Prefabricated assembled city utility tunnel Download PDF

Info

Publication number
CN210369040U
CN210369040U CN201920997448.3U CN201920997448U CN210369040U CN 210369040 U CN210369040 U CN 210369040U CN 201920997448 U CN201920997448 U CN 201920997448U CN 210369040 U CN210369040 U CN 210369040U
Authority
CN
China
Prior art keywords
plate
fixedly connected
supporting
arch
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920997448.3U
Other languages
Chinese (zh)
Inventor
王江朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920997448.3U priority Critical patent/CN210369040U/en
Application granted granted Critical
Publication of CN210369040U publication Critical patent/CN210369040U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a prefabricated assembled city utility tunnel, which comprises a base plate, the last fixed surface of base plate is connected with the arch plate, the inner wall fixedly connected with supporting beam of arch plate, the last fixed surface of base plate is connected with PMKD, the equal fixedly connected with in both sides of PMKD upper surface supports the curb plate, the quantity that supports the curb plate is two, two support fixedly connected with middle part diaphragms between the curb plate, two support the equal fixedly connected with bottom swash plate in below that the curb plate inner wall is located the middle part diaphragm, one side and the base plate fixed connection of bottom swash plate, support one side fixedly connected with bearing plate of curb plate, one side fixedly connected with bracing piece of bearing plate, the one end fixedly connected with of bracing piece supports the arc board. This prefabricated assembled city utility tunnel utilizes the triangle-type pipeline mounting groove that forms between PMKD, support curb plate, middle part diaphragm and the bottom swash plate, constitutes complete piping lane, and stability is good, has played good guard action, compact structure to the pipeline.

Description

Prefabricated assembled city utility tunnel
Technical Field
The utility model relates to a city utility tunnel technical field specifically is a prefabricated assembled city utility tunnel.
Background
Because the traditional directly buried pipeline occupies more underground space of the road, and meanwhile, the laying of the pipeline often cannot be synchronous with the road construction, so that the road is frequently excavated, the normal passage of the road is seriously influenced, and meanwhile, the problems of serious noise, dust emission and other environmental pollution are caused, and the transportation and living agencies for people are greatly inconvenient.
In order to solve the construction defect of cast-in-place formula piping lane, integral prefabricated piping lane structure and prefabricated piping lane structure of assembled have appeared, and integral prefabricated piping lane often volume and weight are great, and transportation and on-the-spot hoist and mount from mill to job site are very inconvenient, and current assembled structure piping lane is many because the structure of assembling is too, and assembly structure poor stability, consequently, proposes a prefabricated assembled city utility tunnel now.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a prefabricated assembled city utility tunnel has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a prefabricated assembled city utility tunnel, includes the base plate, the last fixed surface of base plate is connected with the arch board, the inner wall fixedly connected with supporting beam of arch board, the last fixed surface of base plate is connected with PMKD, the equal fixedly connected with in both sides of PMKD upper surface supports the curb plate, the quantity that supports the curb plate is two, two fixedly connected with middle part diaphragm between the support curb plate, two support the equal fixedly connected with bottom swash plate in below that the curb plate inner wall is located the middle part diaphragm, one side and the base plate fixed connection of bottom swash plate, support one side fixedly connected with bearing plate of curb plate, one side fixedly connected with bracing piece of bearing plate, the one end fixedly connected with of bracing piece supports the arc board.
Optionally, the two sides of the arch plate are fixedly connected with connecting plates, and the connecting plates are fixedly connected with the base plate through fixing anchor rods.
Optionally, a triangular support steel frame is fixedly connected between the support beam and the arch plate.
Optionally, the fixing bottom plate is fixedly connected with the substrate through a fixing screw.
Optionally, one side of the supporting side plate is fixedly connected with a top supporting plate, and the top supporting plate is located below the supporting cross beam.
Optionally, triangular pipeline installation grooves are formed among the fixed bottom plate, the supporting side plates, the middle transverse plate and the bottom inclined plate, and the number of the triangular pipeline installation grooves is four.
(III) advantageous effects
The utility model provides a prefabricated assembled city utility tunnel possesses following beneficial effect:
1. this prefabricated assembled city utility tunnel through the design of supporting the arc board for can laminate mutually with the contact surface of arch plate, play good supporting role to the inside wall of arch plate, can effectively keep out the pressure of horizontal soil layer, moreover, through the design of supporting beam and triangular supports steelframe, play good supporting role to the top of arch plate, improve the stability of overall structure.
2. This prefabricated assembled city utility tunnel, simple structure, the modern design utilizes three angie type pipeline mounting grooves that form between PMKD, support curb plate, middle part diaphragm and the bottom swash plate, constitutes complete piping lane, and stability is good, has played good guard action, compact structure to inside pipeline.
3. This prefabricated assembled city utility tunnel can carry out standardization, batch production prefab production and the construction of assembling on the spot, not only improves production efficiency greatly, reduces construction cost, and batch production has guaranteed the accuracy of prefabricated assembled city utility tunnel installation simultaneously.
Drawings
FIG. 1 is a schematic view of the cross-sectional structure of the present invention;
fig. 2 is a schematic view of the top view structure of the present invention.
In the figure: 1. a substrate; 2. an arch plate; 3. a support beam; 4. fixing the bottom plate; 5. supporting the side plates; 6. a middle transverse plate; 7. a bottom sloping plate; 8. a bearing plate; 9. a support bar; 10. supporting the arc plate; 11. a connecting plate; 12. fixing an anchor rod; 13. a triangular support steel frame; 14. fixing screws; 15. a top support plate; 16. triangle-shaped pipeline mounting groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a prefabricated urban comprehensive pipe gallery comprises a base plate 1, wherein an arch plate 2 is fixedly connected to the upper surface of the base plate 1, connecting plates 11 are fixedly connected to two sides of the arch plate 2, the connecting plates 11 are fixedly connected with the base plate 1 through fixing anchor rods 12, a supporting beam 3 is fixedly connected to the inner wall of the arch plate 2, a triangular supporting steel frame 13 is fixedly connected between the supporting beam 3 and the arch plate 2, a fixing bottom plate 4 is fixedly connected to the upper surface of the base plate 1, the fixing bottom plate 4 is fixedly connected with the base plate 1 through fixing screws 14, supporting side plates 5 are fixedly connected to two sides of the upper surface of the fixing bottom plate 4, a top supporting plate 15 is fixedly connected to one side of each supporting side plate 5, the top supporting plates 15 are positioned below the supporting beam 3, the number of the supporting side plates 5 is two, a middle transverse plate 6 is fixedly connected between the two supporting side plates 5, bottom inclined plates 7 are fixedly connected to inner walls of, three angie type pipeline mounting grooves 16 are formed between PMKD 4, support curb plate 5, middle part diaphragm 6 and the bottom swash plate 7, and three angie type pipeline mounting grooves 16's quantity is four, one side and base plate 1 fixed connection of bottom swash plate 7, one side fixedly connected with bearing plate 8 of support curb plate 5, one side fixedly connected with bracing piece 9 of bearing plate 8, the one end fixedly connected with of bracing piece 9 supports arc board 10.
In conclusion, the prefabricated urban comprehensive pipe gallery can be attached to the contact surface of the arch plate 2 by the design of the supporting arc plate 10, has good supporting effect on the inner side wall of the arch plate 2, can effectively resist the pressure of a transverse soil layer, has good supporting effect on the top of the arch plate 2 by the design of the supporting beam 3 and the triangular supporting steel frame 13, improves the stability of the whole structure, has simple structure and novel design, forms a complete pipe gallery by utilizing the triangular pipeline mounting groove 16 formed among the fixed bottom plate 4, the supporting side plates 5, the middle transverse plate 6 and the bottom inclined plate 7, has good stability, has good protection effect on internal pipelines, has compact structure, can carry out standardized and factory-made prefabricated part production and field assembly construction, not only greatly improves the production efficiency and reduces the construction cost, simultaneously the accuracy of prefabricated assembled city utility tunnel installation has been guaranteed in the industrial production.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a prefabricated assembled city utility tunnel, includes base plate (1), its characterized in that: the upper surface of the base plate (1) is fixedly connected with an arch-shaped plate (2), the inner wall of the arch-shaped plate (2) is fixedly connected with a supporting beam (3), the upper surface of the base plate (1) is fixedly connected with a fixed bottom plate (4), two sides of the upper surface of the fixed bottom plate (4) are fixedly connected with supporting side plates (5), the number of the supporting side plates (5) is two, a middle transverse plate (6) is fixedly connected between the two supporting side plates (5), the inner walls of the two supporting side plates (5) are positioned below the middle transverse plate (6) and are fixedly connected with a bottom inclined plate (7), one side of the bottom sloping plate (7) is fixedly connected with the base plate (1), one side of the supporting side plate (5) is fixedly connected with a bearing plate (8), one side fixedly connected with bracing piece (9) of bearing plate (8), the one end fixedly connected with of bracing piece (9) supports arc board (10).
2. The prefabricated urban comprehensive pipe gallery according to claim 1, characterized in that: the two sides of the arch-shaped plate (2) are fixedly connected with connecting plates (11), and the connecting plates (11) are fixedly connected with the base plate (1) through fixing anchor rods (12).
3. The prefabricated urban comprehensive pipe gallery according to claim 1, characterized in that: a triangular support steel frame (13) is fixedly connected between the support beam (3) and the arch plate (2).
4. The prefabricated urban comprehensive pipe gallery according to claim 1, characterized in that: the fixed bottom plate (4) is fixedly connected with the substrate (1) through a fixing screw (14).
5. The prefabricated urban comprehensive pipe gallery according to claim 1, characterized in that: one side of the supporting side plate (5) is fixedly connected with a top supporting plate (15), and the top supporting plate (15) is located below the supporting cross beam (3).
6. The prefabricated urban comprehensive pipe gallery according to claim 1, characterized in that: triangular pipeline mounting grooves (16) are formed among the fixed bottom plate (4), the supporting side plates (5), the middle transverse plate (6) and the bottom inclined plate (7), and the number of the triangular pipeline mounting grooves (16) is four.
CN201920997448.3U 2019-06-28 2019-06-28 Prefabricated assembled city utility tunnel Expired - Fee Related CN210369040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920997448.3U CN210369040U (en) 2019-06-28 2019-06-28 Prefabricated assembled city utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920997448.3U CN210369040U (en) 2019-06-28 2019-06-28 Prefabricated assembled city utility tunnel

Publications (1)

Publication Number Publication Date
CN210369040U true CN210369040U (en) 2020-04-21

Family

ID=70268088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920997448.3U Expired - Fee Related CN210369040U (en) 2019-06-28 2019-06-28 Prefabricated assembled city utility tunnel

Country Status (1)

Country Link
CN (1) CN210369040U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809723A (en) * 2020-07-29 2020-10-23 鞍山三冶建筑工程有限公司 Concatenation formula steel construction vestibule
CN115478688A (en) * 2022-11-15 2022-12-16 邢台市晟玉建材有限公司 Assembled template structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809723A (en) * 2020-07-29 2020-10-23 鞍山三冶建筑工程有限公司 Concatenation formula steel construction vestibule
CN115478688A (en) * 2022-11-15 2022-12-16 邢台市晟玉建材有限公司 Assembled template structure

Similar Documents

Publication Publication Date Title
WO2017107372A1 (en) Urban underground comprehensive steel pipe gallery
CN210369040U (en) Prefabricated assembled city utility tunnel
CN203702166U (en) Segment lining ring structure applicable to rectangular tunnel
CN209760599U (en) Center steel pipe shaped steel special-shaped column
CN111980297B (en) Assembled section steel externally-wrapped concrete combined special-shaped column and construction method thereof
CN103243638A (en) Bridge space radioactive concrete-filled steel tube bridge pier and construction method thereof
CN214362569U (en) Prefabricated ballast bed structure of built-in pump house department for urban rail transit
CN105821903A (en) Synthesized pipe rack with frame composite structure
CN220150516U (en) Hinged support frame structure system
CN210529471U (en) Bridge package mound on urban rail transit cable
CN208633120U (en) A kind of pattern foundation pit supporting structure assembled concrete-filled rectangular steel tube diagonal brace
CN108951657A (en) A kind of pattern foundation pit supporting structure assembled concrete-filled rectangular steel tube diagonal brace
CN103541435B (en) With the cross node of full assembling of steel plate concrete Cantilever Beams
CN211596350U (en) Bowl type pipe gallery structure of river-crossing
CN210459525U (en) High-performance movable board house
CN210288464U (en) Shock-absorbing foundation structure for large-scale precision impact test
CN204023774U (en) A kind of assembling composite construction seismic structural wall, earthquake resistant wall
CN103967208B (en) The light steel of Z-section-timber with small diameter combination bearing column and making method
CN210684774U (en) Assembled concrete utility tunnel is connected to slot type
CN112814019A (en) Prefabricated formula steel concrete combination looped netowrk cabinet basis
CN113513107A (en) Assembled integral mortise-tenon joint multi-cavity steel plate combined shear wall and manufacturing method thereof
CN208267162U (en) Assembled sash type light steel frame-steel mesh-foamed concrete faced wall
CN108277903B (en) Assembled truss type light steel frame-punched thin steel plate-concrete combined wall
CN202559223U (en) Novel precast approach bridge
CN220301658U (en) Connecting structure of outer gallery and structural floor slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200421

Termination date: 20210628