 1, 2, an integration becomes edge of a wing girder steel structure, including I-shaped girder steel 1 and angle steel frame 2, girder steel 1 is located wall body 3 and floor 4 junction, girder steel 1 bottom flange 11 width is less than top flange 12 width, bottom flange 11 thickness is greater than top flange 12 thickness, both for the pipeline reserved space, girder steel 1 bearing capacity has been guaranteed again, girder steel 1 both sides are equipped with angle steel frame 2 through the welding, angle steel frame 2 includes that a plurality of angle steel 21 welds to form, be equipped with pipeline sleeve pipe 5 between the angle steel frame 2, pipeline sleeve pipe 5 is used for the later stage installation pipeline, decoration panel 6 is installed in the cover of the angle steel frame 2 outside, the gap department of decoration panel 6 is equipped with flexible caulking material 7. The design component is prefabricated, produced and manufactured in a factory, high in machining precision and convenient to assemble and install on site, enough space is reserved for pipeline crossing, the bearing capacity of the steel beam 1 is guaranteed, massive on-site punching work is avoided, construction quality is improved, and manpower and construction period are greatly saved.
The decorative panel 6 is fixed to the angle steel frame 2 by a tapping screw 61.
The surfaces of the decoration panel 6 and the wall body 3 are provided with glass fiber alkali-resistant gridding cloth 8.
The coating surface layer 9 is arranged on the outer side of the glass fiber alkali-resistant mesh cloth 8, so that the finish coat is guaranteed to be smooth.
The decoration panel 6 is made of gypsum board.
The corner between two decoration panels 6 is provided with a gypsum line foot 62, so that the installation is convenient, and the problem of cracking of the wall surface corner is reduced.
The width of the lower flange 11 is less than 110 mm.
The angle steel frame 2 comprises a first angle steel 22, a second angle steel 23, a third angle steel 24 and a fourth angle steel 25, the first angle steel 22, the second angle steel 23 and the third angle steel 24 are welded to form a right-angle triangular structure, the fourth angle steel 25 is welded to the extending end of the third angle steel 24, and the fourth angle steel 25 is welded and fixed with the lower flange 11.
The specific construction method comprises the following steps:
1. prefabricating a steel beam 1 and a welded angle steel frame 2 required by production in a factory;
2. after the main body of the steel beam 1 is installed, welding and installing angle steel frames 2 at two sides of the steel beam 1;
3. the pipeline sleeve 5 is pre-buried and installed between the angle steel frames 2, and the pipeline sleeve 5 penetrates through the lower flange 11 because the width of the lower flange 11 is smaller than that of the upper flange 12;
4. the outer side of the angle steel frame 2 is covered with a decoration panel 6;
5. the gap of the decorative panel 6 is blocked by a flexible caulking material 7, so that the surface is ensured to be smooth;
6. laying glass fiber alkali-resistant mesh cloth 8 on the surfaces of the decoration panel 6 and the wall 3, and coating a coating surface layer 9;
7. the corner between two decoration panels 6 is bonded and installed with the gypsum line foot 62 through the gypsum binder, the cracking problem of the corner of the greatly reduced wall surface is solved, and the integration of the decoration function is realized.
Above is the utility model discloses preferred embodiment the utility model discloses make a plurality of other simple replacements and changes under the design prerequisite, all should regard as belonging to the utility model discloses a protection category.

Claims (8)

1. The utility model provides an integration becomes edge of a wing girder steel structure which characterized in that: including I-shaped steel roof beam and angle steel frame, the girder steel is located wall body and floor junction, and girder steel bottom flange width is less than the top flange width, and bottom flange thickness is greater than top flange thickness, and the girder steel both sides are equipped with the angle steel frame through the welding, and the angle steel frame includes that a plurality of angle steel welds to form, is equipped with the pipeline sleeve pipe between the angle steel frame, and the pipeline sleeve pipe is used for the later stage installation pipeline, and the angle steel frame outside cover installs the decoration panel, and the gap department of decoration panel is equipped with flexible caulking material.
2. The integrated variable-flange steel beam structure according to claim 1, wherein: the decorative panel is fixed with the angle steel frame through self-tapping screws.
3. The integrated variable-flange steel beam structure according to claim 1, wherein: the surfaces of the decoration panel and the wall body are provided with glass fiber alkali-resistant gridding cloth.
4. The integrated variable-flange steel beam structure according to claim 3, wherein: the coating surface layer is arranged on the outer side of the glass fiber alkali-resistant mesh cloth.
5. The integrated variable-flange steel beam structure according to claim 1, wherein: the decoration panel is made of gypsum board.
6. The integrated variable-flange steel beam structure according to claim 1, wherein: the corner between the two decorative panels is provided with a plaster line foot.
7. The integrated variable-flange steel beam structure according to claim 1, wherein: the width of the lower flange is less than 110 mm.
8. The integrated variable-flange steel beam structure according to claim 1, wherein: the angle steel frame comprises a first angle steel, a second angle steel, a third angle steel and a fourth angle steel, the first angle steel, the second angle steel and the third angle steel are welded to form a right-angle triangular structure, the fourth angle steel is welded to the extending end of the third angle steel, and the fourth angle steel is welded and fixed with the lower flange.
CN201920842488.0U 2019-06-05 2019-06-05 Integrated variable-flange steel beam structure Active CN210369563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920842488.0U CN210369563U (en) 2019-06-05 2019-06-05 Integrated variable-flange steel beam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920842488.0U CN210369563U (en) 2019-06-05 2019-06-05 Integrated variable-flange steel beam structure

Publications (1)

Publication Number Publication Date
CN210369563U true CN210369563U (en) 2020-04-21

Family

ID=70263482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920842488.0U Active CN210369563U (en) 2019-06-05 2019-06-05 Integrated variable-flange steel beam structure

Country Status (1)

Country Link
CN (1) CN210369563U (en)

Similar Documents

Publication Publication Date Title
US10145103B2 (en) Premanufactured structures for constructing buildings
US20110296789A1 (en) Construction System and Method for Constructing Buildings Using Premanufactured Structures
CN103374986A (en) Multifunctional combined lightweight concrete curtain wall and constructing method thereof
CN110374230B (en) Mounting node of light partition board of outer wall and construction method of mounting node
CN102839805B (en) Dry-hanging resin plate wall surface decoration system and construction method thereof
CN213572429U (en) Waterproof connection structure of prefabricated outer wall
CN110258917B (en) Construction method of integrated variable-flange steel beam structure
CN210369563U (en) Integrated variable-flange steel beam structure
CN102561691A (en) Method for eliminating cracking of joint between fair-faced concrete shear wall and masonry
CN106939699B (en) Construction method for galvanized steel sheet waterproof layer on inner side of open type ceramic plate curtain wall
CN207829296U (en) A kind of precast beam with groove
CN204238193U (en) Underground Hydro-electric Power Station fitting structure
CN213742297U (en) Prefabricated wall body installation seam shutoff template mounting structure
CN214034300U (en) Assembled loft device
CN115807519A (en) Detachable assembly type ground installation adjusting system and assembly method thereof
CN212897142U (en) Wall body and suspended ceiling integral installation assembly of bathroom space
CN212866706U (en) Assembled aluminum plate dry hanging structure
CN102776991B (en) Steel structure canopy and construction method
CN208202203U (en) A kind of toilet wall body structure
KR20210011466A (en) speed Building Exterior Materials
CN216914280U (en) Prefabricated template system of detachable
CN213927148U (en) Assembly type structure of cornice bracket of antique building
CN210621886U (en) Assembled metal floor drain component and ground splicing system
CN220100262U (en) Assembled wall of integrated pipeline of skirting
CN218540992U (en) Connecting structure of steel beam and prefabricated integral wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Anhui Zhihong Precision Construction Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023990000037

Denomination of utility model: An integrated variable flange steel beam structure

Granted publication date: 20200421

License type: Common License

Record date: 20230113

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangxi Huahong Jinggong Steel Structure Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034645

Denomination of utility model: An integrated variable flange steel beam structure

Granted publication date: 20200421

License type: Common License

Record date: 20230413

EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Lvjian Jinggong Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034833

Denomination of utility model: An integrated variable flange steel beam structure

Granted publication date: 20200421

License type: Common License

Record date: 20230421

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Weinan Guokong Jinggong Green Building Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980009941

Denomination of utility model: An integrated variable flange steel beam structure

Granted publication date: 20200421

License type: Common License

Record date: 20240717

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Chongqing Kunda Precision Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980014873

Denomination of utility model: An integrated variable flange steel beam structure

Granted publication date: 20200421

License type: Common License

Record date: 20240914

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Anhui Huiyu Construction Engineering Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980016463

Denomination of utility model: An integrated variable flange steel beam structure

Granted publication date: 20200421

License type: Common License

Record date: 20240926