CN210358633U - Temporary fixing and straightening device for water supply and drainage pipes in building engineering construction - Google Patents

Temporary fixing and straightening device for water supply and drainage pipes in building engineering construction Download PDF

Info

Publication number
CN210358633U
CN210358633U CN201921352691.6U CN201921352691U CN210358633U CN 210358633 U CN210358633 U CN 210358633U CN 201921352691 U CN201921352691 U CN 201921352691U CN 210358633 U CN210358633 U CN 210358633U
Authority
CN
China
Prior art keywords
straightening
groups
water supply
building engineering
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921352691.6U
Other languages
Chinese (zh)
Inventor
刘洪照
马丽
徐高阳
徐申娟
岳春城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Fuying Construction Group Co ltd
Original Assignee
Qingdao Fuying Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Fuying Construction Group Co ltd filed Critical Qingdao Fuying Construction Group Co ltd
Priority to CN201921352691.6U priority Critical patent/CN210358633U/en
Application granted granted Critical
Publication of CN210358633U publication Critical patent/CN210358633U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a construction engineering construction plumbing pipe temporary fixation coalignment, including workstation and alignment board, the small opening has been seted up to the inside of workstation, and the bilateral symmetry of small opening rotates and is connected with two sets of driving rollers, and the transmission is connected with the drive belt between two sets of driving rollers, servo motor is installed to the preceding terminal surface of workstation, and servo motor passes through the output shaft and is connected with the driving roller transmission that the right side set up, the slide rail is installed to the up end of workstation. The utility model discloses in, at first, adopt automatic walking alignment structure, this kind of structure can be automatic carries out the alignment with the drain pipe and handles, has both reduced operating personnel's work load, has also promoted the efficiency that the drain pipe alignment was handled simultaneously, secondly, adopts structure with adjustable it is whole, and this kind of structure can be according to drain pipe length and diameter condition, adjusts the drain pipe and fixes and the alignment is handled to fixed coalignment's suitability has been promoted.

Description

Temporary fixing and straightening device for water supply and drainage pipes in building engineering construction
Technical Field
The utility model relates to a technical field is laid to the building engineering drain pipe, especially relates to a building engineering construction plumbing pipe temporary fixation coalignment.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities.
When the drainage pipe is laid in the pouring engineering construction, temporary fixing and straightening treatment are needed to be carried out on the drainage pipe, so that the generation of the abnormal phenomena of partial slight bending and butt joint of the drainage pipe is reduced, however, an operator is needed to use a straightening tool to carry out the straightening treatment on the drainage pipe in the straightening process, the operation is time-consuming and labor-consuming, and meanwhile, the straightening treatment efficiency is lower.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problems that an operator needs to use a straightening tool to straighten the water supply and drainage pipe in the straightening process and the straightening efficiency is low, the temporary fixing and straightening device for the water supply and drainage pipe in the building engineering construction is provided.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a temporary fixing and straightening device for water supply and drainage pipes in building engineering construction comprises a workbench and a straightening plate, wherein a leak hole is formed in the workbench, two groups of transmission rollers are symmetrically and rotatably connected to two sides of the leak hole, a transmission belt is connected between the two groups of transmission rollers in a transmission manner, a servo motor is installed on the front end face of the workbench and is in transmission connection with the transmission rollers arranged on the right side through an output shaft, a slide rail is installed on the upper end face of the workbench, two groups of first sliding blocks with T-shaped side sections are symmetrically and slidably connected to the two sides of the slide rail, a fixing frame is fixedly connected to the tops of the two groups of first sliding blocks, a supporting block is fixedly connected to the inner side of the fixing frame, two groups of fixing blocks are symmetrically and fixedly connected to the top and the bottom of the supporting block at the inner side of the fixing frame, and adjusting studs penetrating through, and the inner of adjusting the double-screw bolt rotates through the pivot and is connected with splint, the inboard sliding connection of slide rail has the second slider that runs through the small opening, and the second slider passes through double-screw bolt and drive belt fixed connection, the top fixedly connected with straightening ring of second slider, and annular fixedly connected with three electric telescopic handle of group are personally submitted to the outer end of straightening ring to three electric telescopic handle's of group flexible end transmission is connected with the straightening plate.
As a further description of the above technical solution:
the left side sets up the up end of first slider is located the top symmetry slip of slide rail and has embedded the spacing traveller that runs through first slider, and the exterior wall cover of spacing traveller is equipped with extension spring, and extension spring's one end and the top fixed connection of spacing traveller, the other end and the up end fixed connection of first slider.
As a further description of the above technical solution:
the slide rail is the rectangle frame structure, the inside of slide rail is located the below equidistance of spacing traveller and has seted up the spacing hole that the multiunit is horizontal distribution, and the internal diameter in the spacing hole of multiunit is less than the external diameter of spacing traveller.
As a further description of the above technical solution:
the side sections of the clamping plate and the straightening plate are both arc-shaped structures.
As a further description of the above technical solution:
and a plurality of groups of balls are arranged on the inner side of the straightening plate at equal intervals.
As a further description of the above technical solution:
the middle part of the front end face of the workbench is provided with an electric control switch, and the output end of the electric control switch is electrically connected with the servo motor and the input end of the electric telescopic rod respectively.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, adopt automatic walking alignment structure, be provided with the driving roller on the workstation, drive belt and servo motor, be provided with alignment ring and alignment board at second slider top, the second slider passes through double-screw bolt and drive belt fixed connection simultaneously, when the drain pipe clamping is fixed between two sets of mounts, press electric control switch, servo motor just can drive the drive belt through the driving roller and rotate, thereby it carries out the motion of horizontal direction at the slide rail inside to drive the second slider, thereby carry out the alignment with the drain pipe of bracket between two sets of mounts and handle, this kind of structure can automize and carry out the alignment with the drain pipe and handle, operating personnel's work load has both been reduced, the efficiency of drain pipe alignment processing has also been promoted simultaneously.
2. The utility model discloses in, adopt structure with adjustable it is whole, be provided with the tray in the inboard of mount, the fixed block, adjust double-screw bolt and splint, be provided with electric telescopic handle and alignment board simultaneously on the alignment ring, can be according to the length condition of drain pipe, the first slider that sets up the left side carries out the regulation processing of horizontal direction inside the slide rail, and slide the first slider that the rear side set up to the outside, thereby adjust the dress clamp with the drain pipe between two sets of mounts, can be according to the diameter condition of drain pipe, fix the both ends at the drain pipe through adjusting the double-screw bolt closure with splint, control electric telescopic rod drives the exterior wall of alignment board and drain pipe and laminates each other, this kind of structure can be according to drain pipe length and diameter condition, adjust fixed and alignment processing to the drain pipe, thereby fixed aligning device's suitability has been promoted.
Drawings
Fig. 1 shows a schematic block diagram of a structure provided according to an embodiment of the present invention;
fig. 2 is a schematic view illustrating a connection structure between a slide rail and a first slide block according to an embodiment of the present invention;
fig. 3 shows a side view of a straightening ring provided in accordance with an embodiment of the present invention.
Illustration of the drawings:
1. a work table; 2. an electric control switch; 3. a driving roller; 4. a transmission belt; 5. a servo motor; 6. a slide rail; 601. a limiting hole; 7. a first slider; 8. a fixed mount; 9. a support block; 10. a fixed block; 11. adjusting the stud; 12. a splint; 13. a limiting sliding column; 14. an extension spring; 15. a second slider; 16. a straightening ring; 17. an electric telescopic rod; 18. a straightening plate; 19. and a ball.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
The utility model discloses in, the servo motor 5 model of use is (HF-MP053), and the electric telescopic handle 17 model of use is (XTL-100), and above-mentioned product all can be bought on the market.
Referring to fig. 1-3, the present invention provides a technical solution: a temporary fixing and straightening device for water supply and drainage pipes in building engineering construction comprises a workbench 1 and a straightening plate 18, wherein a leak hole is formed in the workbench 1, two groups of driving rollers 3 are symmetrically and rotatably connected to two sides of the leak hole, a driving belt 4 is connected between the two groups of driving rollers 3 in a driving manner, a servo motor 5 is installed on the front end face of the workbench 1, the servo motor 5 is in driving connection with the driving roller 3 arranged on the right side through an output shaft, a sliding rail 6 is installed on the upper end face of the workbench 1, two groups of first sliding blocks 7 with T-shaped side sections are symmetrically and slidably connected to two sides of the inside of the sliding rail 6, fixing frames 8 are fixedly connected to the tops of the two groups of first sliding blocks 7, supporting blocks 9 are fixedly connected to the inner sides of the fixing frames 8, two groups of fixing blocks 10 are symmetrically and fixedly connected to the tops and the bottoms of the supporting blocks 9, and adjusting studs 11 penetrating through, and the inner of adjusting stud 11 is connected with splint 12 through the pivot rotation, and the inboard side sliding connection of slide rail 6 has second slider 15 that runs through the small opening, and second slider 15 passes through the stud and 4 fixed connection of drive belt, and the top fixedly connected with alignment ring 16 of second slider 15, and the outer end of alignment ring 16 personally submits annular fixedly connected with three electric telescopic handle 17 of group to the flexible end transmission of three electric telescopic handle 17 of group is connected with alignment board 18.
Specifically, as shown in fig. 1 and fig. 2, the upper end surface of the first sliding block 7 arranged on the left side is symmetrically embedded with a limiting sliding column 13 penetrating through the first sliding block 7 in a sliding manner above the sliding rail 6, and the outer wall of the limiting sliding column 13 is sleeved with an extension spring 14, one end of the extension spring 14 is fixedly connected with the top end of the limiting sliding column 13, the other end is fixedly connected with the upper end face of the first slide block 7, the slide rail 6 is in a rectangular frame structure, a plurality of groups of limiting holes 601 which are horizontally distributed are equidistantly arranged in the slide rail 6 below the limiting sliding column 13, the arrangement of the structure is convenient for the limiting sliding column 13 to slide into the limiting hole 601, the arrangement of the limiting sliding column 13 and the multiple groups of limiting holes 601 is convenient for the clamping and fixing treatment of the first sliding block 7 after being adjusted in the sliding rail 6, meanwhile, the arrangement of the extension spring 14 facilitates the elastic clamping processing of the limiting sliding column 13 and the limiting hole 601.
Specifically, as shown in fig. 1-3, the side cross-sections of the clamping plate 12 and the straightening plate 18 are both arc-shaped structures, a plurality of groups of balls 19 are equidistantly mounted on the inner side of the straightening plate 18, the clamping plate 12 and the straightening plate 18 are arranged in an arc-shaped structure, the contact areas of the clamping plate 12, the straightening plate 18 and the outer wall of the drain pipe are increased, the contact area of the fixed connection and straightening of the drain pipe is increased, meanwhile, the contact friction force between the drain pipe and the straightening plate 18 is reduced due to the arrangement of the plurality of groups of balls 19, and therefore the straightening plate 18 can conveniently perform straightening movement treatment on the outer part of the pipe fitting.
Specifically, as shown in fig. 1 and fig. 3, an electric control switch 2 is installed in the middle of the front end face of the workbench 1, and the output end of the electric control switch 2 is electrically connected with the input ends of the servo motor 5 and the electric telescopic rod 17 respectively, so that the servo motor 5 and the electric telescopic rod 17 can be conveniently electrified and controlled by the electric control switch 2.
The working principle is as follows: when the device is used, a power supply is switched on, the limit sliding columns 13 can be lifted upwards according to the actual length of the drain pipe, the two groups of first sliding blocks 7 are adjusted in the sliding rails 6 in the horizontal direction, after the proper distance is adjusted, the drain pipe bracket can be arranged between the two groups of supporting blocks 9, when the limit sliding columns 13 are loosened, the limit sliding columns 13 can slide into the limit holes 601 at the specified positions under the action of the elastic force of the extension springs 14, the adjusting studs 11 are rotated according to the diameter condition of the drain pipe, the two groups of clamping plates 12 can approach to the two ends of the drain pipe, so that the two ends of the drain pipe are clamped and fixed between the two groups of fixing frames 8, the electric control switch 2 is pressed, the electric straightening plate 18 can approach to the outer wall of the drain pipe through the electric telescopic rod 17, when the balls 19 on the straightening plate 18 contact with the outer wall of the drain pipe, the electric control switch 2 can be pressed, and the servo motor 5 can, meanwhile, the transmission belt 4 can drive the second sliding block 15 to move horizontally inside the sliding rail 6, so that the drain pipe is straightened in a walking mode, and the drain pipe can be taken out between the two groups of fixing frames 8 after being straightened.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The temporary fixing and straightening device for the water supply and drainage pipe in the building engineering construction comprises a workbench (1) and a straightening plate (18), and is characterized in that a leak hole is formed in the workbench (1), two groups of transmission rollers (3) are symmetrically and rotatably connected to two sides of the leak hole, a transmission belt (4) is connected between the two groups of transmission rollers (3), a servo motor (5) is installed on the front end face of the workbench (1), the servo motor (5) is in transmission connection with the transmission rollers (3) arranged on the right side through output shafts, a slide rail (6) is installed on the upper end face of the workbench (1), two groups of first slide blocks (7) with T-shaped side sections are symmetrically and slidably connected to the two sides of the slide rail (6), a fixing frame (8) is fixedly connected to the tops of the two groups of first slide blocks (7), and a supporting block (9) is fixedly connected to the inner side of the fixing frame (8), the inboard of mount (8) is located two sets of fixed block (10) of top and the symmetrical fixedly connected with in bottom of tray (9), and all is provided with on two sets of fixed block (10) and runs through regulation double-screw bolt (11) of terminal surface about fixed block (10) to the inner of adjusting double-screw bolt (11) is rotated through the pivot and is connected with splint (12), the inboard sliding joint of slide rail (6) has second slider (15) that runs through the small opening, and second slider (15) are through double-screw bolt and drive belt (4) fixed connection, the top fixedly connected with straightening ring (16) of second slider (15), and the outer end of straightening ring (16) is personally submitted three electric telescopic handle (17) of annular fixedly connected with to the flexible end transmission of three electric telescopic handle (17) of group is connected with straightening plate (18).
2. The temporary fixing and straightening device for the construction and water supply and drainage pipe of the building engineering according to claim 1, wherein the upper end surface of the first sliding block (7) arranged on the left side is positioned above the sliding rail (6) and symmetrically and slidably embedded with a limiting sliding column (13) penetrating through the first sliding block (7), the outer wall of the limiting sliding column (13) is sleeved with an extension spring (14), one end of the extension spring (14) is fixedly connected with the top end of the limiting sliding column (13), and the other end of the extension spring is fixedly connected with the upper end surface of the first sliding block (7).
3. The temporary fixing and straightening device for the water supply and drainage pipes in the building engineering construction according to claim 1 or 2, wherein the slide rail (6) is of a rectangular frame structure, a plurality of groups of horizontally distributed limiting holes (601) are formed in the slide rail (6) at equal intervals below the limiting slide column (13), and the inner diameters of the plurality of groups of limiting holes (601) are smaller than the outer diameter of the limiting slide column (13).
4. The temporary fixing and straightening device for the construction and water supply and drainage pipe of the building engineering according to claim 1, wherein the side sections of the clamping plate (12) and the straightening plate (18) are arc-shaped structures.
5. The temporary fixing and straightening device for the construction and water supply and drainage pipe of the building engineering according to claim 1, characterized in that a plurality of groups of balls (19) are equidistantly arranged on the inner side of the straightening plate (18).
6. The temporary fixing and straightening device for the water supply and drainage pipes in the building engineering construction according to claim 1, wherein an electric control switch (2) is installed in the middle of the front end face of the workbench (1), and the output end of the electric control switch (2) is electrically connected with the servo motor (5) and the input end of the electric telescopic rod (17) respectively.
CN201921352691.6U 2019-08-20 2019-08-20 Temporary fixing and straightening device for water supply and drainage pipes in building engineering construction Expired - Fee Related CN210358633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921352691.6U CN210358633U (en) 2019-08-20 2019-08-20 Temporary fixing and straightening device for water supply and drainage pipes in building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921352691.6U CN210358633U (en) 2019-08-20 2019-08-20 Temporary fixing and straightening device for water supply and drainage pipes in building engineering construction

Publications (1)

Publication Number Publication Date
CN210358633U true CN210358633U (en) 2020-04-21

Family

ID=70251771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921352691.6U Expired - Fee Related CN210358633U (en) 2019-08-20 2019-08-20 Temporary fixing and straightening device for water supply and drainage pipes in building engineering construction

Country Status (1)

Country Link
CN (1) CN210358633U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111715754A (en) * 2020-07-01 2020-09-29 张宇 Stainless steel plate seaming and curling machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111715754A (en) * 2020-07-01 2020-09-29 张宇 Stainless steel plate seaming and curling machine

Similar Documents

Publication Publication Date Title
CN210358633U (en) Temporary fixing and straightening device for water supply and drainage pipes in building engineering construction
CN216029029U (en) Position-adjustable steel structure welding device
CN108436700A (en) A kind of building template grinding device
CN214351663U (en) Stainless steel pipe fitting inner wall burnishing device convenient to adjust
CN209773587U (en) Pipeline cutting auxiliary device for building engineering
CN208613613U (en) Power transmission line various dimensions straightener
CN216344334U (en) Auxiliary supporting mechanism for thermal pipeline construction
CN115451193A (en) Warm logical pipeline location mounting structure of intelligence house
CN211351491U (en) Line strutting arrangement for municipal works
CN213350326U (en) Bending and clamping jig for steel for electric power angle steel tower
CN210918273U (en) Plastering device for cement mortar in constructional engineering
CN212428001U (en) Telescopic scaffold for building engineering
CN113020345A (en) Material bending device for building construction
CN210735820U (en) Tubular product rolling machine convenient to use
CN210318824U (en) Aeration hose installation device
CN220964732U (en) Steel structure bracket
CN204826693U (en) Brick -laying machine
CN214921902U (en) Butt-joint mechanism for welding reinforcing steel bars
CN214412245U (en) Special supporting base for cable distribution box
CN217316729U (en) Steel structure welding device for building engineering
CN221075495U (en) Gas pipeline butt joint locating rack
CN221004042U (en) Auxiliary device for buried pipe of conveying water pipe
CN219623372U (en) Hydraulic engineering pipe jacking device
CN215000567U (en) Electromechanical installation device based on BIM
CN217355818U (en) Pipe conveying device equipment for municipal water supply and drainage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200421