CN210365542U - Discharge apparatus for building engineering - Google Patents

Discharge apparatus for building engineering Download PDF

Info

Publication number
CN210365542U
CN210365542U CN201920558289.7U CN201920558289U CN210365542U CN 210365542 U CN210365542 U CN 210365542U CN 201920558289 U CN201920558289 U CN 201920558289U CN 210365542 U CN210365542 U CN 210365542U
Authority
CN
China
Prior art keywords
platform
discharging
unloading
upper portion
discharging platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920558289.7U
Other languages
Chinese (zh)
Inventor
李维杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920558289.7U priority Critical patent/CN210365542U/en
Application granted granted Critical
Publication of CN210365542U publication Critical patent/CN210365542U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a discharge apparatus for building engineering, including the platform of unloading, platform upper portion one end of unloading is equipped with the material loading platform, the last other end of platform of unloading and middle part are equipped with the passageway of unloading, the passageway of unloading includes the canopy body that shelters from on upper portion, it sets up in building floor opening part to be close to the passageway one end of unloading on the platform of unloading, the platform of unloading is close to passageway one end of unloading and is equipped with the stiff end that is used for welded fastening, platform upper portion of unloading is close to material loading platform one end both sides and is equipped with the rail guard respectively, platform upper portion of unloading is equipped with gliding pay-off slide, be equipped with on the platform of unloading and pay-off slide bottom matched. The utility model overcomes prior art shortcoming, it is rational in infrastructure, the platform is stable firm, transports laborsaving, safe and reliable.

Description

Discharge apparatus for building engineering
Technical Field
The utility model relates to a technical field for the building specifically indicates a discharge apparatus for building engineering.
Background
Building decoration and equipment fixing stage, the construction floor often can need various materials, like the steel pipe, equipment and template, need set up the turnover platform that material and equipment were delivered when transporting the material to building inside, this just need build a platform of unloading, but traditional platform of unloading needs the staff operation on the platform of unloading, move the material to the building in, waste time and energy, and mostly do not have unified standard requirement, do all the other ways, often lead to the platform unstability, certain potential safety hazard exists simultaneously in the emergence accident, consequently, treat a neotype platform of unloading to prior art problem urgent need.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is, overcome prior art shortcoming, provide a discharge apparatus for building engineering, rational in infrastructure, the platform is stable firm, transports laborsaving, safe and reliable.
In order to solve the technical problem, the utility model provides a technical scheme does: a discharging device for building engineering comprises a discharging platform, wherein a feeding platform is arranged at one end of the upper portion of the discharging platform, a discharging channel is arranged at the other end and the middle portion of the discharging platform, the discharging channel comprises a shielding shed body at the upper portion, one end, close to the discharging channel, of the discharging platform is arranged at an opening of a building floor, a fixed end for welding and fixing is arranged at one end, close to the discharging channel, of the discharging platform, guard rails are respectively arranged on two sides of one end, close to the feeding platform, of the upper portion of the discharging platform, a sliding feeding sliding plate is arranged on the upper portion of the discharging platform, a sliding groove matched with the bottom of the feeding sliding plate is arranged on the discharging platform, hanging frames are respectively arranged on two sides of the discharging platform, each hanging frame on one side comprises a vertical column I and a vertical column II, the, the threaded rod of the other end and two upper ends of stand cooperatees and connects on the horizontal pole, on the threaded rod and the horizontal pole lower part department be equipped with fastening screw respectively, the steel wire lifting rope is connected respectively at both ends on the horizontal pole, top end is fixed on the outer wall body of building floor on the steel wire lifting rope, shelter from canopy body upper portion and be equipped with the material transporting device, be equipped with two sets of sprocket groups that set up side by side in the material transporting device, the sprocket group all connects the wheel chain through two sprockets, the sprocket center of two sets of sprocket groups passes through the connecting rod and connects, one side sprocket group upper portion one end and the opposite side sprocket group lower part other end are connected respectively and are equipped with the lifting hook, the lifting hook sets up in sheltering from canopy internal top, one side is.
As the improvement, shelter from including a plurality of in the canopy body main part and shelter from the unanimous support frame that just is used for the support of canopy body skeleton cross section, prevent the harm of high altitude heavy object to the people, support material transporting device simultaneously.
As an improvement, a reinforcing rib plate is arranged between the bottom of the discharging platform and a building floor to enhance the supporting force.
As an improvement, the chain wheel set is controlled to rotate by a motor, and articles with heavier parts can be lifted by the operation of the motor, so that the labor is saved; the motor can be selectively arranged, and most of articles can be unloaded through the feeding sliding plate and the lifting hook.
Compared with the prior art, the utility model the advantage lie in: the material conveying device arranged in the utility model can save more labor and time during the unloading process; the arranged shelter body ensures the safety of personnel to the maximum extent; the arranged feeding sliding plate is convenient for personnel to transport building materials; the arranged hanging bracket further lifts the unloading platform to ensure the safety of personnel; the lifting hooks which are arranged at two ends of two sides and are respectively arranged at the upper part and the lower part of the material conveying device can realize that one lifting hook returns to the initial conveying position after the completion of the conveying, thereby reducing the time consumption of conveying the lifting hooks and saving the labor. The utility model discloses safety and stability connects changes construction materials, ensures that the construction goes on smoothly to can install and dismantle other floors and use, the turnover is convenient, and is not fragile, suitable extensive using widely.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the middle hanger of the present invention.
Fig. 3 is a schematic structural diagram of the material conveying device of the present invention.
As shown in the figure: 1. the device comprises a discharging platform, 2, a feeding platform, 3, a discharging channel, 4, a shielding shed body, 5, a fixed end, 6, a protective guard, 7, a feeding sliding plate, 8, a hanging bracket, 9, a first upright post, 10, a second upright post, 11, a cross rod, 12, a threaded rod, 13, a steel wire lifting rope, 14, a conveying device, 15, a chain wheel set, 16, a lifting hook, 17, a lifting ring, 18, a supporting frame, 19 and a reinforcing rib plate.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
When the utility model is implemented, the utility model relates to a discharging device for building engineering, which comprises a discharging platform 1, wherein one end of the upper part of the discharging platform 1 is provided with a loading platform 2, the other end and the middle part of the discharging platform 1 are provided with a discharging channel 3, the discharging channel 3 comprises a shielding shed body 4 on the upper part, one end of the discharging platform 1 close to the discharging channel 3 is arranged at the opening of a building floor, one end of the discharging platform 1 close to the discharging channel 3 is provided with a fixed end 5 for welding and fixing, two sides of the upper part of the discharging platform 1 close to one end of the loading platform 2 are respectively provided with a protective guard 6, the upper part of the discharging platform 1 is provided with a sliding feeding slide plate 7, the discharging platform 1 is provided with a chute matched with the bottom of the feeding slide plate 7, two sides of the discharging platform 1 are respectively provided with a hanging bracket 8, the bottom ends of the first upright post 9 and the second upright post 10 are fixedly connected with a discharging platform 1, the upper end of the first upright post 9 is hinged with one end of a cross rod 11, the other end of the cross rod 11 is matched and connected with a threaded rod 12 at the upper end of the second upright post 10, the threaded rod 12 and the upper and lower parts of the cross rod 11 are respectively provided with a fastening screw, marks can be arranged on the fastening screws, the stability of the platform is ensured by observing the moving condition of the marks, two ends of the cross rod 11 are respectively connected with a steel wire lifting rope 13, the upper top end of the steel wire lifting rope 13 is fixed on the outer wall body of a building floor, the upper part of the shelter body 4 is provided with a material conveying device 14, two sets of chain wheel sets 15 which are arranged in parallel are arranged in the material conveying device 14, the chain wheel sets 15 are connected with wheel chains through two chain wheels, the centers of the two sets of chain wheel sets 15, the lifting hook 16 is arranged at the top in the shelter body 4, and a lifting ring 17 matched with the lifting hook 16 is arranged on one side of the feeding sliding plate 7.
The shelter shed body 4 comprises a plurality of supporting frames 18 which are consistent with the cross section of the framework of the shelter shed body 4 and used for supporting, reinforcing rib plates 19 are arranged between the bottom of the unloading platform 1 and the building floor, and the chain wheel set 15 is controlled to rotate by a motor.
The utility model discloses a theory of operation: when the lifting device works, building materials placed on the feeding sliding plate 7 are conveyed, the lifting ring 17 is firstly hooked on the lifting hook 16, and the lifting hook 16 is held by hand to be horizontally pulled to move forward for transportation; or the motor controls transmission to pull heavier materials; and the materials enter the interior of the building through the discharging channel 3 to finish discharging.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (4)

1. The utility model provides a discharge apparatus for building engineering, includes platform (1) of unloading, its characterized in that: the building floor structure is characterized in that a feeding platform (2) is arranged at one end of the upper portion of the discharging platform (1), a discharging channel (3) is arranged at the other end and the middle of the discharging platform (1), the discharging channel (3) comprises a shielding shed body (4) at the upper portion, one end, close to the discharging channel (3), of the discharging platform (1) is arranged at an opening of a building floor, a fixed end (5) for welding and fixing is arranged at one end, close to the discharging channel (3), of the discharging platform (1), protective guards (6) are respectively arranged on two sides of one end, close to the feeding platform (2), of the upper portion of the discharging platform (1), a sliding feeding sliding plate (7) is arranged on the upper portion of the discharging platform (1), a sliding groove matched with the bottom of the feeding sliding plate (7) is arranged on the discharging platform (1), hanging brackets (8) are respectively arranged on two sides of the discharging platform (1), and, the equal fixed connection platform of unloading (1) in stand one (9) and two (10) bottoms of stand, the articulated horizontal pole (11) one end in stand one (9) upper end, threaded rod (12) of the other end and two (10) upper ends of stand on horizontal pole (11) cooperate to be connected, threaded rod (12) are gone up and horizontal pole (11) lower part department is equipped with fastening screw respectively, steel wire lifting rope (13) are connected respectively at both ends on horizontal pole (11), the top is fixed on the building floor body on steel wire lifting rope (13), it is equipped with fortune material device (14) to shelter from canopy body (4) upper portion, be equipped with two sets of sprocket group (15) that set up side by side in fortune material device (14), sprocket group (15) all connect the chain through two sprockets, the sprocket center of two sets of sprocket group (15) passes through the connecting rod connection, one side sprocket group (15) upper portion one end and the opposite side sprocket group (15) lower part other end connect respectively and are equipped with lifting hook (16) The lifting hook (16) is arranged at the top in the shelter shed body (4), and one side of the feeding sliding plate (7) is provided with a lifting ring (17) matched with the lifting hook (16).
2. The discharging device for construction engineering according to claim 1, wherein: the shielding shed body (4) comprises a plurality of supporting frames (18) which are consistent with the cross section of the framework of the shielding shed body (4) and are used for supporting.
3. The discharging device for construction engineering according to claim 1, wherein: and a reinforcing rib plate (19) is arranged between the bottom of the discharging platform (1) and a building floor.
4. The discharging device for construction engineering according to claim 1, wherein: the chain wheel set (15) is controlled to rotate by a motor.
CN201920558289.7U 2019-04-23 2019-04-23 Discharge apparatus for building engineering Expired - Fee Related CN210365542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920558289.7U CN210365542U (en) 2019-04-23 2019-04-23 Discharge apparatus for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920558289.7U CN210365542U (en) 2019-04-23 2019-04-23 Discharge apparatus for building engineering

Publications (1)

Publication Number Publication Date
CN210365542U true CN210365542U (en) 2020-04-21

Family

ID=70258547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920558289.7U Expired - Fee Related CN210365542U (en) 2019-04-23 2019-04-23 Discharge apparatus for building engineering

Country Status (1)

Country Link
CN (1) CN210365542U (en)

Similar Documents

Publication Publication Date Title
CN103723636B (en) Indoor overhead hoist
CN106829781A (en) Mobile shipment crane and its operating method of one kind
CN209509515U (en) A kind of hoisting frame discharging platform convenient for unloading
US3876099A (en) Apparatus for delivery of material to floors of a building under construction
CN210365542U (en) Discharge apparatus for building engineering
CN206554524U (en) A kind of construction discharging platform
CN110077969B (en) Material cage lifting system with building main structure lifting along elevator shaft wall
CN208327185U (en) A kind of gallows frame for toilet
CN108483190B (en) Intelligent aluminum alloy template material conveying device and operation method thereof
CN217537955U (en) Safe elevating gear based on housing construction
CN201264878Y (en) Easy-to-detach hoisting combined rack
CN213738121U (en) Full-intelligent self-climbing conveying operation table
CN113213315A (en) Transfer method for building partition board
CN210885075U (en) Equipment secondary transportation and hoist and mount frame of taking one's place
CN112374328A (en) Building site lift transportation platform
CN106884543A (en) A kind of curtain wall lifting and transporting device
CN206521946U (en) A kind of dolly for installing metope radiation proof stereotype
CN208883352U (en) A kind of dismountable hanging device
CN208486542U (en) Material hoisting platform for scaffold
CN205222407U (en) Novel cage hoist and mount conveyor system
CN215558664U (en) Lifting device for material transportation in vertical shaft
CN219672177U (en) Floor unloading platform and double-head fixing part matched with same
CN219906223U (en) Rail mounted floor platform auxiliary feeding device of unloading
CN214217862U (en) Raw materials promotes conveyor
CN220011043U (en) Conveyer that hoist and mount were used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200421

Termination date: 20210423

CF01 Termination of patent right due to non-payment of annual fee